Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : Syntax Idea

Produktivitas Alat Gali Muat Pada Pengupasan Overburden Dengan Metode Overall Equipment Effectiveness (OEE) di Pit East Kawi PT. Marunda Grahamineral Sofi Miftah Alrasyid; Yossa Yonathan Hutajulu; Fahrul Indrajaya; Yunida Iashania; Ferdinandus
Syntax Idea 1419-1434
Publisher : Ridwan Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/syntax-idea.v6i3.3129

Abstract

Marunda Grahamineral is a coal company, in its mining activities using the services of the contractor PT. Riung Mitra Lestari in Pit East Kawi. The objective of this study is to analyze the productivity of the plywood on overloading with the Overall Equipment Effectiveness method. (OEE). OEE is a method of measuring the level of efficiency of a device that can help identify the actual problem placement of the produced production. With quantitative descriptive methods the researchers developed mathematical models and theories that relate to the land clearance activities of the cover. The result of the calculation of the actual productivity of the Excavator CAT 395 (1215) is 569.61 BCM/hour with an OEE value of 66%, whereas the excavator Cat 395 (1226) is 391.81 BCM / hour with a OEE rate of 45%, where the target productivities of the excavator CAT 396 are 620 BCM per hour. Advanced calculations of the Six Big Losses and analyzed with the pareto chart the greatest factor resulting in the low OEE values of the exhaustor CAT 395 (1215) are reduced speed of 12.9%, and of the extractor CAT 395, (1216) are breakdown losses of 30.8%. In order to efficiency improvements are performed on the OEE factor, with the utilization factor and speed factor the value of OEE is obtained after improvement is 72%, and the performance after improvements is 620,31 BCM./hour on the excavador CAT395 (1215). This value does not meet the world-class OEE value of ≥ 85%, but for the post-improvement productivity value of 629.31 BCM/hour, the value exceeds the plan's productive target of 620 BCM /hour.
Co-Authors Agustiani , Reni Agustina, Lastiur Al Fiah. B, Dwi Ayu Ambeng, Rafvie Resido Ambeng, Ravie Resido Apriliyanti, Nia Aqli, Yusuf Kavin Ariyantho, Dody Asri Fridtriyanda Audy Mirelia W.S Betrio L, Prayoga Bryan Faith Situmorang Deddy Tanggara Dedy Jupiter Sihombing Enzelina Silaban, Yunita Fahrul Indrajaya Fahrul Indrajaya Fahrul Indrajaya Faradila, Naila Fatma Sarie Ferdinandus Ferdinandus Ferra Murati Fidayanti, Neny Fransisco, Theo Gabriela Elsandika Hendra Wiryanto, Yustinus I Dewa Made Prawindya Kumara I Putu Putrawiyanta Ibnu Sina Indrajaya, Fahrul Inso, Yos David Iqramina Sista Dewi keliat, egiandre Khairi Kristianti, Novera Luwyk Djanas Usup, Hepryandi Melinda, Sena Nababan, Berkat Obniel Nababan, Immanuel Nainggolan, Willy Kusuma Neny Sukmawatie Ni Putu Ayu Indyastika Novalisae Noveriady Nuansa Mare Apui Ganang Onie D. Sanitha Onie D. Sanitha Onie Dian Sanitha Onie Dian Sanitha Pebryanto, Pebryanto Pramana, Andika Prayoga, Aditia Rahayu, Elis Sri Reni Agustiani Reni Agustiani, Reni Rivaldo Tarigan, Rio S. Duna, Benny Irawan Salsa Ayudhia Pratama samsul arifin Saptawartono Saptawartono Saptawartono, Saptawartono Sari Pratiwi Sihombing, Yusuf Aditya Silaban, Lamture Simamora, Andre Sinaga, Elme Romayani Sista Dewi, Iqramina Sofi Miftah Alrasyid Sompotan, Audy Mirelia Wirly Sukmawatie, Neny Sylvana Anethe Taruna, Yulian Taufiqurahman Taufiqurahman, Taufiqurahman Theo Fransisco Theo Fransisco Theo Fransisco Utari, Pradita Valentinus Waruwu Virgiyanti, Lisa Waruwu, Valentinus Wijaya, Dody Ariyantho Kusma Wijaya, Dody Ariyantho Kusuma Wiryanto, Yustinus Hendra Yakub Reba, Isai Yohanes, Yosindo Yossa Yonathan Hutajulu Yunita Enzelina Silaban Yusias Andri Yusuf Aditya Sihombing Zebua, Augusyoellisman