PENGARUH PENAMBAHAN BUTON ROCK ASPHALT (BRA) SEBAGAI FILLER PADA CAMPURAN LASTON LAPIS AUS (AC-WC) Razuardi, Razuardi; Saleh, Sofyan M.; Isya, Muhammad
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.10031

Abstract

Abstract: The main cause of road damage is inseparable from stability and flexibility which is the determinant of the quality of pavement. One way to overcome that is to improve performance by modifying pavement mixture using additive, With low penetration value and high temperature in Indonesia, buton rock asphalt suitable for use as an additive. This research discusses the examination of mixtures whose performance has been optimized with buton rock asphalt modifications as filler. This study aims to determine the effect of minerals and bitumen contained in buton rock asphalt to marshall characteristics which are then compared with hot asphalt mixture using dust as filler. Variations of asphalt content used were 4.5%, 5%, 5.5%, 6% and 6.5% for both different filler types. In marshall test yield value of VIM, VMA, VFB, Stability, flow and marshall quentient, from the values obtained optimum bitumen content. Optimum asphalt content by using Buton rock asphat as filler of 5.87%. From marshall parameter result obtained the best stability value at 5% asphalt content of 1302,30 kg, density 2,41 gr / cm3, VIM 5,59%, VMA 17,42%, VFB equal to 67,96% and flow equal to 3 , 2 mm, and marshall quentient of 565,74 kg / mm, While the optimum asphalt content by using stone ash as filler is 5,51% yielding the best stability at 5,5% asphalt level 1767,02 kg, density 2,39 gr / cm3, VIM equal 3%, VMA equal to 16,21% , VFB of 81.99% and flow of 2.7 mm, and marshall quentient of 523.75 kg / mm.Abstrak: Penyebab utama dari kerusakan jalan raya tidak terlepas dari stabilitas dan fleksibilitas yang merupakan parameter penentu kualitas perkerasan jalan. Salah satu cara untuk mengatasinya yaitu dengan memperbaiki kinerja campuran dengan memodifikasi perkerasan menggunakan bahan tambah. Dengan nilai penetrasi yang rendah dan temperatur yang cukup tinggi di Indonesia, asbuton butir cocok di gunakan sebagai bahan tambah. Penelitian ini membahas tentang pemeriksaan campuran yang kinerjanya telah di optimumkan dengan penambahan buton rock asphalt (BRA) tipe 5/20 sebagai filler . Penelitian ini bertujuan untuk mengetahui pengaruh mineral dan bitumen yang terkadung didalam buton rock asphalt terhadap karakteristik marshall yang kemudian dibandingkan dengan campuran beraspal panas menggunakan abu batu sebagai filler. Variasi kadar aspal yang digunakan adalah 4,5%,5%,5,5%,6% dan 6,5% untuk kedua jenis filler yang berbeda. Pada uji marshall menghasilkan nilai VIM, VMA, VFB, Stabilitas, flow dan marshall quentient, dari nilai-nilai tersebut diperoleh kadar aspal optimum. Kadar aspal optimum dengan menggunakan Buton rock asphat sebagai filler sebesar 5,87 %. Dari hasil parameter marshall didapat nilai stabilitas terbaik pada kadar aspal 5% sebesar 1302,30 kg, density 2,41 gr/cm3, VIM sebesar 5,59%, VMA sebesar 17,42%, VFB sebesar 67,96% dan flow sebesar 3,2 mm, dan marshall quentient sebesar 565,74 kg/mm, sedangkan kadar aspal optimum dengan menggunakan abu batu sebagai filler sebesar 5,51 % menghasilkan stabilitas terbaik pada kadar aspal 5,5 % sebesar 1767,02 kg, density 2,39 gr/cm3, VIM sebesar 3%, VMA sebesar 16,21%, VFB sebesar 81,99% dan flow sebesar 2,7 mm, dan marshall quentient sebesar 523,75 kg/mm.
KAJIAN BEBAN AKTUAL KENDARAAN PADA KONSTRUKSI JALAN MENGGUNAKAN WEIGH IN MOTION (WIM) Martina, Rita; Saleh, Sofyan M.; Isya, Muhammad
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.10029

Abstract

Abstract: Road infrastructure plays an important role as land transportation in Aceh. The transport mobility in Aceh province west coast highway kept increase every year. So that, the construction of the road had got load (traffic volume and axle load) increased every time. The addition of traffic load caused the level of damage to the road construction was increasing. Early damage can happen immediately, if the load exceeded the standard load plan. So that needed to be examined to the weight of the vehicle on the construction of theAceh province west coast highway by using Weigh In Motion (WIM). The goal is to identify the actual condition of the vehicle burden on the construction of roads (traffic volume and axle load) which occurred on roads Bts. Kota Banda Aceh-Aceh Barat and to reviewgovernment policy to the road maintenance management and to instruct management of road infrastructure maintenance. This studywas located at Simpang Rima point. The research method was descriptive- analysis, Weigh In Motion was used as the primary means of data collection. The data measured by WIM, including the data types of vehicles, speed, vehicle length, weight and configuration of the vehicle wheelbase. The data was analyzed to obtain the value of Destroyer Road factor (Vehicle Damage Factor - VDF) of each type of vehicle. From the results of flattenering during the measurement of axis load it was obtained the average of Equivalent Standard Axles (ESA) factor of each type of vehicle for each road was being reviewed. Results of this study are indicative of the occurrence of overloading the vehicle 2-axis and 3-axis truck type. It indicated that the direction of road maintenance was appropriate with the direction of government policy. The Value of International Roughness Index (IRI) are in the good category is between 4- 8, precisely 5.03. While the value of Surface Distress Index (SDI) was less than 50 m / km.Abstrak: Infrastruktur jalan memegang peranan penting sebagai prasarana transportasi darat di Aceh. Mobilitas arus transportasi lintas Barat Provinsi Aceh terus meningkat tiap tahunnya. Sehingga konstruksi jalan dari waktu ke waktu mengalami pembebanan (volume lalulintas dan beban sumbu) yang terus meningkat. Penambahan beban lalulintas mengakibatkan tingkat kerusakan terhadap konstruksi jalan semakin meningkat. Kerusakan dini dengan segera dapat terjadi, apabila beban lalulintas melebihi beban standar rencana. Sehingga perlu dilakukan kajian terhadap beban kendaraan pada konstruksi jalan lintas Barat Provinsi Aceh menggunakan Weigh In Motion(WIM). Tujuannya untuk mengidentifikasi kondisi aktual beban kendaraan pada konstruksi jalan (volume lalulintas dan beban sumbu) yang terjadi pada ruas jalan Bts. Kota Banda Aceh-Aceh Barat dan mengkaji kebijakan pemerintah terhadap manajemen pemeliaraan jalan serta mengarahkan manajemen pemeliharaan infrastruktur jalan. Penelitian iniberlokasi pada ruas jalan titik Simpang Rima. Metode penelitian adalah analisis deskriptif, Weigh In Motion digunakan sebagai alat pengumpulan data primer. Data yang diukur oleh WIM antara lain data jenis kendaraan, kecepatan, panjang kendaraan, konfigurasi berat dan jarak sumbu kendaraan. Data yang diperoleh kemudian dianalisis untuk memperoleh nilai Faktor Perusak Jalan (Vehicle Damage Factor VDF) dari tiap jenis kendaraan. Dari hasil perataan selama pengukuran beban sumbu diperoleh faktor Equivalent Standard Axle (ESA) rata-rata dari setiap jenis kendaraan untuk masing-masing ruas jalan yang ditinjau. Hasil penelitian ini adalah indikasi terjadinya overloading pada kendaraan jenis truk 2 sumbu dan 3 sumbu.Hal ini mengindikasikan bahwa arahan pemeliharaan jalanadalah pemeliharaan rutin telah sesuai dengan arahan kebijakan pemerintah. Nilai International Roughness Index (IRI) berada pada kategori baik yaitu antara 4-8, tepatnya dengan nilai 5,03. Sedangkan nilai Surface Distress Index (SDI) lebih kurang dari 50 m/km.
UJI DURABILITAS CAMPURAN AC-WC MENGGUNAKAN KOMBINASI LIMBAH PLASTIK DAN ABU SERABUT KELAPA SEBAGAI FILLER Ondriani, Ondriani; Saleh, Sofyan M.; Isya, Muhammad
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.10027

Abstract

Abstract: The cause of damage and strength reductionon highway flexible pavement isthe low strength and durability on the wear layer. To cope withthis problem, it is necessary to add some particular additivethat can increase the asphalt concrete performance. One of the additional material that can be used are plastic. Stone ash, cement and fly ash has been commonly used as a filler in asphalt mixture. But these kind of filler was hard to get and the price were relatively expensive. The coconut fiber ash wich has a specific grafity greater than asphalt is expected to be one alternative. This research aims to determine the influence of plastic wastecombination substitution into the asphalt pen. 60/70 and the use of coconut fiber ash as filler on AC-WC mixture performance. The plastic used in this research is polyethylene terephthalate, polypropylene and polystyrene. The early stages of this research is to find the optimum asphalt content (OAC). After OAC obtained, then the specimens were mixed without and with the combination substitution of plastic waste as much as 2.7%; 4.7%; 6.7% against the weight of asphalt on OAC + 0.5% with and without the coconut fiber ash as a filler. The study results showed the use of plastic waste combination and the coconut fiber ash can not improve the durability value. The highest value of durability obtained at 4.7% combination substitution of plastic waste, it was 77.53%, While the lowest was in substitution of 6.7% plastic waste combination with 38.27% coconut fiber ash as a filler. The duration value of AC-WC mixture with plastic waste combination substitution and the use of coconut fiber ash filler did not meet the requirement that is 90%.Abstrak: Penyebab kerusakan dan penurunan kekuatan perkerasan lentur jalan raya adalah rendahnya kekuatan dan keawetan di dalam lapisan aus. Untuk menanggulangi hal ini dibutuhkan suatu bahan tambah yang dapat meningkatkan lapis aspal beton. Salah satu bahan tambah yang dapat di gunakan adalah plastik. Abu batu, semen dan fly ash sudah biasa digunakan sebagai filler dalam campuran aspal. Tetapi, jenis filler tersebut susah didapatkan dan harganya relatif mahal. Abu serabut kelapa yang memiliki berat jenis lebih besar dari aspal, diharapkan dapat menjadi alternatifnya. Penelitian ini bertujuan untuk mengetahui nilai durabilitas campuran AC-WC menggunakan kombinasi limbah plastik dan abu serabut kelapa. Plastik yang digunakan pada penelitian ini adalah Polyethylene Terephthalate, Polypropylenedan Polystyrene. Tahap awal penelitian ini adalah mencari kadar aspal optimum (KAO). Setelah KAO didapat kemudian dilakukan pembuatan benda uji tanpa dan dengan substitusi kombinasi limbah plastik sebesar 2,7%; 4,7%; 6;7% terhadap berat aspal pada KAO + 0,5% tanpa dan dengan abu serabut kelapa sebagai filler. Hasil penelitian menunjukkan penggunaan kombinasi limbah plastik tidak dapat meningkatkan nilai durabilitas. Nilai durabilitas tertinggi didapat pada substitusi kombinasi limbah plastik 4,7% yaitu 77,53% sedangkan yang terendah terdapat pada subtitusi kombinasi limbah plastik 6,7% dengan filler abu serabut kelapa yaitu 38,27%. Nilai Durabilitas campuran AC-WC dengan substitusi kombinasi limbah plastik dan penggunaan abu serabut kelapa sebagai filler tidak memenuhi syarat yaitu 90%.
STUDI KERUSAKAN JALAN DITINJAU DARI FAKTOR SETEMPAT (STUDI KASUS RUAS JALAN BLANGKEJEREN LAWE AUNAN) Mulyadi, Mulyadi; Isya, Muhammad; Saleh, Sofyan M.
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.10012

Abstract

Abstract: Blangkejeren - Lawe Aunan road conditions overall is on the slopes of the mountains which is strongly influenced by local environmental factors such as drainage, topography, soil conditions, material conditions and vehicle load conditions across the road. It should be noted in order to avoid a decrease in the road quality due to road surface damage that can affect the traffic safety, comfort and smoothness.. Therefore, it is necessary to study the evaluation of the condition of the damaged road surface and the local factors that affect the damage in order to avoid a decrease in the roads quality. This study took place on Blangkejeren - Lawe Aunan roads started from Sta. 529 + 700 - Sta. 535 + 206. Generally, the condition of roads in this segment were found damage that disturb the comfort, smoothness and safety of the roads users. In this study, the primary data obtained by actual surveys in the form of data field length, width, area, and depth of each type of damage as well as local factors that lead to such damage. Actual field surveys conducted along the 5.506 km, with the distance interval of each segment is 100 m. The secondary data obtained from the relevant institutions and other materials related to this research. This study analyzed the PCI method (Pavement Condition Index) to obtain the level of damage in order to know how to handle, while for the identification of the damage done by observation factors descriptively appropriate observation in the field such as the number of damage points. The results of this study found that the type of damage caused to roads is damage to the cover layer, a hole, and curly. This type of damage that commonly occurs on the road Blangkejeren - Lawe Aunan is damage to the edges with a percentage of 87.30%. The local factors that greatly affect drainage on the percentage of damage is 62.00%. PCI average value is 13.47 which indicates a very bad condition (very poor) and requires maintenance or improvement of reconstruction.Abstrak: Kondisi jalan Blangkejeren Lawe Aunan secara keseluruhan berada di lereng pegunungan sangat dipengaruhi oleh faktor lingkungan setempat seperti drainase, topografi, kondisi tanah, kondisi material dan kondisi beban kendaraan yang melintasi jalan tersebut. Hal ini perlu diperhatikan agar tidak terjadi penurunan kualitas jalan akibat kerusakan permukaan jalan sehingga dapat mempengaruhi keamanan, kenyamanan, dan kelancaran dalam berlalu lintas. Oleh karena itu, perlu dilakukan penelitian evaluasi terhadap kondisi permukaan jalan yang mengalami kerusakan serta faktor setempat yang mempengaruhi kerusakan tersebut agar tidak terjadi penurunan kualitas jalan. Penelitian ini mengambil lokasi di ruas jalan Blangkejeren Lawe Aunan yang dimulai dari Sta. 529+700 - Sta. 535+206. Umumnya kondisi ruas jalan pada segmen ini banyak ditemukan kerusakan-kerusakan yang dapat mengganggu kenyamanan, kelancaran, dan keamanan pengguna jalan. Dalam penelitian ini data primer diperoleh dengan melakukan survei aktual lapangan yaitu berupa data panjang, lebar, luasan, dan kedalaman tiap jenis kerusakan serta faktor setempat yang mengakibatkan kerusakan tersebut. Survei aktual lapangan dilakukan sepanjang 5,506 km, dengan jarak interval setiap segmen adalah 100 m. Adapun data sekunder diperoleh dari lembaga terkait dan bahan lainnya yang berhubungan dengan penelitian ini. Penelitian ini dianalisis dengan metode PCI (Pavement Condition Index) untuk mendapatkan tingkat kerusakan agar diketahui cara penanganannya, sedangkan untuk identifikasi faktor kerusakannya dilakukan dengan pengamatan secara diskriptif sesuai hasil pengamatan di lapangan berupa jumlah titik kerusakan. Hasil penelitian ini didapatkan bahwa jenis kerusakan yang terjadi pada ruas jalan adalah kerusakan lapisan penutup, lubang, dan keriting. Jenis kerusakan yang umum terjadi pada ruas jalan Blangkejeren Lawe Aunan adalah kerusakan tepi dengan persentase 87,30 %. Faktor setempat yang sangat mempengaruhi kerusakan adalah drainase dengan persentase 62,00%. Nilai PCI rata-rata yaitu 13,47 yang menunjukkan kondisi sangat buruk (very poor) dan memerlukan pemeliharaan peningkatan atau rekonstruksi.
PENGARUH SUBSTITUSI POLYSTYRENE (PS) DAN ABU ARANG TEMPURUNG KELAPA SEBAGAI FILLER TERHADAP KARAKTERISTIK CAMPURAN AC-WC Isnanda, Isnanda; Saleh, Sofyan M.; Isya, Muhammad
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.10002

Abstract

Abstract: Asphalt concrete strength is influenced by the material properties of the mixture. Asphalt mixture can be modified by adding several kinds of additives, ranging from chemical additives, natural materials, and the rest of the waste. One of the waste materials that were encountered and also difficult to disentangle by nature is plastic waste. One way to use it with the use as an additive in asphalt mixture. This mixture is also called polymer modified asphalt. In this study, the polymer material of the type used plastic Polystyrene (PS) and the use of coconut charcoal powder as filler in a mixture of AC-WC. Stone dust, cement, and fly ash hard to come by and relatively expensive. Coconut charcoal powder has the elements in the asphalt that is non-Polar Carbon by 91% is expected to be one alternative. This study aims to determine the effect of substitution of plastic using the dry process and the use of a filler combination of coconut charcoal powder and portland cement mixture on the characteristics Marshall of the AC-WC. Early stages of this research is to find the optimum asphalt content (OAC). After OAC obtained and then do the test object without substitution manufacture plastics and plastic waste substitution percentage variation PS 7%, 9%, 11% to the weight of the asphalt is substituted into the aggregate. The results showed substitution PS plastic on asphalt mix, the value of stability increased compared with no substitution of plastic. Value of stability without the plastic substitution of 1270.24 kg while the value of stability effective of PS substitution percentage of 11% with asphlat content of 4.70% which amounted to 1497.85 kg. the value of durability of a AC-WC mixture with and without substitution PS plastic by dry process not meeting the requirements of 90%.Abstrak: Kekuatan beton aspal dipengaruhi oleh sifat-sifat dari material campuran. Campuran aspal dapat dimodifikasi dengan menambah beberapa macam zat tambahan, mulai dari aditif bahan kimia, bahan alam, dan sisa limbah. Salah satu bahan limbah yang banyak ditemui dan juga sulit untuk diurai oleh alam adalah limbah plastik. Salah satu cara untuk memanfaatkannya dengan menggunakan sebagai bahan tambahan pada campuran beraspal. Campuran ini disebut juga dengan aspal modifikasi polimer. Pada penelitian ini bahan polimer yang digunakan dari jenis plastik Polystyrene (PS) serta penggunaan abu arang tempurung kelapa sebagai filler pada campuran AC-WC. Abu batu, semen dan fly ash susah didapatkan dan harganya relatif mahal. Abu arang tempurung kelapa memiliki unsur-unsur pada aspal yaitu Carbon non Polar sebesar 91% diharapkan dapat menjadi salah satu alternatifnya. Penelitian ini bertujuan untuk mengetahui pengaruh substitusi plastik dengan cara kering serta penggunaan filler kombinasi abu arang tempurung kelapa dan semen portland terhadap karakteristik Marshall campuran AC-WC. Tahapan awal penelitian ini adalah mencari kadar aspal optimum (KAO). Setelah KAO didapat kemudian dilakukan pembuatan benda uji tanpa substitusi plastik dan dengan substitusi variasi persentase limbah plastik PS 7%, 9%, 11% terhadap berat aspal yang disubstitusikan ke dalam agregat. Hasil penelitian menunjukkan substitusi plastik PS pada campuran aspal, nilai stabilitas campuran meningkat dibandingkan dengan tanpa substitusi plastik. Nilai stabilitas tanpa substitusi plastik sebesar 1270,24 kg sedangkan nilai stabilitas dari persentase substitusi terbaik jenis PS 11% pada kadar aspal 4,70% yaitu sebesar 1497,85 kg. Untuk nilai durabilitas campuran AC-WC dengan dan tanpa substitusi plastik PS tidak memenuhi persyaratan yaitu 90%.
UJI MARSHALL TERHADAP CAMPURAN AC-WC DENGAN SUBSTITUSI KOLABORASI LIMBAH PET DAN SBB KE DALAM ASPAL PENETRASI 60/70 Iqbal, Iqbal; Saleh, Sofyan M.; Isya, Muhammad
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.10001

Abstract

Abstract: Many materials for asphalt mixture are from waste that believed can be improved the pavement performance, such as stability and durability. The remaining polyethylene terepthalate type (PET) plastic waste which is used for plastic bottles of mineral water and second tires dust (STD) was the result of grated outer tires of the four wheels vehicle. The aims of this research is to determine influence of collaboration PET waste and STD into asphalt pen. 60/70 against Marshall test on AC-WC mixture. The first stages of this research is to determine the optimum asphalt content, then create the specimens without substitution waste and with collaboration substitution both of waste additive on collaboration percentage variations of PET 25% + STD 75%, PET 50% + STD 50%, PET 75% + STD 25% with Marshall test. From the research results obtained the value of stability without substitution those were 1602,84 kg and the greater results of stability value with collaboration variations obtained on percentage of PET 75% + STD 25% those were 1942,44 kg. The result of Marshall parameters value without and with collaboration both of waste such as stability, flow, Marshall Quantient, density, VIM, VMA, and VFB, still meet the requirements of Bina Marga specification (2014). The durability value without and with collaboration substitution were 93,82 %, and 97,13%. All of the durability value with substitution on waste percentage variation into asphalt had met the requirement of Bina Marga (2014), those were 90%.Abstrak: Banyak bahan material untuk campuran ke dalam aspal merupakan dari limbah yang diyakini dapat meningkatkan kinerja seperti stabilitas dan durabilitas. Sisa limbah plastik jenis polyethylene terepthalate (PET) yang merupakan bahan digunakan untuk botol plastik air mineral dan serbuk ban bekas (SBB) merupakan hasil dari parutan ban luar kendaraan roda empat. Tujuan penelitian ini untuk mengetahui pengaruh kolaborasi limbah PET dan serbuk ban bekas ke dalam aspal Pen. 60/70 terhadap uji Marshall pada campuran AC-WC. Tahapan pertama dari penelitian ini adalah menentukan kadar aspal optimum, selanjutnya dilakukan pencampuran tanpa substitusi limbah dan dengan campuran substitusi kolaborasi kedua bahan aditif limbah dengan variasi persentase kolaborasi PET 25% + SBB 75%, PET 50% + SBB 50%, PET 75% + SBB 25% dengan pengujian parameter Marshall. Dari hasil penelitian didapatkan nilai stabilitas tanpa substitusi yaitu 1602,84 kg dan hasil nilai stabilitas variasi kolaborasi tertingi di dapat pada persentase PET 75% + SBB 25% yaitu 1942,44 kg. Nilai parameter untuk tanpa dan kolaborasi yang dihasilkan berupa stabilitas, flow, Marshall Quantient, density, VIM, VMA, dan VFB masih memenuhi persyaratan spesifikasi Bina Marga tahun 2014. Nilai durabilitas tanpa substitusi yaitu sebesar 93,82% dan nilai durabilitas untuk substitusi kolaborasi yaitu 97,13%. Semua nilai durabilitas substitusi pada variasi persentase limbah ke dalam aspal telah memenuhi syarat yang ditentukan Bina Marga tahun 2014 yaitu 90%.
ANALISIS TINGKAT KERUSAKAN JALAN DAN PENGARUNYA TERHADAP KECEPATAN KENDARAAN (STUDI KASUS: JALAN BLANG BINTANG LAMA DAN JALAN TEUNGKU HASAN DIBAKOI) Wirnanda, Intan; Anggraini, Renni; Isya, Muhammad
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.10000

Abstract

Abstract: Abstract:Damage that occurs on some road segment causing huge lossed, especially for road users such as a long travel time, traffic jam, incident, and etc. In general there variety factor that caused of road damage such as age of the road that has been passed, puddle onthe road surface that cannot flow due to the poor drainage, trafic load excessively repetitive (overloaded). Which can cause life time is shorter than planning. Improper planning, poor monitoring and the implementation is not accordance with the existing plan, in addition to the lack of maintenance costs, delays in budget spending and priorities of improper handling also be the cause. It should be noted in order to avoid decreased in the quality of roads due to damage on road surface. The purpose of this study is to determined damage of the road extent/level using PCI method (Pavement Condition Index), determined the effect of road damage to the speed of vehicle using Regression Analysis method. This research take location in the road segment of Blang Bintang Lama road, and Teungku hasan Dibakoi each road is divided into 7 that being reviewed according to the level of damage. Primary data collected by field actual survey in the form of geometric data, extensive damage to the road, and vehicle speed. The results showed that damage of the road is very affected on the vehicle speed as seen on Blang Bintang Lama in V segment the value of PCI is 10 with failed condition and vehicle speed just reached 5.31 Km/h, while in VII segment PCI value is 87 with perfect road condition (excellent) vehicle speed reached to 58.34 Km/h, so that the equation obtained by regression analysis of Y = (3,571)(0,032) , while for segment in Teungku Hasan Dibakoi road as seen in III Segment PCI value is 4 with failed condition with vehicle speed just 4.95 Km/h, while in the VII segment PCI value is 88 with perfect road condition (excellent) vehicle speed reached to 68.64 Km/h, so the equation obtained by regression analysis of Y is Y= (3,822)(0,035) . This suggests that higher levels of road damage will affected to slower speed of vehicle, otherwise the lower level of damage road, will make the higher speed of vehicle.Abstrak: Kerusakan jalan yang terjadi di beberapa ruas jalan menimbulkan kerugian yang sangat besar terutama bagi pengguna jalan seperti waktu tempuh yang lama, kemacetan, kecelakaan, dan lain-lain. Secara umum penyebab kerusakan jalan ada berbagai sebab yaitu umur rencana jalan yang telah dilewati, genangan air pada permukaan jalan yang tidak dapat mengalir akibat drainase yang kurang baik, beban lalu lintas berulang yang berlebihan (overloaded) yang menyebabkan umur pakai jalan lebih pendek dari perencanaan. Perencanaan yang tidak tepat, pengawasan yang kurang baik dan pelaksanaan yang tidak sesuai dengan rencana yang ada, selain itu minimnya biaya pemeliharaan, keterlambatan pengeluaran anggaran serta prioritas penanganan yang kurang tepat juga menjadi penyebabnya. Hal ini perlu diperhatikan agar tidak terjadi penurunan kualitas jalan akibat kerusakan permukaan jalan. Tujuan penelitian ini adalah untuk menentukan tingkat dan jenis kerusakan jalan dengan menggunakan metode PCI (Pavement Condition Index), mengetahui pengaruh kerusakan jalan terhadap kecepatan kendaraan dengan menggunakan metode Analisis Regresi. Penelitian ini mengambil lokasi pada ruas Jalan Blang Bintang Lama dan ruas Jalan Teungku Hasan Dibakoi yang masing-masing jalan terbagi atas 7 segmen yang ditinjau menurut tingkat kerusakannya. Pengumpulan data primer dilakukan dengan survey aktual lapangan yaitu berupa data geometrik jalan, luas kerusakan jalan, dan kecepatan kendaraan. Hasil penelitian menunjukkan bahwa kerusakan sangat berpengaruh terhadap kecepatan kendaraan seperti yang terlihat pada ruas jalan Blang Bintang Lama pada segmen V dengan nilai PCI 10 kondisi jalan gagal (failed) dengan kecepatan kendaraan mencapai 5,37 Km/Jam, sedangkan pada segmen VII nilai PCI sebesar 87 dengan kondisi jalan sempurna (excellent) kecepatan kendaraan mencapai 58,34 Km/Jam, sehingga didapat persamaan dengan metode analisis regresi Y= (3,571)(0,032) , sedangkan untuk ruas Jalan Teungku Hasan Dibakoi terlihat pada segmen III nilai PCI 4 kondisi jalan gagal (failed) dengan kecepatan mencapai 4,95 Km/Jam, sedangkan pada segmen VII nilai PCI sebesar 88 dengan kondisi jalan sempurna (excellent) kecepatan kendaraan mencapai 68,64 Km/Jam, sehingga didapat persamaan dengan metode analisis regresi Y= (3,822)(0,035) . Hal ini menunjukkan bahwa semakin tinggi tingkat kerusakan jalan maka semakin rendah kecepatan kendaraan, sebaliknya semakin rendah tingkat kerusakan maka semakin tinggi kecepatan kendaraan.
KARAKTERISTIK CAMPURAN AC-WC MENGGUNAKAN AGREGAT SIMEULUE DENGAN VARIASI ASPAL RETONA BLEND 55 DAN ASPAL PENETRASI 60/70 Firdaus, Firdaus; Yunus, Yuhanis; Isya, Muhammad
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.9999

Abstract

Abstract: Asphalt concrete pavement is depend on the type and composition of aggregate, asphalt, and filler being used. In this study, the aggregate used was an aggregate of Simeulue Island. In this Regency are difficult to find enough hard aggregate because the majority of the rocks there come from the process of particles mineral deposition, rest of the animals and plants which are found in the River (Aribowo, 2014). This research was conducted to find out the level of asphalt mixtures resistance using Simeulue aggregate with asphalt variation percentage of retona blend 55 and pen. 60/70 as a binder. This research begins with an examination of the physical properties of asphalt and aggregate next manufactured specimens based on gradations planning to determine of optimum asphalt content (OAC) with the overlapping method. From the results obtained, the elongation and flakiness index value did not meet the required specifications, those were 35.27% and 14.38%. The soundness aggregate against of Sodium and Magnesium sulfate (Mg2SO4) = 26.43% where is the maximum value required 12%. Aggregate wear value still meets the requirement, that was 23.84% 40%. OAC for AC-WC mixture using 100% RB, 100% Pen, 80% RB/ 20% Pen, 65% RB/ 35% Pen, 50% RB/ 50% Pen. was in the amount of 6.18%; 6.37%; 6.20%; 6.06% and 6.06%. From the Marshall test results in every OAC for all variations of immersion, showed the stability value using RB higher than by using Pen. 60/70. This was becauseasphaltRBcantie theSimeulue aggregatewellcompared toasphaltPen.60/70. The flow value was higher than the asphalt RB. VIM and MQ value at all immersion variation, using asphalt RB were higher than by using asphalt Pen. The durability value in all types of AC-WC mixture still meets the requirements of the Dept. PU (2010) 90%. While the durability value of 48-hour immersion already is under 90%.Abstrak: Perkerasan beton aspal sangat tergantung pada jenis dan komposisi agregat, aspal serta filler yang digunakan. Penelitian ini menggunakan agregat dari Kabupaten Simeulue. Pada Kabupaten ini sulit ditemukan agregat yang cukup keras karena mayoritas batuan yang ada berasal dari proses pengendapan partikel mineral, sisa hewan dan tanaman yang terdapat di sungai dan memiliki nilai pelapukan yang tinggi (Aribowo, 2014). Penelitian ini dilakukan untuk mengetahui tingkat ketahanan agregat Simeulue dengan variasi persentase aspal retona blend 55 dan aspal penetrasi 60/70 sebagai bahan pengikat dengan harapan dapat menghasilkan perkerasan yang lebih baik. Penelitian ini diawali dengan pemeriksaan sifat fisis aspal dan agregat selanjutnya dilakukan pembuatan benda uji berdasarkan gradasi rencana untuk menentukan kadar aspal optimum (KAO) dengan metode overlapping. Dari hasil penelitian agregat diperoleh nilai indeks kepipihan dan kelonjongan tidak memenuhi syarat yaitu sebesar 35,27% dan 14,38%. Kekekalan bentuk agregat terhadap larutan NaCl dan MgSO4 = 26,43% dimana nilai yang disyaratkan maksimal 12%. Untuk nilai keausan agregat masih memenuhi syarat yaitu sebesar 23,84% 40%. KAO campuran AC-WC menggunakan 100% RB, 100% Pen. 60/70, 80% RB/ 20% Pen, 65% RB/ 35% Pen, 50% Rb/ 50% Pen, masing-masing sebesar 6,18%; 6,37%; 6,20%; 6,06% dan 6,06%. Dari hasil uji Marshall pada setiap KAO untuk semua variasi rendaman, menujukkan nilai stabilitas menggunakan aspal RB lebih tinggi dibandingkan dengan Pen. 60/70. Hal ini dikarenakan aspal RB dapat mengikat agregat Simeulue dengan baik. Nilai flow lebih tinggi dibandingkan aspal RB. Untuk nilai VIM dan nilai MQ menggunakan aspal RB lebih tinggi dibandingkan dengan Pen. 60/70. Nilai durabilitas pertama pada semua jenis campuran masih memenuhi persyaratan Departemen PU (2010) 90%. Sedangkan nilai durabilitas kedua sudah berada di bawah 90%.
PENENTUAN PRIORITAS PENANGANAN JALAN DI KECAMATAN SEULIMEUM KABUPATEN ACEH BESAR DENGAN MENGUNAKAN ANALISIS MULTI KRITERIA riza, Fakhrur; Anggraini, Renni; Isya, Muhammad
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.487

Abstract

Abstrak Kecamatan Seulimeum merupakan kecamatan yang mempunyai tingkat kerusakan jalan yang paling berat diantara kecamatan lainnya yang ada di Kabupaten Aceh Besar. Jalan kabupaten di Kecamatan Seulimeum terdapat sebanyak 23 ruas dengan kondisi rusak berat sepanjang 69,50 km (50,44%) dari 137,80 km. Mengingat Pemerintah Kabupaten Aceh Besar mempunyai keterbatasan anggaran pada sektor jalan, maka penanganan jalan di Kecamatan Seulimeum perlu dicarikan prioritas penanganan. Penelitian ini bertujuan untuk menganalisis kriteria yang dominan perlu dipertimbangkan dalam penanganan jalan dan menganalisis urutan prioritas penanganan jalan di Kecamatan Seulimeum. Penelitian ini menggunakan pendekatan metode kuantitatif melalui kuesioner. Teknik sampling yang digunakan adalah purposive sampling yaitu pengambilan sampel dengan pertimbangan yang didasarkan pada pihak pemangku kepentingan dan pengambil kebijakan (stakeholders) bidang jalan. Responden ditetapkan sebanyak 5 stakeholders yaitu Kepala Bidang Bina Marga Dinas Pekerjaan Umum dan Penataan Ruang (PUPR) Kabupaten Aceh Besar, Kepala Bidang Program Pembangunan Daerah Badan Perencanaan Pembangunan Daerah (Bappeda) Kabupaten Aceh Besar, Anggota Komisi IV Bidang Pembangunan Dewan Perwakilan Rakyat Kabupaten (DPRK) Aceh Besar, Camat Seulimeum, dan akademisi. Kriteria penanganan jalan yang ditinjau adalah kondisi jalan, tata guna lahan, aksesibilitas, kependudukan, fasilitas sosial, fasilitas pemerintahan, dan sarana perekonomian. Teknik analisis data digunakan Analisis Multi Kriteria (AMK). Hasil penelitian meunjukkan bahwa kriteria yang dominan perlu dipertimbangkan dalam penanganan jalan adalah kriteria kondisi jalan dengan nilai bobot kriteria rata-rata sebesar 0,323. Prioritas penanganan jalan adalah alternatif Jalan Seulimeum-Lamteuba sebagai prioritas 1 dengan kinerja alternatif sebesar 4,095, alternatif Jalan Entee Gajah-Lhieb sebagai prioritas 2 dengan kinerja alternatif sebesar 3,715, dan alternatif Jalan Lamteuba-Lamteuba Droe sebagai prioritas 3 dengan kinerja alternatif sebesar 3,619. Kata kunci: Prioritas, penanganan, jalan, kriteria, alternatif, Kecamatan Seulimeum  Abstract Seulimeum sub-district is a sub-district that has the heaviest level of road damage among other sub-districts in Aceh Besar District. There are 23 regency roads in Seulimeum District with severely damaged conditions along 69.50 km (50.44%) of 137.80 km. Considering that the Aceh Besar District Government has a limited budget in the road sector, the handling of roads in Seulimeum District needs to be looked for priority handling. This study aims to analyze the dominant criteria that need to be considered in road handling and to analyze the priority order of road handling in Seulimeum District. This study uses a quantitative method approach through a questionnaire. The sampling technique used was purposive sampling, namely sampling with considerations based on the stakeholders and road sector stakeholders. The number of respondents was assigned as many as 5 stakeholders, namely the Head of Bina Marga Division of the Public Works and Spatial Planning (PUPR) of Aceh Besar District, Head of the Regional Development Program Division of the Regional Development Planning Agency (Bappeda) Aceh Besar District, Members of Commission IV for the Development Sector of the District People's Representative Council (DPRK) Aceh Besar, Head of Seulimeum sub-district, and academics. The road handling criteria reviewed are road conditions, land use, accessibility, population, social facilities, government facilities and economic facilities. The data analysis technique used Multi Criteria Analysis (MCA). The results showed that the dominant criterion that needs to be considered in road handling is the criteria for road conditions with an average criterion weight value of 0.323. The road handling priority is the Seulimeum - Lamteuba road alternative as priority 1 with an alternative performance of 4.095, the Entee Gajah - Lhieb road alternative as priority 2 with an alternative performance of 3.715, and the alternative Jalan Lamteuba - Lamteuba Droe as priority 3 with an alternative performance of 3.619. Keywords: Priority, handling, roads, criteria, alternatives, Seulimeum District
Performance Analysis of Flexible Pavement on the Banda Aceh–Medan National Road Using the Pavement Condition Index Method Isya, Muhammad; Setyawan, Ary; Pillai, Salu S.
Journal of Engineering and Technological Science Vol. 2 No. 1 (2026): Journal of Engineering and Technological Science, February 2026
Publisher : Lembaga Penelitian dan Pendidikan (LPP) Kalibra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70716/jets.v2i1.224

Abstract

The Banda Aceh–Medan National Road serves as a strategic transportation corridor in northern Sumatra, supporting regional mobility and economic activities. Continuous traffic loading and environmental effects have caused progressive deterioration of flexible pavement performance along this route. This study aims to evaluate the functional performance of flexible pavement on the Banda Aceh–Medan National Road using the Pavement Condition Index (PCI) method. A quantitative descriptive approach was employed through visual pavement surveys, damage identification, severity classification, and PCI calculation following ASTM D6433 standards. The road section was divided into several sample units to ensure representative condition assessment. The results indicate that the average PCI value of the observed segments falls within the “fair” to “poor” condition categories, with dominant distress types including alligator cracking, rutting, and raveling. Comparative analysis with previous studies confirms the reliability of the PCI method in reflecting actual pavement conditions and supporting maintenance decision-making. The findings emphasize the necessity for timely preventive and corrective maintenance strategies to extend pavement service life. This study contributes empirical evidence for pavement management systems on national roads in Indonesia and reinforces the applicability of PCI as a standardized evaluation tool.
Co-Authors Adia Saputra Alfiansyah Yulianur Alfiansyah Yulianur BC Alfiansyah, Reza Alwin Rusydi Andris Wandi Ariadi Ariadi Ary Setyawan Bahron Bakti Bakauddin, Bakauddin Bambang Tripoli Chaira Chaira Chaira Chaira Cut Mutiawati Etty Herawaty Fadli Fadli Fadli Idris Fadli Idris Fahrezi, Ahmad Egi Firdaus Firdaus Firdaus Firdaus Fisaini, Juliana Fitri, Suraya Fitrika Mita Suryani Hafnidar A. Rani Hamdani Hamdani Handayani Handayani Intan Wirnanda Iqbal Iqbal Iqbal Iqbal Irfan Irfan Irin Caisarina Irwin Irwin Isnanda Isnanda Isnanda Isnanda Joly Srianty Keumala, Putri Pirusa Liza Karmina Lulusi Lulusi Martina, Rita Marwan Marwan Matjakriandi Matjakriandi Matjakriandi, Matjakriandi Mirza Irwansyah Mirza Sofyan Mubarak Mubarak Mudinillah, Adam Mudji Burrahman Mufazzil Yusra Muhammad Ahlan Mulyadi Mulyadi Mulyadi Mulyadi Muntazar Muntazar Nasution, Wenny Rahmadhani Natalia Tanan, Natalia Nazariani Nazariani Noer Fadhly Nova Viyantimala Nura Usrina Ondriani Ondriani Ondriani, Ondriani Pillai, Salu S. Pinta Sari Raby, Shahrial Rahmad Saputra Ramli, Yuswardi Razuardi Razuardi Razuardi, Razuardi Renni Anggraini Renni Anggraini Rijalul Qadri Riski, Sita Rita Martina riza, Fakhrur Ruslan Ruslan Salmannur, Alfi Satria Mandaraira Shafira, Zadia Sofyan M. Saleh Sofyan M. Saleh Sofyan M. Saleh Sofyan M. Saleh Sofyan M. Saleh Sugiarto Sugiarto Suraya Fitri Suryani*, Fitrika Mita Tarmizi Tarmizi Tarmizi Tarmizi Taufiq, Luthfi Chaliqi Tety Sriana Teuku Aswardi Teuku Fadrial Mahfud Tri Handayani Wirnanda, Intan Yuhanis Yunus Yunus, Yuhanis Yusria Darma Yuswardi Ramli Zahroel Barady