Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Serambi Engineering

Rancangan SOP Penyimpanan Material Limbah Produksi Menggunakan Metode First Waste First Out Pada Divisi Infrastruktur Perhubungan PT. Pindad Persero Natabita Ayum Adiyuna; Nenden Kostini; Nurillah Jamil Achmawati Novel
Jurnal Serambi Engineering Vol. 10 No. 1 (2025): Januari 2025
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT Pindad (Persero) is a manufacturing company engaged in the production of defence equipment. In the production process, PT Pindad (Persero) generates various types of waste such as slag, scrap, tap and flash. The management of these wastes is carried out through the remanufacturing process in the Support Department of the Transportation Infrastructure Division. However, irregularities in the storage and distribution of waste cause accumulation, waste of space and operational obstacles. This research proposes the creation of a waste storage SOP using the First Waste First Out (FWFO) method as a solution to waste storage and distribution management. FWFO is the author's design, adapted from the FIFO (First In First Out) method, designed to accelerate waste turnover, prevent quality degradation such as corrosion of metals, and improve operational efficiency. The research was conducted using a qualitative method with primary data sources from interviews with the head of the smelting section and the head of the warehouse, and secondary data sources from literature and previous reports. It is expected that the draft SOP for waste storage using the first waste first out method will effectively reduce the accumulation of waste, maximise the use of waste according to specifications, and improve the efficiency of storage and reprocessing at PT Pindad.
Analisis Urgensi Database Perancangan Sistem Informasi PT PSL Dengan Fishbone Diagram dan Diagram Pareto Fasha, Adinda; Nenden Kostini; Tribowo Rachmat Fauzan
Jurnal Serambi Engineering Vol. 10 No. 3 (2025): Juli 2025
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In the era of technology and increasingly tight logistics industry competition, the speed and accuracy of distribution services are very important to maintain the company's competitiveness. Various reasons, including the lack of digitization of motor vehicle delay recording (KBM) as the company's distribution key. The purpose of this study is to identify the factors that cause these delays and to determine how important database development is to build an efficient logistics information system. This study uses a Pareto diagram based on the 80/20 principle to determine the most important factors causing obstacles and Fishbone Diagram analysis to map the causal factors in a structured manner. The results of the analysis show that more than 80% of distribution delays are caused by KBM problems, operational problems, and road conditions. Additionally, the Fishbone diagram analysis indicates that engine factors (KBM) and operational policies are the two primary causes requiring special attention. This further strengthens the fact that creating a comprehensive and accurate database is very important as a basis for designing PT PSL's logistics information system.