cover
Contact Name
Mahdika Putra Nanda
Contact Email
dikananda.ft@unwir.ac.id
Phone
+628995210308
Journal Mail Official
jri@unwir.ac.id
Editorial Address
Jl. Ir. H Juanda KM. 03, Karanganyar, Kec. Indramayu, Kabupaten Indramayu, Jawa Barat 45213. Telp/Fax. (0234) 275907
Location
Kab. indramayu,
Jawa barat
INDONESIA
Jurnal Rekayasa Infrastruktur
Published by Universitas Wiralodra
ISSN : 2460335     EISSN : 26866587     DOI : https://doi.org/10.31943/jri.v8i1
Core Subject : Engineering,
Structural Engineering, Geotechnical Engineering, Hydraulic and Water Resources Engineering, Environmental Engineering, Infrastructure Maintenance and Rehabilitation Transportation Engineering, and Construction Management & Construction work health and safety
Articles 134 Documents
Perbandingan Metode Line Of Balance Dan Precedence Diagram Metod Untuk Pekerjaan Konstruksi Gedung 3 Lantai Fahry Miraji; Nono Suhana; Komarudin Komarudin
Jurnal Rekayasa Infrastruktur Vol. 9 No. 2 (2023): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v9i2.206

Abstract

Line Of Balance diterapkan karena mampu menjadwalkan pekerjaan berulang dan menganalisis kemungkinan terjadinya hambatan pada pelaksanaan konstruksi, walau tidak mampu menunjukkan logika ketergantungan antar pekerjaan. Penjadwalan pada Precedence Diagram Method mempertimbangkan hubungan ketergantungan antar aktivitas dan durasi setiap aktivitas. Memilih metode penjadwalan proyek yang sesuai akan menjadi salah satu langkah guna memenuhi kebutuhan dalam pelaksanaan konstruksi. Penggunaan penjadwalan proyek metode line of balance (LoB) dan Precedence Diagram Method (PDM) mampu memperoleh waktu 144 hari dan 150 hari.
Analisis Kebutuhan Jembatan Penyeberangan Orang (Studi Kasus: Pasar Cilet Indramayu) Bachtiar Ibnuwiwoho; Sarwanta Sarwanta; Hamdani Abdulgani; Mahdika Putra Nanda
Jurnal Rekayasa Infrastruktur Vol. 9 No. 2 (2023): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v9i2.222

Abstract

Salah satu fasilitas di jalan raya yang harus tersedia adalah fasilitas pejalan kaki berupa fasilitas penyeberangan. Penyediaan fasilitas penyeberangan bertujuan untuk meminimalkan konflik langsung antara pedestrian/pejalan kaki dan kendaraan yang melintas pada jalan arteri nasional tersebut. Jalan Raya Losarang merupakan jalur arteri nasional, jalan ini merupakan salah satu jalur utama logistik Pulau Jawa dan menjadi salah satu koridor utama konektivitas nasional yang seharusnya jalan bebas hambatan karena berkecepatan tinggi. Peneliti bertujuan untuk menganalisis tentang kelayakan fasilitas jembatan penyeberangan orang di jalan raya losarang. Metode yang digunakan dalam penelitian ini adalah penelitian deskriptif dengan pendekatan kuantitatif. Dari hasil penelitian didapatkan analisis kelayakan fasilitas jembatan penyeberangan orang di jalan tersebut didapatkan nilai PV2 pada jam puncak hari senin sejumlah 5,5x109 dan hari rabu sejumlah 6,5x109, serta hari minggu sejumlah 5,3x1010 sehingga pada jalan tersebut sudah masuk kriteria kebutuhan jembatan penyeberangan orang.
Pemodelan Kinerja Simpang Sebidang Bersinyal Menggunakan Perangkat Lunak Vissim Sarwanta Sarwanta; Hamdani Abdulgani
Jurnal Rekayasa Infrastruktur Vol. 9 No. 2 (2023): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v9i2.223

Abstract

A signalized level intersection is the meeting point for vehicles heading towards the intersection and vehicles leaving the intersection. The problem at road intersections is the potential for queues and delays because vehicles will reduce their speed when passing through the intersection. Traffic control at signalized intersections is by using signals or traffic lights with the aim of minimizing queues and delays. As time goes by, there is an increase in traffic volume, this will result in a decrease in intersection performance, so an evaluation of intersection performance needs to be carried out. The aim of this research is to evaluate the performance of one of the signalized intersections in the city of Balikpapan, namely Simpang Lab Coal/BDS, in existing conditions and in the next 5 years. Evaluation of the performance of this intersection uses the guidelines of the Indonesian Road Capacity Manual (MKJI 1997) and modeling using Vissim software. The results of the performance evaluation based on MKJI 1997 in existing conditions showed that the intersection capacity was 4854.6 pcu/hour. The degree of saturation was obtained at 1.003, the intersection delay was 49.7 pcu/sec, the average queue length was 36.80 m. The results of modeling using Vissim software, in existing conditions, the average queue length is 60 meters. the average delay at the intersection is 17 pcu/sec and the intersection performance is at level of service C. At the intersection conditions in the next 5 years, the queue length is obtained at 144 meters, the largest
Nilai Tekanan Pengembangan Tanah Ekspansif Ketika Menerima Beban Dan Tanpa Menerima Beban Slab Cahyo Agung Saputra; Fahira Rhomianti Putri
Jurnal Rekayasa Infrastruktur Vol. 9 No. 2 (2023): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v9i2.227

Abstract

Expansive soil is a soil that easily shrinks and expands. so that it often causes problems for civil building construction, for example causing road construction to experience damage to cracks, waves, and potholes. holes. This soil has the following characteristics large shrinkage expansion due to changes in pore volume that can cause a lifting force to the existing construction existing construction so that it can cause damage to the construction. The purpose of this research is to find out how muchvalue of the swelling pressure that occurs when expansive soil is in a loaded and unloaded state.state and without load. This research is the result of combining two studies that are summarized into one. summarized into one, so as to obtain a more in-depth analysis. The form of this research is experiment with the material used expansive soil taken from Sambungmacan, Sragen, Central Java. Central Java. Test equipment main test equipment used in this test is in the form of test box made of steel. The soil expansive soil is then compacted inside the test box. Then expansive soil is then gradually little by little moistened with water until it reaches maximum water content to determine the swelling pressure that occurs. The results showed that the value of the swelling pressure values that occur have fluctuating values
Optimasi Mix Design Beton Melalui Teknologi Machine Learning Adji Putra Abriantoro; J Rajes Khana
Jurnal Rekayasa Infrastruktur Vol. 9 No. 2 (2023): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v9i2.228

Abstract

The concrete mix design is a crucial step in ensuring the quality of concrete used in construction projects. Traditional mix design methods rely on trial and error, which can be time-consuming and escalate construction costs. In recent years, machine learning technology has been developed to predict concrete properties and optimize mix designs for high-quality concrete. This study aims to explore the application of machine learning in high-quality concrete mix design, considering theoretical conditions, methods, and related research. The focus of this research is to test the use of machine learning techniques in predicting concrete properties and optimizing mix designs for high-quality concrete. The theory and concepts of machine learning will be applied to concrete mix design datasets and relevant properties. The methods employed will include data pre-processing, feature selection, and model training and evaluation. The performance of the machine learning model will be compared with traditional mix design methods to determine its effectiveness. Furthermore, the results and benefits of this study will demonstrate the potential advantages of using machine learning in determining high-performance concrete mix designs. By accurately predicting concrete properties and optimizing mix designs, construction projects can be completed more efficiently and with higher quality. This technology also has the potential to reduce costs associated with trial and error methods and minimize the environmental impact of concrete production. The success of this study will pave the way for further research and development in the field of machine learning for high-performance concrete mix designs.
Penggunaan Bekisting Modular Dalam Transformasi Proyek Konstruksi Ardi Priyatna; Inayah Tulillah; Laelatul Milleniasih; Mahdika Putra Nanda
Jurnal Rekayasa Infrastruktur Vol. 9 No. 2 (2023): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v9i2.230

Abstract

Sistem modular dalam pekerjaan konstruksi dapat menjadi lebih efisien dan cepat setiap modul dapat diproduksi secara terpisah dengan kualitas yang terkontrol, dan kemudian dipasang bersama-sama di lokasi konstruksi. Berdasarkan hasil penelitian bahwasanyya pekerjaan bekisting sistem modular menunjukkan harga awal pekerjaan bekisting modular lebih tinggi, mencapai total sebesar Rp. 77.038.564, sedangkan pekerjaan konvensional memiliki biaya awal sebesar 66.965.144. Meskipun demikian, perhitungan biaya ini tidak mencakup pekerjaan berikutnya. Pentingnya diketahui, meskipun harga awal bekisting modular lebih mahal, namun untuk pekerjaan selanjutnya, bekisting modular hanya memerlukan perbaikan pada sheating, sehingga biayanya jauh lebih murah dibandingkan dengan bekisting konvensional. Ini menunjukkan bahwa meskipun investasi awal lebih besar, bekisting modular memiliki potensi untuk menghemat biaya dalam jangka panjang
Analisis Kebutuhan Dan Kelayakan Investasi Fasilitas Parkir Di Rsud Pantura M A Sentot Patrol Indramayu Rahman, Ajai Fikar Habibur
Jurnal Rekayasa Infrastruktur Vol. 10 No. 1 (2024): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v10i1.238

Abstract

Rumah Sakit Umum Daerah Pantura M A Sentot Patrol adalah Rumah Sakit Umum Daerah yang berada diwilayah Kabupaten Indramayu. metode pengumpulan data dengan pengamatan atau observasi di lapangan dan menggunakan data sekunder dari pengelola parkir di rumah sakit. metode yang digunakan dalam penelitian ini yaitu analisis deskriptif yang mana menitikberatkan pada perhitungan. Dari hasil analisis diperoleh: kapasitas tersedia kendaraan roda 2 sebesar 832 SRP dan kapasitas tersedia kendaraan roda 4 sebesar 81 SRP. Rata-rata volume parkir kendaraan roda 2 sebesar 437 kend/hari. Rata-rata durasi parkir sebesar 2,58 jam, Volume parkir diestimasikan tahun ke-20 volume rata-rata perhari sebesar 1.259 kend/hari. Rata-rata volume parkir roda empat sebesar 96 kend/hari. Rata-rata durasi parkir sebesar 2,13 jam, Volume parkir diestimasikan tahun ke-20 rata- rata volume parkir 169 kend/hari,Untuk Analisis kelayakan investasi parkir pada kondisi eksisting dengan berbagai skema tarif parkir flat: BEP berada di tahun ke-18. investasi parkir Nilai BCR 1,12, nilai NPV Rp 703.593.437,-, dan nilai IRR sebesar 11,85%, dan untuk skema tarif progresif: BEP berada di tahun ke-10. Nilai BCR sebesar 1,71, nilai NPV Rp 4.177.936.930,-, dan nilai IRR 10,55%, dan skema tari parkir kombinasi : BEP berada di tahun ke-8 investasi. nilai BCR sebesar 2,01, nilai NPV Rp 5.915.108.676,- dan nilai IRR 10,87%. Analisis kelayakan investasi parkir dari berbagai skema layak untuk dilanjutkan investasi
Pemodelan Kinerja Persimpangan Sebidang Jalan Raya Menggunakan Perangkat Lunak Vissim Sarwanta, Sarwanta; Abdulgani, Hamdani
Jurnal Rekayasa Infrastruktur Vol. 10 No. 1 (2024): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v10i1.239

Abstract

Persimpangan jalan sebidang  merupakan  tempat yang berpotensi terjadinya konflik antar kendaran yang pada saat yang bersamaan berada pada titik  yang sama.. Untuk menghindari terjadinya  kecelakaan  di persimpangan setiap  kendaraan yang mendekati persimpangan harus  melakukan pengurangan kecepatan. Hal ini  mengakibatkan terjadinya antrian dan tundaan. Panjang antrian dan durasi waktu tundaan merupakan parameter untuk mengukur kinerja persimpangan.  evaluasi kinerja pesrsimpangan perlu dilakukan secara periodik  agat dapat  dilakukan langkah antisipasi agar kinerja simpang dpat dijaga dan dipertahankan dalam kondisi baik. Dalam penelitian ini, akan dilakukan analisis kinerja persimpangan dengan menggunakan pedoman pada Manual Kapasitas Jalan Indonesia (MKJI) 1997 dan Pemodelan dengan  menggunakan perangkat lunak  Vissim. Lokasi penelitian adalah di simpang Balikpapan Baru. Data yang digunakan sebgagai  masukan   meliputi data arus lalulintas pada jam sibuk atau jam puncak, data  geometri persimpangan. Keluaran  hasil  yang dihasilkan oleh model adalah informasi kinerja simpang berupa parameter  Degree of Saturation (DS) pada kondisi eksisting 0,88  Parameter panjang antrian 190 sampai 900 meter dan waktu tundaan pada kondisi eksisting adalah 64  detik/smp dan 108 detik/smp dan untuk proyeksi 5 tahun yang akan datang adalah 353 sampai 725 m dan waktu tundaan 74 detik/smp sampai dengan 210 detik/smp
Analisis Kesiapan Manajemen K3L Pembangkit Listrik Tenaga Uap (PLTU) Indramayu Dalam Menghadapi Keadaan Darurat Rosalinda, Rosalinda; Nanda, Mahdika Putra; Abdulgani, Hamdani
Jurnal Rekayasa Infrastruktur Vol. 10 No. 1 (2024): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v10i1.244

Abstract

Penelitian ini dilatarbelakangi oleh pentingnya kesiapan manajemen K3L dalam menghadapi keadaan darurat untuk melindungi keselamatan, kesehatan kerja, dan lingkungan. Tujuan utama penelitian adalah untuk menganalisis kesiapan manajemen K3L Pembangkit Listrik Tenaga Uap (PLTU) Indramayu dalam menghadapi keadaan darurat, dengan fokus pada pemahaman definisi keadaan darurat, tanggap darurat, elemen pokok sistem tanggap darurat, dan rencana pemulihan keadaan darurat. Metode penelitian yang digunakan adalah deskriptif kuantitatif, yang memberikan gambaran persentase capaian setiap variabel yang diteliti menggunakan angket dengan pengukuran menggunakan skala Guttman. Hasil penelitian menunjukkan bahwa secara keseluruhan persentase rata-rata kesiapan manajemen K3L dalam menghadapi keadaan darurat adalah 88,9%, yang dikategorikan Baik. Kesimpulan dari penelitian ini adalah bahwa manajemen K3L PLTU Indramayu memiliki kesiapan yang sangat baik dalam menghadapi keadaan darurat, namun pelaksanaan dan perencanaan yang telah dibuat perlu ditingkatkan dalam pengawasannya dengan pengembangan program pelatihan lanjutan, evaluasi berkala dan pembaruan rencana dalam meningkatkan keselamatan, kesehatan kerja, dan lingkungan secara menyeluruh. Kata kunci: Manajemen K3L, keadaan darurat, tanggap darurat, PLTU Indramayu
Analisis Pengaruh Hambatan Samping Terhadap Kinerja Lalu Lintas (Studi Kasus: Jalan Raya Condet, Jakarta Timur) Radestya, Syaima; Windari, Aulia Choiri; Sari, Ribut Nawang
Jurnal Rekayasa Infrastruktur Vol. 10 No. 1 (2024): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v10i1.245

Abstract

Hambatan samping yang terdiri dari kendaraan umum atau kendaraan lain yang berhenti, pejalan kaki, kendaraan masuk serta keluar sisi jalan, dan kendaraan yang berjalan lambat merupakan bagian dari kegiatan lalu lintas yang sangat mempengaruhi nilai kapasitas dan tingkat pelayanan segmen suatu jalan. Jika tidak ada pengelolaan khusus terhadap setiap tipe hambatan samping, maka hal yang dapat terjadi adalah bertambahnya nilai derajat kejenuhan yang merupakan parameter dalam menentukan kategori atau kelas kinerja jalan. Tujuan dari penelitian ini adalah untuk mengetahui pengaruh dari frekuensi hambatan samping serta cara mengatasi tipe kejadian yang paling berpengaruh terhadap bagan Jalan Raya Condet. Metode yang digunakan adalah perangkat lunak KAJI yang merupakan aplikasi berdasarkan dari kaidah Manual Kapasitas Jalan Indonesia tahun 1997. Dari hasil penelitian, didapatkan nilai frekuensi hambatan sisi jalan pada jam puncak yaitu sebesar 502,5 dan nilai tersebut menunjukkan kategori hambatan yang tinggi, serta didominasi oleh tipe parkir dan kendaraan yang berhenti. Hasil dari nilai kapasitas jalan juga lebih rendah daripada nilai volume kendaraan, sehingga nilai derajat kejenuhan yang didapatkan yaitu sebesar 1,057 (kategori F). Oleh sebab itu, pengaturan dalam manajemen lalu lintas terutama pada hambatan samping perlu dilakukan perbaikan untuk meningkatkan kapasitas jalan.