Perencanaan Pengendalian Biaya dan Waktu pada Proyek Pembangunan Rumah Susun Stie Tazkia Cendikia Bogor dengan Metode Earned Value Nabil, Rizki Ramadhan; Furuhitho, X; Setiawan, Lilik; Susanto, Remigius Hari; Slameto, Purwanto Joko
Innovative: Journal Of Social Science Research Vol. 3 No. 6 (2023): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Keterlambatan pada pelaksanaan proyek sering kali terjadi, maka dari itu perlu dilakukan pengendalian pada proyek agar pelaksanaannya dapat kembali terlaksana sesuai dengan waktu yang telah dijadwalkan. Metode Earned Value merupakan salah satu metode yang digunakan untuk perencanaan dan pengelolaan proyek agar pekerjaan pelaksanaan proyek dapat berjalan sesuai tujuan akhir tanpa banyak penyimpangan. Perencanaan biaya dan waktu ini dilakukan pada Proyek Pembangunan Rumah Susun STIE Tazkia Cendikia Bogor yang bertujuan untuk mengetahui indeks kinerja proyek, perkiraaan biaya dan waktu yang diperlukan, memberikan alternatif penyelesaian untuk mengatasi keterlambatan yang terjadi serta membuat kurva S setelah percepatan. Durasi pelaksanaan yang direncanakan adalah 330 hari dengan nilai kontrak Rp55.747.044.800,00 dan pada realisasinya berjalan selama 344 hari dengan kerterlambatan 14 hari dari rencana. Hasil perhitungan dengan metode earned value menunjukkan bahwa proyek sudah berjalan dengan biaya yang efisien, berdasarkan nilai CPI yang secara keseluruhan bernilai > 1. Sedangkan untuk nilai SPI pada minggu ke-13 hingga minggu ke-48 walatu tidak semnuanya memiliki nilai kurang dari < 1, hal ini menunjukkan proyek sedang mengalami keterlambatan. Percepatan yang dilakukan untuk mengejar keterlambatan yaitu menggunakan metode crashing dengan alternatif percepatan yang paling efektif untuk diterapkan yaitu penambahan 4 jam kerja lembur pada pekerjaan besi beton lantai 1,2 yang mampu mengejar keterlambatan proyek hingga sesuai dengan rencana yang di tentukan. Sehingga proyek dapat berjalan sesuai dengan durasi normal yang telah direncanakan dengan biaya sebesar Rp804.485.769. Dari biaya normal yaitu Rp539.784.000 dengan durasi percepatan 14 hari.
Pengendalian Biaya dan Waktu dengan Metode Earned Value pada Proyek Pembangunan Hotel Citra Dream Blok III Bintaro Tanggerang Selatan HP, Lilik Setyawan; Wicaksono, Damar Adjie; Slameto, P Joko; Dimyati, Dimyati; Pramono, Didiek; Susanto, Remigius Hari
JURNAL KRIDATAMA SAINS DAN TEKNOLOGI Vol 6 No 02 (2024): JURNAL KRIDATAMA SAINS DAN TEKNOLOGI
Publisher : Universitas Ma'arif Nahdlatul Ulama Kebumen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53863/kst.v6i02.1376

Abstract

Delays in project implementation often occur, therefore it is necessary to carry out control on the project so that its implementation can be carried out again according to the time and cost that have been determined. Control was carried out on the Citra Dream Hotel Development Project, Block III Bintaro. The planned implementation time at that stage was 560 days. Acceleration was carried out using the Earned Value method. The yield value method is a control method used to control project costs and schedules. This method provides information on project performance in a reporting period and provides information on the predicted costs required and the time required to complete all work based on performance indicators at the time of reporting. In the Citra Dream Hotel Development Project, Block III Bintaro, the BCWS (Budget Cost of Work Schedule) value was obtained = Rp. 2,517,673,147,940.23, the BCWP (Budget Cost of Work Performance) value = Rp. 2,441,825,773,572.85, the ACWP (Actual Cost of Work Performance) value = Rp. 2,342,994,346,366.87, based on the schedule aspect, this project is delayed, this is proven by the SV (Schedule Variance) value = -Rp. 919,362,113.54 and SPI (Schedule Performance Index) = 0.97 <1. Based on the acceleration management that has been carried out to accelerate the project by adding overtime hours for 2 hours. The addition of overtime hours can save the project duration by up to 9 days
Optimalisasi Penjadwalan Proyek dengan Menggunakan Metode CPM Pembangunan WWTP Relocation PT. Frisian Flag Indonesia Plant Pasar Rebo Jakarta Timur Susanto, Remigius Hari; Furuhitho, X; Slameto, Purwanto Joko; Listiyono, Sidik; Armanu, Junica Aulia Rahma
Innovative: Journal Of Social Science Research Vol. 5 No. 2 (2025): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Proyek pembangunan Wwtp Relocation and Plant Improve di PT. Frisian Flag Indonesia Plant Ciracas, berlokasi di Pasar Rebo, Jakarta Timur, memiliki nilai kontrak Rp. 13.695.000.000 dan durasi 310 hari. Namun, pada minggu ke-10, proyek mengalami keterlambatan akibat pengiriman material. Untuk mengatasi keterlambatan ini, dilakukan percepatan progres pekerjaan. Penelitian ini bertujuan untuk mengidentifikasi lintasan kritis dalam perencanaan percepatan dan menganalisis waktu serta biaya setelah percepatan. Metode yang digunakan adalah Critical Path Method (CPM) dengan penambahan jam kerja (lembur), dibantu oleh software Microsoft Project. Hasil analisis menunjukkan bahwa dengan penambahan 1 jam lembur, biaya meningkat sebesar Rp. 1.742.125.127, sehingga total durasi pekerjaan dapat dihemat hingga 42 hari.