Claim Missing Document
Check
Articles

Found 24 Documents
Search

Factors that influence worker behavior towards occupational safety and health using the SEM-PLS method at PT. Industri Kapal Indonesia (Persero) Makassar Herdianzah, Yan; Wahyuni P, A. Dwi; Ahmad, Arfandi; Chantika, Aulia Marista Dewi; Saleh, Anis; Fole, Asrul; Safutra, Nur Ihwan
OPSI Vol 17 No 2 (2024): ISSN 1693-2102
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Industri UPN "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/opsi.v17i2.11211

Abstract

PT. IKI is a shipbuilding company owned by the Indonesian government which carries out several industrial activities such as ship building, repair and docking. The results of initial observations found that there were still workers in the production division who experienced work accidents and occupational diseases. In this research, it is very important to analyze the factors that influence the behavior of production division workers to find out what suggestions for improvements are appropriate in overcoming problems with production division workers. This research employs the SEM-PLS method to investigate the impact of knowledge factors (X1), attitudes (X2), and the availability of facilities (X3) on the occupational safety and health of production division workers. It aims to provide valuable insights for enhancing workplace safety by identifying factors that positively influence these outcomes. The findings of this study reveal a significant correlation between the availability of facilities (X3) and occupational safety and health, as evidenced by a p-value of 0.000, which is less than the predetermined significance level of 0.05. Based on these results, recommendations for improvement can be proposed. The company is advised to uphold and enhance the implementation of Standard Operational Procedures about Occupational Safety and Health (K3) while also ensuring the continuous provision of comprehensive Personal Protective Equipment (PPE) for all employees
Perancangan Sistem Informasi Manajemen Administrasi Pengiriman Hasil Produksi Ke Buyer Pada Pt Katingan Timber Celebes Saleh, Anis; Herdianzah, Yan; Pawennari, Andi; Ahmad, Arfandi
Jurnal Engineering Vol. 6 No. 1 (2024): Volume 6, Nomor 1, 2024
Publisher : Universitas Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT.KTC adalah sebuah industri yang bergerak dibidang pengolahan kayu lapis. Perusahaan tersebut masih menggunakan program pengolah angka microsoft excel dalam penginputan data pengiriman sehingga menimbulkan beberapa permasalahan. Penelitian ini bertujuan untuk Mengidentifikasi sub-system yang terkait dengan sistem informasi manajemen administrasi pengiriman barang ke buyer serta merancang sistem informasi manajemen administrasi pengiriman hasil produksi sebagai alat evaluasi dan pengawasan. Perancangan sistem informasi pengiriman hasil produksi menggunakan pendekatan prototype yang berfokus pada penyajian form input dan output melalui tahap conceptual system design dalam sistem informasi manajemen. Hasil penelitian ini menunjukkan bahwa terdapat lima input dan empat output berdasarkan penentuan set system objective dalam sistem informasi pengiriman hasil produksi yang menjadi alat pengawasan dalam proses pengiriman. Adapun hasil rancangan model sistem informasi manajemen yang didapatkan adalah (1) menggunakan Software berbasis Website, (2) Semua data dari bagian terkait bisa diakses oleh admin yang membutuhkan laporan terkait pengiriman hasil produksi, (3) Penginputan data menggunakan SIM dapat mengefisienkan waktu.
SCHEDULING MAINTENANCE PROPOSAL FOR TURBINE MACHINES USING THE AGE REPLACEMENT METHOD AT BALAMBANO HYDROELECTRIC POWER PLANT PT. Vale Indonesia Tbk. Malik, Rahmaniah; Rauf, Nurhayati; Alisyahbana, Takdir; Ahmad, Arfandi; Fole, Asrul
Journal of Industrial Engineering Management Vol 9, No 1 (2024): Journal of Industrial Engineering and Management Vol 9 No 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v9i1.1841

Abstract

PT. Vale Indonesia Tbk. is a company engaged in the mining industry, particularly in nickel processing (Ni). The company operates a power plant at Balambano Hydroelectric Power Plant (2x68.5 MW). The company's usual maintenance practice is limited to corrective maintenance, which involves replacing or repairing components only when they are damaged. The aim of this research is to determine the optimal replacement time for preventive maintenance on turbine machines in order to minimize downtime. The age replacement method is used to calculate the replacement interval for components based on their usage life. The research findings show that the mean time to failure (MTTF) of the wicket gate is 2217.824 hours or 92.41 days, which means that the component may experience failure again after operating for that MTTF duration. Therefore, the recommendation is to replace the component every 85 days of operation and perform inspections every 15 days.
ANALYSIS OF THE EFFECTIVENESS OF CLEAN WATER DISTRIBUTION MACHINE USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD Mail, Abdul; Dahlan, Muhammad; Rauf, Nurhayati; Chairany, A Nurul; Ahmad, Arfandi; Jufri, Khhairunnisa
Journal of Industrial Engineering Management Vol 6, No 1 (2021): Journal of Industrial Engineering Management Vol. 6 No. 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v6i1.884

Abstract

Clean water distribution machines are very important for local drinking water companies to be able to supply clean water to customers. The need for water continues to increase, so an analysis is needed to determine the decline in engine pump performance in the production process. Maintenance activities need to be carried out to maintain the reliability (realiability) of the machine so that it can operate properly. Therefore, a good strategy is needed to maintain the continuity of the production process. The purpose of this research is to measure the performance of the water distribution pump machine / equipment associated with the low level of clean water production, to identify the losses experienced by the company. The Overall Equipment Effectiveness (OEE) value obtained before repairs were carried out in November 2019 for Lapi I was 69.38% and Lapi II was 69. 75% while in December 2019 for Lapi I it was 74.02% and Lapi II was 73.65% still below the JIPM standard, namely ≥85%. From the results of the six big losses, the clean water distribution pump machine as a whole still needs evaluation to make improvements in increasing effectiveness and productivity, especially in the problem of redeuced speed losses so that suggestions can be made to improve the clean water distribution machine. After repairs in January 2020 for Lapi I was 87.90% and Lapi II was 87.26% while in February 2020 for Lapi I it was 90.34% and Lapi II was 85.81%. From the results of the six big losses, the clean water distribution pump machine as a whole still needs evaluation to make improvements in increasing effectiveness and productivity, especially in the problem of redeuced speed losses so that suggestions can be made to improve the clean water distribution machine. After repairs in January 2020 for Lapi I was 87.90% and Lapi II was 87.26% while in February 2020 for Lapi I it was 90.34% and Lapi II was 85.81%. From the results of the six big losses, the clean water distribution pump machine as a whole still needs evaluation to make improvements in increasing effectiveness and productivity, especially in the problem of redeuced speed losses so that suggestions can be made to improve the clean water distribution machine. After repairs in January 2020 for Lapi I was 87.90% and Lapi II was 87.26% while in February 2020 for Lapi I it was 90.34% and Lapi II was 85.81%