Claim Missing Document
Check
Articles

Model Vehicle Routing Problem dengan Karakteristik Rute Majemuk, Multiple Time Windows, Multiple Products dan Heterogeneous Fleet untuk Depot Tunggal Ary Arvianto; Aditya Hendra Setiawan; Singgih Saptadi
Jurnal Teknik Industri Vol. 16 No. 2 (2014): DECEMBER 2014
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (704.807 KB) | DOI: 10.9744/jti.16.2.83-94

Abstract

In this paper we developed a VRP model for multiple routes, multiple time windows for multiple products and heterogeneous vehicles. The solution were constructed using a heuristic approach, i.e, a sequential insertion algorithm. Additionally, this model is applied to solve fuel distributions for eight customers in East Nusa Tenggara. It needs two tankers with capacity of 4700 kilo liters, so that those distributions can be accomplished with a minimum number of vehicles, total completion time, and range of completion time. The result of this study shows that for a heterogeneous vehicles problem, a vehicle with the largest capacity may not necessarily be the vehicle that provides an optimal solution. Moreover, advance trials should be conducted by providing a limited number of tankers for each tanker capacity, so the description of heterogeneous vehicles becomes more visible. In the future research, the solution will be improved by utilizing relocation techniques.
SIMULASI SISTEM PARKIR SPASIAL BERBASIS AGEN: SEBUAH PERANCANGAN KONSEP DAN IMPLEMENTASI MODEL Ary Arvianto; Wiwik Budiawan; Ahmad Karami; Fachrul Rozi; Jose Daniel Marthin
J@ti Undip: Jurnal Teknik Industri Vol 17, No 2 (2022): Mei 2022
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (599.299 KB) | DOI: 10.14710/jati.17.2.71-81

Abstract

Parkir dapat menimbulkan permasalah transportasi diperkotaan. Rendahnya okupansi ruang parkir sebuah fasilitas umum juga berdampak pada kemacetan lalu lintas di sekitarnya. Studi ini berfokus pada optimalisasi ruang parkir dengan mengukur tingkat okupansinya. Mikro simulasi diterapkan untuk mendapatkan gambaran okupansi secara spasial. Oleh karena itu, pendekatan agent based digunakan untuk dapat menangkap aspek mikro terutama perilaku pengemudi dalam mencari tempat parkir. Simulasi ini menggunakan tiga skenario dalam analisis okupansinya yaitu parkir yang terjadi pada hari kerja, hari akhir minggu, dan hari raya atau masa libur panjang. Hasilnya adalah okupansi tertinggi terjadi pada skenario hari raya khususnya pada area pintu masuk, railway, dan area mesin tiket. Sementara itu, area tunnel adalah area yang paling sedikit diminati oleh pengendara dan memiliki okupansi paling sedikit. Penambahan pintu masuk dan mesin tiket di dekat area tunnel dapat meningkatkan okupansi parkir yang berarti berpotensi dapat manambah okupansi kendarannya.
MEMBANGUN INDEKS KOMPOSIT DALAM MENGEVALUASI EFEKTIVITAS KEBIJAKAN SNI WAJIB: LITERATURE REVIEW Pramumardani, Ery Vita; Bachtiar, Arfan; Arvianto, Ary
J@ti Undip: Jurnal Teknik Industri Vol 19, No 1 (2024): Januari 2024
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/jati.19.1.46-57

Abstract

Masih ditemukannya produk yang tidak sesuai standar yang beredar di pasar menjadi dasar perlunya pengukuran efektivitas dari kebijakan SNI wajib di Indonesia. Indeks komposit merupakan salah satu metode yang banyak digunakan untuk menganalisis kebijakan public dan dapat mempermudah dalam monitoring dan kaji ulang kebijakan secara berkala. Penelitian ini bertujuan untuk memberikan informasi yang diharapkan dapat digunakan sebagai rujukan dalam penelitian pengukuran indeks efektivitas kebijakan SNI wajib, dengan cara melakukan analisis bibliometrik untuk mengetahui tren penelitian saat ini, serta melakukan Systematic Literature Review untuk mengetahui metode dan indikator apa saja yang dapat digunakan. Hasilnya diketahui walaupun terdapat peningkatan tren penelitian 10 tahun terakhir pada jurnal internasional, namun tidak ditemukan penelitian pada bidang standar produk dalam tren tersebut melainkan lebih banyak ditemukan pada kebijakan yang bersifat lingkungan seperti iklim, polusi, sustainability, dan sejenisnya. Sementara itu metode yang paling banyak digunakan adalah Principal Component Analysis (PCA), Benefit of Doubt (BoD), equal weight, entropy weight, dan Analytic Hierarchy Process (AHP). Indikator efektivitas yang paling sering digunakan adalah penurunan impor dan kesesuaian hasil uji pengawasan pasar. Abstract [Building A Composite Index In Evaluating The Effectiveness of Mandatory SNI Policies: Literature Review] The discovery of products that do not comply with standards circulating on the market is the basis for measuring the effectiveness of the mandatory SNI policy in Indonesia. The composite index is a method that is widely used to analyze public policy and can ease to monitor and review policies periodically. This research aims to provide information that is expected to be used as a reference in research measuring the effectiveness index of mandatory SNI policies, by conducting bibliometric analysis to determine current research trends, as well as conducting a Systematic Literature Review to find out what methods and indicators can be used. The results show that although there has been an increase in research trends in the last 10 years in international journals, there was no research found in the field of product standards in this trend, but more was found in environmental policies such as climate, pollution, sustainability, and the like. Meanwhile, the methods most widely used are Principal Component Analysis (PCA), Benefit of Doubt (BoD), equal weight, entropy weight, and Analytic Hierarchy Process (AHP). The most frequently used indicators of effectiveness are the reduction in imports and the suitability of market surveillance test results.Keywords: composite index; policy effectiveness; product standards; effectiveness indicators; weighting method
PERANCANGAN DAN PENGEMBANGAN BAK PENGOLAHAN DENGAN METODE QUALITY FUNCTION DEPLOYMENT (QFD) UNTUK MEREDUKSI DEFECT KETEBALAN KARET Nugraha, Restu Adi; Arvianto, Ary
Industrial Engineering Online Journal Vol 13, No 4 (2024): WISUDA PERIODE OKTOBER TAHUN 2024
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakPT. Perkebunan Negara IX Kebun Ngobo merupakan perusahaan manufaktur yang melakukan prosespengolahan karet dari getah karet. Pada proses produksi ditemukan sebuah defect yaitu berupa karetmemiliki ketebalan yang melebihi standar yang ditetapkan setelah proses pembekuan. Karet yang memilikiketebalan melebihi standar tidak bisa untuk melewati mesin penggiling karena dapat merusak mesinpenggiling sehingga harus dilakukan rework. Hasil karet defect ini juga akan memengaruhi waste lainnyabaik secara langsugn ataupun tidak langsung. Penelitian ini bertujuan untuk melakukan perancangan danpengembangan terhadap bak pengolahan untuk mereduksi defect karet tebal tidak sesuai standar. Hasilevaluasi alternatif menunjukan desain alternatif 1 menjadi desain rancangan usulan terpilih kemudian hasilevaluasi rancangan yang berpengaruh terhadap defect yaitu untuk untuk kelonggaran plat dinilai sangatbaik dibandingkan bak pengolahan saat ini dalam mereduksi defect, sedangkan untuk gerigi bawah dinilaisama saja dibandingkan bak pengolahan saat ini.Kata kunci: Perancangan, Function Analysis System Technique, Defect Abstract[DESIGN AND DEVELOPMENT OF A PROCESSING TANK USING THE QUALITY FUNCTIONDEPLOYMENT (QFD) METHOD TO REDUCE RUBBER THICKNESS DEFECTS] PT. PerkebunanNegara IX Kebun Ngobo is a manufacturing company that processes rubber from latex. In the productionprocess, a defect has been identified where the rubber has a thickness exceeding the established standardafter the freezing process. Rubber that exceeds the standard thickness cannot pass through the grindingmachine as it may damage the machine, necessitating rework. This defective rubber also affects other waste,both directly and indirectly. This study aims to design and develop the processing tank to reduce the defectof rubber thickness not meeting the standard. The evaluation of alternatives indicates that Alternative Design 1 is the selected proposed design. Furthermore, the evaluation of the design's impact on defectsshows that the plate clearance is rated as very good compared to the current processing tank in reducingdefects, while the lower serrations are rated the same as the current processing tank.Keywords: Design, Function Analysis System Technique, Defect
EVALUASI PEMILIHAN VENDOR BERDASARKAN PENETAPAN KRITERIA EVALUASI REKANAN MENGGUNAKAN METODE ANALYTICAL NETWORK PROCESS (ANP) PADA PENGADAAN KOMPONEN BATTERY N-70 (STUDI KASUS: PT PINDAD PERSERO) Cahyani, Dihan Chofifah; Arvianto, Ary
Industrial Engineering Online Journal Vol 13, No 1 (2024): WISUDA PERIODE JANUARI TAHUN 2024
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakBattery excavator N-70 merupakan salah satu produk yang dibutuhkan oleh PT Pindad secara rutin untuk melakukan proses perakitan produk excavator. Berdasarkan data perusahaan pada tahun 2019-2022 terjadi perubahan pemasok komponen battery excavator dalam 3 kali pengadaan komponen tersebut, hal tersebut menunjukkan PT Pindad belum menemukan supplier terbaik untuk komponen battery excavator. Penelitian ini bertujuan untuk menganalisis pemilihan supplier komponen battery excavator N-70 menggunakan metode ANP (analysis Network Process) berdasarkan kriteria harga, kualitas, delivery, maupun service pasca jual untuk dapat dievaluasi supplier mana yang memiliki tingkat kesesuaian paling baik sesuai dengan kriteriakriteria pemilihan tersebut sehingga dapat dilakukan pengadaan dengan sistem penunjukkan langsung agar waktu yang diperlukan dalam proses pemilihan supplier hingga produk sampai di tangan user dapat lebih efektif dan efisien. Penelitian evaluasi kinerja dengan ANP ini menggunakan 4 kriteria dengan 16 sub kriteria yang sudah divalidasi dan dikonsultasikan dengan pihak perusahaan. Penelitian ini menghasilkan urutan kriteria-kriteria yang paling berpengaruh dalam pemilihan supplier komponen battery excavator yaitu kriteria mutu, pengiriman, pelayanan purna jual, dan terakhir kriteria biaya, serta urutan pemilihan supplier berdasarkan kriteria yang ditetapkan dengan urutan supplier yaitu Bina Pertiwi, GS Battery, dan urutan terakhir adalah Mulia Utama Trasindo.Kata kunci: Analytical Network Process (ANP), Evaluasi Kinerja Rekanan, Evaluasi Pemilihan Supplier, Pengadaan.Abstract[Evaluation of Vendor Selection Based on Determining Partner Evaluation Criteria Using Analytical Network Process (ANP) Method in Procurement Of N-70 Battery Components (Case Study: PT Pindad Persero)] The N-70 excavator battery is one of the products that PT Pindad regularly needs to carry out the process of assembling excavator products. Based on company data for 2019–2022, there was a change in supplier of excavator battery components in three component procurements. These show that PT Pindad has not found the best supplier for excavator battery components. This research aims to analyze the selection of N-70 excavator battery component suppliers using the ANP (analysis network process) method based on the criteria of price, quality, delivery, and post-sales service to be able to evaluate which supplier has the best level of suitability according to the selection criteria. These means that procurement can be carried out using a direct appointment system, so that the time required for the supplier selection process until the product reaches the user's hands can be more effective and efficient. This performance evaluation research with ANP uses 4 criteria with 16 sub-criteria that have been validated and consulted with the company. This research produces the order of the most influential criteria in selecting excavator battery component suppliers, namely quality criteria, delivery, after-sales service, and the last is cost criteria. The order of supplier selection based on criterias determined by the order of suppliers, namely Bina Pertiwi and GS Battery; and the last list is Mulia Utama Trasindo.Keywords: Analytical Network Process (ANP), Partner Performance Evaluation, Procurement, Supplier Election Evaluation.
ANALISIS EFEKTIVITAS MESIN PORTABLE SPOT WELDING (PSW) DENGAN PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PRODUKSI UNIT TD (Studi Kasus : PT. Krama Yudha Ratu Motor) Parhusip, Yohana Natalia Putri Gani; Arvianto, Ary
Industrial Engineering Online Journal Vol 13, No 4 (2024): WISUDA PERIODE OKTOBER TAHUN 2024
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT Krama Yudha Ratu Motor adalah perusahaan perakitan Make To Order (MTO) yang jugamerupakan salah satu perusahaan industri otomotif di Indonesia yang memproduksi beragam kendaraanniaga dengan beberapa tipe yaitu TD (Colt Diesel), Fuso, dan TA (Fuso Fighter). Aliran proses produksidi PT Krama Yudha Ratu Motor meliputi proses Welding – Metal Finish – Painting – Trimming – TesterLine – Road Test – Pre Delivery – Delivery – Handling Post Delivery – Pengendalian Lingkungan.Berdasarkan hasil wawancara, penelitian, dan data histori breakdown serta data maintenance, mesinPSW proses Welding pada unit TD memiliki beberapa penyebab kerusakan yang dapat berpengaruhterhadap proses selanjutnya, dikarenakan proses Welding ini merupakan proses paling awal dalampembuatan unit. Hal ini dapat dilihat dari data Summary Defect Welding TD tahun 2022, dimanaSebagian besar defect yang terjadi pada proses Welding ini disebabkan oleh kerusakan pada mesin PSW.Permasalahan pada proses Welding, tentu akan mempengaruhi proses produksi pada tahap selanjutnyamenjadi terhambat sehingga dapat menimbulkan potensi pemenuhan produksi yang tidak sesuai demand.Oleh karena itu, perlu dilakukan analisis maintenance terhadap permasalahan yang terjadi pada mesinPSW pada proses Welding Unit TD untuk mengetahui jenis kerusakan yang ada, mengidentifikasi carapenyelesaian pada mesin PSW dan penyebabnya menggunakan metode Total Productive Maintenance(TPM) dan pendekatan Overall Equipment Eficiency (OEE).Kata Kunci: Total Productive Maintenance; Overall Equipment Eficiency; Industri Otomotif Abstract [Identification of Problems in Portable Spot Welding Machines (PSW) Production of TD Units Usingthe Total Productive Maintenance (TPM) Method with the Overall Equipment Effectiveness (OEE)Approach (Study Case: PT. Krama Yudha Ratu Motor)]. PT Krama Yudha Ratu Motor is a Make ToOrder (MTO) assembly company which is also one of the automotive industry companies in Indonesiathat produces various types of commercial vehicles, namely TD (Colt Diesel), Fuso, and TA (FusoFighter). The flow of the production process at PT Krama Yudha Ratu Motor includes the process ofWelding – Metal Finish – Painting – Trimming – Line Tester – Road Test – Pre Delivery – Delivery –Handling Post Delivery – Environmental Control. Based on the results of interviews, research, andhistorical breakdown data as well as maintenance data, the Welding process PSW machine in the TDunit has several causes of damage that can affect the next process, because the Welding process is theearliest process in making a unit. This can be seen from the TD Welding Defect Summary data for 2022,where most of the defects that occur in the welding process are caused by damage to the PSW machine.Problems in the welding process, of course, will affect the production process at a later stage andbecome obstructed so that it can lead to the potential for fulfilling production that does not matchdemand. Therefore, it is necessary to carry out a maintenance analysis of the problems that occur inthe PSW machine in the Welding Unit TD process to find out the types of damage that exist, identifyways to solve the PSW machine and the causes using the Total Productive Maintenance (TPM) methodand the Overall Equipment Efficiency (OEE) approachKeywords: Total Productive Maintenance; Overall Equipment Eficiency; Automotive Industry
USULAN PERENCANAAN PERSEDIAAN MATERIAL GYPSUM DAN COAL DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PADA PT INDOCEMENT TUNGGAL PRAKARSA TBK PLANT CIREBON Alamanda, Novia; Arvianto, Ary
Industrial Engineering Online Journal Vol 13, No 4 (2024): WISUDA PERIODE OKTOBER TAHUN 2024
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakPersediaan bahan baku adalah bagian penting dalam rantai pasokan suatu perusahaan. Dalammengontrol persediaan bahan baku produksi, PT Indocement Tunggal Prakarsa Tbk Plant Cirebonmenerapkan metode Min-Max. Namun, berdasarkan data endstock material Gypsum dan Coalmengalami stockout dan overstock. Hal tersebut mengakibatkan proses produksi terhambat danperusahaan perlu mengeluarkan biaya tambahan untuk melakukan pile up stock. Maka dari itu, perludilakukan usulan perencanaan persediaan bahan baku yang lebih matang untuk material gypsum dancoal dengan menggunakan metode Material Requirement Planning (MRP) seperti Lot-for-lot (LFL) danEconomic Order Quantity (EOQ). Penelitian ini bertujuan untuk memperoleh persediaan yang optimalsesuai dengan kebutuhan perusahaan dan biaya yang paling minimum. Dalam penelitian ini,perhitungan dilakukan secara teoritis dan pendekatan riil berdasarkan ketentuan kuantitas pembelianperusahaan. Hasil perhitungan menunjukkan bahwa metode LFL menghasilkan persediaan palingminimum baik untuk gypsum dan coal, dengan penghematan sebesar 3,50% untuk gypsum dan 0,91%untuk coal. Dengan demikian, metode LFL dapat diterapkan oleh perusahaan untuk memperoleh biayapersediaan yang paling minimum dengan jumlah persediaan yang sesuai dengan jumlah kebutuhanbersih pada periode terkait. Kata Kunci: Economic Order Quantity, Lot for lot, Lot sizing, MRP, Pengendalian PersediaanAbstractRaw material inventory is an important part of a company's supply chain. In controlling the inventoryof production raw materials, PT Indocement Tunggal Prakarsa Tbk Plant Cirebon applies the Min-Maxmethod. However, based on endstock data, Gypsum and Coal materials experienced stockouts andoverstock. This results in the production process being hampered and the company needs to incuradditional costs to pile up stock. Therefore, it is necessary to propose a more mature raw materialinventory planning for gypsum and coal materials using Material Requirement Planning (MRP)methods such as Lot-for-lot (LFL) and Economic Order Quantity (EOQ). This research aims to obtainoptimal inventory according to company needs and the minimum costs. In this study, calculations arecarried out theoretically and a real approach based on the provisions of the company's purchasequantity. The calculation results show that the LFL method produces the minimum inventory for bothgypsum and coal, with savings of 3.50% for gypsum and 0.91% for coal. Thus, the LFL method can beapplied by companies to obtain the minimum inventory costs with the amount of inventory in accordancewith the amount of net demand in the related period.Keywords: Economic Order Quantity, Inventory Control, Lot for lot, Lot sizing, MRP
PENENTUAN JUMLAH TENAGA KERJA MENGGUNAKAN WORK LOAD ANALYSIS (WLA) DAN WORK FORCE ANALYSIS (WFA) PADA DIRECT LOADING DAN DIRECT UNLOADING HOD PT TIRTA INVESTAMA Firmansyah, Muhammad Bintang; Arvianto, Ary
Industrial Engineering Online Journal Vol 13, No 3 (2024): WISUDA PERIODE JULI TAHUN 2024
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Pada era industri sekarang, sering terdapat permasalahan terkait tanaga kerja, seperti rendahnya utilitastenaga kerja . Oleh karena itu diperlukan cara optimalisasi penggunaan tenaga kerja. PT Tirta Investama merupakan perusahaan manufaktur yang memproduksi air mineral kemasan di Klaten, JawaTengah.Utilitas tenaga kerja PT Tirta Investama area Direct Loading dan Unloading tidak sesuai standarperusahaan Hal tersebut diakibatkan oleh tingkat absensi para pekerja yang kurang disiplin dan parapekerja yang kurang produktif. Penelitian ini dilakukan untuk mengukur beban kerja serta menentukanjumlah tenaga kerja berdasarkan beban kerja sebagai upaya peningkatan utilitas tenaga kerja. Untukpenentuan jumlah tenaga kerja digunakan metode WLA dan WFA. Metode WLA dapat menentukan jumlahtenaga kerja berdasarkan beban kerja, sedangkan WFA dapat menentukan jumlah tenaga kerjaberdasarkan tingkat absensi dan perputaran tenaga kerja (LTO). Sebagai hasil pengolahan datadidapatkan bahwa beban kerja yang ada di Direct Loading overload jika hanya dilakukan oleh 1 orangtenaga kerja saja, sedangkan Direct Unloading masih di dalam kategori underload jika dilakukan oleh 1orang di setiap lininya. Oleh karena itu, jumlah tenaga kerja yang diperlukan adalah 6 orang untuk arealoading dan 3 orang untuk unloading. Sehingga akan dilakukan pengurangan tenaga kerja sebanyak 3orang pada area direct loading dan 3 orang pada area unloading.Kata kunci: Penentuan Jumlah Tenaga Kerja Optimal, WLA, WFA Abstract In the current industrial era, there are often problems related to labor, such as low labor utility. Thereforewe need a way to optimize the use of labor. PT Tirta Investama is a manufacturing company that producesbottled mineral water in Klaten, Central Java. The workforce utility of PT Tirta Investama in the DirectLoading and Unloading area does not meet company standards. This is caused by the absentee level ofworkers who are less disciplined and workers who are less productive. This research was conducted tomeasure workload and determine the number of workers based on workload as an effort to increase laborutility. To determine the number of workers used the WLA and WFA methods. The WLA method candetermine the number of workers based on workload, while the WFA can determine the number of workersbased on absenteeism and labor turnover (LTO). As a result of data processing, it is found that the workloadin Direct Loading is overloaded if it is only carried out by 1 person in the workforce, while Direct Unloadingis still in the underload category if it is carried out by 1 person in each line. Therefore, the number ofworkers needed is 6 people for the loading area and 3 people for unloading. So that there will be a reductionin the workforce of 3 people in the direct loading area and 3 people in the unloading area.Keywords: Determination of the Optimal Number of Workers;WLA;WFA
EVALUASI PEMILIHAN SUPPLIER KEMASAN BOTOL REGULAR MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) (STUDI KASUS: PT. XYZ) Setyawan, Rafly Zuhdi; Arvianto, Ary
Industrial Engineering Online Journal Vol 13, No 1 (2024): WISUDA PERIODE JANUARI TAHUN 2024
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakPT. XYZ adalah perusahaan manufaktur yang memproduksi pelumas. Dalam beberapa bulan terakhir, kinerja supplier bahan baku kemasan jenis botol regular dinilai belum stabil. Keterlambatan maupun kedatangan lebih awal pada proses pengiriman dan ketidaksesuaian kualitas material kemasan jenis botol regular yang mengakibatkan bahan baku tidak dapat masuk ke gudang dapat menghambat proses produksi. Dalam melakukan pengadaan kemasan jenis botol regular PT. XYZ menjalin kerjasama dengan empat supplier yaitu, PT. A, PT. B, PT. C, dan PT. D. Untuk memantau kinerja supplier, dilakukan proses pengevaluasian kinerja supplier setiap bulannya oleh divisi logistik dan tim Quality Control. Penilaian kinerja supplier dinilai mulai tidak efektif dan relevan yang mengakibatkan kuota pemesanan kepada supplier tidak sesuai dengan kapabilitas supplier dalam memenuhi keinginan dan kebutuhan supplier. Oleh karena itu, perlu dilakukan evaluasi ulang kinerja supplier pada proses pengiriman kemasan jenis botol regular dengan beberapa kriteria baru dan memperhatikan bobot dan prioritas setiap kriteria yang diharapkan dapat ditentukan supplier mana yang dapat diprioritaskan oleh perusahaan.Kata kunci: supplier; Supplier Performance Evaluation; analytical hierarchy processAbstract [Title: Evaluation Of Regular Bottle Packaging Supplier Selection Using The Analytical Hierarchy Process (Ahp) Method (Case Study: PT. XYZ)] PT. XYZ, is a manufacturing company that produces lubricants. In recent months, the performance of suppliers providing packaging raw materials, specifically regular bottle types, has been deemed unstable. Delays or early arrivals in the delivery process and discrepancies in the quality of regular bottle packaging materials have resulted in the raw materials being unable to enter the warehouse, thus impeding the production process. To procure regular bottle packaging, PT. XYZ, has established collaborations with four suppliers: PT. A, PT. B, PT. C, and PT. D. In order to monitor supplier performance, a monthly supplier performance evaluation process is conducted by the logistics division and the Quality Control team. The assessment of supplier performance has been deemed ineffective and irrelevant, resulting in the ordering quotas not aligning with the suppliers' capabilities to meet the company's desires and needs. Therefore, a reassessment of supplier performance is necessary in the regular bottle packaging delivery process, introducing new criteria and considering the weight and priority of each criterion. This is expected to help determine which supplier can be prioritized by the company.Keywords: Supplier; Supplier Performance Evaluation; Analytical Hierarchy Process
Evaluating the impact of autonomous material handling on the performance of production system: a simulation approach Purwaningsih, Ratna; Shintyastuti, Annisa Rahma; Arvianto, Ary; Hapsari, Chaterine Alvina Prima; Putri, Ade Aisyah Arifna; Dzulfikar, Rifki Daris
SINERGI Vol 29, No 2 (2025)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/sinergi.2025.2.004

Abstract

In developing countries, low employment rates lead to manual material handling due to low labor costs. This article analyzes the impact of transitioning from semi-manual to fully automatic material handling systems by replacing the hand pallet system with AGV for transporting materials on the production floor. A simulation model was created to evaluate the impact of the transition on cost and quality. The model focuses on production lines with predetermined pathways and fixed working hours for workstations. The discrete event simulation was developed using ExtendSim. Queuing theory model is employed to assess the utilization of resources within the system. Three scenarios are developed: a human system, systems with 2 AGVs, and 3 AGVs.The findings suggest that systems with AGVs surpass human-operated systems in terms of system reliability, cost-effectiveness, and product excellence. The findings provide essential insights for management decision-making, specifically for deterministic production lines. The research findings emphasize the possibility of significant enhancements in production system performance by implementing autonomous material handling.
Co-Authors Adhitya Sulistyawan Aditya Hendra Aditya Hendra Setiawan Aditya Hendra Setiawan Ahmad Karami Ahmad Muzakki Alamanda, Novia Anatashia Rosa Ferella Ardanesia Ardanesia Arfan Bachtiar, Arfan Arien Dewi Rakhmawati Arien Dewi Rakhmawati Arya Anantama R, Arya Anantama Bambang Purwanggono Bariqi Rahadyan Putera Bibit Setyo Pambudi Budiman Nurhidayat Cahyani, Dihan Chofifah Damar Jiwo Kuntoprasetyo Darminto Pujotomo Desmond Ryan Khrisnanda Dhana Antasari Diana Puspita Sari Dina Tauhida Dina Tauhida Dinar Enggar Puspita Dwi Satria Perkasa, Dwi Satria Dyah Ika Rinawati Dythia Rointan Sianturi Dzulfikar, Rifki Daris Fachrul Rozi Faiz Hanif Kurniawan Findy Nurlitasari Nampira Firmansyah, Muhammad Bintang Fithria Khoirunnisa Galih Setyo Pambudi, Galih Setyo Grace Olivia Hanifah Fitri Izzati Hapsari, Chaterine Alvina Prima Haryo Santoso Heru Prastawa Hery Suliantoro I Ketut Suada Izzuddin Naufal Jose Daniel Marthin Khairunnisa Hanan Yancadianti Liem Kevin Renard Wiryono Maizar Rizki Biruni Martha, Kezia Elyani Marudut Mujur Muhamad Firman Prayogi Muhammad Hani Nabiel Putra Adam Nabiel Putra Adam Nabiel Putra Adam, Nabiel Putra Naniek Utami Handayani Nartadhi, Rizal Luthfi Nartadhi, Rizal Luthfi Nia Budi Puspitasari Nugraha, Restu Adi Opan Pardiyana Parhusip, Yohana Natalia Putri Gani Permana, Imam Indra Pramumardani, Ery Vita Prasetyo Adi W Purnawan Adi W Purnomo Setyo Kusumo Putri Fajar Wulandari Putri, Ade Aisyah Arifna R. Ristanto Baskoro, R. Ristanto Ratna Purwaningsih Rayana Andari Bardijan Rheza Arista Rifki Muhammad Rosi Puspitasari Ryan Ramanda Nasution Samosir, Rian Simon Saputra, Dhimas Wachid Nur Sarsa Surya Rizkita Setyawan, Rafly Zuhdi Shintyastuti, Annisa Rahma Sigit B. Prayudo Singgih Saptadi Sri Hartini Sriyanto Sriyanto Sriyanto Sriyanto Suci Farida Astuti Torop Nadeak Sihombing Tresia Siahaan, Yohana Sara Try Aji Wisnubroto Wiwik Budiawan Wiwik Budiawan Wiwik Budiawan Zaenal Fanani Zekben S, Meikel