cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota lhokseumawe,
Aceh
INDONESIA
Teras Jurnal
ISSN : -     EISSN : -     DOI : -
Core Subject : Social, Engineering,
Teras Jurnal is a journal that communicates the results of research within the scope of civil engineering and scientific development as well as aspects of practitioners. The process of manuscript submission is open throughout the year. All submitted manuscript will be screened with double-blind peer review and editorial review before they are accepted to publish. Teras Jurnal receives a manuscript from the following area below civil engineering science and development with the interdisciplinary and multidisciplinary approach:
Arjuna Subject : -
Articles 390 Documents
Efek Pengempaan Pada Proses Pembuatan Bata Ringan Geopolimer Sultan, Mufti Amir; Adingku, Julham; Kusnadi, Kusnadi
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1151

Abstract

Abstrak Pasir batu apung sebagai bahan baku pembuatan bata ringan dengan menggunakan geopolimer sebagai pengikat menggantikan semen. Geopolimer terbentuk dari bahan baku yang banyak mengandung unsur silika  dan alumina. Penelitian ini menggunakan perbandingan volume agregat pengisi berupa pasir batu apung sebesar 50% dan binder 50%. Binder terdiri atas 55% fly ash dan 45% aktivator, di mana aktivator merupakan campuran dari Na2SiO3 dan larutan NaOH 10M dengan perbandingan 1:1. Proses produksi bata dengan pengempaan bervariasi 3,3 MPa, 6,7 MPa, 10,0 MPa, dan 13,3 MPa. Benda uji kontrol tidak dilakukan pengempaan. Untuk mempercepat proses polimerisasi bedan uji dipanaskan dengan menggunakan oven pada suhu 800C selama 8 jam. Hasil penelitian menunjukkan bahwa semakin tinggi pengempaan yang diberikan pada proses produksi bata cenderung meningkatkan kuat tekan dan berbanding terbalik dengan penyerapan air. Pada pengempaan 10,0 MPa dan 13,30 MPa masing-masing menghasilkan mutu bata III dan IV. Kata kunci:  pasir batu apung, bata ringan, geopolimer, mutu bata    Abstract Pumice sand as a raw material for making lightweight bricks using geopolymer as a binder to replace cement. Geopolymers are formed from raw materials that contain lots of silica and alumina elements. This research uses a volume ratio of aggregate filler in the form of pumice sand at 50% and binder at 50%. The binder consists of 55% fly ash and 45% activator, where the activator is a mixture of Na2SiO3 and 10M NaOH solution in a ratio of 1:1. The brick production process with compression varies from 3.3 MPa, 6.7 MPa, 10.0 MPa, and 13.3 MPa. The control test specimen was not pressed. To speed up the polymerization process, the test bed was heated using an oven at 800C for 8 hours. The research results show that the higher the compression given in the brick production process tends to increase the compressive strength and this is inversely proportional to water absorption. At 10.0 MPa and 13.30 MPa compression, they produce brick grades III and IV respectively. Keywords: pumice sand, light brick, geopolymer, brick quality
Pengaruh Hambatan Samping Terhadap Biaya Operasional Kendaraan Pada Depan Pasar Simpang Baru, Kota Pekanbaru Rhoma, Benny Hamdi; Adiman, Edi Yususf; Makarim, Muhammad Iqbal; Prakasa, Rizqy Ridho
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1152

Abstract

Abstrak Aktivitas Pasar Simpang Baru pada Jalan HR. Soebrantas merupakan hambatan samping yang mengurangi kapasitas jalan dan kecepatan kendaraan. Akibatnya akan berdampak pada kinerja jalan dan biaya operasional kendaraan (BOK). Maka perlu diketahui seberapa besar pengaruh hambatan samping terhadap BOK. Analisis berdasarkan kondisi eksisting dan kondisi tanpa hambatan, serta menggunakan analisis statistik untuk menghitung pengaruhnya. Besar hambatan samping tertinggi adalah 744,3 bobot kejadian, Derajat kejenuhan tertinggi adalah 0,732 (tingkat pelayanan C). BOK kendaraan kondisi eksisting yaitu sebesar Rp. 1.662,22/km untuk kendaraan ringan, Rp. 2.384,86/km untuk kendaraan berat dan Rp. 362,41/km untuk sepeda motor. Setelah hambatan samping dihilangkan nilai derajat kejenuhan menjadi 0,593 (tingkat pelayanan A), BOK kendaraan ringan menjadi 1.423,60/km, BOK kendaraan berat menjadi Rp. 2.260,13/km; dan BOK sepeda motor menjadi Rp. 319,24/km. Besar pengaruh hambatan samping terhadap BOK LV yaitu 50,5%, pengaruh hambatan samping terhadap BOK HV sebesar 38,1%, dan pengaruh hambatan samping terhadap BOK MC sebesar 57,7%. Kata kunci: hambatan samping, biaya operasional kendaraan, kinerja jalan    Abstract Simpang Baru market activities on HR. Soebrantas road is a side friction that reduce road capacity and vehicle speed. As a result, it will have an impact on road performance and vehicle operating costs (VOC). So it is necessary to know how much influence side friction on VOC. The analysis based on existing conditions and without side friction conditions, and used statistical analysis to calculate the effect. The highest amount of side friction is 744.3 event. The highest degree of saturation is 0.732 (level of service C). BOK for vehicles in existing condition is Rp. 1,662.22/km for light vehicles, Rp. 2,384.86/km for heavy vehicles and Rp. 362.41/km for motorcycles. After removing side friction, the value of the degree of saturation becomes 0.593 (level of service A), the BOK for light vehicles becomes 1,423.60/km, the BOK for heavy vehicles becomes Rp. 2,260.13/km; and BOK for motorcycles becomes Rp. 319.24/km. The influence of side friction on BOK LV is 50.5%, the influence of side friction on BOK HV is 38.1%, and the influence of side resistance on BOK MC is 57.7%. Keywords: side friction, vehicle operating cost, road performance
Penentuan Jenis Penanganan Jalan Perkerasan Lentur Berdasarkan Metode Indeks Kondisi Perkerasan (IKP) Gon, Martha Elisa Kurniaty
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1153

Abstract

 Abstrak Tujuan penelitian ini adalah menentukan jenis penanganan perkerasan lentur Jalan Lehong-Kp. Peot berdasarkan Metode Indeks Kondisi Permukaan (IKP) sesuai Pd 01-2016-B Kementerian PUPR 2016. Dari penelitian diketahui bahwa kondisi fisik permukaan jalan mengalami kerusakan bervariasi yang tergambarkan pada Nilai Pengurang Terkoreksi (NPT) sehingga jenis penanganannya juga berbeda menurut Indeks Kondisi Perkerasan (IKP). Rinciannya, yaitu  STA. 0+000 - STA. 0+250 IKP sebesar 36,6 < 55 dengan jenis penanganan rekonstruksi/daur ulang. STA. 0+250 - STA. 1+750 IKP bervariasi antara 55,7 - 65,2 berada pada rentang IKP yang disyaratkan 55 sampai 70 sehingga penanganannya peningkatan struktural. STA.1+750 - STA. 2+250 IKP 88,2 sampai 88,4 ‰¥ 85 (IKP yang disyaratkan) dengan jenis penanganan pemeliharaan rutin. STA.2+250 - STA. 2+750 IKP 73,4 - 76,3 berada pada rentang IKP 70 - 85 dengan jenis penanganan pemeliharaan berkala, dan STA. 2+750-STA. 3+500 IKP sebesar 61,6 - 65,8 berada pada rentang IKP yang disyaratkan 55 - 70 sehingga penanganannya peningkatan struktural. Kata kunci: Metode IKP, kondisi permukaan, perkerasan lentur, jenis penanganan     Abstract The aim of this research is to determine the type of flexible pavement treatment on Jalan Lehong-Kp. Peot based on the IKP value. From research it is known that the type of treatment is also different according to the Pavement Condition Index (IKP). The details, namely STA. 0+000 - STA. 0+250 IKP of 36.6 < 55 with reconstruction/recycling type of treatment. STA. 0+250 - STA. 1+750 IKP varies between 55.7 - 65.2 which is in the required IKP range of 55 to 70 so that the handling is structural improvement. STA.1+750 - STA. 2+250 IKP 88.2 to 88.4 ‰¥ 85 (required IKP) with routine maintenance type. STA.2+250 - STA. 2+750 IKP 73.4 - 76.3 is in the IKP 70 - 85 range with the type of periodic maintenance handling, and STA. 2+750-STA. 3+500 IKP of 61.6 - 65.8 is in the required IKP range of 55 - 70 so that the handling is structural improvement. Keywords: IKP method, surface condition, flexible pavement, type of treatment 
Analisa Risiko Penyebab Keterlambatan pada Proyek Konstruksi Pabrik Pupuk di Kabupaten Gresik Dengan Metode Pohon Kesalahan PRAFITASIWI, AVISHA GITA; Kuncoro, Naufal Ramadhani; Wibisono, Cahyo Umar
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1155

Abstract

Abstrak Guna mendukung produktivitas pertanian Indonesia maka PT Petrokimia Gresik mendirikan pabrik pupuk NPK Cair. Namun, pelaksanaan konstruksi pabrik mengalami keterlambatan sehingga biaya proyek meningkat. Penelitian ini bertujuan untuk menemukan inti masalah keterlambatan pada proyek konstruksi pabrik tersebut secara komprehensif menggunakan metode analisa risiko dan Fault Tree Analysis (FTA). Kuisioner dan wawancara dilakukan dalam proses pengumpulan data. Hasil dari analisa risiko didapatkan 6 (enam) risiko dengan kategori high yaitu: (1) Izin Kerja terlambat, (2) Kualitas dan kuantitas pekerja kurang, (3) Pengiriman ulang material karena perbedaan gambar dan spesifikasi, (4) Kesalahan perhitungan volume pekerjaan sehingga dilakukan pemesanan tambahan, (5) Pemesanan tambahan material karena perubahan spesifikasi serta (6) Pemesanan tambahan material karena perubahan desain yang mendadak. Akar penyebab risiko tersebut dicari dengan FTA, didapatkan 11 basic event dan 5 kombinasi basic event. Pemesanan tambahan material karena perubahan spesifikasi memiliki signifikansi terbesar sebagai penyebab keterlambatan proyek (Q sebesar 0,003994). Kata kunci: konstruksi pabrik, risiko, keterlambatan proyek, Fault Tree Analysis, structured interviewed   Abstract In order to support Indonesia's agricultural productivity, PT Petrokimia Gresik established a new factory. However, the factory project is delayed which has increased project costs. This research aims to present a comprehensive method for exploring the root cause that causes delays using risk analysis and Fault Tree Analysis (FTA). Questionnaires and interview were carried out in the data collection process. The results of the risk analysis showed that there were 6 (six) risks in the high category, namely: (1) Late work permits, (2) Insufficient quality and quantity of workers, (3) Re-delivery of materials due to differences in drawings and specifications, (4) Errors in calculating BOQ, (5) additional materials order due to changes in specifications and (6) Orders for additional materials due to sudden design changes. The results obtained 11 basic events and 5 basic event combinations. Additional material orders due to changes in specifications have the greatest significance as a cause of delays in the project (Q=0.003994). Keywords: factory construction, risk, project delay, Fault Tree Analysis, structured interviewed
Pengaruh Hidrodinamika Terhadap Letak Alternatif Hard Structure Pantai Bemu, Pulau Seram Rumihin, Ony Frengky
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1156

Abstract

Abstrak Indonesia, sebagai negara kepulauan dengan garis pantai yang panjang, menghadapi tantangan abrasi dan erosi akibat faktor alam dan aktivitas manusia. Penelitian ini bertujuan untuk mengurangi kerusakan pantai Bemu, Pulau Seram, yang terletak di tepi Laut Banda, melalui analisis hidrodinamika guna menentukan penempatan struktur keras (revetment) yang tepat. Metode penelitian mencakup pengumpulan data primer melalui survei lapangan, seperti data pasang surut, arus, dan gelombang, serta pengolahan data sekunder berupa data angin. Analisis juga dilakukan dengan bantuan perangkat lunak untuk memvalidasi model. Hasil menunjukkan bahwa struktur keras revetment perlu diletakkan pada ketinggian 1,50 meter untuk mereduksi kerusakan pantai lebih lanjut. Kecepatan angin dominan dari arah selatan (59,87%), dan jenis gelombang rencana adalah swell dengan tinggi gelombang ekstrim 1,58 meter. Penelitian ini menekankan pentingnya penanggulangan abrasi secara efektif melalui pendekatan berbasis hidrodinamika. Kata kunci: kerusakan pantai, pulau seram, hard structure  Abstract Indonesia, as an archipelagic country with an extensive coastline, faces challenges of coastal erosion and abrasion due to natural factors and human activities. This research aims to mitigate coastal damage at Bemu Beach, Seram Island, located along the Banda Sea, by utilizing hydrodynamic analysis to determine the optimal placement of hard structures (revetments). The research methodology includes primary data collection through field surveys, such as tidal, current, and wave data, along with secondary data analysis, including wind data. The analysis was supported by software modeling to validate the results. Findings indicate that the revetment should be placed at an elevation of 1.50 meters to effectively reduce further coastal damage. The dominant wind speed is from the south (59.87%), with the planned wave type being swell, having an extreme wave height of 1.58 meters. This study underscores the importance of effective coastal abrasion control through hydrodynamic approaches. Keywords: coastal damage, Seram Island, hard structure
Identifikasi Faktor-Faktor yang Mempengaruhi Kelaikan Fungsi Bangunan Gedung Terhadap Sertifikat Laik Fungsi Menggunakan Diagram Fishbone ratnaningsih, anik; putra indarto, yoga mandala; sukmawati, sri
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1158

Abstract

Abstrak Keamanan bangunan menjadi aspek krusial demi menghindari kejadian kegagalan konstruksi. Pemerintah memberikan persyaratan administratif dan kelaikan teknis sesuai fungsi bangunan, salah satu persyaratan yang ditetapkan adalah Sertifikat Laik Fungsi (SLF). Pemerintah Jember akan menerapkan kewajiban pemeriksaan kelaikan fungsi bangunan gedung pelayanan publik. Namun, banyak pemilik atau pengelola bangunan masih banyak yang belum mengetahui pentingnya SLF. Berdasarkan hal tersebut maka penelitian ini bertujuan untuk mengetahui tingkat kesiapan pengelola bangunan gedung pelayanan publik dalam menyambut penerapan SLF di Kota Jember. Metode diagram fishbone digunakan untuk mengidentifikasi faktor utama yang berpengaruh pada efektifitas dan berpengaruh pada kelaikan fungsi bangunan. Langkah-langkah penelitian meliputi studi literatur, pengumpulan data, analisis menggunakan pemodelan diagram fishbone, dan penyusunan rekomendasi peningkatan persyaratan kelaikan fungsi bangunan. Adapun hasil analisis menggunakan diagram fishbone dan brainstorming didapatkan hasil 21 variabel dominan dalam pengajuan persyaratan kelaikan fungsi bangunan dan beberapa upaya yang dapat dilakukan untuk peningkatan persyaratan kelaikan fungsi bangunan. Kata kunci: Sertifikat Laik Fungsi, Fishbone, Brainstorming, Pelayanan Publik, Green Building  Abstract Building safety becomes an important factor to avoid undesirable events. To address this, the government provides administrative and technical feasibility requirements according to the function of the building, which is the Certificate of Feasibility (SLF). Jember government will implement the obligation of inspecting the feasibility of public service buildings. Many building owners or managers still unaware of the importance of SLF. The fishbone diagram method is used to identify the main factors influencing the effectiveness and feasibility of building functions. Based on this, this research aims to determine the readiness level of public service building managers in welcoming the implementation of SLF in Jember City. The research include literature study, data collection, analysis using fishbone diagram modeling, and recommendations for improving building feasibility requirements. The analysis results there are 21 dominant variables in submitting building feasibility requirements and several efforts that can be made to improve the building feasibility requirements. Keywords: Certificate of Occupancy, Fishbone, Brainstorming, Public Service, Green Building
Evaluasi Penilaian Kinerja Irigasi dan Angka Kebutuhan Nyata Pengelolaan Irigasi Way Merias Kabupaten Lampung Tengah Rahmadani, Eria Zundi; Wahono, Endro P; Purwadi, Ofik Taufik
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1179

Abstract

Abstrak Kegiatan operasi dan pemeliharaan (O&P) irigasi adalah bagian dari manajemen irigasi yang bertujuan untuk keberlangsungan dan kemandirian sistem irigasi. Di wilayah irigasi ini, belum pernah dilakukan pemulihan atau perbaikan secara berkala, sehingga asset irigasi terus mengalami penurunan fungsi. maka diperlukan studi evaluasi kinerja irigasi dan angka kebutuhan nyata pengelolaan irigasi (AKNPI). Daerah Irigasi Way Merias merupakan Daerah Irigasi yang berada di bawah kewenangan Dinas Sumber Daya Air Kabupaten Lampung Tengah, daerah irigasi Way Merias memiliki luas fungsional 79.44 Ha dari luas baku dan potensial yang dimanfaatkan secara fungsional. Daerah Irigasi Way Merias, Kabupaten Lampung Tengah, masih di bawah standar di mana pada Permen PUPR No. 12/PRT/M/2015 menjelaskan untuk katergori Nilai Bobot 80-100 kinerja irigasi tersebut sangat baik, sedangkan pada Daerah Irigasi Way Merias nilai kinerja sistem irigasi 55-69 bahwa pada daerah irigasi tersebut kurang dan perlu perhatian, Total biaya yang dibutuhkan untuk pengelolaan daerah irigasi Way Merias adalah sebesar Rp 317.803.367. Kata kunci: Operasi Dan Pemeliharaan, Angka Kebutuhan Nyata Pengelolaan Irigasi. Kinerja Irigasi,   Abstract Irrigation operation and maintenance (O&M) activities are part of irrigation management which aims to ensure the sustainability and independence of the irrigation system. In this irrigation area, regular restoration or repairs have never been carried out, so irrigation assets continue to decline in function. Therefore, an evaluation study of irrigation performance and real irrigation management needs (AKNPI) is needed. The Way Merias Irrigation Area is an irrigation area under the authority of the Central Lampung Regency Water Resources Service. The Way Merias irrigation area has a functional area of 79.44 Ha. The Way Merias Irrigation Area, Central Lampung Regency, is still below standard. In PUPR Ministerial Decree No. 12/PRT/M/2015 explains that for the Weight Value category 80-100 the irrigation performance is very good, whereas in the Way Merias Irrigation Area the irrigation system performance value is 55-69, which means that in this irrigation area it is lacking and needs attention. from the standard and potential area utilized functionally. The total costs required to manage the Way Merias irrigation area are IDR 317,803,367. Keywords: Operation and Maintenance, Real Needs Figures for Irrigation Management
Pemanfaatan Abu Batu Hasil Proses Pemecah Batu Sebagai Material Pengganti Lapis Drainase Pada Pondasi Perkerasan Jalan Beton: A Systematic Literature Review Budilaksono, Obo Pulih; Bagus Hario Setiadji, Bagus Hario; Sadono, Kresno Wikan
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1182

Abstract

Abstrak Limbah Konstruksi dihasilkan adanya pembangunan infrastruktur yang memberikan dampak negatif terhadap lingkungan. Pesatnya pembangunan infrastruktur di Indonesia tentunya hal ini juga akan menghasilkan limbah konstruksi yang jumlahnya banyak dan cepat penambahannya. Sumber limbah konstruksi bisa dalam bentuk padat, cair, gas atau kombinasi dari semua bentuk tersebut. Proyek konstruksi merupakan penghasil limbah padat yang sangat besar. Manajemen pengelolaan dan pemanfaatan limbah konstruksi perlu dilaksanakan secara seksama, Indonesia merupakan negara berkembang yang laju pembangunan infrastrukturnya sangat pesat sekarang ini tetap mendukung pencapaian SDGs Agenda 2030, salah satu SDGs adalah Zero Waste Project dengan melaksanakan prinsip œThe 6 Rs of sustainability. Beberapa penelitian sebelumya terkait pemanfaatan abu batu digunakan sebagai penganti agregat halus campuran pembuat beton. Mengacu penelitiaan sebelumnya terkait pemanfaatan abu batu belum terdapat pemanfaatan abu batu digunakan sebagai material pengganti lapis drainase pada pondasi pekerasan jalan beton, sehingga masih terdapat gap pada penelitian sebelumnya yang akan dilakukan penelitian ini. Kata Kunci: Limbah Konstruksi, Abu Batu, Lapis Drainase, Perkerasan Beton  Abstract Construction waste is generated by infrastructure development that has a negative impact on the environment. The rapid development of infrastructure in Indonesia will certainly also produce construction waste in large quantities and increasing rapidly. Sources of construction waste can be in the form of solid, liquid, gas or a combination of all these forms. Construction projects are very large producers of solid waste. Management of construction waste management and utilization needs to be carried out carefully, Indonesia is a developing country with a very rapid rate of infrastructure development currently still supporting the achievement of the SDGs Agenda 2030, one of the SDGs is the Zero Waste Project by implementing the principle of "The 6 Rs of sustainability". Several previous studies related to the utilization of stone ash were used as a substitute for fine aggregate in concrete mixtures. Referring to previous studies related to the utilization of stone ash, there has been no use of stone ash as a substitute material for drainage layers on concrete road pavement foundations, so there is still a gap in previous research that will be carried out in this study. Keyword: Construction waste, Stone Ash, Drainage Layer, Concrete Pavement
Analisis Kinerja Struktur Bangunan Gedung Laboratorium 5 Lantai Terhadap Gempa Kuat Enggartiasto, Lintang; Kristiawan, Agung; Ikhwanudin, Ikhwanudin; Afifah, Risdiana Cholifatul
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1186

Abstract

Abstrak Perencanaan ketahanan gempa untuk bangunan gedung sangat diperlukan sebagai konsekuensi kondisi geografi Negara Indonesia yang sebagian besar memiliki resiko gempa yang tinggi. Penelitian ini membahas kinerja struktur gedung laboratorium 5 lantai eksisting terhadap gempa kuat. Metode yang digunakan meliputi non-linier statik pushover dan non linier dinamik riwayat waktu (time history). Rekaman gempa yang digunakan digunakan adalah gempa kuat dengan percepatan spektrum 0.2 detik dengan rasio redaman 5% untuk periode 2500 tahun. Hasil analisis pushover level kinerja struktur saat performance point arah X termasuk kategori Immediate Occupancy dan arah Y termasuk kategori Damage Control dengan parameter sistem struktur hasil analisis non linier yang memenuhi syarat terhadap parameter desain SNI 1726-2019. Drift ratio terbesar pada analisis riwayat waktu menghasilkan level kinerja struktur dengan kategori Damage Control. Disimpulkan dengan kategori level kinerja struktur tersebut, saat terjadi gempa kuat (periode 2500 tahun) struktur akan mengalami kerusakan struktural yang ringan dan masih dapat diperbaiki untuk difungsikan kembali. Kata kunci: Desain berbasis kinerja, analisis non-linier, level kinerja struktur  Abstract Due to the geography of Indonesia, most of which has a high seismic risk, seismic design of buildings is necessary. This research discusses the structural performance of an existing 5-story laboratory building against strong earthquakes.  The methods used include nonlinear static pushover and nonlinear dynamic time history. The earthquake record used is a strong earthquake with an acceleration spectrum of 0.2 seconds and a damping ratio of 5% for a period of 2500 years. The results of the pushover analysis of the structural performance level at the performance point in the X-direction include the Immediate Occupancy category and in the Y-direction include the Damage Control category with the structural system parameters of the nonlinear analysis results that meet the requirements of the SNI 1726-2019 design parameters. The largest drift ratio in the time history analysis results in a structural performance level with the Damage Control category. It is concluded that with this category of structural performance level, during a strong earthquake (2500 year period), the structure will experience minor structural damage and can still be repaired to function. Keywords: Performance Based Design, Non-Linier Analysis, Structural Performance Level
Prediksi Dampak Pembangunan Jalan Tol Trans Sumatera Pada Permintaan Perjalanan Udara Antar Provinsi di Pulau Sumatera Yuliyanto, Andry; P, Kirtinanda; Abyasa, Ariel Krisar; Pranata, M Reno
Teras Jurnal : Jurnal Teknik Sipil Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v14i2.1188

Abstract

 Abstrak   Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi perpindahan perjalanan penumpang udara ke kendaraan bermotor akibat pembangunan jalan Tol Trans Sumatera dan kenaikan harga tiket pesawat. Rute Bandar Lampung - Palembang, Pekanbaru - Padang, dan Medan - Aceh dianalisis sebagai rute yang paling representatifmenggambarkan situasi di Pulau Sumatera. Studi ini berfokus pada perjalanan antar kota dengan maksud perjalanan bisnis dan non bisnis. Variabel yang digunakan dalam studi ini yaitu waktu perjalanan, waktu tunggu, biaya perjalanan, tingkat keamanan, dan tingkat kenyamanan. Sebagai alat pengumpulan data digunakan teknik Stated Preference (SP) dan multinomial logit model untuk metodologi analisis. Model yang didapatkan menunjukan biaya perjalanan dan waktu perjalanan merupakan variabel yang paling signifikan. Model ini juga menegaskan bahwa Jalan Tol Trans Sumatera berdampak pada penurunan permintaan perjalanan udara di Pulau Sumatera. Selain itu pelaku perjalanan non bisnis lebih mudah untuk berpindah moda dibandingkan dengan perjalanan bisnis. Penelitian ini menunjukan bahwa penumpang pesawat bersifat inelastik terkait perubahan waktu tempuh dan biaya perjalanan.   Kata kunci: Stated Preference, Multinomial Logit Model, Jalan Tol Trans Sumatera, Permintaan Perjalanan Udara     Abstract   This study aims to analyze the factors that affect the potential transfer from air travel demand to the motorized vehicles due to the Trans Sumatra Toll Road construction and the increase in air ticket prices. Bandar Lampung - Palembang, Pekanbaru - Padang, and Medan - Aceh routes were assigned as the most representative routes for evaluating demand distribution in Sumatra. This study focuses on inter-city travel with business and non-business travel. The variables used in this study are travel time, time for waiting for the mode, travel costs, security level, and comfort level. To collect the data Stade Preference (SP) and multinomial logit model were used for the analysis. The model shows that travel costs and time are the most significant variables. This model also confirms that the Trans Sumatra Toll Road impacts decreasing demand for air travel on Sumatra Island. In addition, non-business travellers are more accessible to change modes than business trips. This research found that air passengers were inelastic related to changes in travel time and travel costs.   Keywords: Stated Preference, Multinomial Logit Model, Trans Sumatera Toll Road, Air Demand

Filter by Year

2011 2025


Filter By Issues
All Issue Vol. 15 No. 1 (2025): Volume 15 Nomor 1, Maret 2025 Vol. 15 No. 2 (2025): Teras Jurnal (September) Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024 Vol. 14 No. 1 (2024): Volume 14 Nomor 1, Maret 2024 Vol. 13 No. 2 (2023): Volume 13 Nomor 2, September 2023 Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023 Vol. 12 No. 2 (2022): Volume 12 Nomor 2, September 2022 Vol. 12 No. 1 (2022): Volume 12 Nomor 1, Maret 2022 Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021 Vol. 11 No. 1 (2021): Maret 2021 Vol. 10 No. 2 (2020): Volume 10 Nomor 2 September 2020 Vol. 10 No. 1 (2020): Volume 10 Nomor 1 Vol. 9 No. 2 (2019): Volume 9, Nomor 2, September 2019 Vol 9, No 1 (2019): Volume 9, Nomor 1, Maret 2019 Vol. 8 No. 2 (2018): Vol 8 No 2 September 2018 Vol. 8 No. 1 (2018): Vol 8 Nomor 1, Maret 2018 Vol. 7 No. 2 (2017): Vol. 7 Nomor 2, September 2017 Vol. 7 No. 1 (2017): Vol 7 No 1 Maret 2017 Vol 6, No 1 (2016): Volume 6 Nomor 1 (2016), Teras Jurnal, Vol 6 No 1, Maret 2016 Vol. 6 No. 2 (2016): Volume 6 Nomor 2, September 2016 Vol 5, No 2 (2015): TERAS JURNAL Vol.5, No.2, September 2015 Vol 5, No 1 (2015): TERAS JURNAL, Vol. 5, No. 1, Maret 2015 Vol 4, No 2 (2014): TERAS JURNAL, VOL.4, NO.2, SEPTEMBER 2014 Vol 4, No 1 (2014): TERAS JURNAL, VOL.4, NO.1, MARET 2014 Vol 3, No 2 (2013): Teras Jurnal, Vol 3, No 2, September 2013 Vol 3, No 1 (2013): Teras Jurnal, Vol 3, No.1, Maret 2013 Vol 2, No 4 (2012): Teras Jurnal, Vol 2, No 4, Desember 2012 Vol 1, No 1 (2011): Teras Jurnal, Vol.1, No.1, Maret 2011 More Issue