Claim Missing Document
Check
Articles

ANALISIS PERANCANGAN ANGGARAN BIAYA RUKO DUA LANTAI TIPE 340 DI KABUPATEN NGADA, NTT Kota, Reynaldus Sean; Maulana, Rizal; hermawan, anggi; Sari, Sely Novita
STORAGE: Jurnal Ilmiah Teknik dan Ilmu Komputer Vol. 3 No. 1 (2024): Februari
Publisher : Yayasan Literasi Sains Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55123/storage.v3i1.3141

Abstract

Peningkatan jumlah penduduk di sebuah kota dapat menyebabkan terjadinya peningkatan aktivitas kota tersebut, tentu saja peningkatan itu membutuhkan lahan yang luas dan strategis namun peningkatan jumlah penduduk yang meningkat tidak berjalan lurus dengan ketersediaan lahan sehingga perlu efisiensi dalam penggunaan lahan. Karena fungsi ganda tersebut pembangunan ruko perlu direncanakan terlebih dahulu, salah satunya perencanaan anggaran biaya agar pembangunan ruko menjadi lebih terencana dan ekonomis dari segi biaya. Metode penelitian ini menggunakan metode deskriptif. Metode penelitian ini digunakan untuk memecahkan masalah dengan mengumpulkan data, klasifikasi, analisis, kesimpulan dan laporan. Dari hasil analisa Rencana Anggaran Biaya (RAB) yang telah dikerjakan, estimasi biaya yang dibutuhkan untuk membangun ruko dua lantai tipe 340 di Kabupaten Ngada, NTT sebesar Rp.1.336.880.307,63 (Satu Miliar Tiga Ratus Tiga Puluh Enam Juta delapan ratus delapan puluh ribu Tiga Ratus Tujuh Enam Puluh Tiga Rupiah).
ANALISIS BIAYA DAN WAKTU DENGAN METODE NILAI HASIL PADA PROYEK PEMBANGUNAN GEDUNG BALAI NIKAH DAN MANASIK HAJI KUA KECAMATAN RAO, KABUPATEN PASAMAN Alwarizi, Fahrol; Sari, Sely Novita; hermawan, anggi
STORAGE: Jurnal Ilmiah Teknik dan Ilmu Komputer Vol. 3 No. 1 (2024): Februari
Publisher : Yayasan Literasi Sains Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55123/storage.v3i1.3142

Abstract

ANALISIS BIAYA DAN WAKTU DENGAN METODE NILAI HASIL PADA PROYEK PEMBANGUNAN GEDUNG BALAI NIKAH DAN MANASIK HAJI KUA KECAMATAN RAO, KABUPATEN PASAMANProyek konstruksi berkembang seiring dengan pertumbuhan kehidupan manusia. Kegiatan pengendalian biaya dan waktu dapat dilakukan menggunakan metode nilai hasil. Penelitian dilakukan untuk mengkaji penyimpangan biaya dan waktu serta untuk mengetahui pengaruh biaya dan waktu terhadap indeks produktifitas dan kinerja proyek. Data yang digunakan adalah RAB, time schedule kurva”S” dan laporan mingguan. Dari segi biaya, pelaksanaan proyek menghabiskan dana sebesar Rp. 947.529.607,00, sesuai dengan kontrak. Kinerja waktu pelaksanaan proyek pada minggu ke 3,7,11-15, serta minggu ke 20 dan 21 mengalami keterlambatan dari jadwal rencana. Sedangkan pada minggu ke 2,4,5,6,8,9,10 dan 16, mengalami percepatan pekerjaan. Perbandingan setelah di analisis menggunakan konsep nilai hasil (Earned value concept) diperoleh nilai SVkomulatif = 349.733.178 nilai (+) menunjukkan pekerjaan berjalan lebih cepat dari jadwal yang telah direncanakan. Dari segi biaya dianalisa menggunakan BCWS dan BCWP sesuai dengan anggaran, akan tetapi untuk nilai varasi biaya karena data yang terbatas maka tidak bisa ditentukan nilai variasi biaya dari proyek tersebut.
ANALISA PENERAPAN MANAJEMEN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG UNIT PELAYANAN TEKNIS PUSAT BALAI LATIHAN KERJA BANTUL Mokoagow, Fahrul Nurfajri; Maulana, Rizal; Ardian, Oggi Heical; Sari, Sely Novita
STORAGE: Jurnal Ilmiah Teknik dan Ilmu Komputer Vol. 3 No. 1 (2024): Februari
Publisher : Yayasan Literasi Sains Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55123/storage.v3i1.3153

Abstract

Proyek yang dilaksanakan secara temporer tentu perlu diatus dan dikendalikan dengan baik. Manajemen proyek adalah aplikasi dari pengetahuan, keahlian, dalat dan tekntik untuk melaksanakan aktivitas sesuai dengan kebutuhan proyek. Untuk mengetahui masalah-masalah yang terjadi dilapangan seperti kendala waktu, teknis dan lain-lain diperlukannya system manajemen waktu yang baik untuk menjawab permasalahan yang ada. Metode PDM menjadi sarana untuk perancangan jaringan kerja kegiatan, kemudian menghubungkannya dengan anak panah untuk menunjukkan ketergantungan tiap kegiatan. Hasil dari penelitian kali ini yaitu, terdapat keterlambatan proyek disebabkan produktivitas sumber daya yang kurang memadai dan penerpan manajemen waktu yang kurang tepat sehingga menghasilkan bobot pekerjaan yang tidak sesuai dengan rencana. Durasi rencana pekerjaan diselesaikan untuk perencaanaan struktur adalah 119 hari dan menjadi 98 hari setelah dilakukannya perhitungan menggunakan metode PDM. Lintasan kritis yang terjadi pada proyek kali ini terdapat 66 lintasan kritis. Produktivitas tenaga kerja sangat mempengaruhi durasi pekerjaan maka dibutuhkan penambahan tenaga kerja agar bisa didapatkan durasi optimal.
ANALISIS PERHITUNGAN ANGGARAN BIAYA RUMAH TINGGAL TIPE 240 DI KABUPATEN TORAJA UTARA Yobel, Felix; Maulana, Rizal; hermawan, anggi; Sari, Sely Novita
STORAGE: Jurnal Ilmiah Teknik dan Ilmu Komputer Vol. 3 No. 1 (2024): Februari
Publisher : Yayasan Literasi Sains Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55123/storage.v3i1.3154

Abstract

Kabupaten Toraja Utara merupakan salah satu Kabupaten di Provinsi Sulawesi Selatan, dan salah satu daerah dataran tinggi. Pada era globalisasi sekarang ini pertumbuhan penduduk semakin meningkat sehingga kebutuhan akan akan rumah tinggal semakin meningkat pula. Kebutuhan akan rumah tinggal merupakan kebutuhan dasar setelah makanan dan pakaian. Membangun sebuah rumah bukan perkara mudah bagi orang-orang pada umumnya, karena dalam membangun sebuah rumah dibutuhkan biaya yang banyak dan perlu diperhatikan. Perkiraan biaya memegang peran penting dalam proses pembangunan rumah tinggal atau gedung. Oleh karena itu diperlukan perhitungan yang cermat mulai dari jumlah pekerjaan, jenis pekerjaan, dan harga bahan hingga upah pekerja. Metode penelitian yang digunakan dalam penetian ini adalah metode penelitian deskriptif. Metode penelitian ini digunakan untuk memecahkan masalah dengan mengumpulkan data, klasifikasi, analisis, kesimpulan dan laporan. Dilakukan juga beberapa studi literatur dengan memanfaatkan analisa yang lebih mendalam yang diwujudkan dengan pengolahan data yang lebih fokus serta menyeluruh. Dari hasil analisa Rencana Anggaran Biaya (RAB) yang telah dilakukan dapat disimpulkan bahwa biaya yang dibutuhkan untuk pembangunan rumah tinggal tipe 240 di Kabupaten Toraja Utara adalah sebesar Rp. 1.067.728.448,- (Satu Miliar Enam Puluh Tujuh Juta Tujuh Ratus Dua Puluh Delapan Ribu Empat Ratus Empat Puluh Delapan Rupiah).
Analisis Rencana Anggaran Biaya Pada Bangunan Gedung Student Center Universitas Atma Jaya Yogyakarta Putri Jea, Maria Carvallo; Sari, Sely Novita; Hermawan, Anggi
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Cost estimation is a critical aspect of project execution, serving to ascertain the necessary funding for construction. This research centers on the Estimated Budget Plan (Rencana Anggaran Biaya or RAB) for the construction of Atma Jaya University Yogyakarta's Student Center Building. Its primary objective is to determine the comprehensive cost for the building's construction. Adhering to the SNI No. 1 of 2022 guidelines, the research employs a combination of primary and secondary data collection methods, drawing from sources like Plan Drawings, the Unit Price of Goods and Services (SHBJ), and Unit Price Analysis Guidelines. Subsequently, the research involves several key steps, including quantifying the volume of each type of work, assessing unit prices for these tasks, formulating the budget plan, and concluding with a comprehensive summary of costs for each category of work. Microsoft Excel is the tool of choice for these budget plan calculations. The analytical process encompasses volume computations, unit price assessments, and the final RAB, yielding a total cost estimate of Rp 71,899,735,842.00 for the construction of the Student Center Building at Atma Jaya University Yogyakarta.
Penerapan K3 (Keselamatan dan Kesehatan Kerja) Pada Bangunan Gedung Di Daerah Istimewa Yogyakarta Afredo Tubur, Hasi; Sari, Sely Novita; Hermawan, Anggi
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In the Special Region of Yogyakarta, the central hub of government, economy, and industry constitutes essential elements with diverse infrastructure and resources. Nevertheless, construction projects in this area often pose high risks to occupational safety and health. This situation has led to a poor safety record within the construction sector. To address this issue, efforts have been implemented in the form of Occupational Safety and Health (OSH) measures on construction projects, aiming to create a safer, healthier, and more productive work environment. This study examines the application of OSH on building construction projects in the Special Region of Yogyakarta, utilizing a quantitative field research method and questionnaires as primary data sources. The research findings indicate that the overall implementation of OSH on these projects is relatively good, with a lower standard deviation compared to the means of independent (X) and dependent (Y) variables. Variable X2 shows a positive influence on Y, while X1 and X3 do not exhibit significant positive effects. In summary, the independent variables collectively have a positive influence on the dependent variable, with a 53% impact.
Faktor Keterlambatan Pada Proyek Pembangunan Gedung Balai Nikah dan Manasik Haji Keccamatan Dumoga Utara di Kabupaten Bolaang Mongondow Hadi Riswanto, Teguh; Sari, Sely Novita; Maulana, Rizal
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In planning a project, it is necessary to have an activity schedule that can be used as a guide by implementers in carrying out their activities in the field, this shows that scheduling is very influential in the implementation of a project. Good project scheduling can make a project run effectively and efficiently, but in reality it is not always the same as what was planned. In this case, it can be seen in the implementation of the construction of the Marriage Hall and Hajj Pilgrimage Building in Dumoga Utara District in Bolaang Mongondow Regency. In the construction process for the construction of the Balai Nikah and Manasik Haji Building, North Dumoga District in Bolaang Mongondow Regency, there were delays caused by several factors in the field, resulting in a delay of 25 days which was originally planned to be completed in 120 days but in the field the project was completed in 145 days. Because this happens, an analysis of project scheduling is carried out in order to find out what causes delays in the project. From the results of the analysis obtained, the cause of the delay is in the foundation work item. Factors that cause delays are unfavorable weather, lack of labor, and contractors.
Penentuan Daerah Terdampak Kekeringan dan Potensi Air Kabupaten Gunung Kidul Tahun 2023 Sari, Sely Novita; Hermawan, Anggi; Maulana, Rizal; Ardian, Oggi Heicqal
Jurnal Pengabdian Masyarakat Bangsa Vol. 1 No. 12 (2024): Februari
Publisher : Amirul Bangun Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpmba.v1i12.729

Abstract

Kabupaten Gunung Kidul yang terletak di Provinsi Daerah Istimewa Yogyakarta, memiliki karakteristik geografis dan iklim yang dapat memengaruhi ketersediaan air untuk keperluan domestik, pertanian, dan industri. Kegiatan Abdimas ini bertujuan untuk menentukan daerah terdampak kekeringan dan potensi air di Kabupaten Gunung Kidul pada tahun 2023. Kegiatan ini memberikan landasan untuk merumuskan kebijakan pengelolaan air yang berkelanjutan, mengidentifikasi daerah rentan terhadap kekeringan, dan merencanakan upaya mitigasi yang tepat untuk menjaga keberlanjutan sumber daya air di Kabupaten Gunung Kidul pada tahun 2023 dan masa depan. Melalui metode survei lapangan, analisis iklim, dan evaluasi penggunaan lahan, penelitian ini mengidentifikasi 11 desa yang terdampak kekeringan. Badan Penanggulangan Bencana Daerah (BPBD) Gunung Kidul telah berupaya mengatasi krisis air dengan menyediakan total volume dropping air bersih sebesar 16.935.000 liter. Selain itu, ditemukan 33 embung berpotensi sebagai sumber air tambahan di musim kemarau, dan terdapat 74 titik potensi sumur bor untuk memperluas akses air bersih bagi masyarakat.
Analisis Kapasitas Mesin Pencacah Limbah Plastik dan Tekstil Menggunakan Unit Penghancur (Shredder) Rivan Muhfidin; Sely Novita Sari; Rizqi Prastowo
G-Tech: Jurnal Teknologi Terapan Vol 8 No 3 (2024): G-Tech, Vol. 8 No. 3 Juli 2024
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33379/gtech.v8i3.4400

Abstract

Sampah plastik menjadi isu lingkungan mendesak dengan produksi global mencapai jutaan ton per tahun, berdampak negatif di darat dan laut. Daur ulang sampah plastik adalah salah satu solusi terbaik. Penelitian ini bertujuan menghasilkan mesin pencacah plastik dan tekstil tipe shredder, menggunakan metode eksperimen untuk memodifikasi mesin pencacah yang ada agar lebih sederhana dan sesuai kebutuhan Rumah Sampah Ringas Trengginas. Sampel uji meliputi PET, HDPE, dan sampah tekstil. Data dikumpulkan melalui observasi dan studi literatur, dianalisis berdasarkan perencanaan pembuatan mesin dan hasil Pencacahan limbah. Mesin ini mampu mencacah 100 gram plastik 0,3 mm dalam 27 detik (13,3 kg/jam), plastik 0,5 mm dalam 30 detik (12 kg/jam), dan tekstil 0,2 mm dalam 45 detik (8 kg/jam). Rata-rata kapasitas mesin adalah 10,13 kg/jam.
Penilaian Pelaksanaan Pemeliharaan dan Perawatan Bangunan Hotel di Sleman Yogyakarta Sely Novita Sari; Rizal Maulana; Anggi Hermawan; Oggi Heicqal Ardian
G-Tech: Jurnal Teknologi Terapan Vol 8 No 3 (2024): G-Tech, Vol. 8 No. 3 Juli 2024
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33379/gtech.v8i3.4556

Abstract

Pemerintah telah menetapkan pedoman melalui Peraturan Menteri Pekerjaan Umum No. 24/PRT/M/2008 mengenai pemeliharaan dan perawatan bangunan Hotel. Pedoman ini bertujuan untuk mengurangi kerusakan dan masalah pada konstruksi bangunan dari segi kualitas, fasilitas, dan keamanan, serta mempermudah penanganan jika terjadi kerusakan. Pengamatan struktural bangunan memerlukan pengujian yang cermat. Penelitian ini menilai pemeliharaan dan perawatan Hotel sesuai peraturan tersebut. Hasilnya menunjukkan bahwa dari enam hotel yang diperiksa, pelaksanaan pemeliharaan bangunan mencapai 55,57%, sementara pelaksanaan perawatan mencapai 63,39%. Penelitian ini membantu menilai sejauh mana pedoman tersebut diterapkan dan dipahami di lapangan
Co-Authors Afredo Tubur, Hasi Albani Musyafa, Albani Alfinur Insaniyati Umi Sa'adah Alwarizi, Fahrol Amir Machmud Amir Machmud, Amir Andary, Fauziah Andrea Sumarah Asih Andri Daeng Salimung Anggi Hermawan Ardian, Oggi Heical Ariza Tiara Ramadhanti Astuti Umasugi Avon Budiono Bagus Gilang Pratama, Bagus Gilang Bere, Gracensia Bismoko Rahadrian Suseno Cengiz, Korhan Chandra Wahyu Herbyanto Clara Anggreini Ines Benge Dandi Pramono Payungan Dandi Pranomo Darlahanus, David Dian Nurcahyani Dika, Resa Priya Do’o, Ricko Rivaldo Ruben Fahrul Nurfajri Mokoagow Fajar, Muhammad Rizky Fandanu Firdyan Syah Faturrahman Jahrun Trumpi Filipus Alfriyadi Junaidi Filipus Alfriyadi Junaidi Fitri Nugraheni Fitri Nugraheni Grito, Mortalesel Hadi Riswanto, Teguh Hafid, Anggun Abdul Ilham Mopio Ilham Mopio Ircham Iwan Tri Riyadi Yanto Iwan Tri Riyadi Yanto, Iwan Tri Riyadi Jesika Dekrita Uan Joko Prasojo Kartika, Erawati Kota, Reynaldus Sean Kristin Yunita Mahbubi, Khairul Mokoagow, Fahrul Nurfajri Muhammad Hanif Jufri Mustafa Mat Deris Musyafa', Albani Mutiara Pasande Surugallang Nawawi, Ilham nico siliansyah Norhalina Senan Oggi Heical Ardian Oggi Heicqal Ardian Oni Yuliani Ozyurt, Basak Putri Jea, Maria Carvallo Putri, Silfia Dwi Rahmad Junaidi, Rahmad Rahmatullah Gafar kahar Ramadhani, Fauziah Ramadhani, Nanda ratih dwi indrajad ratih Ratna Kartikasari Rd. Rohmat Saedudin Ricko Rivaldo Ruben Do’o Ridayati Ridayati Ridwan, Khalid S Riswan Rizal Maulana Rizal Maulana Rizal Maulana, Rizal Rizky Tri Astuti Rizqi Prastowo Sa’adah, Alfinur Insaniyati Umi Sabila, Yusrina Nur Amalia Sabrina Putri Puspitasari Sarwidi Sarwidi Sarwidi, Sarwidi Setya Winarno sianturi, faldi daud suiyoso Sogar, Aris Umbu Soru Sulton, Adam Syach Reza Fachlevi Syamsul Arifin Tedy Kurniawan Topac, Tuna triwuryanto Triwuryanto Triwuryanto Triwuryanto Veronica Diana Anis Anggorowati wahyu anisa dwi bekti Wijanarko, Yulius Yobel, Felix Zulkahhar Ariga