Claim Missing Document
Check
Articles

Found 15 Documents
Search

ANALISIS DAYA DUKUNG PONDASI BORED PILE PROYEK PEMBANGUNAN RSNTT18-01 PASAR JUM’AT JAKARTA SELATAN Muhammad Rizki Arif; Nur Syahidah Aini; Hadyan Arifin Bustam; Nurwanda Sari
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 11, No 2 (2025): JURNAL TEKNIK SIPIL DAN TEKNOLOGI KONSTRUKSI
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jts-utu.v11i2.13139

Abstract

As urban populations grow, additional housing is urgently needed. The development of housing infrastructure is therefore crucial to supporting the community's daily activities. The Pasar Jumat High-Rise Apartment Development Project (RSNTT18-01) is located on Jalan Sapta Taruna Raya in Lebak Bulus, South Jakarta. One area worked on is the foundation. A foundation is defined as a construction at the base of a structure or building that transfers the load from the upper part of the structure or building to the soil layer below. Every foundation must be able to support loads up to a predetermined safety limit. This study aims to determine the bearing capacity of the piles that can withstand these loads. The RSNTT18-01 project uses a bored pile foundation. The bearing capacity of a bored pile foundation is calculated using bored  Penetration Test (SPT) data. According to the research, the bearing capacity of a bored pile at a depth of 12 meters is 3,8× N, with a structural load (Pu) equal to 6.5647 x 109 N, then one pile cap requires 18 piles.
Signal Coordination Analysis Between Intersection: Case Study Muhammad Abi Berkah Nadi; Achmad Vicky Rumandanu; Ahmad Yudi; Siska Apriwelni; Nurwanda Sari; Meutia Nadia Karunia
Journal La Multiapp Vol. 7 No. 1 (2026): Journal La Multiapp
Publisher : Newinera Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37899/journallamultiapp.v7i1.2959

Abstract

The increase number of vehicles every year has caused a declining road function and performance, which then causes a high volume of vehicles in Intersection I of Endro Suratmin street – Pulau Tegal street / Pulau Legundi street, Intersection II of Urip Sumoharjo street – Soekarno-Hatta street, and Intersection III of Urip Sumoharjo street – Arif Rahman Hakim street. The distance between intersection I to II is 460 m, and Intersection II to III is 700 m. The distance between these intersections become a factor that lead to unsatisfactory level of comfort for road users, which in turn causes problems. The problem occurs because of the absence of signal coordination between the three intersections which causes traffic jams during peak hours. Therefore, this research will provide alternative solutions to overcome these problems. This research uses data from field surveys including traffic volume, intersection geometry, and traffic signal data. VISSIM software is used to analyze queue lengths and delays in existing conditions and signal coordination planning. In addition, reference methods such as the calculation of the Indonesian Road Capacity Manual, the Webster Method, and the Transportation Research Board in Highway Capacity Manual are also used. As the result of the analysis, it was found that the performance of the three intersections had not been coordinated. In the existing condition, the service level value in each arm reached E service level, only a few arms at the three intersections have C service level with a delay time of 29.58 seconds/vehicle. Therefore, three planning solutions were conducted to coordinate signals between the three intersections using a plan with a new cycle time acquired from the Webster method. Plan I coordinates the signals of the three intersections by using the new cycle time of intersection I at each intersection, Plan II coordinates the signals of the three intersections by using a new cycle time of intersection II at each intersection, and Plan III coordinates the signals of the three intersections in each arms using the new cycle time. Out of the three plans, the first plan is obtained as the best solution for giving a significant reduction in delays with an average service level of B.
Analisis Dampak Mud Pumping Terhadap Kerusakan Sleeper Pada Jalur Kereta Api Tanjung Karang – Rejosari (Studi Kasus Divre IV Tanjung Karang) Muhammad Rizki Arif; Roy Jones Lumban Siantar; Febriyadi Febriyadi; Arif Setyaji; Nurwanda Sari; Nur Annisa Mardhotillah; Nur Syahidah Aini; Rahmatika Dwi Putri Jori
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 14 No 1 (2026): Jurnal Konstruksi dan Infrastruktur Vol 14 No.1 : April 2026
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v14i1.11977

Abstract

This study analyzes the impact of mud pumping on track stability and damage to K-550-type monoblock concrete sleepers on the Tanjung Karang–Rejosari line (DIVRE IV Tanjung Karang). This Class I track, with a gauge of 1,067 mm, carries an annual load of 82,883.21 tons. Mud pumping causes water mixed with mud to rise to the surface of the ballast, which disrupts load distribution and the stability of the track structure. The research methodology comprises four main stages: (1) field observations at four critical locations (Km 13+8/9, Km 14+2/3, Km 25+2/3, and Km 28+5/6); (2) measurements using a Dynamic Cone Penetrometer (DCP) and a densometer to obtain RC, CBR, and Evd parameters; (3) track geometry evaluation to detect elevation deviations; and (4) technical analysis of sleepers based on an elastic modulus of 150,093.30 kg/cm² and a permissible stress of 210 kg/cm². The research results indicate that the most critical condition is at Km 25+2/3, with an RC value of 14.37 kN/m, a CBR of 3.85%, and an Evd of 41.6 MN/m². Overall, several segments have CBR values below the safe threshold (15–24%), indicating a significant decrease in ballast density due to mud pumping. Technical analysis confirms that mud accumulation disrupts the distribution of effective stress and accelerates sleeper deterioration. As a mitigation measure, it is recommended to install woven geotextile, replace the ballast material, and implement periodic monitoring using DCP/densometer instruments to maintain track stability within acceptable limits and extend the service life of the railway infrastructure.
Proses Penanganan Rel Aus Pada Lengkung NO.16A KM 4+8/0 Jalur Hilir Lintas Manggarai – Tanah Abang Nurmagita Pamursari; Muhamad Farras Fadhilah; Nurwanda Sari
PendIPA Journal of Science Education Vol 9 No 2 (2025): June
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/pendipa.9.2.364-371

Abstract

Railways is a unified system consisting of infrastructure, facilities, and human resources, as well as norms, criteria, requirements and procedures for the implementation of railway transportation. Railroad infrastructure is a railway line, train stations and train operating facilities. Railway maintenance activities are preventive measures (preventive) and / or replacement in accordance with the technical age. In this study there are several types of maintenance in handling rail replacement on the Manggarai - Tanah Abang crossing. From this study the total wear that occurred from KM 4+800 to 5+00 reached 232.2 meters of track. Wear occurs in curve number 16A. Then there are several treatments carried out such as checking rail material data, replacing rail roads, maintaining forces and electricity, normalizing arrows, and thermite welding. In this rail replacement, maintenance is carried out by inspecting the railroad, maintaining the lighting force whose height must be adjusted to the radius of the curve, and returning the arrows which require prior calculation in carrying out maintenance. Calculation of arrows and elevation must be in accordance with applicable regulations or standards.
Perancangan Filter Pasif Pada Gardu Traksi di Stasiun Citayam Guna Mengurangi Efek Distorsi Harmonisa Rahmatika Dwi Putri Jori; Nurwanda Sari; Lulu Syahira Desliana; Siti Maulidina; Nur Anisa Mardhotillah; Muhammad Rizki Arif; Nur Syahidah Aini
PendIPA Journal of Science Education Vol 9 No 3 (2025): October
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/pendipa.9.3.742-751

Abstract

Electric Rail Trains (KRL) have become the most frequently used transportation mode for daily activities in the community. One of the existing problems within the operation system of Electric Rail Trains (KRL) lies in the current rectification process. During this rectification process, an effect occurs that can cause disturbances in the KRL's electrical system. This resulting effect is the harmonic effect. This study aims to address the problem of power quality degradation in the Electric Rail Train (KRL) at the Citayam Station Traction Substation, which is caused by this harmonic effect. The harmonic effect arises from the process of rectifying alternating current (AC) into direct current (DC) using a silicon rectifier, which can lead to voltage drop, speed reduction, or even the operational stoppage of the KRL.The research method used is quantitative descriptive. The study did not conduct direct measurements but instead used averaged assumption data from three related journals as primary data. The data analyzed were the values of Total Harmonic Distortion (THD) for both current and voltage, particularly focusing on the 5th, 7th, and 11th harmonic orders, which were identified as the highest contributors to the harmonic distortion. To mitigate the harmonics, this study designed a single-tuned passive filter using the ETAP (Electric Transient Analysis Program) software. The design aims to suppress the harmonic distortion, thereby improving the electrical power quality, maintaining the reliability of the traction substation, and optimizing KRL operations. The single-tuned passive filter designed in this research was capable of suppressing harmonics by up to 0.009%.