Claim Missing Document
Check
Articles

Found 32 Documents
Search

Studi Perbandingan Beban Gempa Pada Gedung Rawat Inap Non Bedah RSUD Dr. H. Abdul Moeloek, Bandar Lampung Dengan Analisis Respon Spektrum Sesuai SNI 1726:2012 dan SNI 1726:2019 Hania Cipta, Ade Permata; Isneini, Mohd.; Husni, Hasti Riakara; Kusnadi, Andi
Jurnal Rekayasa Sipil dan Desain Vol 11, No 2 (2023): Edisi Juni 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The rapidly growing population is directly proportional to the increasing amount of land use, especially in urban areas, one of which is in the city of Bandar Lampung. The construction of vertical structures or high-rise building structures is an option in overcoming the limited land. However, high-rise building structures are considered to be risky to lateral loads such as earthquake loads, so that in planning, earthquake loads must be considered.This study aims to determine differences in response to the earthquake acceleration spectrum in the City of Bandar Lampung, especially the Non-Surgical Inpatient Building at Dr. H. Abdul Moeloek based on SNI 1726:2012 and SNI 1726:2019. Based on the results of this study, it was found that due to the influence of the earthquake the input spectrum response was in accordance with SNI 1726:2012 and SNI 1726:2019, the base shear force due to the earthquake spectrum response for SNI 1726:2012 was 12900.4864 kN and SNI 1726:2019 was 14931.0787 kN . Interstory drift between levels that occur in the structure are still in the safe category because they do not exceed the story drift allowable levels, 48.4615 mm.
Perencanaan 4D Scheduling Simulation Dengan Menggunakan Building Information Modeling (BIM) Pada Gedung 6 (Enam) Rumah Sakit Pendidikan Perguruan Tinggi Negeri Universitas Lampung Dzakiroh, Alda Alfiah; Bayzoni, Bayzoni; Siregar, Amril Ma'ruf; Husni, Hasti Riakara
Jurnal Rekayasa Sipil dan Desain Vol 11, No 1 (2023): Edisi Maret 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractThe use of Building Information Modeling (BIM) is an alternative solution to optimize the time for each step of work in a project. This study aims to determine the duration of scheduling with the normal and overtime method accompanied by the addition of heavy equipment and to determine the stages of planning with the application of 4-Dimensional BIM. The analytical method used is the implementation of a 4D Scheduling Simulation in Building 6th of the State University Education Hospital (RSPTN), University of Lampung. The calculation result by using the scenario of labor use with a normal duration of 8 hours/day showed that the completion of the work takes 272 days. After crashing with the addition of working hours (overtime) for 3 hours and the addition of heavy equipment, the duration was reduced to 200 days with a difference of 72 days. Based on this research, it can be concluded that the use of crashing method increases time efficiency by 36% higher than duration planning using the normal method and the application of BIM 4D can provide solutions that can be used as a reference in understanding engineering and construction plans.Keywords: Building Information Modeling (BIM), 4D Scheduling Simulation, Building 6th RSPTNAbstrakPenggunaan Building Information Modeling (BIM) merupakan solusi alternatif untuk pengoptimalan penggunaan waktu tiap tahap pekerjaan dalam suatu proyek. Penelitian ini bertujuan untuk memodelkan dan mengetahui durasi penjadwalan dengan metode normal dan lembur yang disertai penambahan alat berat serta mengetahui tahapan perencanaan dengan penerapan BIM 4 Dimensi. Metode analisis yang digunakan yaitu dengan penerapan 4D Scheduling Simulation pada Gedung 6 Rumah Sakit Pendidikan Perguruan Tinggi Negeri (RSPTN) Universitas Lampung. Hasil perhitungan dengan menggunakan skenario penggunaan tenaga kerja dengan durasi normal selama 8 jam/hari menunjukkan bahwa penyelesaian pekerjaan membutuhkan waktu selama 272 hari. Setelah dilakukan crashing dengan penambahan jam kerja (lembur) selama 3 jam serta penambahan alat berat didapat pengurangan durasi menjadi 200 hari dengan perbedaan selisih waktu 72 hari. Berdasarkan penelitian ini diperoleh kesimpulan bahwasannya penggunaan metode crashing meningkatkan efisiensi waktu 36% lebih tinggi dibandingkan dengan perencanaan durasi menggunakan metode normal serta penerapan BIM 4D dapat memberikan solusi yang dapat dijadikan acuan dalam pemahaman teknik dan rencana konstruksi.Kata kunci: Building Information Modeling (BIM), 4D Scheduling Simulation, Gedung 6 RSPTN
Evaluasi Kinerja Struktur Gedung Bertingkat dengan Metode Analisis Respon Spektrum (Studi Kasus: Gedung 5 Rumah Sakit Pendidikan Perguruan Tinggi Negeri (RSPTN) Universitas Lampung) Sabila, Widya Lulu Amalia; Husni, Hasti Riakara; Bayzoni, Bayzoni; Isneini, Mohd
Jurnal Rekayasa Sipil dan Desain Vol 11, No 3 (2023): Edisi September 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractThe high occurrence rate of damage to buildings and infrastructure due to earthquakes necessitates a review or analysis of earthquake-resistant structural planning. Considering the importance of hospital functions, it is necessary to conduct an evaluation of the performance of the building structure under seismic loads using the latest standards to determine the structural suitability of the building. The level of safety in high-rise buildings is considered crucial to be known, so in this study, a case study was conducted on Building 5 of RSPTN UNILA using the method of response spectrum dynamic analysis. The structural analysis was calculated using a commercial structural analysis program in a three-dimensional model to determine whether the structure is safe or not according to the inter-storey drift limits specified in SNI 1726:2019. The results of the analysis show that as the earthquake acceleration increases, the drift value in the building structure also increases. The drift values obtained for the evaluated building are 15.5850% in the X direction and 19.3563% in the Y direction compared to the allowable drift. The drift (Δ) occurring in the building structure satisfies the allowable story drift (Δa) requirements according to SNI 1726:2019.Key words : structural performance, earthquake, dynamic analysis, spectrum response.  AbstrakTingginya tingkat terjadinya kerusakan pada bangunan dan infrastruktur akibat terjadinya gempa membuat perlu adanya peninjauan atau analisis terhadap perencanaan struktur tahan gempa. Mengingat pentingnya fungsi rumah sakit maka perlu diadakannya evaluasi kinerja struktur gedung terhadap beban gempa dengan standar terbaru untuk menentukan kelayakan struktur gedung. Tingkat keamanan gedung bertingkat tinggi dinilai sangat penting untuk diketahui sehingga dalam penelitian kali ini dilakukan studi kasus pada Gedung 5 RSPTN UNILA dengan menggunakan metode penelitian analisis dinamik respon spektrum. Analisis struktur dihitung menggunakan program analisis struktur komersial dalam model tiga dimensi bertujuan mengetahui apakah struktur aman atau tidak sesuai batas simpang antar tingkat dalam SNI 1726:2019. Hasil dari analisis yang dilakukan diketahui bahwa semakin besar percepatan gempa, maka nilai drift atau simpangan akan semakin besar juga pada struktur gedung. Nilai drift atau simpangan ini dipengaruhi juga oleh ketidakberaturan vertikal, sistem struktur, geometri gedung, dan fungsi gedung. Simpangan yang terjadi pada struktur gedung memenuhi syarat simpangan antar tingkat izin sesuai dengan SNI 1726:2019.Kata kunci : kinerja struktur, gempa, analisis dinamik, respon spetrum
Implementasi Building Information Modeling (BIM) Dalam Analisis Waste Material Tulangan Balok Pada Gedung Kuliah Umum 2 Institut Teknologi Sumatera Nurvireza, Daffa; Bayzoni, Bayzoni; Husni, Hasti Riakara; Ashruri, Ashruri
Jurnal Rekayasa Sipil dan Desain Vol 11, No 4 (2023): Edisi Desember 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Perkembangan teknologi tak terhindarkan, termasuk dalam industri konstruksi. Inovasi bertujuan untuk mempercepat penjadwalan, menghemat biaya, dan mengurangi pemborosan material. Melaksanakan konstruksi bangunan tanpa menghasilkan waste material merupakan suatu tantangan yang sulit. Oleh karena itu, konsep Building Information Modeling (BIM) diterapkan dalam perencanaan untuk meningkatkan efektivitas dan efisiensi dalam penggunaan material, dengan tujuan meminimalisir waste material. Penelitian ini dilakukan untuk mengevaluasi penerapan Building Information Modeling (BIM) dalam optimalisasi waste material pada penulangan balok. Penerapan Building Information Modeling (BIM) dalam penelitian ini menggunakan software Autodesk Revit. Tahapan penelitian mencakup pengumpulan data, pemodelan struktural 3D, pemodelan tulangan, input schedule mark tulangan, clash detection, output Bar Bending Schedule (BBS), cutting list menggunakan software 1D Cutting Optimization Pro, dan analisis waste material. Hasil penelitian menunjukkan berat total sebesar 188.655,89 kg. Persentase waste material pada D10 adalah 0,5%, D13 adalah 6,46%, D16 adalah 6,07%, dan D19 adalah 15,09%
Evaluasi Kinerja Struktur Gedung Bertingkat dengan Metode Analisis Riwayat Waktu (Studi Kasus: Gedung 6 Rumah Sakit Pendidikan Perguruan Tinggi Negeri (RSPTN) Universitas Lampung) Mudia, Tutia Rahmayani; Bayzoni, Bayzoni; Husni, Hasti Riakara; Isneini, Mohd
Jurnal Rekayasa Sipil dan Desain Vol 11, No 2 (2023): Edisi Juni 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractThe vulnerability level of a building due to the earthquake force is directly proportional to the height. The design of earthquake-resistant buildings must provide life safety performance, where the structure doesn’t run into collapse prevention but run into moderate damage so that a reduction of fatalities from earthquake disasters. In this case, it is necessary to do research on the evaluation of structural performance due to the quake according to the latest codes. This research takes a case study at the Building 6th of The State University Education Hospital University of Lampung using the time history analysis method with 5 earthquake records (accelerograms) such as: Loma Prieta (1989), Landers (1992), Duzce (1999), Parkfield (2004), and L’Aquila (2009). Structure analysis is calculated using a structure analysis commercial program in a three-dimensional model to find out whether the structure still meets the safety requirements or not according to the drift value between the stories listed in the SNI 1726: 2019. The research result obtained that the value of natural fundamental period is 0,71 seconds and 1,137 seconds in X,Y direction respectively. The Y direction period value exceeds the maximum period of T=1,0571 seconds. The value of base shear already meets the requirements which time history base shear (Vt) is more than 100% of equivalent static base shear (V). The results of drift control of each story meet the requirements of drift permit story (Δa) according to SNI 1726: 2019.Key words : time history analysis, earthquake, structural performanceAbstrakTingkat kerawanan suatu bangunan dalam menahan gaya gempa berbanding lurus dengan ketinggian bangunan yang ada. Perencanaan bangunan tahan gempa harus memberikan kinerja life safety, dimana struktur tidak mengalami keruntuhan tetapi mengalami kerusakan sedang, sehingga berkurangnya korban jiwa dari bencana gempa bumi. Dalam hal ini, perlu dilakukan penelitian mengenai evaluasi kinerja struktur gedung bertingkat akibat gempa sesuai dengan peraturan terbaru. Penelitian ini mengambil studi kasus pada Gedung 6 RSPTN Universitas Lampung menggunakan metode analisis riwayat waktu dengan 5 rekaman gempa (akselerogram) antara lain: Loma Prieta (1989), Landers (1992), Duzce (1999), Parkfield (2004), dan L’Aquila (2009). Analisis struktur dihitung menggunakan program analisis struktur komersial dalam model tiga dimensi bertujuan mengetahui apakah struktur aman atau tidak sesuai batas simpang antar tingkat dalam SNI 1726:2019. Hasil dari penelitian yaitu nilai periode fundamental alami sebesar 0,71 detik dan 1,137 detik untuk arah X dan Y. Nilai periode arah Y melebihi nilai periode maksimal yaitu T=1,0571 detik. Nilai gaya geser dasar sudah memenuhi persyaratan dimana gaya dasar riwayat waktu (Vt) lebih besar 100% dari gaya dasar statik ekivalen(V). Hasil kontrol simpangan antar tingkat memenuhi syarat simpangan antar tingkat izin (Δa) sesuai dengan SNI 1726:2019.Kata kunci : riwayat waktu, gempa, kekuatan struktur
Pemodelan Gedung Kuliah Bersama Politeknik Negeri Lampung Menggunakan Building Information Modeling (BIM) Anggraini, Tiara; Husni, Hasti Riakara; Bayzoni, Bayzoni; Ashruri, Ashruri
Jurnal Rekayasa Sipil dan Desain Vol 11, No 3 (2023): Edisi September 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Building Information Modeling (BIM) is one of the technologies that can present information about building elements through 3D modeling. One of the BIM software that can be used to model buildings in 3D is Autodesk Revit. The purpose of this research is to model the Joint Lecture Building of Lampung State Polytechnic in 3D by applying the BIM concept to obtain the volume of work as a reference for making decisions when operational and maintenance will be carried out and comparing the results obtained with the existing Bill of Quantity (BoQ). The data used in this research refers to the as plan drawing. The modeling process involves setting units, creating grids and levels, creating structural families and modeling them, creating architectural families and modeling them, entering identity data, conducting clash checks, and then issuing the volume of work. This research produces the volume of work on wall paint, doors, windows, tiles (ceramic/granite), and ceilings with scenarios in the form of volume for each room on each floor. Based on the results of this research, it can be concluded that modeling the Joint Lecture Building of Lampung State Polytechnic using the BIM concept with Autodesk Revit 2023 software is a more effective and efficient method because the volume output obtained is not only comprehensive but can be specialized on certain floors or rooms.Key words : Building Information Modeling (BIM), Autodesk Revit, operational and maintenance
Analisis Waste Material Tulangan Pelat Menggunakan Building Information Modeling (BIM) Pada Proyek Pembangunan SMPN 41 Bandar Lampung Bastari, Muh Alieftama Dytam; Husni, Hasti Riakara; Bayzoni, Bayzoni; Ashruri, Ashruri
Jurnal Rekayasa Sipil dan Desain Vol 12, No 1 (2024): Edisi Maret 2024
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Building Information Modeling (BIM) telah muncul sebagai pendekatan yang efektif dalam merancang, membangun, dan mengelola proyek konstruksi. Salah satu permasalahan dalam proyek konstruksi yaitu adanya waste material. Penelitian ini dilakukan di Proyek Pembangunan SMPN 41 Bandar Lampung. Tujuan penelitian ini yaitu menghasilkan volume total, berat material tulangan pelat, dan mengetahui perbandingan waste material tulangan tipe 1 dan 2 (untuk tipe 1 pola pemotongan per segmen dan tipe 2 pola pemotongan per 12 meter). Metode penelitian menggunakan software Autodesk Revit dan 1D Cutting Optimization Pro. Hasil analisis didapatkan berat total volume material pelat sebesar 2402,10 kg untuk tipe 1 dan 2166,60 kg untuk tipe 2. Untuk persentase berat material, tulangan tipe 2 lebih hemat 9,80% dibanding tipe 1. Untuk persentase waste material, tulangan pelat tipe 2 lebih hemat 36,36 % dibandingkan tipe 1. Berdasarkan waste level, tulangan pelat tipe 1 sebesar 7,44% serta tulangan pelat tipe 2 sebesar 3,00%. Sehingga tulangan pelat tipe 2 lebih kecil 4,44 % dibandingkan tipe 1. Penyebab terjadinya waste material pada penelitian ini karena adanya perbedaan pola pemotongan pada tulangan.Kata kunci : Sisa Material, Building Information Modeling (BIM), Autodesk Revit, 1D Cutting Optimization Pro, Volume Material.
Implementasi Building Information Modeling (BIM) untuk Maintenance Gedung Laboratorium Teknik OZT Institut Teknologi Sumatera Prameswari, Sabrina Cintia; Husni, Hasti Riakara; Bayzoni, Bayzoni; Ashruri, Ashruri
Jurnal Rekayasa Sipil dan Desain Vol 12, No 1 (2024): Edisi Maret 2024
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Implementasi Building Information Modeling (BIM) menggunakan Autodesk Revit 2023 dimana memodelkan 3D Gedung Laboratorium Teknik OZT Institut Teknologi Sumatera untuk menghasilkan output volume pekerjaan seperti pintu, jendela, penutup lantai, cat, dan plafon sebagai informasi yang diperlukan untuk fase pemeliharaan dan perawatan (O&M). Data penelitian meliputi gambar kerja, Bill of Quantity (BoQ), dan informasi terkait lainnya. Tahapan penelitian meliputi pengumpulan data, pemodelan 3D, identity data, clash check, pemodelan 4D, dan penyusunan laporan. Hasil pemodelan digunakan untuk menyusun skenario pemeliharaan dan perawatan gedung. Perbandingan volume pekerjaan dari hasil pemodelan dengan BoQ menunjukkan adanya perbedaan disebabkan oleh beberapa faktor. Kesimpulan menunjukkan bahwa hasil pemodelan BIM dapat digunakan sebagai referensi untuk pengambilan keputusan dalam pemeliharaan dan perawatan gedung karna dinilai merupakan metode yang lebih efektif dan efisien baik perencanaan maupun maintenance gedung. Pemodelan BIM bisa merepresentasikan bentuk nyata bangunan sertaoutput volume yang dihasilkan dikelompokkan berdasarkan tiap ruangan, tiap lantai, dan secara keseluruhan.
Analisis Waste Material Tulangan Pelat Menggunakan Building Information Modeling (BIM) pada Proyek Pembangunan Gedung Kantor Baru Pengadilan Agama Gedong Tataan Atullah, Rafif Ansori; Husni, Hasti Riakara; Bayzoni, Bayzoni; Ashruri, Ashruri
Jurnal Rekayasa Sipil dan Desain Vol 11, No 3 (2023): Edisi September 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kemajuan teknologi membuat manusia harus bisa beradaptasi dengan teknologi seperti Building Information Modelling (BIM). Salah satu permasalahan dalam proyek konstruksi yaitu adanya waste material. Penelitian ini dilakukan di Proyek Pembangunan Gedung Kantor Baru Pengadilan Agama Gedong Tataan. Tujuan penelitian ini yaitu menghasilkan volume total dan berat material tulangan pelat, mengetahui perbandingan waste material tulangan tipe 1 dan 2, serta mengetahui penyebab terjadinya waste material pada proyek ini. Metode penelitian yang digunakan yaitu kuantitatif eksperimental murni serta menggunakan software Autodesk Revit dan 1D Cutting Optimization Pro. Berdasarkan hasil analisis didapatkan berat total volume material pelat sebesar 34808,74 kg untuk tipe 1 dan 28824,59 kg untuk tipe 2. Untuk persentase berat material, tulangan tipe 2 lebih hemat 17,19% dibanding tipe 1. Untuk persentase wastematerial, tulangan pelat tipe 2 lebih hemat 84,12 % dibandingkan tipe 1. Berdasarkanwaste level, tulangan pelat tipe 1 D6 sebesar 27,44 %, D10 sebesar 0,20% serta tulangan pelat tipe 2D6 sebesar 3,08%, D10 sebesar 0,48%. Sehingga tulangan pelat tipe 2 D6lebih kecil 24,36 % dibandingkan tipe 1. Tulangan pelat tipe 1 D10 lebih kecil 0,28 % dibandingkan tipe 2. Penyebab terjadinya waste material pada penelitian ini karena adanya perbedaan pola pemotongan pada tulangan. Kata kunci : Sisa Material, Building Information Modeling (BIM), Autodesk Revit, Software 1D Cutting Optimization Pro, Volume Material.
Pemodelan dan Perhitungan Kembali Rencana Anggaran Biaya (RAB) Gedung UKM FISIP Tahap 2 Universitas Lampung Berbasis Teknologi Building Information Modelling (BIM) Farabi, Muhammad Al; Husni, Hasti Riakara; Siregar, Amril Maruf; Bayzoni, Bayzoni
Jurnal Rekayasa Sipil dan Desain Vol 11, No 2 (2023): Edisi Juni 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The rapid development that occurs in the construction sector is important because the construction sector is an important part of the development of a country. The rapid development and high level of project complexity require construction service providers to work more effectively and efficiently. Currently, the development of technology and communication science is able to answer these problems, one of which is by using Building Information Modeling (BIM), which facilitates a more integrated design and construction process in order to obtain efficient results. Stages of research methodology: 1) Preparatory stage; 2) Data collection stage; 3) 3D modelling stage with Autodesk Revit; 4) Clash Check examination stage; 5) Stage of releasing work volume; 6) Stage of preparing The Cost Budget Plan (RAB); 7) Stage of drawing conclusions and presenting results. Overall, the total price difference between the total price using the total volume of work contained in the Bill of Quantity (BoQ) results in a greater total price than using the total volume of work produced by Autodesk Revit, with the following indicators: There is a calculation error in the form of human error in the process of preparing the RAB using the total volume of work contained in the BoQ by planning consultants, such as material double-count errors. From this research, it can be concluded: 1) Modeling with Autodesk Revit greatly speeds up planning work because it is very complex to be applied to various construction projects; 2) The use of BIM is very efficient due to the full-integrity facility; and 3) Output volume issued can minimize human error in calculating work volume manually. Minimizing human error greatly affects the contractor's profit.