cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
jpr@pnp.ac.id
Editorial Address
Limau Manis , Padang. Sumatera Barat - Indonesia
Location
Kota padang,
Sumatera barat
INDONESIA
Jurnal Ilmiah Poli Rekayasa
ISSN : 18583709     EISSN : 26853922     DOI : 10.30630/jipr
Core Subject : Education,
Jurnal Ilmiah Poli Rekayasa adalah jurnal ilmiah yang diterbitkan 2 edisi dalam setahun, bulan April dan Oktober. Terbit sejak tahun 2005. Fokus Kajian jurnal ini adalah Fokus kajian artikel dalam JPR mencakup Mechanical Engineering, Civil Engineering, dan Electronica, Electricty dan Telecomunication EngineeringLingkup Jurnal Ilmiah Poli Rekayasa meliputi : 1) Energi terbarukan (rewnable energy), 2) Inovasi kendaran bermotor hemat BBM, 3) Material Maju, 4) Emisi dan pembakaran motor bakar, 5) Rekayasa termal dan fluida, 6) Rekayasa power plant, 7)Material komposit, 8) Biomaterial, 9)Teknologi pengujian tak merusak (Non Distruction Test/NDT), 10) Kontrol dan mekatronika, 11) Planing untuk pengurangan resiko bencana, 12) Sistem transportasi antar moda, 13) Rekayasa konstruksi, bangunan, jembatan dan Jalan, 14) Manajemen daerah aliran sungai, air tanah, sedimen dan waduk, 15) Remote Sensing Harap baca panduan ini dengan seksama. Penulis yang ingin mengirimkan artikel ke Jurnal Ilmiah Poli Rekayasa, harus mengikuti panduan penulisan. Jika artikel yang dikirim tidak sesuai dengan panduan penulisan atau ditulis dalam format yang berbeda, maka akan DITOLAK oleh editor sebelum ditinjau lebih lanjut. Para editor hanya menerima artikel yang memenuhi format yang ditetapkan. Artikel ditulis dalam bahasa indonesia. Jurnal Ilmiah Poli Rekayasa menggunakan prosedur penilaian Double Blind. Dimana antara penulis dengan mitra bestari tidak saling mengenal identitasnya masing-masing. Silahkan kirimkan artikel anda dan untuk unduh Template DI SINI Etika Publikasi dapat dilihat pada tautan berikut ini : ETIKA PUBLIKASI.
Arjuna Subject : -
Articles 171 Documents
ANALISIS PERKEMBANGAN PENERAPAN BUILDING INFORMATION MODELING (BIM) PADA PROYEK APARTEMEN DI INDONESIA SARIFAH, FITRIANA
Jurnal Ilmiah Poli Rekayasa Vol 19, No 2 (2024): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.19.2.356

Abstract

The application of Building Information Modeling (BIM) in Indonesian construction has also been carried out in apartment projects. BIM is a process of managing construction during the life cycle of apartment buildings, from planning, design, construction, and use to maintenance. The process The scope of this research is an apartment project built by 3 (three) BUMN construction, namely PT PP (Persero) Tbk (PTPP), PT Wijaya Karya (Persero) Tbk (WIKA), and PT Adhi Karya (Persero) Tbk (ADHI). This study aims to analyze the development of BIM implementation in apartment projects built by the three BUMN contractors. The apartments in this study are apartments with the application of BIM that have been used, not apartments still being built. This research method is carried out with a secondary data content analysis approach, especially the company's annual report that can be accessed by the public from the company's official website, including the identification of apartment projects that have been built and apply BIM to analyze the application of BIM in apartment projects. The results of this study are apartments that have been completed with the application of BIM by PTPP since 2017, ADHI since 2018, and WIKA since 2019. The number of apartments that have been completed with the application of BIM in this study are 4 apartments by WIKA, 5 apartments by PTPP, and 7 apartments by ADHI. All apartments that have been completed with the application of BIM in this study are located on the island of Java.
PERBANDINGAN BIAYA PEMBANGUNAN RUMAH SEDERHANA DENGAN RUMAH KONSEP AMAN GEMPA BERDASARKAN ANALISA BENEFIT COST RATIO SKENARIO GEMPA 50 TAHUN Natalia, Monika; Mirani, Zulfira; Mafriyal, Mafriyal; Sari, Desnila; Hanum, Riska Fauziah
Jurnal Ilmiah Poli Rekayasa Vol 19, No 2 (2024): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.19.2.361

Abstract

In mitigation to minimize the risk of earthquakes, protection is needed to reduce the impacts. Damage caused by earthquakes can be minimized by planning and building earthquake-resistant houses. To get an earthquake-resistant house, by adding earthquake-strengthening components based “Pedoman Teknis Rumah dan Bangunan Gedung Tahan Gempa and SNI 1726-2019”. This research aims to design earthquake-resistant houses concept for an earthquake period of 50 years and analyze the benefit-cost ratio by comparing residential houses designed with earthquake-safe features to conventional residential houses. The concept of earthquake-resistant houses is carried out in conventional type 120 residential houses. The research results that the cost for a conventional residence is IDR 387,223,000 and the cost of an earthquake house concept is IDR. 407,593,000, where there is a cost difference of IDR 20,370,000 or 5% (more expensive). Benefit-cost ratio value for conventional residential houses for the 50-year earthquake scenario is 0.64; 0.71; 0.77; 0.82; and 0.87 where the value of BCR <1, then this residential house is not effective in facing a 50-year earthquake scenario. Benefit-cost ratio for earthquake-safe housing was 1.12; 1.34; 1.58; 1.84; and 2.09. The BCR>1 and the value moves up until the 50th year. So with an additional cost of 5% for earthquake-safe features, this house is considered very effective for the 50-year earthquake period scenario.
EVALUASI KINERJA DAN PERENCANAAN TRAYEK ANGKUTAN KOTA DI KOTA DENPASAR Surya Tapa, I Gede Fery; Kumara, I Nyoman Indra; Indrashwara, Decky Cipta
Jurnal Ilmiah Poli Rekayasa Vol 19, No 2 (2024): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.19.2.348

Abstract

There have been many changes in the use of city transportation in Denpasar City since the 1990s until now. Therefore an evaluation of the transportation performance, planning of route systems, and the transportation operational system is needed. Primary data is obtained from headway, interview, and on-board surveys—the calculation of BOK, routes system planning, and operational systems using the Department of Transportation method. The results of the analysis show that almost all routes are not following the standards, both operational performance and service quality. The results of the new route planning are Renon-Penatih with a route length of 19,2 km, circulation time of 63,7 minutes, and the number of vehicles as many as 13 units ; Renon-Ubung with a length of the route of 22 km, circulation time of 69,8 minutes and the number of cars as many as 46 units; Renon-Sanur with a length of the route of 14,3 km, circulation time of 45,6 minutes and the number of vehicles as many as 3units; Renon-Sanglah-Lapangan Kompyang Sujana with a length of route of 18 km, circulation time of 57,9 minutes and the number of cars as many as 31 units; Renon-Sesetan-Suwung with a route length of 17,4 km, circulation time of 56,3 minutes and the number of cars as many as 29 units and; Renon-Teuku Umar-Pedungan with a route length of 15,1 km, circulation time of 47,9 minutes and the number of cars as many as 39 units.
PROPORSI PENGGUNAAN SUMBER DAYA PROYEK PADA BANGUNAN GEDUNG DI BALI Yuni, Ni Kadek Sri Ebtha; Sudiasa, I Wayan; Sudiarta, I Komang; Yuliana, Ni Putu Indah; Wahyudi, I Gede Bambang
Jurnal Ilmiah Poli Rekayasa Vol 19, No 2 (2024): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.19.2.359

Abstract

Construction projects are activities carried out with limited time and costs. In its implementation, the project requires resources, namely materials, wages, tools and decisions on the use of subcontractors. Project implementation always begins with implementation planning. This activity consists of planning work methods, calculating project resource requirements, and determining the schedule for procuring these resources. Every project implementation always has risks in it. This risk can originate from human resources, implementation methods, and work environment conditions. Due to the limited time for implementing construction projects, it is not uncommon for planning project resource requirements to experience calculation errors. This error could be a lack of budget allocated to one of the project resource components. This research was carried out with the aim of obtaining the proportion of each resource, namely materials, wages and tools, which can later be used as a reference in preparing project plans in a short time. This research was conducted on a building construction project that functions as a hotel and villa. The projects reviewed are 2 hotels, 1 villa and 1 resort. The results of this research show that the average proportion of project resource use to the total value is (1) Materials 64.45%, (2) Wages 24.75%, (3) Tools 7.64%, and (4) use of subcontractors 3 .17%. The proportion of use of material resources, equipment, wages and subcontractors is greatly influenced by the type of building construction, material specifications and work contracts.
Analisis Spasial Terhadap Kesesuaian Lahan Permukiman Pada Kawasan Rawan Erupsi Gunung Agung Pada Kawasan Permukiman Kecamatan Rendang, Karangsem Anggreni, Ni Luh Jaya; Putri, Putu Indah Dianti
Jurnal Ilmiah Poli Rekayasa Vol 19, No 2 (2024): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.19.2.344

Abstract

Mount Agung is a type of volcano that is still active and showing signs of eruption. The existence of Mount Agung is located in Rendang District, Karangasem Regency, and is a tourist attraction for the area, which encourages the acceleration of development, so that quite a few people in Rendang District, or indeed, the existing ones, live in residential areas that are included in areas prone to volcanic eruptions. This will, of course, be high-risk because the living conditions are unsafe against the risk of a disaster that could come suddenly. To anticipate the possibility of being affected by volcanic eruptions, research is needed to identify the level of vulnerability to Mount Agung eruptions in residential areas of Rendang District. The research method used is a quantitative descriptive method using a spatial analysis approach with the help of GIS (Geographic Information System) analysis tools and scoring analysis. Based on the results of the analysis, it was found that residential areas in Penempatan, Besakih, and Menanga Villages are not suitable for housing because they have a high level of risk of volcanic eruptions with a total score of 131. Residential areas in Rendang, Nongan, and Pesaban Villages are categorized as suitable for housing because they have a low risk of volcanic eruptions, with a total score of 126. It can be concluded that residential areas in the villages of Penempatan, Besakih, and Menanga have a high risk of being affected by volcanic eruptions. so that in the future it is hoped that it will become a reference for the area when there will be a relocation or when developing built-up land so that the risk of disasters in this area can be anticipated.
MANAJEMEN RISIKO ESTIMASI BIAYA PADA TAHAP PERENCANAAN PROYEK KONSTRUKSI Yuliana, Ni Putu Indah; Ebtha Yuni, Ni Kadek Sri
Jurnal Ilmiah Poli Rekayasa Vol 19, No 2 (2024): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.19.2.360

Abstract

Cost estimation as a reference for analyzing the budget for the implementation of construction projects is very vulnerable to risks, so analysis is needed to reduce losses that can occur. The aim of study is to discover dominant risks, evaluate risks, define risk mitigation strategies and risks ownership to the cost estimation process at the planning stage. The research uses mix methods beetween qualitative and quantitative and data collection through surveys and interviews. The research respondents used the purposive sampling method. The results of the study showed that the identified risks amounted to 35 (thirty-five) risks and came from 9 (nine) risk sources. Risks that are included in the dominant category are unacceptable risks (unacceptable) as many as 10 risks and undesirable (undesirable) risks as many as 25 risks. The mitigation carried out is to appoint an experienced estimator, improve coordination between teams, ensure the availability and accuracy of data and learn more details of tender documents. The allocation of risk ownership on the contractor side is 33 risks (94.29%), followed by the owner and planning consultant each have 1 risk allocation (2.86%).
ANALISA KEGAGALAN KONTRAKTOR DALAM PROSES TENDER DI KOTA PADANG Fetriani, Micky; Novitasari, Lilis; Vernando, Vero Gusri
Jurnal Ilmiah Poli Rekayasa Vol 20, No 2 (2025): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.20.2.387

Abstract

Kontraktor merupakan penyedia jasa yang akan mengerjakan suatu proyek kontruksi. Proyek kontruksi dilaksanakan melalui sistem terder secara elektonik dimana pada proses tersebut banyak kontraktor gagal karena kesalahan yang dibuatnya. Penyebab - penyebab kegagalan kontraktor dalam proses tender didapat dari beberapa literature dan hasil penelitian terdahulu meliputi lima faktor yaitu; aspek administrasi (X1), aspek teknis (X2), aspek harga (X3), aspek klarifikasi (X4) dan aspek lainnya (X5). Berbagai penyebab kegagalan kontraktor ini perlu diteliti agar dapat mengantisipasi kegagalan yang terjadi pada tender selanjutnya. Oleh karena itu dilakukan penelitian untuk mengindentifikasi faktor-faktor yang mempengaruhi kegagalan kontraktor dalam proses tender dengan sistem elektronik. Penelitian ini dilaksanakan di Kota Padang pada paket pekerjaan tahun 2024 dengan responden adalah kontraktor yang telah mengikuti tender secara elektronik pada situs lpse kota padang. Analisa ini menggunakan analisa kuantitatif dengan teknik pengumpulan data yang digunakan yaitu kuisioner dengan memakai instrument Skala linkert 1-5. Setelah dilakukan analisa maka didapatkan faktor paling dominan yang sering menjadi penyebab kegagalan kontrktor dalam proses tender di kota padang adalah X2.2 dukungan material dari suplier tidak ada atau salah dengan hasil mean 4,28 dan standart deviasi 0,980.
STUDI EKSPERIMENTAL PENGARUH FLY ASH DAN SERAT KELAPA PADA BETON UNTUK PERKERASAN KAKU Suhelmidawati, Etri; Guspari, Oni; Hidayati, Rahmi; Rahmadani, Putri; Prima, Razaq
Jurnal Ilmiah Poli Rekayasa Vol 20, No 2 (2025): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.20.2.388

Abstract

Concrete structures are very vulnerable to cracking due to the brittle nature of the material and strong against pressure, but weak against tension. Meanwhile, green technology and sustainable materal are popular nowadays due to global warming issues. Therefore, subtituting  material in concrete which are come from waste disposal are used in this research. Waste materials as a substitute for aggregate in concrete is currently increasing as the demand of green technology. In this research, the waste material used are fly ash and coconut fiber. Fly Ash as the replacement of cement from PLTU of Teluk Sirih and coconut fiber from Padang Pariaman will be studied. The aim of this research was to find out the effect of using Fly Ash and coconut fiber on the compressive strength and flexural strength of concrete. For the use of fiber, soaking will be carried out using NaOh which will affect the wettability angle of the fiber. The experimental method was used in this study, while the tests carried out included material testing, compressive strength test and flexural strength test. Tests carried out refer to the American Standard Testing and Materials (ASTM). Mix design were investigated based on ACI 211 4R-93 for High Strength Concrete. Based on the experimental results, the highest value of compressive strength test was attained in the 4th concrete variation with a concrete mixture of 15% Fly Ash + 1% Coconut Fiber + Sika Viscocrete with a value of 32.1 MPa and the flexural strength value as of 5.3 Mpa.
PERANCANGAN MESIN PENCACAH PAKAN TERNAK MULTIFUNGSI MENGGUNAKAN SYSTEM PENGGERAK MOTOR BAKAR BENSIN nalahuddin, Muchlisi; Saputra, Candra; Arief, Rudi Kurniawan
Jurnal Ilmiah Poli Rekayasa Vol 20, No 1 (2024): Oktober
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.20.1.364

Abstract

This research introduces the design of a multifunctional animal feed chopper machine using a gasoline engine as the driving system. The gasoline engine used is Ecolite TE160 5.5 HP which can provide reliable power and performance to drive the feed chopper machine. The test material used is banana stems which are effectively finely chopper to obtain consistent and high quality chopper results. This design methodology includes identification of needs, mechanical design, material selection and testing of the tool. The working method of this machine is to insert the banana stem into the input hopper where the chopper knife rotates using a gasoline engine as the driving source. The chopper blade is specially designed with sharpness and thickness that suits the needs needed to get maximum and effective chopper results. The frame of this multifunctional animal feed chopper machine uses L 35 mm x 35 mm x 2.5 mm profile steel with a size of 105 cm long x 35.5 cm wide x 72.5 cm high. From the data obtained, the engine rotation used is 2500 Rpm. The results of testing this machine can be concluded that the heavier the material to be chopper, the longer the chopper time obtained, the thickness obtained is consistently 1.3 cm thick. Overall the development of a multifunctional animal feed chopper machine represents a significant advancement in pemp technology
ANALISIS PENGARUH GAYA GEMPA TIDAK SERAGAM TERHADAP RESPONS STRUKTUR JEMBATAN GANTUNG Sari, Putri Kumala; Fransiska, Yolla
Jurnal Ilmiah Poli Rekayasa Vol 20, No 2 (2025): April
Publisher : Pusat Penelitian dan pengabdian kepada Masyarakat (P3M) Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jipr.20.2.393

Abstract

Bridges are essential infrastructures that serve to connect two regions separated by various geographical conditions. Among the various types of bridges, suspension bridges are commonly used for long-span applications. The main structural components of a suspension bridge consist of the main cables and vertical suspenders. Due to their long spans, suspension bridges are susceptible to differential ground motions at each support, which may arise from varying soil conditions—this phenomenon is referred to as multi-support excitation. In this study, three types of analyses were conducted: static analysis, dynamic analysis under longitudinal seismic excitation, and dynamic analysis under transverse seismic excitation, using MIDAS Civil software. The soil conditions applied in all three analyses were assumed to be stiff soil at the left support and soft soil at the right support. The structural responses observed include internal forces and displacements. The seismic loads were defined using the time history method. The time history records were derived from the conversion of response spectra for the Bukittinggi region, considering both stiff and soft soil conditions. The results indicate that, in both longitudinal and transverse dynamic seismic analyses, the highest internal force values predominantly occurred at the support located in the soft soil area, except for moment values, which reached their maximum at the support in the stiff soil area. The maximum Dynamic Amplification Factor (DAF) in the longitudinal direction of the girder occurred at an element located at 0,25 of the span length on the right side, with a value of 2,621.