cover
Contact Name
Aris Fiatno
Contact Email
abi.fiat@gmail.com
Phone
+6282113270340
Journal Mail Official
teknikindustri@universitaspahlawan.ac.id
Editorial Address
Jl. Tuanku Tambusai No. 23 Bangkinang Kampar, Riau » Tel / fax : (0762) 216 77 / (0762) 216 77
Location
Kab. kampar,
Riau
INDONESIA
Jurnal Teknik Industri Terintegrasi (JUTIN)
ISSN : 26208962     EISSN : 26208962     DOI : 10.31004jutin
Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses manufaktur, kegagalan dan rekayasa material, perawatan berbasis keandalan, keselamatan kerja, perancangan sistem kerja dan ergonomi, pengendalian dan penjaminan mutu, tata letak fasilitas, penelitian operasional, kewirausahaan dan pengembangan bisnis
Arjuna Subject : -
Articles 69 Documents
Search results for , issue "Vol. 7 No. 3 (2024): July" : 69 Documents clear
Analisis Faktor Keterlambatan Penyelesaian Proyek Peningkatan Jalan Ruas Ambemali (Studi Kasus Jln. Belalo/Lasolo – Jln. Arisunggu) Sakti, Putra; Junarto, Junarto
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.29943

Abstract

Delays in implementing construction projects can have negative impacts on contractors and owners. Contractors whose construction projects are late will experience losses in terms of time and costs, because the profits expected by the contractor will be reduced, or even no profits at all. Respondent characteristics based on the questionnaire were classified into several categories, work experience, latest education, company category and field of work in the company. Factors causing delays in work on the Ambemali Road Improvement construction project, Jln. Belalo – Jln. Lasolo, Wawotobi District, Konawe Regency, according to the perception of PPK/PPTK, Directors, Consultants and Service Providers (Contractors) of PT Kendari Baruga Pratama, is caused by Labor Factors with indicators of contractor negligence, Equipment Factors with indicators of Equipment Damage, material factors with this being the lack of material available around the work site , financial factors indicating limited contractor funds, managerial factors namely inappropriate implementation methods, design suitability factors indicating design changes and other factors namely material sources far from the work location.
Penjadwalan Maintenance Mesin Jumbo Roll Tissue (JRT) Menggunakan Model Age Replacement Dermawan, Dedi; Yul, Faradila Ananda; Nurzen, Muhammad; Denur, Denur
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30115

Abstract

PT. Pindo Deli Pulp and Paper Tbk is an industry in the field of paper and tissue production. The processing system is one of the factors influencing production results. Maintenance measures must be an important concern. Based on observations and looking at data on machine maintenance costs, it is known that the largest cost incurred by the company in carrying out JRT machine maintenance is IDR 256,000,000, which if it continues will be detrimental to the company. To minimize expenses and optimize component performance, it is necessary to analyze maintenance/replacement policies using the Age Replacement method. One component that is experiencing quite large costs is Unwinder 1, which will be determined by scheduling replacement and maintenance using Age Replacement. Based on the results of data processing using Age Replacement, a replacement schedule for Unwinder 1 components was obtained, namely 10 months with cost savings of IDR 248,444
Analisis Tingkat Pengetahuan Berdasarkan Keluhan Pekerja Terhadap Gangguan Gerak Otot Kerangka (Gotrak) Pada UD. Radalla Collection Sugiantoro, Sugiantoro; Sunaryo, Merry; Sunaryani , Rosita Putri; Nurani , Ilmi Tri; Reynaldi , Ivan Alvian
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30395

Abstract

Occupational Safety and Health (K3) is very important for all workers and company owners to prevent occupational accidents and occupational diseases (PAK). UD. Radalla Collection, which manufactures screen printing and children's clothing, involves repeated use of the hands in a long sitting position, which increases the risk of PAK such as musculoskeletal disorders. Socialization is needed to educate craftsmen about the dangers and risks of ergonomics. Previously, a subjective survey had been conducted to identify complaints of Musculoskeletal Disorders (MSDs). From the observation results, it was found that workers did not know about skeletal muscle movement disorders, so workers worked carelessly. UD workers. The Radalla Collection is expected to increase awareness and understanding of the importance of preventing skeletal muscle disorders (gotrak) to avoid accidents and occupational diseases.
Analisa dan Usulan Perbaikan Layanan Sertifikasi Produk dengan Metode Lean Service Kacaribu, Loista Sevnin; Tarigan, Uni Pratama; Sembiring, Anita; Budiman, Irwan
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30454

Abstract

Product Certification Service is a service to business actors who want to get their products certified through the Indonesian National Standard Mark User Product Certificate (SPPT SNI), either compulsorily or voluntarily regulated products. Therefore, the Standardization and Industrial Services Center (BSPJI) Medan as a public service unit that has a Product Certification Agency (LSPro) is needed. The problem is the length of the LSPro BSPJI Medan service process to complete the company's SPPT SNI starting from the application until the issuance of the SPPT SNI. This causes losses for business actors both in funds and time. The purpose of this study is to provide suggestions for improvement and optimize time by maintaining value-added activities and reducing non-value-added activities. The methods used are Lean Service, Waste Analysis and for design using the FVSM Method. The results showed that there was waste that occurred in the LSPro BSPJI Medan service. From the results of the FVSM carried out, there was a reduction in service time from 92 working hours to 26 working hours.
Mitigasi Risiko Keterlambatan Pembangunan Jembatan Perawang di Kecamatan Tasik Putripuyu Menggunakan Simulasi Monte Carlo Arafat, Muhammad
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30563

Abstract

This study analyzes the risk of delays in the construction of the Perawang Bridge in Tasik Putripuyu District using Monte Carlo Simulation. Risk identification highlights several key factors that could cause delays, including design changes, delayed document approvals, and contractor financial issues. The Monte Carlo Simulation estimates a potential project delay of more than 30 days and a cost increase of up to 15% from the initial budget. To address these issues, the study proposes several mitigation strategies, such as improving stakeholder coordination, more effective project planning, and managing weather and safety risks. Implementing these strategies is expected to reduce the risk of delays and enhance the success of future infrastructure projects. The findings provide practical guidance for better project management and can be applied to similar infrastructure projects
Penerapan Sistem Inferensi Fuzzy untuk Menentukan Jumlah Pembelian Produk Berdasarkan Data Persediaan dan Penjualan dengan Menggunakan Metode Mamdani (Studi: Kasus RM Habibi) Hidayati, Nani; Kasini, Kasini; Permata, Aprilia
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30604

Abstract

RM Habibi is a restaurant business that serves dishes to buyers and provides a place to enjoy the meal, as well as determining food and service costs. Although restaurants generally serve on site, there are also those that provide take away and delivery services as a form of service to buyers. Restaurants usually specialize in the types of food they provide and are their best sellers. Inventory problems are a problem that buyers always face. Inventory is needed because demand patterns are basically irregular. Inventory is carried out to ensure certainty that when needed the product is available. Fuzzy logic is one of the components that make up soft computing.  The application of the fuzzy inference system (FIS) with the mamdani method in the Demand, Supply and Sales prediction system can be concluded that the use of fuzzy logic can be used to predict demand, inventory and totals at the Habibi Restaurant. And test results with real data and surveys show results with a conformity level of up to 90%.
Desain Proses Produksi dalam Proyek Pembuatan Mesin Pencacah Kompos pada Kegiatan di PT Raja Ampat Indotim Surya, Raygalan Kalmas; Maksum, Apid Hapid
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30682

Abstract

The performance of the industrial system in producing goods will be very important for business continuity, such as meeting consumer demand so that it can maintain the sustainability and/or continuity of the company in order to survive. Currently, companies will always be required to maintain and improve their competitive capabilities, so one way to do this is by increasing productivity at all levels within the company. The author tries to identify the work process of PT. Raja Ampat Indotim in the production of Compost Chopper Machines due to the results of interviews conducted at the company, there were no procedures for the work process in producing Compost Chopper Machines, so on this occasion the author intends to design a standard work process in the production of compost chopper machines at PT. Raja Ampat Indotim. Data processing in this research was carried out using an Operation Process Map. Based on the operational process map that has been created, the time required to produce a Compost Shredding Machine is 968.29 minutes.
Kajian Peranan Konsultan Manajemen Konstruksi pada Proyek Konstruksi di Makassar Amin, Burhamsyah; Ashad, Hanafi; Maricar, Husni
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30751

Abstract

Implementation of work on construction projects generally involves the collaboration of several parties, namely the work owner, contractors and consultants. There are several consultants involved in construction projects, one of which is Construction Management Consultants (MK). The success of the role of an MK consultant can be measured through achievements in terms of cost, time and quality of work. Research to examine the role of MK consultants at the construction project implementation stage and examine the influence of the role of MK consultants on the timeliness of work on the Rehabilitation project for Buildings B, C, D, Makassar Unhas Hospital. Quantitative research method with multiple linear regression analysis techniques. The results of the research are that the role of construction management consultants at the implementation stage of construction projects is carried out well based on the highest positive response (Agree), namely the capability of MK consultants in taking corrective action on deviations between planning and implementation (X4) reaching a value of 68.35% and the role of project management consultants positive influence or significance even though the correlation value is low on the progress of project work, the highest correlation value is on the variable (X2) consistency of MK consultant personnel in implementing existing plans with a value of 0.348 and the lowest correlation value on variable (X5) capability of MK consultants in management project costs to the progress of project work with a value of 0.088.
Analisis Keselamatan dan Kesehatan Kerja Menggunakan Metode Hirarc dan Heart (Studi Kasus : PT. Paku Jaya) Firmansyah, Muhammad Aldy; Ismiyah, Elly
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30807

Abstract

Occupational Safety and Health is one of the most important elements that must be applied in the working stages. The implementation of K3 in the workplace can create a safe, comfortable, and efficient workplace. PT Paku Jaya as one of the companies engaged in the construction sector is always committed to implementing K3 in the work area. One of the jobs that are often done by PT Paku Jaya is Cleaning Scrubbing. During the work process there are violations in the implementation of K3 in the work area. This can cause accidents in the work area. The methods used to conduct occupational safety and health analysis in this study are HIRARC and HEART. Based on the results of the study using HIRARC method, 9 types of hazards were found. Based on the analysis using HEART method, the largest HEP value is 0.192, which is opening the Blind Sprayer line. Risk control can be carried out in accordance with the hierarchy of hazard control that can be applied to Cleaning Scrubber work, namely Engineering, Administrative Control, and PPE.
Penjadwalan Produksi Label Menggunakan Metode Palmer untuk Meminimasi Makespan di CV. PQR Firdaus, Muhammad Fauzan; Amalia, Akhsani Nur; Widarman, Agung
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30829

Abstract

CV. PQR is a company operating in the printing sector. The main printing produced at the company is labels for vegetable products. When producing labels, the company always strives to produce quality products that reach consumers on time. In order for the production process to run, good production scheduling is needed. This research aims to schedule label production on CV. PQR. The label production scheduling method used is Palmer. The results of production scheduling calculations using the Palmer method have a job sequence of 10-9-8-7-6-4-5-3-2-1 and produce a makespan value of 248740 seconds or 69.0944 hours and require 8.6368 days to complete everything. jobs. There is a time difference between the company's initial condition production scheduling and production scheduling using the Palmer method, namely 13160 seconds or 3.6556 hours or 0.45695 days. So the Palmer method can minimize delivery delays