Perancangan Aplikasi Web Pengelolaan Dokumen Shop Drawing Pada Proyek Konstruksi Bangunan Gedung Fadhilah, Bima Rizky; Purnomo, Adhi; Lenggogeni, Lenggogeni
Jurnal Pendidikan Tambusai Vol. 10 No. 1 (2026)
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai, Riau, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jptam.v10i1.36326

Abstract

Industri konstruksi menghadapi tantangan besar dalam pengelolaan dokumen teknis, khususnya shop drawing, yang sering kali dilakukan secara manual melalui aplikasi pesan instan dan penyimpanan lokal. Kondisi ini menimbulkan risiko keterlambatan, duplikasi pekerjaan, serta kesulitan dalam melacak status dokumen. Penelitian ini bertujuan untuk merancang sistem manajemen dokumen shop drawing berbasis website dengan studi kasus proyek pembangunan Eka Hospital Juanda. Metode penelitian menggunakan model pengembangan 4D, namun penelitian ini hanya dilakukan sampai tahap Define, yaitu identifikasi kebutuhan sistem. Hasil identifikasi menunjukkan perlunya repositori dokumen terpusat, mekanisme kontrol versi yang jelas, penandaan status dokumen (draft, submit, approved, revisi), fitur komunikasi terintegrasi antar tim, serta pelacakan progres pekerjaan secara real-time. Temuan ini konsisten dengan literatur yang menekankan pentingnya digitalisasi pengelolaan dokumen untuk meningkatkan keterlacakan, transparansi, dan efisiensi koordinasi proyek. Penelitian ini memberikan kontribusi berupa dasar konseptual bagi pengembangan sistem manajemen dokumen shop drawing berbasis website yang dapat dilanjutkan pada tahap perancangan dan implementasi di penelitian berikutnya.
Penerapan BIM 4D Proyek Rehap Total Gedung Sekolah SMPN 117 Jakarta Wicaksono, Ari Ikhsan; Purnomo, Adhi; HS, Muh Abdhy Gazali
Jurnal Teknik Sipil Vol 6, No 2 (2025)
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.jts.2025.v6i2.7768

Abstract

The application of Building Information Modeling (BIM) 4D technology in the total rehabilitation project of SMP Negeri 117 East Jakarta has been proven to contribute significantly to the effectiveness of project management, especially in the aspect of scheduling. By integrating time data into a three-dimensional model, BIM 4D enables a more informative and interactive visualisation of construction progress. This approach not only makes it easier for stakeholders to understand the sequence of implementation, but also helps detect potential scheduling conflicts from the planning stage. Through the Define, Design, Develop, and Disseminate stages used in the Research and Development (RD) approach, the process of developing the 4D BIM model was carried out systematically. Microsoft Project-based scheduling and modelling through the educational version of Autodesk Navisworks successfully produced a visual simulation of the project that illustrates the relationship between construction activities and their implementation time. The results show that BIM 4D can improve cross-disciplinary coordination, reduce the risk of delays due to miscommunication, and optimise resource allocation. In addition, the potential for re-work can be minimised as all stages of construction have been thoroughly simulated prior to implementation in the field. Thus, the implementation of BIM 4D is a strategic solution in supporting efficiency, accuracy, and transparency in the implementation of educational building construction projects.
Peran Job Safety Analysis (JSA) dalam Penerapan Keselamatan dan Kesehatan Kerja (K3) pada Proyek Konstruksi (Literature Review) Danavia, Thoriq Fadhil Muhammad; Mulyono, Tri; Purnomo, Adhi
Jurnal Pendidikan Tambusai Vol. 10 No. 1 (2026)
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai, Riau, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jptam.v10i1.37086

Abstract

Sektor konstruksi memiliki tingkat kecelakaan kerja yang tinggi karena karakteristik pekerjaan yang kompleks dan berisiko. Job Safety Analysis (JSA) merupakan salah satu instrumen penting dalam penerapan keselamatan dan kesehatan kerja (K3) yang berfungsi untuk mengidentifikasi potensi bahaya, menilai tingkat risiko, serta menetapkan langkah pengendalian sebelum pekerjaan dilaksanakan. Penelitian ini bertujuan untuk mengkaji peran Job Safety Analysis (JSA) dalam penerapan K3 pada proyek konstruksi melalui metode literature review. Sumber data diperoleh dari artikel jurnal nasional dan internasional yang relevan dalam lima hingga sepuluh tahun terakhir. Hasil kajian menunjukkan bahwa penerapan JSA secara konsisten dapat menurunkan tingkat kecelakaan kerja, meningkatkan kesadaran keselamatan pekerja, serta memperkuat pengendalian risiko di lapangan. Namun, implementasi JSA masih sering bersifat administratif dan belum optimal. Oleh karena itu, JSA perlu diterapkan secara operasional dan terintegrasi dalam manajemen proyek konstruksi.