Claim Missing Document
Check
Articles

Maintenance System of Universal Goss Printing Machine based on failure data using RCM and RCS method Sarashvati, Made Shanti; Nopendri, Nopendri; Alhilman, Judi; Atmaji, Fransiskus Tatas Dwi; Aulia, Valinouski
International Journal of Innovation in Enterprise System Vol. 2 No. 2 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Over time a machine will get experience a decrease in reliability, causing the engine to be damaged at the time of operation, thus disrupting the production line. To maintain a machine remains reliable then a good maintenance system is required. In this research, we will use Reliability Centered Maintenance (RCM) and Reliability Centered Spare (RCS) analysis on the critical system of Goss Universal printing machine based on engine failure data. The result of RCM analysis obtained the optimal preventive maintenance schedule and the type of treatment, while based on the RCS analysis obtained spare part needs following the maintenance schedule. With the result of this analysis, is expected where the machine will keep good and will continue to operate without a sudden breakdown under the production schedule's need. Based on RCM analysis for each critical subsystem obtained interval preventive maintenance for transfer roller 127.60 hours, Ink fountain roller 24.45 hours, ink form roller 29.23 hours respectively, and the wash-up device is no scheduled maintenance. For spare parts inventory strategies the result using RCS method are: transfer roller104 units, ink fountain roller requires 32 units, ink form roller 36 units and are holding spare policy required, and a wash-up device no holding spare parts. Keywords— Failure data, Maintenance System, RCM, RCS
Analisis Keandalan dan Performansi pada Mesin Bingham Lean Benfield (J1107) dengan Metode Reliability, Availability, Maintainability, dan Safety Analysis (RAMS) di PT Pupuk Kujang Dzakir, Daffa Mukhtar; Alhilman, Judi; Budiasih, Endang
eProceedings of Engineering Vol. 10 No. 3 (2023): Juni 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak-PT Pupuk Kujang merupakan perusahaan yang bergerak pada bidang petrokimia, dan didirikan pada tanggal 9 Juni 1975 di lingkungan departemen Perindustrian, di desa Dawuan Cikampek. Berdasarkan hasil wawancara dan data kerusakan yang ada, mesin yang sering mengalami kerusakan dan downtime adalah mesin bingham lean benfield J1107-C yang terdapat pada plant Ammonia 1A. Fungsi dari mesin bingham lean benfield J1107-C untuk mengalirkan larutan Benfield dari striper ke absorber dimana larutan benfield itu berfungsi untuk menyerap co2 yang berperan dalam proses pembuatan amoniak, jika mengalami kerusakan maka pabrik akan mengalami shutdown dan membuat perusahaan mengeluarkan biaya perbaikan dan kerugian biaya. Tujuan dari penelitian ini adalah untuk mengetahui nilai keandalan, ketersediaan, kemampurawatan, dan tingkat keamanan dari masing-masing subsistem kritis mesin bingham lean benfield J1107-C. Metode yang digunakan ialah reliability, availability, maintainability, dan safety analysis. Dari hasil risk matrix, terpilih subsistem kritis mesin yaitu pump impeller + shaft, dan coupling, sehingga penelitian fokus pada subsistem kritis tersebut. Nilai keandalan eksisting pada masing-masing subsistem kritis pada t = 480 jam adalah 76,42% untuk pump impeller + shaft, 74,04% untuk coupling, dan pada reliability system adalah 56,58%. Nilai inherent Availability subsistem kritis dari mesin bingham lean benfield J1107-C memiliki nilai 99,84%. Menurut standar IVARA, untuk nilai minimum inherent availability sebesar 95%, maka nilai inherent availability dari mesin bingham lean benfield J1107-C adalah baik, karena diatas 95%, dan penggunaan sistem pada Reliability Block Diagram Operational Availability yang bernilai 99.819%. Untuk mencapai nilai maintainability 100% membutuhkan 25 jam untuk Pump Impeller + Shaft dan 10 jam untuk Coupling. Untuk nilai safety integrity level berada pada level SIL 2 untuk t = 24 jam dan SIL 1 untuk t = 144 jam.Kata kunci-Reliability, availability, maintainability, safety integrity level, reliability block diagram.
Usulan Penentuan Kebutuhan Suku Cadang pada Mesin Duan kwei Menggunakan Metode Reliability Centered Spares di PT. XYZ Nurrahman, Ferro Arief; Alhilman, Judi; Pamoso, Aji
eProceedings of Engineering Vol. 10 No. 3 (2023): Juni 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak-PT. XYZ yang merupakan perusahaan industri farmasi di Indonesia yang didirikan oleh Pemerintah Hindia Belanda. Dalam proses produksi pembuatan obat yang dilakukan, terdapat proses yang sangat penting yaitu dalam pengemasan karena proses tersebut merupakan proses akhir sebelum obat didistribusi. Dalam tahap proses pengemasan di PT. XYZ menggunakan mesin bernama mesin Duan Kwei yang berfungsi untuk mengemas seluruh obat herbal yang berbentuk tablet, dengan demikian mesin tersebut perlu adanya perhatian khusus agar mesin tersebut dapat bekerja secara optimal dan dapat menghasilkan produk yang sesuai. Pada analisis akar masalah menggunakan diagram fishbone dan analisis FMEA diketahui bahwa faktor yang berpengaruh dalam kefetivitasan mesin Duan Kwei adalah keterbatasan stock suku cadang. Berdasarkan data historis perusahaan Sub-sistem sensor dan Bearing memeiliki frekuensi kerusakan yang tinggi, oleh karena itu diperlukannya pemeliharaan khusus terhadap mesin tersebut. Pendekatan tersebut dilakukan dengan menggunakan metode Reliability centered spare yaitu suatu pendekatan yang bertujuan untuk menentukan kebutuhan suku cadang yang dibutuhkan berdasarkan through-life cost dan kebutuhan peralatan dalam operasi maintenance untuk mendukung inventory. Dengan menggunakan metode Reliability centered spare didapatkan kebutuhan Sensor dan Bearing yaitu sebanyak 3 dan 4unit komponen dalam satu tahun dengan safety stock 1unit untuk setiap subsistem.Kata kunci - sensor, bearing, reliability centered spare, through-life cost, safety stock
Usulan Perancangan Formulit Pemeliharaan Mesin Duan KWEI di PT XYZ Menggunakan Metode Total Productive Maintenance (TPM) dan Overall Equipment Effectiveness (OEE) Azmi, Moh Daffa Al; Alhilman, Judi; Pamoso, Aji
eProceedings of Engineering Vol. 10 No. 3 (2023): Juni 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak- PT XYZ merupakan salah satu perusahaan BUMN yang bergerak di bidang farmasi. Pada proses blistering produksi herbal terdapat permasalahan yang ditemukan terkait efektivitas proses pengemasan yang akan menjadi fokus penelitian dikarenakan pada proses ini perawatan mesin secara berkala yang kurang optimal. Mesin yang digunakan pada proses pengemasan yaitu Mesin Duan Kwei yang berfungsi untuk pengemasan. Metode yang digunakan yaitu Total Productive Maintenance (TPM) untuk memaksimalkan efektivitas mesin dan dianalisis efisiensi mesin Duan Kwei menggunakan metode Overall Equipment Effectiveness (OEE). Perhitungan Six Big Losses digunakan untuk mengetahui faktor apa yang paling mempengaruhi rendahnya nilai OEE. Berdasarkan hasil perhitungan OEE, nilai OEE pada mesin Duan Kwei pada bulan Januari – Desember 2021 yaitu sebesar 59.86%, yang berarti nilai OEE masih berada di bawah standar JIPM. Berdasarkan perhitungan six big losses terdapat dua faktor losses yaitu reduced speed loss dan idling and minor stoppages loss sebesar 35% dan 18%. Nilai OEE yang rendah dapat dijadikan suatu evaluasi untuk meningkatkan efektivitas mesin Duan Kwei dengan rancangan sistem yang terintegrasi berupa rancangan pemeliharaan mesin. Pemeliharaan mesin ini berbasis Total Productive Maintenance (TPM) yang menggunakan dua pilar yaitu autonomous maintenance dan planned maintenance di PT XYZ.Kata kunci- mesin duan kwei, total productive maintenance, overall equipment effectiveness, six big losses.
Usulan Perancangan Perhitungan Overall Equipment Effectiveness (OEE) Berbasis Excel pada Mesin Packaging Blizter untuk Memaksimalkan Total Productive Maintenance (TPM) di PT XYZ Permana, Yudha; Alhilman, Judi; Pamoso, Aji
eProceedings of Engineering Vol. 10 No. 3 (2023): Juni 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak-PT. XYZ adalah perusahaan yang bergerak dibidang manufaktur farmasi. Proses produksi pada PT. XYZ sangat kompleks, sehingga sangat penting untuk menjaga pemeliharaan dan perawatan mesin, salah satunya adalah mesin Packaging Blizter. Dimana perlu dilakukan evaluasi peningkatan kinerja mesin. Untuk melakukan evaluasi terhadap kinerja mesin packaging blizter, dilakukan menggunakan metode Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE) dan analisa six big losses. Tujuan penelitian ini adalah untuk mengukur efektivitas mesin packaging blizter, mengetahui kerugian yang dihasilkan dalam proses produksi dengan six big losses dan membuat rancangan alternatif solusi untuk membantu proses produksi menggunakan mesin packaging blizter. Berdasarkan perhitungan nilai OEE mesin packaging blizter bulan Januari – Desember 2021 didapatkan rata – rata sebesar 69,1% nilai tersebut tidak memenuhi standar global yang telah ditetapkan oleh Japanese Institute of Plant Maintenance (JIPM). Rendahnya nilai OEE dipengaruhi oleh nilai losses yang paling dominan yaitu reduce speed losses sebesar 28%. Berdasarkan fishbone diagram, tingginya nilai losses ini mempengaruhi performance efficiency pada mesin yang disebabkan oleh faktor manusia, mesin, material, dan metode. Berdasarkan rancangan aplikasi yang telah dibuat aplikasi ini bertujuan untuk mempermudah dalam perhitungan metode TPM, OEE dan six big losses. Aplikasi ini menggunakan Microsoft excel agar lebih mudah diakses serta lebih sederhana.Kata Kunci-overall equipment effectiveness (OEE), six big losses, mesin packaging blizter, total productif maintenance (TPM)
Usulan Perancangan Sistem Pemeliharaan Mesin Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Overall Resource Effectiveness (ORE) pada Pemanfaatan Mesin Packer Chronos 6 Fitria, Tariza; Alhilman, Judi; Pamoso, Aji
eProceedings of Engineering Vol. 10 No. 3 (2023): Juni 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak- PT. Eastern Pearl Flour Mills merupakan perusahaan memproduksi tepung terigu. Pada bulan November 2020 – Oktober 2021, perusahaan mengalami instabilitas total produksi sehingga tidak memenuhi target produksi yaitu 30.000 Ton setiap bulan. Berdasarkan identifikasi permasalahan, penyebabtarget produksi tidak tercapai disebabkan oleh kinerja mesin yang tidak optimal karena frekuensi kerusakan mesin yang tinggi dan usia pemakaian mesin yang sudah lama. Kondisi mesin tersebut menyebabkan downtime yang akan mengganggu produktivitas kerja pada mesin dalam melakukan proses produksi tidak maksimal. Penyelesaian permasalahan dapat dilakukan dengan evaluasi pengukuran efektivitas mesin menggunakan metode OEE dan ORE. Berdasarkan data kerusakan pada bulan November 2020 – Oktober 2021, mesin packer chronos 6 memiliki jumlah frekuensi kerusakan terbanyak, yaitu sebanyak 62 kali.. Hasil penelitian menunjukan bahwa diperoleh nilai OEE sebesar 62.38% dan nilai ORE sebesar 52%. Nilai tersebut menunjukan rendahnya tingkat efektivitas mesin karena berada dibawah standar JIPM yaitu sebesar 85%. Berdasarkan hasil six big losses, jenis kerugian yang dominan adalah faktor reduced speed loss dan idling and minor stoppages loss dengan nilai sebesar 31.54% dan 20.92%. Hal ini mengakibatkan performance mesin rendah sehingga dapat mempengaruhi kualitas produk yang dihasilkan. Usulan hasil perancangan berupa sistem pemeliharaan mesin berbasis dengan penerapan dua pilar TPM yaitu quality maintenance dan autonomous maintenance.Kata kunci - overall equipment effectiveness, overall resource effectiveness, six big losses, total productive maintenance
Perancangan Usulan Pemeliharaan Berdasarkan Analisis Nilai Reliability, Availability, Maintainability Dan Safety (Rams) Pada Mesin Gas Gas Turbine Di Pt. Xyz Hidayat, Diansah; Alhilman, Judi; Dwi Atmaji, Fransiskus Tatas
eProceedings of Engineering Vol. 10 No. 5 (2023): Oktober 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak— PT. XYZ merupakan perusahaan Badan Usaha Milik Negara (BUMN) yang bergerak dibidang transportasi gas di Indonesia. Mesin Gas Turbine C-101-AT merupakan salah satu mesin yang bekerja dengan waktu yang lama, pada mesin Gas Turbine C-101-AT yang memiliki kerusakan mesin Gas Turbine C-101-AT sebanyak 37 dalam waktu 4 tahun. Berdasarkan permasalahan tersebut diperlukan penelitian untuk menilai mesin dengan metode Reliability, availability, Maintainability dan Safety (RAMS) nilai safety berupa tingkatan Safety Integrity Level (SIL). Berdasarkan perhitungan RAMS Analysis dengan menggunakan pemodelan Reliability Block Diagram (RBD) dan analytical approach, nilai reliability pada mesin Gas Turbine Compressor C-101-AT dengan rentang waktu 163 hingga 3177 jam, didapatkan hasil saat t=163 jam sebesar 98.03%, dan pada saat t= 3117 jam 36.49%. Nilai maintainability system untuk mencapai 100% dibutuhkan waktu t=7 jam. Nilai inherent availability system mencapai 99,95 dan nilai operational availability system sebesar 99,99%. Mesin Gas Turbine C-101-AT mendapatkan nilai Safety Integrity Level pada tingkat terendah yaitu 1. Melihat tingginya availability mesin dan rendahnya reliability system mesin. Melakukan perancangan usulan pemeliharaan, dilakukan usulan pemeriksaan tambahan pada pemeriksaan harian dengan mengecek sistem dan subsistem pada mesin, dan mengecek temperatur suhu mesin, dan melakukan perancangan pada pola pengoperasian mesin setiap 1 bulan.Kata Kunci-- Maintenance, Gas Turbine, Reliability, Availability, Maintainability, Safety, Safety Integrity Level (SIL).
Perhitungan Waktu Pemeliharaan Pada Mesin First Expeller Di PTPN V Menggunakan Metode Reliability and Risk Centered Maintenance (RRCM) Taufiq Ismail, M; Alhilman, Judi; Pamoso, Aji
eProceedings of Engineering Vol. 10 No. 5 (2023): Oktober 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak— Perusahaan menggunakan mesin First Expeller EK-150-K di PKO Tandun PTPN V dalam proses pengolahan kelapa sawit menjadi minyak setengah jadi (CPO). Dalam menentukan komponen kritis, penelitian ini menggunakan RPN dari komponen mesin First Expeller EK-150-K dan terpilih 3 komponen kritis yaitu Bearing, Mainshaft, dan Body Cage. Berdasarkan perhitungan yang dilakukan menggunakan metode RRCM, maka didapatkan 5 proposed maintenance task diantaranya, 3 schedule on condition task dan 2 schedule discard task. Pada komponen bearing yaitu untuk schedule on condition task dilakukan setiap 0,86 pekan sekali dan untuk scheduled discard task dilakukan setiap 3 pekan sekali, komponen main shaft untuk schedule on condition task dilakukan setiap 19 pekan sekali dan untuk scheduled discard task dilakukan setiap 2 pekan sekali, serta komponen body cage untuk schedule on condition task dilakukan setiap 1 pekan sekali. total biaya maintenance eksisting yaitu Rp 2.630.557.365 sedangkan untuk total biaya maintenance usulan sebesar Rp 2.362.320.483 Berdasarkan data tersebut biaya maintenance usulan memiliki harga lebih rendah sebesar Rp 268.236.882. dari total biaya pemeliharaan eksisting.Kata kunci— Maintenance, Reliability and Risk Centered maintenance, Proposed Maintenance Task, Interval Waktu Pemeliharaan
Usulan Perencanaan Pemeliharaan Automated Rubber Tyred Gantry Menggunakan Metode Reliability And Risk Centered Maintenance Di PT. Harbarindo Baharitama Pradipta, Sandy Argya; Alhilman, Judi; Atmaji, Fransiskus Tatas Dwi
eProceedings of Engineering Vol. 11 No. 3 (2024): Juni 2024
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Terminal Peti Kemas Semarang (TPKS) merupakansalah satu dari beberapa terminal yang melayani jasa bongkarmuat, untuk mendukung kegiatan bongkar muat, TPKSmemiliki alat angkat-angkut berupa Automated Rubber TyredGantry (ARTG) yang beroperasi selama 24 jam. PT.Harbarindo Baharitama dipercaya untuk melakukanpemeliharaan pada ARTG di wilayah TPKS, untuk memastikankinerja dari ARTG bekerja sebagaimana mestinya. PT.Harbarindo Baharitama telah menerapkan kebijakanpemeliharaan pencegahan (preventive maintenance), untuktetap menjaga keandalan mesin serta dapat mengeluarkanbiaya yang banyak jika terlalu sering melakukan preventivemaintenance, untuk meminimalisir biaya pemeliharaan danmenjaga keandalan ARTG, dibutuhkan jadwal pemeliharaanyang lebih baik. Penelitian menggunakan metode Reliability andRisk Centered Maintenance (RRCM. Hasil penelitian inimenunjukkan bahwa proposed maintenance task yaituScheduled On-Condition Task dengan interval waktu setiap 2minggu untuk pengecekan secara berkala. Hal ini dilakukansebagai salah satu bentuk pemeliharaan dengan tingkat biayapemeliharaan seminimal mungkin. Kata kunci— Preventive Maintenance, Reliability and RiskCentered Maintenance, Proposed Maintenance Task, AutomatedRubber Tyred Gantry
Co-Authors Ade Rizka Eliyus Ade Rizka Eliyus, Ade Rizka Afiva, Wirda Hamro Agus Alex Yanuar Ahmad F Abdillah Ahmad Musnansyah Aji Pamoso Amanah Ansarullah Amelia Kurniawati Annisa Azmi Annisa Prias Maysarah Anselvi Mega Lestari Ariqa Radhwa Aulia, Valinouski Azmi, Moh Daffa Al Azylia Putri Denia Bewana, Zanuar Galang Budi Santosa Chairun Nisa Christanto Triwibisono Damanhuri Nurul Huda Destina Surya Dhamayanti Destina Surya Dhamayanti Destina Surya Dhamayanti, Destina Surya Devi Julietta Nainggolan Dhofar Shafarrizqullah Separman Dian Hayyu Rana Muna Dian Rahmania Ditya Dwi Astuti Dzakir, Daffa Mukhtar Endang Budiasih Fachri Husaini Fachri Husaini Fakhrul Razi Frima Fathnin, Nisrina Fatwa Anggayana Basanta Fitria, Tariza Fransiskus Tatas Dwi Atmaji Hario Ardi Nugroho Hidayat, Diansah I Gede Oka Mahendra Ida Bagus Yoga Samkhyaita Ihsan Mahdi Wiragunanto IKA PRAESITA IKA PRAESITA, IKA Indah Kurniawati Indira Kusuma Wardani Izzaqi, Pebrina Donna Jonathan, Fernaldi Lestari Atika Putri Litasari Widyastuti, Litasari Liza Nafiah Maulidina Liza Nafiah Maulidina Made Shanti Sarashvati Made Shanti Sarashvati Maulidina, Liza Nafiah Mohamad Rizky Utomo Mohammad Badar Mohammad Tajudin Mohammad Tajudin Muhamad Rafif Arrahman Muhammad Faris Solihin Muhammad Hamdan Muhammad Ilham Maulana Muhammad Ilham Z Muhammad Rifki Fadil Muhammad Siddiq Muhammad Tamami Dwi Saputra Muhammad Tamami Dwi Saputra Muthi Maisa Zulfatri Nadia Ulfa Nadia Ulfa Nainggolan, Devi Julietta Naufal Muhammad Iqbal Nisrina Fathnin Nopendri Nopendri Noviyanti Permata Sari Nuha, Hilyatun Nurdinintya Athari Supratman Nurrahman, Ferro Arief Nurul Sholihah Ekowati Oktaria Tyas Pambayun Pebrina Donna Izzaqi Pradipta, Sandy Argya Prima Hutama Putra Abdi Putri Ratnasari Putro, Budi Laksono Putu Eka Dewi Karunia Wati Rahmat Mulyana Rd. Rohmat Saedudin Reano Anggradwika Revy Desfriansyah Rosi Pratiwi Samlistiya, Fahmi Rizal Saputra, Muhammad Tamami Dwi Sarashvati, Made Shanti Sari Wulandari Selvi Marcellia Shabrina Fauzani Shintya Asih Angelita Tampubolon Sutrisno Sutrisno Sutrisno Sutrisno Syahda Bintarum Taufiq Ismail, M Terrin Eliska Ully Tri Kirana Ully Tri Kirana Ully Tri Kirana, Ully Tri Valinouski Aulia Vanita Zahra Zahirah Warih Puspitasari Wirda Hamro Afiva Wirda Hamro Afiva Yudha Permana Yuli Adam Prasetyo Zhafran Ega