cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota lhokseumawe,
Aceh
INDONESIA
Teras Jurnal
ISSN : -     EISSN : -     DOI : -
Core Subject : Social, Engineering,
Teras Jurnal is a journal that communicates the results of research within the scope of civil engineering and scientific development as well as aspects of practitioners. The process of manuscript submission is open throughout the year. All submitted manuscript will be screened with double-blind peer review and editorial review before they are accepted to publish. Teras Jurnal receives a manuscript from the following area below civil engineering science and development with the interdisciplinary and multidisciplinary approach:
Arjuna Subject : -
Articles 417 Documents
KAJIAN POLA INTERAKSI LAND USE DENGAN VOLUME PENUMPANG BSD LINK KORIDOR SEKTOR 1.3 - GREENWICH PARK Upa, Verdy Ananda; Setyadi, Rahmat
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.581

Abstract

Abstrak Bumi Serpong Damai (BSD) merupakan salah satu kota mandiri di kawasan Jabodetabek. Sinarmas Land sebagai developer kawasan BSD telah memulai untuk membangun Angkutan Massal Cepat yang dioperasikan khusus di kawasan tersebut. Konsep Angkutan Massal yang dipilih berupa Bus Rapid Transit (BRT). Jumlah halte bus BSD Link untuk satu koridor dengan dua arah tidak persis sama, karena rute untuk keberangkatan dan kembalinya berbeda. Hal itu disebabkan karena perbedaan karakteristik dari pola tata guna lahan dari rute BSD Link tersebut. Oleh sebab itu, interaksi antara pola tata guna lahan dengan fluktuasi volume penumpang BSD Link setiap halte perlu diketahui. Upaya ini membutuhkan pengetahuan terkait tata guna lahan sepanjang rute BSD Link dan fluktuasi volume penumpang BSD Link di setiap halte. Survei terkait hal tersebut telah dilakukan pada Koridor Sektor 1.3-Greenwich Park pada jam puncak pagi. Hasil survei menunjukkan bahwa bangkitan perjalanan terbesar berasal dari halte East Bussiness District (50%), tarikan perjalanan terbesar berasal dari halte The Breeze (45%) untuk arah Sektor 1.3 - Greenwich Park. Bangkitan perjalanan terbesar berasal dari halte Naava Park (55%) dan tarikan perjalanan terbesar berasal dari halte Sektor 1.3 (35%) untuk arah Greenwich Park - Sektor 1.3. Kata kunci: Tata guna lahan, bangkitan perjalanan, tarikan perjalanan, BSD Link, Sektor 1.3 - Greenwich Park  Abstract Bumi Serpong Damai (BSD) is one of self contained city in Jabodetabek district. Sinarmas as developer of BSD started to develop Mass Rapid Transit which special operated on that. Concept of MRT has been operated in the form of Bus Rapid Transit. Amount of bus shelter for one corridor with two lines not exactly equal, because route for departure and return are different. That was caused by differences characteristic of land use. Thus, interaction between land use with fluctuation of passengers volume need to known. This attempt needs knowledge on land use along the route and fluctuation of passengers volume in each bus shelter. Survey on that knowledge were executed on Corridor Sector 1.3 - Greenwich Park during morning peak hour. The result indicates that peak of trip production generated by East Bussines Distcrict (50%) shelter, peak of trip attraction generated by The Breeze (45%) shelter for Sector 1.3 - Greenwich Park line. Peak of trip production generated by Naava Park (55%) shelter and peak of trip attraction generated by Sektor 1.3 (35%) shelter for Greenwich Park - Sector 1.3 line. Keywords: Land use, trip production, trip attraction, BSD Link, Sector 1.3 - Greenwich Park
PERENCANAAN JARINGAN PERPIPAAN AIR MINUM MENGGUNAKAN APLIKASI WATERCAD V8-I Wesli, Wesli; Fasdarsyah, Fasdarsyah; Kurniawan, Indra; Yusuf, Khairullah; Akbar, Said Jalalul; Maizuar, Maizuar; Arfiandi, Joni
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.554

Abstract

Abstrak Pelayanan kebutuhan air di wilayah IKK Bukit Oregon kurang memadai diduga jaringan pipa menjadi pokok masalahnya sehingga berdasar hal tersebut maka diperlukan evaluasi jaringan perpipaan air minum dan design dibuat dengan menggunakan software Aplikasi Watercad V8-I dan ingin diketahui seberapa besar kebutuhan debit pada proyeksi tahun 2030 termasuk kapasitas pompa dan jenis pipa transmisinya. Hasil pengamatan secara langsung di wilayah studi pada pelayanan terdapat permasalahan yang terjadi pada pipa transmisi, yaitu pipa dari intake (sumber air baku utama) menuju ke Instalasi Pengolahan Air (IPA) yang akan di distribusikan ke masyarakat. Permasalahan yang terjadi adalah pipa induk tersebut mengalami kebocoran akibat umur teknis pipa yang sudah tua. Meningkatnya jumlah penduduk sama halnya semakin meningkatnya pemenuhan akan kebutuhan air bersih. Permasalahan tersebut harus ditanggulangi dengan pergantian pipa dengan jenis dan diameter yang tepat serta kapasitas pompa yang sesuai hasil menggunakan software Watercad V8-i. Dari hasil perhitungan analisa pertumbuhan penduduk pada tahun 2030 dengan jumlah pelanggan 96.770 jiwa kebutuhan air mencapai 102,476 liter/detik. Sistem transmisi menggunakan sistem pompa dengan kapasitas terpasang 90 liter/detik. Jenis pipa yang dipakai untuk pipa transmisi menggunakan pipa HDPE dengan diameter 350 mm. Kata kunci: evaluasi, air bersih, perpipaan, pompa, Watercad V8-i   Abstract The service for water needs in the IKK Bukit Oregon area is inadequate, it is suspected that the pipeline network is the main problem, so based on this, it is necessary to evaluate the drinking water piping network and the design is made using the Watercad V8-I application software and wants to know how much the demand for discharge in the 2030 projection includes pump capacity and type of transmission pipe. The results of direct observations in the study area on the service there are problems that occur in the transmission pipe, namely the pipe from the intake (main raw water source) to the Water Treatment Plant (IPA) which will be distributed to the community. The problem that occurs is that the main pipe has a leak due to the technical age of the pipe which is old. The increasing population is the same as the increasing fulfillment of clean water needs. These problems must be overcome by changing the pipe with the right type and diameter and the pump capacity according to the results using the Watercad V8-i software. From the calculation results of population growth analysis in 2030 with the number of customers 96,770 people, water needs reach 102,476 liters/second. The transmission system uses a pump system with an installed capacity of 90 liters/second. The type of pipe used for the transmission pipe uses HDPE pipe with a diameter of 350 mm. Keywords: evaluation, clean water, piping, pump, Watercad V8-i 
ANALISIS KEKERINGAN METEOROLOGI MENGGUNAKAN METODE STANDARDIZED PRECIPTATION INDEX (SPI) DI DAS BEDADUNG KABUPATEN JEMBER Malini, Citra; Halik, Gusfan; Agung Wiyono, Retno Utami
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.483

Abstract

Abstrak Bencana kekeringan di DAS Bedadung terindikasi dengan tidak terpenuhinya kebutuhan masyarakat akan pasokan air. Kekurangan air akibat defisit curah hujan menjadi indikator kekeringan meteorologi. Penelitian ini bertujuan untuk mendapatkan nilai indeks kekeringan di DAS Bedadung kabupaten Jember. Metode Standardized Precipitation Index (SPI) digunakan untuk mendapatkan tingkat kekeringan. Tingkat kekeringan meteorologi yang dihitung tergantung jumlah curah hujan yang terukur pada alat penakar di stasiun. Hasil penelitian ini menunjukkan bahwa indeks kekeringan ekstrim terjadi pada tahun 2018 dan 2019. Nilai indeks kekeringan (SPI-6) memiliki nilai tertinggi sebesar -2,69 di stasiun Ajung dan nilai     -1,13 di stasiun Kottok. Hasil pemetaan sebaran indeks kekeringan memiliki kesesuaian dengan kondisi kekeringan observasi. Hal ini ditunjukkan dari nilai validasi sebaran kekeringan antara SPI-6 dan data kekeringan observasi dengan tingkat keandalan sebesar 82%. Kata kunci: DAS Bedadung, bencana kekeringan, indeks kekeringan meteorologi, SPI   Abstract Drought disaster in the Bedadung watershed is indicated by the unfulfilled sociaty needs for water supply. Lack of water due to deficit in rainfall is an indicator of meteorological drought. This study aims to obtain the drought index value in the Bedadung watershed, Jember district. The Standardized Precipitation Index (SPI) method is used to obtain the drought saverity index. The meteorological drought index depends on the amount of rainfall observed on the rainfall gauge stations. The results of this study indicated that extreme drought index occurred in 2019. The drought index value (SPI-6) had the highest value of -2.69 at the Ajung station and a value of   -1.13 at the Kottok station. The results of the mapping of the distribution of the drought index are suitable with drought existing conditions. This is indicated by the validation value of the drought distribution between SPI-6 and the observed drought data with a reliability level of 82%. Keywords: Bedadung watershed, drought disaster, meteorological drought index, SPI
EVALUASI STANDAR JALUR EVAKUASI KEBAKARAN PADA BANGUNAN GEDUNG BERTINGKAT (Studi Kasus Gedung BAPPEDA Kabupaten Nagan Raya) Djamaluddin, Rahmat; Zakia, Zakia; Firzan, Firzan; Fajri, Aulil
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.551

Abstract

Abstrak Dampak negatif yang ditimbulkan dari bencana dapat berupa kerugian materiil maupun jiwa. Bencana tersebut dapat dicontohkan seperti banjir, gempa bumi ada pula bencana non alam seperti kebakaran. Penelitian ini bertujuan untuk mengetahui bagaimana kondisi standar jalur evakuasi kebakaran pada kantor BAPPEDA Kabupaten Nagan Raya, mengetahui apakah jalur evakuasi kebakaran pada kantor BAPPEDA Kabupaten Nagan Raya telah memenuhi standar. Data yang digunakan berupa data primer dan sekunder, yang diambil dengan cara penyebaran kuisioner, observasi dan pengamatan secara langsung. Pertanyaan melalui kuisioner diolah menggunakan software SPSS-23, sedangkan data hasil observasi dan pengamatan secara langsung, diolah melalui analisa deskripsi sesuai hasil lapangan. Hasil analisa menunjukkan bahwa semua pertanyaan valid memiliki nilai korelasi lebih besar dari nilai product moment/r tabel 0,632. Sedangkan metode penelitian yang digunakan adalah metode kuantitatif. Hasil evaluasi standar jalur evakuasi kebakaran pada Bangunan Gedung BAPPEDA Kabupaten Nagan Raya, belum sesuai standar Peraturan Menteri Pekerjaan Umum No.26/PRT/M/2008 tentang Persyaratan Teknis Sistem Proteksi Kebakaran Pada Bangunan Gedung dan Lingkungan bahwasanya penerapan peraturan sistem jalur evakuasi kebakaran masih pasif pada gedung BAPPEDA Kabupaten Nagan Raya untuk fungsi bangunan publik serta Kesesuaian fasilitas jalur evakuasi kebakaran yang tersedia pada bangunan gedung BAPPEDA Kabupaten Nagan Raya sangat sulit dilakukan evakuasi jika sewaktu waktu-waktu terjadi kebakaran Kata Kunci: Jalur evakuasi, bangunan gedung, metode kuantitatif, kuisioner   Abstract The negative impact can be in the form of material and life losses. The disaster can be exemplified as floods, earthquakes there are also non-natural disasters such as fire. Disaster is a phenomenon of human life that cannot be known exactly when it happened. This study aims to determine how the standard conditions of fire evacuation routes at the Nagan Raya Regency Bappeda office, find out whether the fire evacuation routes at the Nagan Raya Regency Bappeda office meet the standards. The data used in this study are primary and secondary data, data collection is done by observation and direct observation. While the research method used is a quantitative method. Results of the Standard Identification of Fire Evacuation Paths in Nagan Raya Regency Bappeda Building, according to Minister of Public Works Regulation No.26 / PRT / M / 2008 concerning Rescue Lines that the application of fire evacuation system regulations is still passive in Bappeda Building Nagan Raya Regency for public building functions as well as the suitability of fire evacuation route facilities available in the building of Bappeda Nagan Raya Regency, it is very difficult to evacuate if at any time there is a fire Keywords: Evacuation route, building, quantitative method, questionnaire
PERBANDINGAN PERILAKU PERBAIKAN TANAH METODE PRELOADING VAKUM DAN PRELOADING TIMBUNAN DENGAN ELEMEN HINGGA 2D Gusnadi, Zakwan; Rahardjo, Paulus Pramono; Lim, Aswin
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.513

Abstract

Abstrak Perbaikan tanah lunak dengan pra-beban (preloading) dimaksudkan untuk mereduksi penurunan pada masa operasional dan meningkatkan kekuatan tanah. Preloading dalam perbaikan tanah lunak biasanya dikombinasikan dengan Prefabricated Vertical Drain (PVD) guna mempercepat proses disipasi air pori. Metode preloading dapat dilakukan dengan cara konvensional menggunakan timbunan ataupun dengan tekanan vakum. Untuk mengetahui perilaku preloading dengan tekanan vakum ini digunakan metode elemen hingga 2D menggunakan program bantu ABAQUS (berasal dari nama alat hitung Abacus). Hasil analisis menunjukan pada hari ke 217 perbaikan preloading vakum menghasilkan penurunan sebesar 1,23 m dan preloading timbunan menghasilkan penurunan sebesar 1,18 m, namun pola penurunan yang terjadi dengan preloading vakum terlihat lebih besar pada 35 hari pertama perbaikan. Pada perubahan tekanan air pori preloading vakum menunjukan reduksi tekanan air pori, sedangkan dengan preloading timbunan tekanan air pori meningkat pada masa konstruksi dan tereduksi pada masa perbaikan. Lebih lanjut pada perilaku deformasi lateral di kaki timbunan, metode preloading vakum menunjukan pergerakan lateral ke arah dalam area perbaikan sedangkan dengan preloading konvensional pergerakan lateral tanah terjadi ke arah luar area perbaikan. Kata kunci: ABAQUS, Elemen Hingga 2D, Perbaikan Tanah, Vakum Preloading Abstract Improvement of soft soil by preloading is intended to lower the settlement of operation time and increasing soil strength. Preloading in the improvement of soft soil usually combined with Prefabricated Vertical Drain (PVD) to accelerate the pore water dissipation process. The preloading method can be done in a conventional way using the embankment or vacuum pressure. To find out the behaviour of preloading with this vacuum pressure, we used the finite element method 2D by using the ABAQUS support program. The result of the analysis shows on the 217th day, vacuum preloading improvement produces a settlement by 1.23 m and the embankment preloading produce 1.18 m, but the settlement pattern that occurs with preloading vacuum was seen to be greater in the first 35 days of improvement. In terms of changes in pore water pressure on vacuum preloading shows that the pattern of pore water pressure is reduced, while with pore eater pressure on preloading heap increased during construction and reduced during improvement. Further on the lateral movement behaviour in the toe of the embankment, the vacuum preloading method shows the lateral movement towards the improvement area while embankment preloading shows the lateral movement occurs towards the outside of the improvement area. Keywords: ABAQUS, Finite Element 2D, Soil Improvement, Vacuum Preloading
PERILAKU STRUKTUR GEDUNG BERTINGKAT KETIDAK BERATURAN VERTIKAL KEKAKUAN TINGKAT LUNAK DENGAN ANALISIS BERBASIS KINERJA Tata, Arbain
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.475

Abstract

Abstrak Perkembangan disain struktur bangunan tahan gempa menggunakan konsep Performance Based Design atau analisis berbasis kinerja adalah konsep desain struktur bangunan gedung di mana kegagalan dapat didesain terjadi pada level dan pola tertentu sesuai tingkat kerusakan yang diinginkan. Dalam penerapan konsep Performance Based Design digunakan metode perhitungan perpindahan langsung atau Direct Displacement Based Design (DDBD). Pada penelitian ini struktur gedung merupakan konstruksi beton bertulang dengan pola denah yang beraturan di mana keseluruhan tipe struktur A0, B1, B2, dan B3 yang didesain menggunakan sistem ganda pada arah sumbu kuat (x) dan sistem rangka pada arah sumbu lemah (y). Struktur A0 merupakan struktur dasar yang menjadi pembanding terhadap ketidak beraturan vertikal kekakuan tingkat lunak yang didesain pada Struktur B1, B2, dan B3. Evaluasi hasil kinerja dan asesmen menggunakan metode ATC-40 diketahui bahwa, untuk keseluruhan tipe struktur A0, B1, B2, dan B3 pada arah x dan y berada pada level kinerja Immediate Occupancy (IO) dan termasuk dalam kategori daktilitas penuh (full ductility). Hasil perbandingan nilai drift pada arah sumbu (x) pada sistem ganda diketahui bahwa semua tipe struktur nilainya tidak melebihi design drift limit, sedangkan hasil perbandingan nilai drift pada arah sumbu (y) pada sistem rangka diketahui bahwa struktur B1 dan B2 memiliki nilai drift yang melebihi design drift limit. Kata kunci: perilaku, ketidakberaturan vertikal, analisis berbasis kinerja  Abstract The development of earthquake-resistant building structural designs using the concept of Performance-based design or performance-based analysis is the design concept of building structures where failure can be designed to occur at a certain level and pattern according to the level of damage. The implementation of the concept of Performance-based design use the method of calculating direct displacement or Direct Displacement Based Design (DDBD). Therefore,  the building structure is a reinforced concrete construction with a regular floor plan where all types of structures A0, B1, B2, and B3 are designed using a dual system on the strong axis (x) and the frame system on the weak axis (y). The structure A0 is the basic structure which is a comparison to the vertical irregularity of soft stiffness designed in Structures B1, B2, and B3. Evaluation of performance results and assessment using the ATC-40 method indicate for all types of structures A0, B1, B2, and B3 in the X and Y directions are at the level of performance of Immediate Occupancy (IO) and are included in the full ductility category. The results of the comparison of drift values in the (x) direction of the dual system show that all types of structures do not exceed the design drift limit. Meanwhile, the results of the comparison of drift values in the (y) direction of the frame system show that the structures B1 and B2 have drift values that exceed the design drift limit. Keywords: behavior, vertical irregularity, performance-based analysis
PERILAKU DEFORMASI BENDUNGAN JATIBARANG Kurniawan, Fajar Aldoko; S.P.R Wardani, S.P.R; Sadono, Kresno Wikan
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.592

Abstract

Abstrak Efek utama dari deformasi adalah hilangnya freeboard, kerusakan struktur bangunan pelengkap yang terletak di atas bendungan, retakan pada bendungan urugan (paling merugikan pada impervious core), terbentuknya suatu zona yang mengarah pada hidrolik fracturing, dan kegagalan instrumentasi. Bendungan Jatibarang merupakan bendungan urugan batu zonal inti tegak dengan inti clay. Tujuan dari penelitian ini adalah untuk menganalisis perilaku deformasi pada berbagai tahapan saat konstruksi, selama pengisian awal waduk dan pasca konstruksi (masa layan). Penelitian ini dilakukan dengan menggunakan data pembacaan instrumen pengukur deformasi dan evaluasi menggunakan kriteria penerimaan untuk menilai perilaku normal dan tidak normal. Hasil dari penelitian ini adalah selama konstruksi, deformasi vertikal Bendungan Jatibarang pada kedalaman antara 32 m sampai kedalaman 56 m berada di luar batas deformasi normal. Pergerakan deformasi horizontal pada pengisian awal dari Bendungan Jatibarang mempunyai nilai deformasi yang besar karena berada di atas perilaku umum deformasi horizontal pada beberapa bendungan. Pada kurun waktu konstruksi Bendungan Jatibarang 2014 hingga pembacaan terakhir pada tahun 2020 terlihat tidak terjadi perubahan yang signifikan namun pada kedalaman antara 20-30 m terjadi penurunan yang besar dibandingkan dengan lainnya yang mengindikasikan bahwa pada kedalaman tersebut terjadi konsentrasi penurunan internal yang besar Kata kunci: Bendungan Jatibarang, instrumentasi, deformasi, deformasi vertikal, deformasi horizontal  Abstract The main effects of deformation are loss of freeboard, damage to the auxiliary structure located above the dam, cracks in the embankment dam (impervious core), formation of a zone leading to hydraulic fracturing, and instrumentation failure. Jatibarang Dam is an upright core zonal rockfill dam with a clay core. The purpose of this study is to analyze the deformation behavior at various stages during construction, during the initial filling of the reservoir and post construction (post construction). This research was conducted using the reading data of the deformation instrumen and the evaluation using acceptance criteria to assess normal and abnormal behavior. The result of this research is that during construction, the vertical deformation at a depth between 32 m to 56 m is outside the normal deformation limit. The horizontal deformation at the initial filling of the Jatibarang Dam has a large deformation value because it is above the general horizontal deformation behavior of several dams. During the construction period 2014 until 2020 Jatibarang Dam did not appear to be any significant changes, but at a depth between 20-30 meters there was a large decrease compared to others indicating that at depth there was a large concentration of internal decline. Keywords: Jatibarang dam, instrumentation, deformation, vertical deformation, horizontal deformation
EVALUASI RENCANA PEMASANGAN SENSOR STRUCTURE HEALTH MONITORING SYSTEM JEMBATAN PULAU BALANG II Hartono, Juandra; Khoiroh, Umi
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.549

Abstract

Abstrak Salah satu isu utama dalam setiap penerapan Structure Health Monitoring System (SHMS) jembatan bentang panjang khususnya jembatan Pulau Balang II adalah bagaimana membuat SHMS tersebut dapat diandalkan secara efektif. Penggunaan sensor yang terlalu banyak tidaklah efisien demi mendapatkan informasi yang selengkap-lengkapnya terkait kondisi jembatan. Tujuan utama riset ini adalah untuk menganalisia tipe sensor, posisi penempatan sensor dan jumlah sensor yang akan dipasang pada SHMS jembatan Pulau Balang sesuai kebutuhan sensor yang efektif dan efisien. Pengamatan SHMS meliputi lendutan dek, pylon serta tegangan dek, pylon. Metode penelitian berupa pengamatan langsung di lapangan, analisa data dan diskusi dengan stakeholder jembatan. Dari hasil analisis terdapat 13 jenis sensor yang sebaiknya dipasang pada SHMS Jembatan Pulau Balang dengan total kebutuhan sensor berjumlah 87 buah. Posisi penempatan sensor sebagian besar ada di pylon, kabel dan dek yang disesuaikan dengan tipe jembatan yaitu cable stayed. Untuk sensor gempa disarankan perlu dipasang hal ini dikarenakan wilayah tersebut memiliki seismistis paling rendah yang didominasi oleh tiga zona sesar utama yaitu sesar mangkalihat, sesar tarakan dan sesar maratus oleh karena itu Kalimantan bukanlah daerah yang bebas gempa bumi. Kata kunci: structural health monitoring system (SHMS), sensor, pylon, dek, cable stayed  Abstract One of the main issues in each application of Structure Health Monitoring System (SHMS) in long span bridge particularly Pulau Balang II Bridge is how to make the SHMS effectively dependable. The excessive use of sensors is inefficient in order to obtain complete information regarding the condition of the bridge. The main purpose of this research is to analyze the type of sensor, the position of the sensor placement and the number of sensors that will be installed on the SHMS structure of the Balang Island bridge according to the need for effective and efficient sensors. SHMS observations include deck deflection, pylon and deck stress, pylon. The research method is in the form of direct observation in the field, data analysis and discussions with bridge stakeholders. From the results of the analysis, there are 13 types of sensors that should be installed on the Balang Island Bridge SHMS with a total sensor requirement of 87 units. Most of the sensor placement positions are in the pylons, cables and decks that are adapted to the type of bridge, namely cable stayed. For earthquake sensors, it is recommended to install this because the area has the lowest seismicity which is dominated by three main fault zones, namely the Mangkalihat Fault, Tarakan Fault and Maratus Fault. Therefore, Kalimantan is not an earthquake-free area Keywords: structural health monitoring system (SHMS), sensor, pylon, deck, cable stayed
PENENTUAN PRIORITAS PENANGANAN JALAN DI KECAMATAN SEULIMEUM KABUPATEN ACEH BESAR DENGAN MENGUNAKAN ANALISIS MULTI KRITERIA riza, Fakhrur; Anggraini, Renni; Isya, Muhammad
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.487

Abstract

Abstrak Kecamatan Seulimeum merupakan kecamatan yang mempunyai tingkat kerusakan jalan yang paling berat diantara kecamatan lainnya yang ada di Kabupaten Aceh Besar. Jalan kabupaten di Kecamatan Seulimeum terdapat sebanyak 23 ruas dengan kondisi rusak berat sepanjang 69,50 km (50,44%) dari 137,80 km. Mengingat Pemerintah Kabupaten Aceh Besar mempunyai keterbatasan anggaran pada sektor jalan, maka penanganan jalan di Kecamatan Seulimeum perlu dicarikan prioritas penanganan. Penelitian ini bertujuan untuk menganalisis kriteria yang dominan perlu dipertimbangkan dalam penanganan jalan dan menganalisis urutan prioritas penanganan jalan di Kecamatan Seulimeum. Penelitian ini menggunakan pendekatan metode kuantitatif melalui kuesioner. Teknik sampling yang digunakan adalah purposive sampling yaitu pengambilan sampel dengan pertimbangan yang didasarkan pada pihak pemangku kepentingan dan pengambil kebijakan (stakeholders) bidang jalan. Responden ditetapkan sebanyak 5 stakeholders yaitu Kepala Bidang Bina Marga Dinas Pekerjaan Umum dan Penataan Ruang (PUPR) Kabupaten Aceh Besar, Kepala Bidang Program Pembangunan Daerah Badan Perencanaan Pembangunan Daerah (Bappeda) Kabupaten Aceh Besar, Anggota Komisi IV Bidang Pembangunan Dewan Perwakilan Rakyat Kabupaten (DPRK) Aceh Besar, Camat Seulimeum, dan akademisi. Kriteria penanganan jalan yang ditinjau adalah kondisi jalan, tata guna lahan, aksesibilitas, kependudukan, fasilitas sosial, fasilitas pemerintahan, dan sarana perekonomian. Teknik analisis data digunakan Analisis Multi Kriteria (AMK). Hasil penelitian meunjukkan bahwa kriteria yang dominan perlu dipertimbangkan dalam penanganan jalan adalah kriteria kondisi jalan dengan nilai bobot kriteria rata-rata sebesar 0,323. Prioritas penanganan jalan adalah alternatif Jalan Seulimeum-Lamteuba sebagai prioritas 1 dengan kinerja alternatif sebesar 4,095, alternatif Jalan Entee Gajah-Lhieb sebagai prioritas 2 dengan kinerja alternatif sebesar 3,715, dan alternatif Jalan Lamteuba-Lamteuba Droe sebagai prioritas 3 dengan kinerja alternatif sebesar 3,619. Kata kunci: Prioritas, penanganan, jalan, kriteria, alternatif, Kecamatan Seulimeum  Abstract Seulimeum sub-district is a sub-district that has the heaviest level of road damage among other sub-districts in Aceh Besar District. There are 23 regency roads in Seulimeum District with severely damaged conditions along 69.50 km (50.44%) of 137.80 km. Considering that the Aceh Besar District Government has a limited budget in the road sector, the handling of roads in Seulimeum District needs to be looked for priority handling. This study aims to analyze the dominant criteria that need to be considered in road handling and to analyze the priority order of road handling in Seulimeum District. This study uses a quantitative method approach through a questionnaire. The sampling technique used was purposive sampling, namely sampling with considerations based on the stakeholders and road sector stakeholders. The number of respondents was assigned as many as 5 stakeholders, namely the Head of Bina Marga Division of the Public Works and Spatial Planning (PUPR) of Aceh Besar District, Head of the Regional Development Program Division of the Regional Development Planning Agency (Bappeda) Aceh Besar District, Members of Commission IV for the Development Sector of the District People's Representative Council (DPRK) Aceh Besar, Head of Seulimeum sub-district, and academics. The road handling criteria reviewed are road conditions, land use, accessibility, population, social facilities, government facilities and economic facilities. The data analysis technique used Multi Criteria Analysis (MCA). The results showed that the dominant criterion that needs to be considered in road handling is the criteria for road conditions with an average criterion weight value of 0.323. The road handling priority is the Seulimeum - Lamteuba road alternative as priority 1 with an alternative performance of 4.095, the Entee Gajah - Lhieb road alternative as priority 2 with an alternative performance of 3.715, and the alternative Jalan Lamteuba - Lamteuba Droe as priority 3 with an alternative performance of 3.619. Keywords: Priority, handling, roads, criteria, alternatives, Seulimeum District
APLIKASI TEKNIK LOT SIZING PADA PROYEK GEDUNG LABORATORIUM KEBENCANAAN UNIVERSITAS SYIAH KUALA Lingga, Erwin; Mubarak, Mubarak; Oktaviani, Cut Zukhrina
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.563

Abstract

Abstrak Salah satu faktor mempengaruhi kelancaran dalam pelaksanaan suatu proyek konstruksi adalah pengadaan material ke lokasi. Keterlambatan datangnya material konstruksi yang menyebabkan stockout persediaan material saat akan digunakan membuat pekerjaan menjadi tertunda. Hal ini secara tidak langsung dapat mempengaruhi total waktu pelaksanaan serta biaya proyek. Penentuan tingkat persediaan yang tepat dapat diaplikasikan dengan mengunakan metode Material Requirement Planning (MRP). Tujuan dari penelitian adalah untuk mengetahui ukuran pemesanan dan biaya pengadaan material yang paling efisien dari dua teknik lotsizing yaitu teknik Period Order Quantity (POQ) dan teknik Economic Order Quantity (EOQ) pada Gedung Laboratorium Kebencanaan Universitas Syiah Kuala (USK) di Kota Banda Aceh. Proses yang terdapat dalam MRP meliputi netting, lotting, offsetting, dan explosion. Metode MRP diterapkan pada proyek Gedung Laboratorium Kebencanaan USK, dengan menghitung jumlah kebutuhan material berdasarkan data Rencana Anggaran Biaya (RAB), Analisis Harga Satuan (AHS), dan jadwal pelaksanaan terhadap 28 (dua puluh delapan) material di lokasi proyek. Berdasarkan dari teknik yang dianalisa, teknik lotsizing yang menghasilkan biaya total paling ekonomis untuk semua material adalah teknik Periodic Order Quantity (POQ) dengan biaya sebesar Rp. 9.850.848.30, Sedangkan yang mempunyai biaya pengadaan material sangat tinggi ditunjukkan oleh teknik EOQ, Rp. 9.852.102.40, artinya biaya yang dikeluarkan lebih kecil yaitu Rp. 1.234.00 (97%). Kata Kunci: Gedung Universitas Syiah Kuala, Material Requirement Planning, Lotsizing, Period Order Quantity, Economic Order Quantity  Abstract One of the factors influencing the continuity running of a construction project is material procurement to the site. The delay in the arrival of construction materials which causes a stockout of material supplies when they will be used makes the work delayed. This can indirectly affect the total implementation time and project costs. by using the Material Requirement Planning method. The purpose of this study was to determine the order size and the most efficient material procurement costs from the two lotsizing inventory control techniques, namely the Period Order Quantity (POQ) and the Economic Order Quantity (EOQ) at Disaster Laboratory Building University of Syiah Kuala in Banda Aceh city. The processes contained in MRP is netting, lotting, offsetting, and explosion. The MRP method is applied to the Disaster Laboratory Building University of Syiah Kuala project, by calculating the amount of material needed based on the Budget Plan data, Unit Price Analysis, and the project schedule which includes its 28 materials. Based on the analyzed technique, the lotsizing technique that produces the most economical total cost for all materials is the Periodic Order Quantity (POQ) technique with a cost of Rp. 9,850,848.30, while those who have very high material procurement costs are indicated by the EOQ technique, Rp. 9,852.102.40, meaning that the costs incurred are smaller, namely Rp. 1.234.00 (97%). Keywords: Building University of Syiah Kuala, Material Requirement Planning, Lotsizing, Period Order Quantity, Economic Order Quantity

Filter by Year

2011 2026


Filter By Issues
All Issue Vol. 16 No. 1 (2026): Teras Jurnal Vol. 15 No. 1 (2025): Volume 15 Nomor 1, Maret 2025 Vol. 15 No. 2 (2025): Teras Jurnal (September) Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024 Vol. 14 No. 1 (2024): Volume 14 Nomor 1, Maret 2024 Vol. 13 No. 2 (2023): Volume 13 Nomor 2, September 2023 Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023 Vol. 12 No. 2 (2022): Volume 12 Nomor 2, September 2022 Vol. 12 No. 1 (2022): Volume 12 Nomor 1, Maret 2022 Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021 Vol. 11 No. 1 (2021): Maret 2021 Vol. 10 No. 2 (2020): Volume 10 Nomor 2 September 2020 Vol. 10 No. 1 (2020): Volume 10 Nomor 1 Vol. 9 No. 2 (2019): Volume 9, Nomor 2, September 2019 Vol 9, No 1 (2019): Volume 9, Nomor 1, Maret 2019 Vol. 8 No. 2 (2018): Vol 8 No 2 September 2018 Vol. 8 No. 1 (2018): Vol 8 Nomor 1, Maret 2018 Vol. 7 No. 2 (2017): Vol. 7 Nomor 2, September 2017 Vol. 7 No. 1 (2017): Vol 7 No 1 Maret 2017 Vol 6, No 1 (2016): Volume 6 Nomor 1 (2016), Teras Jurnal, Vol 6 No 1, Maret 2016 Vol. 6 No. 2 (2016): Volume 6 Nomor 2, September 2016 Vol 5, No 2 (2015): TERAS JURNAL Vol.5, No.2, September 2015 Vol 5, No 1 (2015): TERAS JURNAL, Vol. 5, No. 1, Maret 2015 Vol 4, No 2 (2014): TERAS JURNAL, VOL.4, NO.2, SEPTEMBER 2014 Vol 4, No 1 (2014): TERAS JURNAL, VOL.4, NO.1, MARET 2014 Vol 3, No 2 (2013): Teras Jurnal, Vol 3, No 2, September 2013 Vol 3, No 1 (2013): Teras Jurnal, Vol 3, No.1, Maret 2013 Vol 2, No 4 (2012): Teras Jurnal, Vol 2, No 4, Desember 2012 Vol 1, No 1 (2011): Teras Jurnal, Vol.1, No.1, Maret 2011 More Issue