ANALISIS PRODUKTIVITAS TENAGA KERJA PEKERJAAN DINDING PADA PROYEK PEMBANGUNAN PENAMBAHAN RUANG KELAS BARU SMP NEGERI ALOK Bernadeta Barek1; Margaretha Yuneta
SIARTEK - Jurnal Teknik Sipil dan Arsitektur Vol 10 No 2 (2024): SIARTEK - Jurnal Teknik Sipil dan Arsitektur
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Labour productivity in the construction process is crucial for completing work according to the planned schedule because it has a significant impact on cost and time. Low labour productivity can lead to project delays and an extended overall project duration, increasing the project's cost. Therefore, it is necessary to conduct research on labour productivity in the New Classroom Addition Construction project at SMP Negeri Alok in this final project proposal. The data used for this rescarch were obtained through direct observation and field research. The analysis carried out is to find the value of actual labor productivity, plans and the Ministerial Regulation of PUPR08-2023 and its comparison. The results of this research obtained the actual productivity in the field for 1/2 brick wall work is 2.848493 m²/person for workers, 5.484205 m²/person for builders, and 9.917727 m²/person for the head builder and m. The planned productivity value is 3,333 m²/person for workers, 10 m²/person for handymen, 100 m²/person for handyman, and 66,667 m²/person for foremen. And the value of labor productivity according to the Minister of PUPR 08-2023 is 5 m²/person for workers, 10 m²/person for handymen, 100 m²/person for handymen, and 303,030 m²/person for foremen
ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK REHABILITASI 4 RUANG KELAS SDN NAPUNGLANGIR MENGGUNAKAN METODE EARNED VALUE Flaviana Erna; Margaretha Yuneta; Apriono Kaidu
SIARTEK - Jurnal Teknik Sipil dan Arsitektur Vol 11 No 1 (2025): SIARTEK - Jurnal Teknik Sipil dan Arsitektur
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini bertujuan untuk menganalisis kinerja biaya dan waktu pada Proyek Rehabilitasi 4 Ruang Kelas SDN Napunglangir dengan menggunakan metode Earned Value (EV). Penelitian ini bersifat kuantitatif dengan pendekatan deskriptif, dimana data yang digunakan meliputi Rencana Anggaran Biaya (RAB), biaya aktual proyek, jadwal proyek, dan laporan mingguan proyek. Hasil penelitian menunjukkan bahwa proyek mengalami variasi dari segi biaya dan waktu, dengan Cost Performance Index (CPI) yang mengindikasikan apakah proyek sesuai anggaran atau melebihi anggaran, dan Schedule Performance Index (SPI) yang mengindikasikan apakah proyek sesuai jadwal atau mengalami keterlambatan. Hasil analisis indikator Earned Value menunjukkan ACWP kumulatif sampai dengan minggu evaluasi sebesar Rp 355.422.382,46, BCWP sebesar Rp 380.831.641,59 dengan progres realisasi sebesar 81 94%, BCWS pada minggu ke-20 sesuai rencana sebesar Rp 464.768.906,02, CV sampai dengan minggu evaluasi sebesar Rp 25.409.259,13, SV sebesar Rp 238.240.541,22, CPI dengan nilai >1 yaitu 1,07, SPI >1 yaitu 2,67. Perkiraan biaya dan waktu untuk menyelesaikan proyek, B-ETC sebesar Rp 78.336.932,23, B-EAC sebesar Rp 433.759.314,70, S-ETC selama 4 minggu, dan S-EAC selama 15 minggu. Analisis ini membantu mengidentifikasi masalah yang muncul selama pelaksanaan proyek dan memberikan solusi untuk pengendalian biaya dan waktu untuk memastikan proyek selesai sesuai rencana
ANALISIS PERBANDINGAN BIAYA KONSTRUKSI MATERIAL BAJA DAN MATERIAL BETON PADA PEMBANGUNAN MALL PELAYANAN PUBLIK DI JALAN ELTARI KECAMATAN ALOK KABUPATEN SIKKA Yohana Ema Muda; Margaretha Yuneta; Triapriono Kaidu
SIARTEK - Jurnal Teknik Sipil dan Arsitektur Vol 11 No 1 (2025): SIARTEK - Jurnal Teknik Sipil dan Arsitektur
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Reinforced concrete plays a scurecal role in the construction industry. The primary components of concrete are cement,fine aggregate (sand),coarse aggregate (gravel), and water,with the potential addition of chemical additives to enhance its uality.On the other hand, steel stuctures are excellent for earthuake resistance due to the material’s superior strength and ductility compared to otherstructural materials like concrete.The purpose of this research is to determine the budget for reinforced concrete structures, compare the costs between steel and reinforced concrete construction, and evaluate the cost difference between steel and reinforced concrete sctructures. The public service mall project data indicates that a steel structure was used.The results of the cost comparison showed that steel sctructures are more economical. The cost for the existing steel constuction was 1.390.830.035,73, while the cost for concrete concstruction was 1.572.927.091,00 , resulting in a cost difference of 182.092.055,27
ANALISIS KINERJA KONTRAKTOR TERHADAP KUALITAS PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG DI KABUPATEN SIKKA Agnes Margareth Natasya Fernandez; Margaretha Yuneta; Triapriono Kaidu
SIARTEK - Jurnal Teknik Sipil dan Arsitektur Vol 11 No 2 (2025): SIARTEK - Jurnal Teknik Sipil dan Arsitektur
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

From the results of the survey conducted for 2 hours and 30 minutes, the maximum parking accumulation was 93 vehicles for motorcycles, the parking volume was 168 motorcycles, the PTO for motorcycles was 0.38 vehicles/plot/hour, and the maximum motorcycle parking index was 38%. This means that the condition of motorcycle parking can still accommodate vehicles because it is less than 100%. Parking Supply at Upp was 21.11 motorcycles, Parking Needs (NP) for motorcycles was 439 parking plots. This study focuses on the analysis of contractor performance and its impact on the quality of building construction project implementation in Sikka Regency. The research method used is quantitative with a survey approach, where data was collected through questionnaires distributed to 35 respondents, including contractors and consultants who have experience in construction projects for the past five years. The results of the analysis show that there are 15 variables that influence contractor performance. Motivation and material factors were found to be dominant factors, with a mean value of 4.638 and 4.65, respectively, indicating that contractor motivation and the quality of the materials used greatly determine the success of the project. In addition, the analysis also identified aspects of project quality, such as timeliness, conformity to specifications, durability, and aesthetics, all of which were in the good category.
IMPLEMENTASI LIFE CYCLE COST (LCC) PADA PEMELIHARAAN BANGUNAN GEDUNG ASRAMA SISWA SMAN 1 NITA Viola, Theresa; Kaidu, Triapriono; Yuneta, Margaretha
SIARTEK - Jurnal Teknik Sipil dan Arsitektur Vol 12 No 1 (2026): SIARTEK - Jurnal Teknik Sipil dan Arsitektur
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pembangunan dan pemeliharaan Gedung asrama siswa di SMAN 1 Nita memiliki peran penting dalam menciptakan lingkungan belajar yang optimal. Banyak pengeluaran pemeliharaan yang tidak terencana dapat menyebabkan pemborosan anggaran. Oleh karena itu, penelitian ini bertujuan untuk menganalisis umur layan (service life) setiap komponen bangunan serta merancang perhitungan Life Cycle Cost (LCC) untuk pemeliharaan Gedung. Life cycle cost (LCC) merupakan metode yang memperhitungkan total biaya yang dikeluarkan selama umur bangunan, termasuk biaya awal, operasional dan pemeliharaan. Metode yang digunakan dalam penelitian ini adalah analisis Life Cycle Cost (LCC), yang mencakup biaya awal, biaya operasional, dan biaya pemeliharaan selama umur rencana 20 tahun. Data dikumpulkan melalui wawancara dengan konsultan, pengambilan data utilitas serta analisis dokumen Rencana Anggaran Biaya (RAB). Hasil penelitian menunjukkan bahwa total Life Cycle Cost (LCC) selama 20 tahun mencapai Rp 1.962.087.342,00, di mana biaya pemeliharaan dan perawatan menyumbang biaya paling besar yaitu 42% dari total biaya. Biaya konstruksi awal Gedung asrama mencapai Rp 717.559.000,00, sementara biaya operasional selama 20 tahun diperkirakan sebesar Rp 411.600.000,00. Total biaya pemeliharaan dan perawatan selama periode yang sama mencapai Rp 832.928.342,00. Umur layan komponen bangunan bervariasi dari 5 hingga 20 tahun, dengan beberapa komponen seperti atap dan plafond memiliki umur layan yang lebih pendek
Analisis Spasial Indeks Kekeringan Menggunakan NDVI Berbasis GIS di Kecamatan Kewapante Yuneta, Margaretha; Lete, Maria Kurniaty
Decode: Jurnal Pendidikan Teknologi Informasi Vol. 6 No. 1: MARET 2026
Publisher : Program Studi Pendidikan Teknologi Infromasi UMK

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51454/decode.v6i1.1515

Abstract

Kekeringan merupakan salah satu bencana hidrometeorologi yang berdampak signifikan terhadap sektor pertanian dan ketersediaan sumber daya air. Kecamatan Kewapante, Kabupaten Sikka, termasuk wilayah yang memiliki potensi kekeringan cukup tinggi berdasarkan penelitian sebelumnya. Penelitian ini bertujuan untuk menganalisis indeks kekeringan serta memetakan sebaran wilayah terdampak kekeringan menggunakan pendekatan Sistem Informasi Geografis (SIG) berbasis integrasi multi-parameter. Metode yang digunakan meliputi pengolahan citra Landsat 8 untuk memperoleh nilai Normalized Difference Vegetation Index (NDVI), serta integrasi parameter curah hujan, jenis tanah, dan tutupan lahan melalui teknik pembobotan dan overlay spasial. Hasil penelitian menunjukkan bahwa tingkat kekeringan di Kecamatan Kewapante didominasi oleh kategori rendah (50%) dan sangat rendah (45%), sementara kategori sedang hanya sebesar 5%. Distribusi spasial menunjukkan bahwa wilayah dengan tingkat kekeringan lebih tinggi berkorelasi dengan nilai NDVI rendah, curah hujan rendah, serta dominasi tutupan lahan terbuka. Penelitian ini menunjukkan bahwa pendekatan integrasi multi-parameter berbasis SIG mampu memberikan gambaran spasial kekeringan yang lebih komprehensif. Hasil penelitian ini diharapkan dapat mendukung perencanaan mitigasi kekeringan serta pengelolaan sumber daya wilayah secara lebih efektif.