ANALISIS PENGARUH KECEPATAN BELT CONVEYOR JALUR 7.1 TERHADAP PRODUKTIVITAS LIMESTONE KE STORAGE PABRIK INDARUNG VI DI PT SEMEN PADANG. Muhammad Fajar Rahman; Dedi Yulhendra
Journals Mining Engineering : Bina Tambang Vol 8, No 3 (2023): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan FT UNP

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bt.v8i3.126019

Abstract

In terms of delivering limestone to the plant, the process of delivering material using a belt conveyor and crushing using a Lime Stone Crusher (LSC). Belt widths range from 1 meter to 1.2 meters, 1.4 meters to 1.8 meters. How each belt varies in speed, each gearbox installed by the belt conveyor motor has varying capabilities.The author uses a descriptive research design. The descriptive method is a technique that offers many options for solving problems through the collection, compilation, or classification of data, analysis, and interpretation of the data. Therefore, it is necessary to increase production by increasing the efficiency of the belt conveyor conveyance. Recommendations for increasing the productivity of the 6A1J06 conveyor belt with a speed of 3 m / s, an idler angle of 30 ° and a belt width of 1600 mm with a result of 2169.09 tons / hour and for the 6A1J10 conveyor belt with a speed of 2 m / s, an idler angle of 30 ° and a belt width of 1800 mm with a result of 2079.09 tons / hour. Simulation of improvements made by eliminating or reducing obstacles that occur in the performance of the conveyor belt or other factors outside the performance of the conveyor belt is able to meet the production targets of the company, where the effective working time from 389.20 hours / month to 531.42 hours / month. This will certainly increase the work efficiency value of the conveyor belt conveyance, which initially 57.91% increased to 79.08% with an increase in limestone production of 1,089,607 tons (126%).
Analisis Pencapaian Produksi Terhadap Rencana Sekuen Penambangan PT Baramutiara Prima, Desa Sri Gunung, Kecamatan Sungai Lilin, Kabupaten Musi Banyuasin, Provinsi Sumatera Selatan Agus Susanto; Dedi Yulhendra
Journals Mining Engineering : Bina Tambang Vol 9, No 2 (2024): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan FT UNP

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bt.v9i2.128977

Abstract

Adanya indikasi ketidaktercapaian target produksi pada PT Baramutiara Prima, pada bulan Oktober dan November 2023, sehingga diperlukan suatu analisis antara rencana sekuen penambangan terhadap realisasinya di lapangan untuk mengetahui tingkat ketercapaian produksi, letak ketidaksesuaian, dan mengapa hal tersebut dapat terjadi. Dalam penelitian ini menggunakan jenis penelitian kuantitatif. Hal ini dikarenakan dalam penelitian nantinya, akan menggunakan data-data berupa angka-angka. Berdasarkan jenis data yang diperoleh maka teknik analisis data menggunakan data kuantitatif, yaitu dengan mengolah kemudian disajikan dalam bentuk tabel atau grafik. Untuk mempresentasikan hasil pengolahan data tersebut kemudian dianalisis dengan menggunakan metode analisis data statistik dan persentasi. Pada pelaksanaanya terdapat perbedaan antara rencana penambangan yang dengan realisasinya di lapangan. Perbedaan tersebut akan menyebabkan ketidaktercapaian produksi. Setelah dilakukan perbandingan antara rencana sekuen penambangan dengan situasi tambang diakhir bulan Oktober tahun 2023 ketercapaian pengupasan overburden sebesar 77,60 % dari target 219.708,00 BCM yaitu 170.500,00 BCM, sedangkan untuk produksi batubara sebesar 86,18 % dari target 84.006,00 Ton yaitu 72.400,00 Ton, nilai stripping ratio rencana 2,62 sedangkan nilai stripping ratio aktual 2,35. Pada bulan November tahun 2023 diperoleh persentase ketercapaian pengupasan overburden sebesar 71,38 % dari target 221.477,70 BCM yaitu 158.085,20 BCM, sedangkan untuk produksi batubara sebesar 89,40 % dari target 86.854,00 Ton yaitu 77.644,66 Ton, nilai stripping ratio rencana 3,06 sedangkan nilai stripping ratio aktual 2,44. Ketidaktercapaian produksi tersebut meningkatkan nilai stripping ratioyang akan menjadi beban pekerjaan untuk bulan selanjutnya. 
Analisis Kinerja Belt Conveyor dalam Memenuhi Target Produksi 1000 TPJ pada Coal Handling Facility PT. Surya Global Makmur Kabupaten Muaro Jambi, Jambi Rachim, Velya; Yulhendra, Dedi
Jurnal Pendidikan Tambusai Vol. 6 No. 2 (2022): Agustus 2022
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai, Riau, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jptam.v6i2.3888

Abstract

Surya Global Makmur memiliki Coal Handling Facility di Kabupaten Muaro Jambi, Jambi. Jenis kegiatan yang dilakukan adalah pemindahan batubara dari stockpile ke tongkang menggunakan belt conveyor dengan target 1000 Ton perjam. Penelitian ini bertujuan untuk mendapakan analisis kinerja belt conveyor untuk meningkatkan asil produksi dengan metode penelitian kuantitatif. Dari hasil perhitungan produktivitas teoritis belt conveyor BC-01 dengan nilai 1.173,24 Ton perjam, BC-02 dengan nilai 1.288,35 Ton perjam dan BC-03 dengan nilai 1.184,80 Ton perjam. Produktivitas actual pada bulan Oktober dengan rata-rata 291,61 Ton perjam. Penyebab tidak tercapainya target produksi karena waktu standby, kemapuan feeding material, stok material yang terbatas, kondisi cuaca dan pemeliharaan alat. Upaya yang dilakukan untuk meningkatkan hasil produksi dengan menganalisa parameter penentu dalam perhitungan kapasitas belt conveyor yaitu lebar belt, kecepatan belt dan sudut idler. Rekomendasi peningkatan produktivitas BC-01 dan BC-03 dengan kecepatan 4 m/s, sudut idler 45º dan lebar belt 1600 mm dengan hasil produksi 3.995 Ton perjam dan untuk BC-02 dengan kecepatan 4 m/s, sudut idler 35º dan lebar belt 1600 mm dengan hasil produksi 4.139,24 Ton perjam.
GIS-based landslide susceptibility mapping in IV Koto, Matur, and Tanjung Raya Subdistricts of Agam Regency, West Sumatra Maiyudi, Riko; Octova, Adree; Anaperta, Yoszi Mingsi; Gusman, Mulya; Yulhendra, Dedi; Naldo, Exwil; Baron, Adhitya
Journal of Degraded and Mining Lands Management Vol. 13 No. 1 (2026)
Publisher : Brawijaya University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15243/jdmlm.2026.131.9319

Abstract

Landslides are a recurrent hazard in West Sumatra, driven by steep slopes, high rainfall, and expanding human activity on unstable terrain. This study assesses landslide susceptibility in IV Koto, Matur, and Tanjung Raya Subdistricts of Agam Regency, West Sumatra using a Geographic Information System (GIS) framework. Slope gradients were derived from DEMNAS (Digital Elevation Model Nasional), land use data were reclassified based on expected stability effects, and rainfall statistics were discretized into intensity classes. These standardized layers were integrated through a weighted overlay to produce a susceptibility surface, subsequently partitioned into two classes: vulnerable and very vulnerable. The results highlight elongated belts of very vulnerable terrain where steep slopes coincide with high rainfall and disturbed land covers such as settlements, open fields, and mining areas. Cross-sectional profiles with gradients of   40.9-56% confirmed the geomorphic plausibility of the mapping. The outputs provide actionable guidance for spatial planning, disaster preparedness, and conservation, while offering a transparent baseline for more advanced susceptibility models as data availability improves.
Analisis Pengaruh Lemparan Flyrock pada Aktivitas Peledakan di Pit E Utara Banko Tengah PT Bukit Asam, Tbk. Aisya Mulyanti; Riam Marlina A.; Dedi Yulhendra; Mulya Gusman
Journals Mining Engineering : Bina Tambang Vol 10, No 2 (2025): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan, Fakultas Teknik, Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bina tambang.v10i2.135622

Abstract

Analisis Kebutuhan Alat Gali Muat (Excavator), Alat Angkut (Dump Truck), dan Bulldozer untuk Memenuhi Target Produksi Overburden 664.101,37 BCM/Bulan di Pit Section 2 PT Andalan Artha Primanusa Muhammad Risky; Mulya Gusman; Dedi Yulhendra; Riam Marlina A.
Journals Mining Engineering : Bina Tambang Vol 10, No 1 (2025): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan, Fakultas Teknik, Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bina tambang.v10i1.134010

Abstract

PT Andalan Artha Primanusa mempunyai target produksi pengupasan overburden sebesar 664.101,37 BCM/bulan pada bulan juni 2024 di pit section 2, sedangkan aktual hanya sebesar 532.280,50 BCM/bulan. Dapat disimpulkan bahwa produksi overburden bulan juni 2024 tidak tercapai. Target produksi tidak tercapai disebabkan belum adanya kajian teknis terkait kebutuhan alat gali muat (excavator), alat angkut (dumptruck), dan bulldozer. Maka perlu dilakukannya analisis kebutuhan alat gali muat (excavator), alat angkut (dumptruck), dan bulldozer guna mencapai target produksi yang optimal. Metode rasional digunakan untuk membandingkan produktivitas alat dengan volume material yang ditangani. Didapatkan kebutuhan alat gali muat (excavator) sebanyak 3 unit, kebutuhan alat angkut (dumptruck) sebanyak 24 unit, namun realisasi dilapangan hanya terdapat 19 unit untuk alat angkut (dumptruck), dibutuhkan penambahan alat angkut sebanyak 5 unit. Selain itu, analisis terhadap durasi aktivitas slippery menunjukkan perlunya 9 unit bulldozer untuk mempertahankan waktu rencana slippery sebesar 1,79 jam/hari. Optimalisasi pembagian segmen kerja untuk bulldozer dilakukan guna meningkatkan efektivitas operasional alat, sedangkan pada area disposal dibutuhkan 5 unit. Setelah dilakukan perbaikan dengan penambahan unit yang diperlukan, produksi overburden pada bulan Juni 2024 meningkat dari 532.280,50 BCM/bulan menjadi 681.948,92 BCM/bulan, melampaui target produksi yang ditetapkan sebesar 664.101,37 BCM/bulan.
Hubungan Scaled Distance Terhadap Getaran Tanah Jeninu Nunu Alvares; Tri Gamela Saldy; Dedi Yulhendra; Aulia Hidayat Burhamidar
Journals Mining Engineering : Bina Tambang Vol 10, No 2 (2025): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan, Fakultas Teknik, Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bina tambang.v10i2.135309

Abstract

Penelitian ini mengkaji korelasi antara muatan ledak dan radius pengukuran terhadap getaran tanah, sekaligus merumuskan rekomendasi muatan untuk mencapai Peak Particle Velocity (PPV) 1 mm/s. Pendekatan berbasis scaled distance kombinasi radius pengukuran dan muatan ledak digunakan sebagai variabel independen, sedangkan PPV sebagai variabel dependen. Analisis empiris menunjukkan hubungan signifikan antara kedua parameter (R²=69,09%) dengan konstanta k=5473,3 dan n=-1,641. Untuk mencapai target PPV 1 mm/s, persamaan yang dihasilkan merekomendasikan penggunaan muatan 20,007 kg pada radius ≥850 m atau 46,693 kg pada radius 1300 m. Temuan ini memberikan landasan ilmiah bagi optimasi peledakan, khususnya di lokasi berisiko tinggi, dengan menegaskan akurasi prediksi PPV melalui pendekatan scaled distance dan konstanta spesifik lokasi.
Evaluasi Produktivitas Alat Gali Muat (Excavator) untuk Mencapai Target Produksi Overburden 106.775 BCM/Bulan Menggunakan Metode Overall Equipment Effectiveness (OEE) di Pit Barat PT Anugerah Jambi Coalindo Desviana A.; Mulya Gusman; Dedi Yulhendra; Aulia Hidayat Burhamidar
Journals Mining Engineering : Bina Tambang Vol 10, No 1 (2025): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan, Fakultas Teknik, Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bina tambang.v10i1.133944

Abstract

PT Anugerah Jambi Coalindo merupakan perusahaan tambang batubara yang menggunakan metode tambang terbuka. Pada Oktober 2024, target produksi pengupasan overburden sebesar 106.775 BCM di Pit Barat tidak tercapai, dengan realisasi hanya 75.320 BCM atau 70% dari target. Untuk mengatasi hal ini, dilakukan analisis produktivitas menggunakan metode Overall Equipment Effectiveness (OEE) guna mengidentifikasi penyebab rendahnya kinerja alat gali-muat. Selanjutnya, digunakan diagram fishbone untuk menganalisis sebab-akibat serta regresi linear sederhana untuk mengevaluasi loss time. Setelah dilakukan perbaikan, produksi meningkat menjadi 168.259,35 BCM, melebihi target bulanan. Nilai OEE alat gali-muat meningkat menjadi 42% dan 44%, namun masih di bawah standar OEE dunia ≥85%, yang menunjukkan masih adanya ruang perbaikan. Studi ini menunjukkan pentingnya evaluasi menyeluruh terhadap kinerja alat dan manajemen waktu kerja guna mencapai target produksi secara optimal.
Perencanaan Fleet pada Pengupasan Overburden berdasarkan Tingkat Produktivitas di Pit E PT Satria Bahana Sarana, Tanjung Enim, Provinsi Sumatera Selatan Febyola Mustika; Rudy Anarta; Dedi Yulhendra; Heri Prabowo
Journals Mining Engineering : Bina Tambang Vol 10, No 1 (2025): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan, Fakultas Teknik, Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bina tambang.v10i1.134099

Abstract

Pengupasan overburden pada tambang terbuka merupakan tahap krusial dalam operasi penambangan batubara, di mana perencanaan fleet alat berat seperti excavator dan dumptruck sangat memengaruhi efisiensi dan produktivitas. PT Satria Bahana Sarana, kontraktor pertambangan di PT Bukit Asam Tbk, Tanjung Enim, Sumatera Selatan, menghadapi ketidakseimbangan produktivitas akibat waktu tunggu (delay) pada alat gali-muat dan angkut. Penelitian ini bertujuan menganalisis perencanaan fleet berdasarkan tingkat produktivitas aktual untuk mencapai target pengupasan overburden sebesar 1.817.000 BCM. Hasil penelitian menunjukkan variasi produktivitas alat gali-muat dan angkut pada lima fleet, dengan tingkat keserasian kerja (MatchFactor/MF) yang tidak optimal. Pada fleet 1, 2, dan 5, MF > 1 menunjukkan underutilizationexcavator, sementara fleet 3 dan 4 mengalami antrian dumptruck (MF < 1). Evaluasi mengusulkan penambahan unit dumptruck dari 6 menjadi 7 per fleet untuk mencapai MF = 1, sehingga meningkatkan efisiensi operasional. Studi ini memberikan rekomendasi praktis bagi perusahaan dalam optimasi penggunaan alat berat untuk mencapai target produksi.
Co-Authors Abdullah, MT, Dr. Rijal Adinda Adinda Adree Octova Agus Susanto Aisya Mulyanti Aldo Mahyandra Aldo Mahyandra Andhini, Dhini Andree Octova Andres Melbaral Androly Andreas Annisa Intan Y.R Ansosry Ansosry Aulia Defriansyah Aulia Hidayat Burhamidar Aulia Hidayat Burhamidar Baron, Adhitya Benti Jul Sosantri Bianda F Aprilla Bimo Elang Putra Byma Bryanco Desviana A. Devit Aswandi Dhini Andhini Diah Wulandari Diki Saputra Elsa Rahma Afrila Fadel Rahman Febrianto Febrianto Febryanti Febryanti Febyola Mustika Fellya Septia Fauzi Feraldo Sandrio Fikriansyah Ersyad Firdaus Firdaus Fitratul Rahmi Fitri Desri Yeni Fitri Nadia Fitrya Monica Gamma Putra Harifan Prima Hastia Ulfa Heri Prabowo Icksan Lingga Pradana Indra Lesmana Putra Jeffry - Albadri Jeninu Nunu Alvares Kiki Gusmaningsih Laju Boy Ardi Harahap M. Fadly M. Ravil Akbar Elfiantra Marchellevandra Gomis Marta Weri Mhd Zanil Mia Fazira Miftahul Jannah Arida Milia Putri Moudy Intan Fandini Muhammad Aditya Faisal Muhammad Al Fajri Tamsin Muhammad Fajar Rahman Muhammad Hazwafi Ardeva Muhammad Rafif Gusvi Rahardi Muhammad Rakha Aqiliyan Muhammad Risky Muhammad Rizky Mulya Gusman Murad Murad Nabilla Kansha Naldo, Exwil Nefa Rizki Dian NILA RAHMAD DEFITA Octova, Andree Pranata, Hendri Purwoko, Agus Putri Pasaribu Rachim, Velya RAHUL GONZALES Raimon Kopa Randa Ramadhan Reynaldi Ezra Reza Taufiqurrahman Riam Marlina A. Rian Saputra Riandy Kurniawan Rico Fernandes Rihan Efendi Rijabul Mulia Rika Yastavia Riki Adha Riko Maiyudi Ronaldo Davinci Rudy Anarta Saldy, Tri Gamela Sugiono Sugiono Sumarya Sumarya Syamsul Arifin Syarifa Amalia Tri Yeli Marsa Velya Rachim Wiza Esti Ningrum Yoszi Mingsi Anaperta Yulia Minara