Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Mimbar Keadilan

PERBANDINGAN ANTARA UNDANG-UNDANG NOMOR 13 TAHUN 2003 KETENAGAKERJAAN DENGAN UNDANG-UNDANG NOMOR 11 TAHUN 2020 CIPTA KERJA DALAM PEMUTUSAN HUBUNGAN KERJA BAGI PEKERJA PERJANJIAN KERJA WAKTU TERTENTU PADA MASA KONTRAK Poernamadjaja, Doddy; Hufron, Hufron
Mimbar Keadilan Vol 15 No 1 (2022): Februari 2022
Publisher : Faculty of Law, Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/mk.v15i1.5848

Abstract

the aim of this research was conducted analyze legal protection for workers' contracts, who are dismissed before the end of their working period. This research was conducted using juridical-normative legal research, The research produces the first answer PKWT workers who are dismissed based on the employees have not provided maximum legal protection for PKWT workers, Article 62 of the employment only provides compensation for workers/ laborers. workers until the end of the work agreement. The attestation of the Job Creation Law and PP 35 of 2021 raises legal problems in the form of conflicting norms (antinomy norms) and does not reflect legal protection in the theory of equitable legal objectives. requires employers to provide compensation in the amount of which is based on the period of PKWT that has been implemented. by the Employer. hen based on the results of the research, the norm of Article 16 PP 35 of 2021 is contrary to a higher norm, namely Article 62 of the employment of Law.
Stakeholder Engagement: Analyzing the Role of Community Participation in EIA Document Crafting for PT Semen Indonesia's Cement Plant Fatmawati, Leony; Hufron, Hufron; Shulga, Ievgenii
Mimbar Keadilan Vol. 17 No. 1 (2024): Februari 2024
Publisher : Faculty of Law, Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/mk.v17i1.9714

Abstract

This study aims to clarify the community involvement process in preparing AMDAL papers for the construction of a cement plant by PT Semen Indonesia (Persero) Tbk in Rembang Regency, Central Java Province. An Environmental Impact Assessment (AMDAL) document is mandatory for any development and mining operation and must be prepared by the party responsible. The community's involvement in decision-making and evaluation stages is crucial for the construction site. This research utilizes a normative technique incorporating a statutory, conceptual, and case-based approach. The findings illustrate community engagement through their involvement in preparing AMDAL papers. This study investigates the level of community engagement in preparing Environmental Impact Assessment (EIA) reports for establishing a cement factory by PT Semen Indonesia (Persero) Tbk in Rembang Regency, Central Java Province. Furthermore, it examines the disputes between PT Semen Indonesia (Persero) Tbk and the local community on regulating community involvement in preparing the Environmental Impact Assessment (EIA) document