Claim Missing Document
Check
Articles

Found 6 Documents
Search
Journal : Inisiasi

DESAIN PENGEMBANGAN POTENSI “EKOWISATA KAWASAN PASAR IKAN DESA KEDUNGOMBO BATURETNO” Iwan Ristanto; Satria Agung Wibawa
Inisiasi Volume 11, Edisi 1, Juni 2022
Publisher : Badan Perencanaan Pembangunan Daerah dan Penelitian dan Pengembangan Kabupaten Wonogiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (737.424 KB) | DOI: 10.59344/inisiasi.v11i1.33

Abstract

RPJMDes Kedungombo 2019-2025, APBDes 2021 Fish Market Development Plan, Village financial policy directions and regional priority programs, accompanied by work plans including "Development of Fish Market Area Potential". For this reason, comprehensive planning is needed from the aspect of developing village areas through a Master Plan which will be assisted by the service staff in this case the Civil Engineering Study Program Service Team, Universitas Veteran Bangun Nusantara Sukoharjo."PKM Potential Development "Ecotourism in the Fish Market Area of ​​Kedungombo Village" Service activities through planning and developing village potential are carried out through several stages, as follows:(1) Licensing and Cooperation in Kedungombo Village, Baturetno,(2) Survey and Measurement,(3) Pre-Design Creation and Presentation,(4) Design Public Outreach & Test, (5) Revision of Design Drawings and Calculation of RAB. The development of the Fishing Pond Area and Selfie Area in Kedungombo Village, Baturetno, there was an increase in understanding of 67%, while 2) Participants' understanding of the Bestek (Development Plan) and RAB images increased by 75% from a total of 26 (twenty six) participants representing the community. attended the socialization and public test of the Ecotourism Development Design for Fish Market Area in Kedungombo Village, Baturetno.
ANALISIS STUDI KELAYAKAN PROYEK PEMBANGUNAN WISATA PENDIDIKAN AGRO & FARMING ISLAMIC CENTRE AL HUDA, SELOGIRI Iwan Ristanto; Satria Agung Wibawa
Inisiasi Volume 12, Edisi 1, Juni 2023
Publisher : Badan Perencanaan Pembangunan Daerah dan Penelitian dan Pengembangan Kabupaten Wonogiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59344/inisiasi.v12i1.125

Abstract

Development of the Free Learning Curriculum for 2022, and the amount of public enthusiasm for the Integrated Islamic Education model has encouraged the Integrated Islamic Boarding School (PPIT), to develop formal education based on Islamic boarding schools; PAUD IT, SDIT, SMPIT, SMKIT, SMAIT which are integrated in character education through the development of an independent curriculum outside the classroom through the Short Semester Course Agro& Farming educational tour program at the Islamic Center Al Huda, Selogiri The construction of an educational tourism facility for the Agro& Farming Islamic Center Al Huda in Selogiri requires a large amount of money so a project feasibility study analysis is needed which is an important factor in a project evaluation although technical and social aspects also determine it. To carry out an economic analysis, economic benefits and costs are needed, which are then made into cash flows based on the implementation program. Calculating the value of the EIRR is assumed to be the loan service, calculating the B/C Ratio which is the difference between Benefit and Cost, and calculating the NPV value which is the difference between the profit (benefit) and cost (cost) in the conditions of average margin mudhorobah/murabahah loan services -12% average. Based on the Feasibility Study for the Development of the Agro& Farm Islamic Center Al Huda Wonogiri, it can be concluded that; the amount of EIRR = 24.0% > 12%, it is assumed that with the loan service margin being greater than 12% (current interest rate), then the project can be said to be economically viable. The B/C value = 1.932 > 1 means that if the B/C value at the loan service margin is 12% > 1, then the construction of the Agro& Farm Islamic Center Al Huda Wonogiri can be built. The difference between the profit (benefit) and cost (cost) on the condition of an average loan margin of 12% is (B-C) = IDR 723,283,139.00 > 0  
ANALISIS PENURUNAN TANAH TIMBUNAN PADA BENDUNGAN PIDEKSO MENGGUNAKAN ALAT TOTAL STATION DAN INSTRUMENTASI (INCLINOMETER) Agus, Agus Puji Utomo; Tri Nalasrsih, Retno; Ristanto, Iwan
Inisiasi Volume 13, Edisi 2, Desember 2024
Publisher : Badan Perencanaan Pembangunan Daerah dan Penelitian dan Pengembangan Kabupaten Wonogiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59344/inisiasi.v13i2.226

Abstract

Pidekso Dam is a dam on the Bengawan Solo River, located in Giriwoyo District Wonogiri Regency. According to the Directorate General of Water Resources and the Ministry of PUPR, the Pidekso Dam is one of the national strategic projects (PSN) which is targeted for completion in 2021. As a new dam, reducing the dam's embankment is something that needs to be paid attention to and monitored periodically. This research was conducted to determine the decline in the Pidekso Dam stockpiles after it was inaugurated within a period of 7 months, namely from January 2022 to July 2022. The method used in this research is observing surface movement monuments using a total station and observing settlement using Inclinometer instrumentation. The results of this research are that there has been a decrease in embankment at Pidekso Dam, both according to observations with a total station and observations with an inclinometer. Based on the results of observations, the average decline in Pidekso Dam through observations of surface movement monuments value is -0.047 m compared to observations using inclinometer is -0.039 m. However, the difference in the average value of the decrease is not too big.
EVALUASI MUTU BETON BANGUNAN PERTASHOP DI WILAYAH WONOGIRI BERDASARKAN UJI SERTIFIKAT LAIK FUNGSI (SLF) METODE CONCRETE HAMMER TEST ristanto, iwan; Agung Wibawa, Satria
Inisiasi Volume 14, Edisi 1, Juni 2025
Publisher : Badan Perencanaan Pembangunan Daerah dan Penelitian dan Pengembangan Kabupaten Wonogiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59344/inisiasi.vi.270

Abstract

This study aims to evaluate the concrete quality of Pertashop buildings in Wonogiri Regency based on compressive strength results using the Concrete Hammer Test method (SNI 03-4430-1997). Building Approval or Persetujuan Bangunan Gedung (PBG) as well as Certification of Functionality (SLF) during the period from January to March 2024 with a total of 10 Pertashops in all areas of Wonogiri Regency with a test area of ​​9 test areas that were 28 days old. Each area was tested with 10 shots. The purpose of this study was to determine the quality results of the concrete structure quality of the Pertashop building in Wonogiri Regency based on the value of the hammer test compressive strength factor. From the results of concrete testing on the Pertashop building in Wonogiri Regency by taking samples of 10 points of the Pertashop location where it was built, it can be concluded that the Pertashop machine seat floor has a better concrete quality than K.225kg/cm2, while the Pertashop yard floor and Pertashop column pillars are still below the quality of K.225kg/cm2. Statistical tests in scatter-plots whose data comes from samples that are normally distributed multivariate, conclude that the quality of the Pertashop machine seat concrete plate H0 is rejected or data from two variables (Quality of floor slab concrete and column concrete).
STRATEGI MANAJEMEN KOLABORATIF PERANGKAT DAN PKK DESA BERBASIS INDEK DESA MEMBANGUN (IDM) BERKEMBANG Ahya, Rahmatul; Iwan Ristanto; Agung Wibawa, Satria; Sri Lestari, Mathilda
Inisiasi Volume 14, Edisi 1, Juni 2025
Publisher : Badan Perencanaan Pembangunan Daerah dan Penelitian dan Pengembangan Kabupaten Wonogiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59344/inisiasi.vi.302

Abstract

This study aims to analyze the collaborative management strategy between village officials and PKK (Family Welfare Movement) cadres in enhancing the village’s economic resilience based on the Village Development Index (IDM) in Sendangagung Village, Giriwoyo Subdistrict, Wonogiri Regency. The research employed a qualitative approach with a case study design, supported by quantitative data from two training programs: an Android-based application training for preparing rural road budget plans (RAB), and dish soap production training for PKK cadres. The findings reveal that the collaborative strategy between village officials and PKK was implemented through participatory planning, integrated execution, and utilization of local resources and appropriate technology. Quantitatively, village officials (N=12) demonstrated an average RAB preparation time of 2.2 minutes using the application, with all participants mastering the basic functions. Meanwhile, PKK cadres (N=15) experienced an average knowledge score increase of 37.7 points, and 40% expressed interest in producing dish soap independently. This collaborative strategy has proven effective in strengthening the community’s social and economic resilience dimensions and contributes to improving the village’s IDM status.
ANALISIS PERBANDINGAN KINERJA WAKTU DAN BIAYA PROYEK MENGGUNAKAN METODE EARNED VALUE ANALYSIS (Studi Kasus : Kinerja Kontraktor Proyek Pekerjaan Jalan) Ristanto, Iwan; Ayu Septiana, Dellia; Agung Wibawa, Satria
Inisiasi Volume 14, Edisi 2, Desember 2025
Publisher : Badan Perencanaan Pembangunan Daerah dan Penelitian dan Pengembangan Kabupaten Wonogiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59344/inisiasi.vi.321

Abstract

The purpose of this study is to determine the comparison of contractors' time and cost performance using the Earned Value Analysis method. The required data include general project data, Project RAB, S-Curve, and Weekly Reports. The results of the study indicate that the performance of contractors in the Wonogiri and Surakarta areas has a positive SV value, meaning the project is running faster than the planned schedule, while the SPI (Schedule Performance Index) value is above 1, this indicates that they are able to complete the project in a more efficient time compared to the plan. Meanwhile, the performance of contractors in the Karanganyar area shows a negative SV value, meaning the project is experiencing delays where the work completed is less than the initial plan. The SPI (Schedule Performance Index) value in the Karanganyar area is equal to 1, this indicates that even though the project is experiencing delays, there is room for improvement in the efficiency of work completion.