p-Index From 2021 - 2026
14.122
P-Index
This Author published in this journals
All Journal J@TI (TEKNIK INDUSTRI) Teknosains: Media Informasi Sains dan Teknologi SITEKIN: Jurnal Sains, Teknologi dan Industri Jurnal Ilmiah Teknik Industri Tekinfo | Scientific Journal of Industrial and Information Engineering Jurnal DISPROTEK Juriti Prima (Jurnal Ilmiah Teknik Industri Prima) International Journal of Engineering, Technology and Natural Sciences (IJETS) SPEKTA (Jurnal Pengabdian Kepada Masyarakat : Teknologi dan Aplikasi) Jurnal Aplikasi Ilmu Teknik Industri (JAPTI) ETNIK : Jurnal Ekonomi dan Teknik Jurnal Inovasi dan Kreativitas (JIka) Jurnal Jarlit Jurnal Cakrawala Ilmiah Jurnal Riset Teknik Industri KOMMAS: Jurnal Pengabdian Kepada Masyarakat Jurnal Universal Technic JUSTI (Jurnal Sistem dan Teknik Industri) Jurnal Teknologi dan Manajemen Industri Terapan JURTI Jurnal Teknik Industri Jurnal Teknologi dan Manajemen Sistem Industri Jurnal Teknik Mesin, Industri, Elektro dan Informatika Jurnal Manajemen dan Teknologi Rekayasa Al-DYAS : Jurnal Inovasi dan Pengabdian kepada Masyarakat JIE.UPY JURNAL ILMIAH SAINS TEKNOLOGI DAN INFORMASI Jurnal Manajemen Dan Bisnis Ekonomi Jurnal Kajian dan Penelitian Umum Jurnal Ilmiah Research and Development Student JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI (JISI) Jurnal Rekayasa Proses dan Industri Terapan Jurnal Ilmiah Research Student JT-IBSI (Jurnal Teknik Ibnu Sina) Jurnal Teknik Industri, Bisnis Digital, dan Teknik Logistik: Jurnal Trinistik JURNAL MULTIDISIPLIN ILMU AKADEMIK Bhinneka Multidisiplin Journal Jurnal Ilmiah Nusantara Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika Cosmic Jurnal Teknik Ulil Albab Jurnal Kendali Teknik dan Sains
Claim Missing Document
Check
Articles

Analisis Perawatan dan Perbaikan Mesin Carding dengan Menggunakan Metode FMEA (Failure Mode and Effect Analysis) Muhammad Irfan Maulana; Ferida Yuamita
JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI Vol. 3 No. 1 (2025): Januari : Jurnal Ilmiah Teknik Industri dan Inovasi
Publisher : CV. ALIM'SPUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59024/jisi.v3i1.990

Abstract

PT Primayudha Mandirijaya adalah perusahan manufaktur pemintal benang yang pada setiap kegiatan produksinya mesin sangat berperan penting. Salah satu mesin produksi pengolah material rayon menjadi sliver yaitu mesin carding. Penelitian ini membahas mengenai perawatan dan perbaikan unit mesin carding di spinning 3 PT Primayudha Mandirijaya yang menyebabkan penurunan kinerja produktivitas pada tahap selanjutnya yaitu drawing menjadi tidak optimum. Tujuan dari penelitian ini untuk mengetahui komponen mesin carding yang memiliki nilai RPN (Risk Priority Number) paling tinggi dan melakukan evaluasi pada komponen tersebut. Pada penelitian ini metode yang digunakan adalah metode FMEA (Failure Mode and Effect Analysis). Kegagalan dari setiap komponen akan dilakukan perankingan dengan menghitung nilai RPN untuk menentukan komponen prioritas perbaikan. Berdasarkan hasil analisis menggunakan metode FMEA diperoleh nilai rata-rata skala Risk Priority Number (RPN) yaitu 161,6, dan komponen yang menjadi pritoritas utama adalah Mounting Doffer sebesar 360, kemudian Stationary Flat dengan RPN sebesar 280, delivery roll dengan RPN sebesar 175, dan Belt Cylinder dengan RPN sebesar 168. Faktor penyebab kegagalan setiap komponen adalah lifetime tercapai, kelalaian manusia, dan perbedaan antara komponen import dan lokal.
Analisis Beban Kerja Mental Penjahit Menggunakan Metode NASA-TLX Pada CV. XYZ Jastika Amelia Atmaja; Ferida Yuamita
JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI Vol. 3 No. 1 (2025): Januari : Jurnal Ilmiah Teknik Industri dan Inovasi
Publisher : CV. ALIM'SPUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59024/jisi.v3i1.1042

Abstract

CV. XYZ is a company that works in the service sector and produces sports gloves (golf, equestrian, etc.). From production data, the number of requests for gloves increased greatly in June-October, the number of requests was above 5000. Workers felt tired due to age, level of pattern difficulty, type of glove material and age of machines so that many employees experienced fatigue which resulted in a decrease in work productivity. The aim of this research is to find out how high or large the mental load faced by workers at CV. Cahaya Setia Mulia using the NASA-TLX method. In this research, the population is the tailors at CV. XYZ, totaling 16 people. Based on the research results obtained, of the 16 respondents there were 9 respondents in the very high category, 2 respondents in the high category, and 4 respondents in the somewhat high category. And of the 6 NASA-TLX indicators, the highest indicator is Physical Demands (PD) of 76.0 and the lowest is the Frustration (FR) indicator of 58.7. Proposed improvements include adding 5 tailors to the workforce of 5 tailors, 2 madome tailors, 1 zigzag tailor or increasing rest time to 1 hour and reducing working hours on Saturdays to 5 hours.
Analisis Risiko Kecelakaan Kerja pada Proyek Pembangunan Gedung Kelas Baru dengan Pendekatan Job Safety Analysis Else Reviati; Ferida Yuamita
JURNAL ILMIAH RESEARCH AND DEVELOPMENT STUDENT Vol. 3 No. 1 (2025): Februari : Jurnal Ilmiah Research and Development Student
Publisher : CV. ALIM'SPUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59024/jis.v3i1.1077

Abstract

Proyek pembangunan gedung kelas baru melibatkan sembilan pekerja dengan risiko keselamatan kerja pada pengerjaan struktur, seperti pondasi, tie beam, sloof, dan kolom. Analisis Job Safety Analysis (JSA) mengidentifikasi potensi bahaya fisik, seperti tertusuk material, tergores alat kerja, tertimpa bahan, terjepit, tersandung, terpeleset, dan terjatuh, serta ancaman ergonomi akibat gerakan berulang. Masalah utama adalah rendahnya kesadaran K3, pengawasan operasional yang kurang optimal, dan minimnya penggunaan alat pelindung diri (APD). Rekomendasi pengendalian mencakup edukasi SOP dan penyediaan APD lengkap. Implementasi strategi ini bertujuan meningkatkan kesadaran K3, pengawasan yang lebih efektif, dan menciptakan lingkungan kerja yang aman, serta meminimalkan potensi bahaya dan risiko kecelakaan.
Evaluasi Pelayanan Akademik pada Perguruan Tinggi Swasta Prodi Teknik Industri Menggunakan Metode IPA dan SERVQUAL Fithriya Nur Hana; Ferida Yuamita
JURNAL MANAJEMEN DAN BISNIS EKONOMI Vol. 3 No. 1 (2025): January : JURNAL MANAJEMEN DAN BISNIS EKONOMI
Publisher : Institut Teknologi dan Bisnis (ITB) Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54066/jmbe-itb.v3i1.2751

Abstract

This study provides insights for improving academic service quality and enhancing student satisfaction. The Industrial Engineering Program aims to enhance academic service quality to support students’ success. Recent survey data indicate a decline in satisfaction, with a 9.11% drop from 2021/2022 to 2022/2023 (from an average score of 4.39 to 3.99) and a further 20.80% decline from 2022/2023 to 2023/2024 (down to 3.16). This study analyzes service quality using SERVQUAL and IPA methods across 22 service attributes to identify areas needing improvement. Results show all attributes with a negative gap, with the smallest gap in academic advising (P10) at -0.76, indicating it is closest to meeting student expectations. The IPA framework categorizes improvements into four quadrants, prioritizing restroom cleanliness, laboratory facilities, and classroom comfort (Quadrant 1). Suggestions include aligning service attributes more closely with student needs and exploring how service quality impacts academic performance and well-being. This research provides key insights to enhance service quality and student satisfaction in the future.
Analisis Human Error Pada Pekerja Jalur 1 Produksi Dengan Menggunakan Metode Human Error Assesment And Reduction Technique (HEART) mila jamilatul mahmudah, mila; Yuamita, Ferida
JURITI (Jurnal Ilmiah Teknik Industri )Prima Vol 8 No 1 (2024): Juriti Prima (Jurnal Ilmiah Teknik Industri Prima)
Publisher : Fakultas Teknologi dan Ilmu Komputer, Universitas Prima Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Human error (kesalahan manusia) kerap menjadi risiko kecelakaan kerja yang terjadi di lapangan kerja, penyebab human error diantaranya yaitu karena dari manusia itu sendiri, mesin, dan lingkungan. Dengan adanya analisis human error dapat mengurangi risiko kecelakaan kerja pada PT KONSTRUKSI. PT KONSTRUKSI bergerak dalam bidang industri dan konstruksi. Bedasarkan data tahun 2023 PT KONSTRUKSI didapatkan 5% dari 8 pekerja yang ada di jalur1 mengalami kecelakaan kerja seperti tangan tergores oleh mesin. Hasil penelitian ini didapatkan task dengan nilai human error probability tertinggi pada Proses Welded Beam terdapat pada task 1.1 menyiapkan dan menggunakan APD sesuai dengan potensi bahaya yang mungkin terjadi dengan possible human error tidak menggunakan alat pelindung diri (APD) nilai HEP nya sebesar 0,594 dan upaya pengendalian melakukan sosialisasi standar pemakaian APD. Pada Proses Cutting Plat terdapat pada task 1.2 memastikan mesin dalam keadaan bersih dan tidak dalam perbaikan dengan possible human error pekerja mengabaikan mesin saat proses perbaikan (maintenance) nilai HEP nya sebesar 0,962 dan upaya pengendaliannya dilakukan pemeriksaan berkala dan sediakan alat pemedam api ringan (APAR) di titik terjangkau.
Optimisasi Systematic Layout Planning dan Perbandingan Work Sampling untuk Efisiensi Waktu Produksi di UD Cantenan Dimas Hendarjati Pamungkas; Muhamad Samsul Huda; Roby Septiawan; Agung Joko Prasetya; Rizki Anugrah Robby; Ferida Yuamita
Jurnal Rekayasa Proses dan Industri Terapan Vol. 3 No. 1 (2025): Februari: Jurnal Rekayasa Proses dan Industri Terapan ( REPIT )
Publisher : Politeknik Kampar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59061/repit.v3i1.875

Abstract

This research aims to increase production efficiency at UD Cantenan, an aluminum metal manufacturing industry, through the application of the Systematic Layout Planning (SLP) method, the Kanban system, and Work Sampling productivity analysis. The initial layout shows the material movement distance between workstations is 41 m², with daily material handling costs reaching IDR 105,544. Through the SLP method, the layout was improved so that the moving distance was reduced to 37 m², and material handling costs fell to IDR 70,626 per day. The Kanban system was implemented to visually improve production flow, minimize waiting time, and reduce inventory buildup. Kanban implementation increased product delivery accuracy from 70% to 95%. Furthermore, productivity analysis using Work Sampling showed a non-productive activity ratio of 53% and productive activity reaching 65%. Normal production time measurements yield an average of 14 minutes per unit, indicating increased work efficiency. A total budget plan for implementing relayout of IDR 5,203,000 was also prepared as part of company resource management. The results of this research show that the combination of SLP, Kanban, and Work Sampling methods can significantly increase operational efficiency, optimize facility layout, and reduce production time and costs.
Analisis Postur Kerja Menggunakan Metode REBA pada Mekanik Bengkel di PT. Mitra Pratama Mobilindo Sleman Ihsan, Auliya; Yuamita, Ferida
Al-DYAS Vol 4 No 1 (2025): FEBRUARI
Publisher : Lembaga Yasin AlSys

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58578/aldyas.v4i1.4664

Abstract

Vehicles play an important role in the mobility of the economic sector,the automotive industry is one of the main pillars of the Indonesian economy.PT Mitra Pratama Mobilindo Sleman is a well-known workshop that offers repair services, car sales, and spare parts.Mechanics in this increases the risk of fatigue,muscle injury,and muscle disorders. To find the risks and provide suggestions for improvement, this study uses the REBA (Rapid Entire Body Assessment) method to analyze the working postures of mechanics. Data was collected through observation, photo documentation of workers, and Nordic Body Map (NBM) questionnaire. Based on the results of the analysis, the work postures performed showed a significant risk of injury as indicated by the high REBA score, namely in the work postures of grease up, hydraulic repair, and diesel filter replacement. To reduce the risk of musculoskletal disorders, it is necessary to make recommendations for improving work postures based on the results of REBA calculations. The improvements include the use of small chairs and tools such as car creepers and the design of more ergonomic work postures.The results showed a significant decrease in REBA scores after the analysis of the proposed improvements. This indicates that the ergonomic risk value of the proposed improvements if implemented will improve the safety and health of mechanical workers and optimize the quality of work in automotive workshops.
Analisis Postur Pekerja Pada Bagian Ekstraksi Dengan Metode Rapid Entire Body Assessment (Reba) Untuk Mengurangi Resiko Cidera Di PT XYZ Gilang, Gilang Muhamad Fatahyasin; Yuamita, Ferida
Cosmic Jurnal Teknik Vol 1 No 3 (2024): Agustus
Publisher : Ali Institute or Research and Publication

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pada proses produksinya PT XYZ masih menggunakan aktivitas MMH yang berperan dominan pemindahan barang secara manual.pekerja yang melakukan aktivitas barang dapat menyebabkan penyakit cidera terlebih jika pekerjaan tersebut tidak dilakukan dengan benar. Penelitian ini bertujuan untuk mengurangi terjadinya terjadinya cidera pada pekerja, Penelitian dilakukan dengan mengumpulkan data keluhan pekerja menggunakan kuesioner Nordic Body Map, kemudian mengidentifikasi postur kerja pekerja menggunakan pendekatan metode Rapid Entire Body Assessment (REBA) untuk mengetahui berapa level resikonya. Hasil dari penelitian menunjukkan terdapat adanya keluhan yang di rasakan oleh pekerja hasil kuesioner Nordic Body Map Xiaoxiao terdapat beberapa keluhan level agak sakit dengan nilai 22,96% , level sakit dengan nilai 12,6% dan level sangat sakit dengan nilai 3,15%. Hasil analisis penilaian postur pekerja yang tergolong kategori 2 berarti berbahaya level sedang, beresiko menyebabkan cidera pada pekerja, sehingga perlu dilakukan perbaikan yaitu pada aktivitas kerja pencucian simplisia, Pengambilan bahan baku yang telah di rebus dan memasukan kedalam mesin peras dan aktivitas kerja menekan simplsia agar lebih cepat terperas, sedangka postur pekerja yang masuk pada kategori 3 berarti berbahaya level tinggi, beresiko menyebabkan cidera pada pekerja dan perlu dilakukan perbaikan secepatnya yaitu, pada aktivitas kerja pengambilan hasil pemerasan dan memasukan hasil pemerasan kedalam mesin evavorasi
Pengukuran Beban Kerja Fisik Dan Mental Pada Pekerja Bagian Persiapan Produksi Menggunakan Metode CVL Dan Nasa TLX Di PT Mandiri Jogja Internasional Gilang, Gilang Muhamad Fatahyasin; Yuamita, Ferida
Cosmic Jurnal Teknik Vol 1 No 4 (2024): Nopember
Publisher : Ali Institute or Research and Publication

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55537/cosmic.v1i4.649

Abstract

PT Mandiri Jogja International, perusahaan pengolahan produk dari kulit seperti tas, dompet, dan berbagai aksesoris. Perusahaan ini dapat memproduksi tas 120 pcs/hari, dengan jam kerja 8 jam per hari. Kegiatan produksi di PT Mandiri Jogja Internasional masih menggunakan bantuan manusia dimana pada aktivitas kerja menggunakan alat manual yang mengandalkan manusia. Penelitian ini bertujuan untuk mengukur beban kerja fisik dan mental untuk mengurangi beresiko terjadiya kelebihan beban dimana beban kerja yang berlebihan mengakibatkan penurunan kualitas kerja. Beban kerja fisik diukur menggunakan perhitungan %CVL, beban kerja mental diukur menggunakan kuesioner NASA-TLX. Hasil perhitungan beban kerja fisik pada pekerja bagian persipan produksi terdapat satu pekerja yang memperoleh nilai %CVL >30% yaitu pemotongan 7, dengan memperoleh nilai %CVL sebesar 34,9 yang artinya diperlukan perbaikan tetapi tidak mendesak sedangkan ke16 pekerja bagian produksi lainnya memperoleh nilai %CVL <30% yang artinya tidak mengalami kelelahan. Hasil perhitungan beban mental di dapat kelima proses memperoleh nilai skor dengan interval 61 – 80 yang masuk pada kategori tinggi yaitu proses spray lem dengan skor 80,3, hendel skor 77,6, pemotongan 76,7, dan seset lop 66,3 sedangkan satu pekerjaan dengan interval skor 41 – 60 yang artinya masuk kategori sedang yaitu pada proses aksesoris.
Optimisasi Systematic Layout Planning dan Perbandingan Work Sampling untuk Efisiensi Waktu Produksi di UD Cantenan Dimas Hendarjati Pamungkas; Muhamad Samsul Huda; Roby Septiawan; Agung Joko Prasetya; Rizki Anugrah Robby; Ferida Yuamita
Jurnal Kajian dan Penelitian Umum Vol. 3 No. 1 (2025): Jurnal Kajian dan Penelitian Umum
Publisher : Institut Nalanda

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47861/jkpu-nalanda.v3i1.1551

Abstract

This research aims to increase production efficiency at UD Cantenan, an aluminum metal manufacturing industry, through the application of the Systematic Layout Planning (SLP) method, the Kanban system, and Work Sampling productivity analysis. The initial layout shows the material movement distance between workstations is 41 m², with daily material handling costs reaching IDR 105,544. Through the SLP method, the layout was improved so that the moving distance was reduced to 37 m², and material handling costs fell to IDR 70,626 per day. The Kanban system was implemented to visually improve production flow, minimize waiting time, and reduce inventory buildup. Kanban implementation increased product delivery accuracy from 70% to 95%. Furthermore, productivity analysis using Work Sampling showed a non-productive activity ratio of 53% and productive activity reaching 65%. Normal production time measurements yield an average of 14 minutes per unit, indicating increased work efficiency. A total budget plan for implementing relayout of IDR 5,203,000 was also prepared as part of company resource management. The results of this research show that the combination of SLP, Kanban, and Work Sampling methods can significantly increase operational efficiency, optimize facility layout, and reduce production time and costs.
Co-Authors AA Sudharmawan, AA Abu Ayyub Al Anshari Achlis Haidar Rafi Adwiyah Asyifah Agung Joko Prasetya Ainnelsa, Khayatul Ilma Aldora Gavrila Faiq Anak Agung Gede Sugianthara Andung Jati Nugroho Anis Nur Aini Anwar, Arsya Amira Arief Firdaus Arif Wicaksono arif wicaksono wicaksono Arif Yuana Ayuni Anastasya Bagaskara Susi Asmara Bima Putra Pranoto Bonaventura Exsa Berta Putra David Gultom Dendi Pratama Deni Kurniansyah Deni Kurniawan Deni Desi Ayu Rahmadani Desrina Ratriningsih Dewi Safitri Dicky Kurniawan Diki Taufik Hidayat Dimas Hendarjati Pamungkas Dinda Oe Mardy Dwi Nur Setiawan Elsavira, Efri Else Reviati Elvina Mulyana Endah, Tisnawati Erwin Noer Wahyu Murti Erwin Noer Wahyu Murti fajar, Moch akbar sulthan Fatoni, Febriyanto Arifiyan Fithriya Nur Hana Gatam Mandala Krida Gilang, Gilang Muhamad Fatahyasin Gultom, David Hafian, Sultan Hamdani, Erwin Harefa, Juven Fangdo Heldayani Hersinta, Hesti Hetharia, Monica Myline Ihsan, Auliya Ikhsan Shihab Budin Ismah Juiw Lailani Jastika Amelia Atmaja Jayawarsa, A.A. Ketut Jusri Juven Fangdo Harefa Kharida Rif’at Al Khumaidi Khayatul Ilma Ainnelsa Krisna Aditya Rokhim Kurniawan, Otniel Odi Kusumaningsih, Erma Kyswantoro, Yunita Firdha M Irfan Ardiyanto Putra M Reza Fadillah Ma`ruf, Avesena Ahmad Aim Matim Mila Jamilatul Mahmudah Mila Jamilatul Mahmudah mila jamilatul mahmudah, mila Miranda, Suci Muh Reza Fadillah Muh Rifki Sacky Muhamad Samsul Huda Muhammad Anton Alifandi MUHAMMAD ARIFIN Muhammad Arifin Wagiman Muhammad Hafiz Anshari Muhammad Husein Abituta Muhammad Irfan Maulana Muhammad Syauqi Ramadhani Muladi, Cep Ahmad Nadia Putri Nilamsari Nando, Ragil Nofra Niken Irma Nuryani Nugroho, Aldy Mei Nurlita, Laela Nurmalitasari, Citra Nurraudah, Restu Prabowohendhi, Santra Pradana, Aldi Yoga Puji Priyono Pulung Akbar Mukti Mulyojati Pulung Akbar Mukti Mulyojati Putra, Bimo Haykal Nugroho Putri Rismantia Putri Rismantia Ragil Nofra Nando Rahmadani, Desi Ayu Ratri Nurina Widyanti Restu Restu Nuraudah Restu Nurraudah Restu Nurraudah Reza Ade Irmansyah Rifka Alivia Rio Yuwono, Rio Rizki Anugrah Robby Roby Septiawan Sagio Sagio, Sagio Saloni Waruwu Saptoto, Anang Sary, Retno Arum Satria Adi Sayid Muhammad Muhajir Sefiani Adella, Tyas Sholikhin Tri Admojo Silaen, Rebecca Angelina Solekha, Arni Stevana Balili Sugiharto, Ari Sultan Alvian Chrisanda Hanif Suryo Wibowo Suryo Wibowo Susi Asmara, Bagaskara Syahrul Faiz Teja Rahmanadi Teja Rahmanadi Tisnawati, Endah Ulfa Amalia Valentino Adhy Nuantra Wahyu Kristianto Waldoni Pramudita Wardah, Zahra Nafisah Waruwu, Saloni Williyastuti Rizqiyan Williyastuti Rizqiyan Yudha Pratama Yusuf Nur Ahmad Zanuar Ilham Mahendra