Claim Missing Document
Check
Articles

Found 28 Documents
Search

ANALISIS PENERAPAN GREENSHIP EXISING BUILDING VERSI 1.1 PADA BANGUNAN GEDUNG UMALAS HOTEL & RESIDENCE Dewa Ketut Sudarsana; Kadek Diana Harmayani; Merry Kristianty
Jurnal Ilmiah Teknik Sipil Jurnal Ilmiah Teknik Sipil, Vol. 24, No. 2, Juli 2020
Publisher : Department of Civil Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/JITS.2020.v24.i02.p09

Abstract

Pengembangan pariwisata di Indonesia memiliki potensi besar sebagai sumber pendapatan negara, terutama untuk daerah-daerah yang memiliki kekayaan alam dan budaya ‘tumpah ruah’. Pulau Bali adalah tujuan pariwisata paling eksotis di Indonesia karena memiliki sesuatu yang istimewa. Salah satu isu lingkungan di Bali adalah pencemaran air bersih yang disebabkan oleh meningkatnya pembangunan akomodasi pariwisata seperti salah satunya, yaitu hotel. Kerusakan pada lingkungan bisa terjadi apabila pembanguan yang dilakukan tidak memperhatikan aspek-aspek di sekitarnya seperti penggunaaan lahan yang efektif, hemat dalam penggunaan energi dan air serta pemilihanan material yang ramah lingkungan. Green Building dapat menjadi salah satu solusi di bidang konstruksi. GBCI membuat suatu perangkat penilaian yaitu Greenship Exisiting Building yang dibuat khusus untuk gedung yang sudah terbangun mengingat bahwa gedung existing yang menerapkan konsep Green Building di Indonesia masih sangat kurang. Sertifikasi Green Building pada gedung existing dapat dilakukan dengan cara menerapkan beberapa perubahan pada gedung tersebut agar menjadi lebih ramah lingkungan. Penelitian ini dilakukan untuk mengetahui persentase Green Building dengan perangkat penilaian Greenship Existing Building Versi 1.1 dan memberikan rekomendasi teknis sehingga Umalas Hotel & Residence dapat melakukan beberapa perubahan yang mengarah kepada penerapan konsep Green Building. Dari 40 kriteria kredit dengan poin maksimal 117, gedung Umalas Hotel & Residence memperoleh 54 poin. Persentase memenuhi kriteria Green Building sebesar 46% sehingga dapat dikategorikan dalam predikat Silver.
PENYERTAAN MANFAAT EKONOMI MAKRO BERUPA PDRB DALAM ANALISIS EKONOMI PEMBANGUNAN JALAN PENGHUBUNG BALI UTARA-SELATAN Dewa Ketut Sudarsana
Jurnal Ilmiah Teknik Sipil Vol. 15, No. 2 Juli 2011
Publisher : Department of Civil Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (203.629 KB)

Abstract

Regional Economic growth of Bali province is not evenly distributed in each regency/city which could be due to the lack of connection and interaction between centre of economic activities. These conditions indicate the need of infrastructures and facilities that link the between two areas particulary road connecting North-South of Bali which has standards of capacity and accessibility. This paper analyses the economic aspects based on the existing economic developments using the cost-benefit analysis method. The economic benefits of road construction generally account for the direct benefit of road users in the form of savings on vehicle operating costs and the time value. Meanwhile, indirect benefit in the form of macroeconomic GRDP (Gross Regional Domestic Product) is included in this study. The study results are: (1). if the economic feasibility of a direct benefit on the interest rate of 12%, NPV = Rp 118.7 billion; BCR = 1.2 and IRR = 14.9%; (2) With the inclusion of GDP benefits of macro economic, the feasibility of this project is quite sensitive. This happened if the investment risk on the interest rate of 18%, 15% increase in costs and 15% decrease in benefit with the economic feasibility indicators NPV = Rp 146.09 billion; BCR = 1.24 and IRR = 18.9%.
STUDI PENENTUAN NILAI MARKUP MINIMUM SEBAGAI STRATEGI UNTUK MEMENANGKAN PENAWARAN PROYEK KOSNTRUKSI DENGAN MODEL FAIR AND REASONABLE MARKUP (FARM) Dewa Ketut Sudarsana; Putu Dharma Warsika; I G. N. Jaya Surya Dharma
Jurnal Ilmiah Teknik Sipil Vol. 15, No. 1 Januari 2011
Publisher : Department of Civil Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (113.011 KB)

Abstract

The rapidly growing in the development of construction project inIndonesia has brought a very powerful impact in the construction business. Therise of the development of construction business has led to tight competition forcontractors to win the tender. A model of Fair and Reasonable Markup (FARM) byFarid and Boyer in 1985 is used to determine the smallest markup value /minimum bid price that used by contractors to meet the return on investment /capital which is expected in the project. By using FARM models, contractors areexpected to determine a price that is competitive, but it still can generate sufficientprofits for the contractors as bidders. The study results in markup values rangingfrom 1.58% to 1.69% and the rate of return on investment expected by thecontractor is about 20% per year.
STUDI PENYERTAAN FAKTOR PERHITUNGAN NILAI WAKTU DALAM KONTRAK PROYEK KONSTRUKSI JALAN Dewa Ketut Sudarsana
Jurnal Ilmiah Teknik Sipil Jurnal Ilmiah Teknik Sipil, Vol. 17, No. 1, Januari 2013
Publisher : Department of Civil Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (122.49 KB)

Abstract

Abstrak: Penerapan prinsip waktu adalah uang /time value of money dalam perhitungan nilai waktu  memberi dampak positif ekonomi secara umum. Prinsip metode ini adalah  memberi motivasi berupa biaya pengganti kepada kontraktor jika bisa mereduksi  waktu pelaksanaan konstruksi, sehingga dampak negatif semasa konstrusksi  bisa diperkecil. Di  Amerika penyertaan perhitungan faktor nilai waktu ini telah dicoba dan memberikan hasil yang sangat  signifikan.Penerapan dilakukan dengan menggunakan  metode bidding on cost/time dan insentif/disinsentif. Sampai saat ini penyertaan faktor nilai waktu dalam kontrak proyek konstruksi jalan di Indonesia belum pernah dilakukan. Studi ini meneliti kelayakan penyertaan perhitungan faktor nilai waktu  dalam kontrak  proyek konstruksi jalan   di Indonesia  ditinjau dari aspek teknis saja. Studi dilakukan dengan mengambil  kasus Proyek Peningkatan Jalan  dan Penggantian Jembatan Provinsi Bali pada suatu periode tahun anggaran. Metoda diskriptip dipergunakan dalam kajian yang dilengkapi uji satisitik  t-tes untuk melihat perbedaan antara nilai waktu terhadap nilai denda. Unsur dampak ekonomi negatif  eksternal  berupa kerugian pendapatan pelaku bisnis lokal sepanjang sisi  jalan turut disertakan dalam perhitungan.  Hasil analisa studi kasus  cara penetapan calon pemenang lelang dan denda harian akibat keterlambatan menyatakan bahwa ditinjau dari aspek teknis faktor nilai waktu  layak dipertimbangkan  penyertaannya dalam kontrak proyek konstruksi jalan di Indonesia.
AKSELERASI PENYELESAIAN PROYEK DENGAN ANALISA PERTUKARAN WAKTU DAN BIAYA ( TIME COST TRADE OFF ) Dewa Ketut Sudarsana
Jurnal Ilmiah Teknik Sipil Vol. 9, No. 1 Januari 2005
Publisher : Department of Civil Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (34.737 KB)

Abstract

Three main objective in the constructing construction project thereare cost, time and quality. Cost and time have great relationship and depending oncethan the other. Some time in the field we founded nonconform between the duration ofcompletion in the contract with the realization. On the case studi of PembangunanStadion Olah Raga Buruan in Kecamatan Blahbatuh, Gianyar, the owner need thatproject be completed earlier than the agreement completion. The influence ofacceleration completion project with the project cost need to study.In this case the CPM (Critical Path Method) be used with compressed the duration ofactivities on the critical path and do time cost trade off analysis. The project costmeans is the total cost project. The total project cost are direct cost (material, workersand equipment) and indirect cost (the other direct cost).The outcome of analysis be founded that accelerate (crash) maximum 65 days done, sothe earliest completion by 265 days without total project cost added. The projectcompletion optimum be founded too, with project duration 316 days and project totalcost minimum amount Rp. 13.358.425.131,28, that’s below 0.55 % than project cost in contract. This phenomenon show that accelerate the duration completion project notalways be increasing the total project cost, because the duration of completion projectin the contract probably does not the optimum duration of completion.
RANCANGAN PEMBOBOTAN PENILAIAN KINERJA JASA KONSULTANSI DENGAN METODE ANALYTICAL HIERARCHY PROCESS A.A. Gde Agung Yana; Dewa Ketut Sudarsana; Mirah K. Agung
Jurnal Ilmiah Teknik Sipil Vol. 12, No. 1 Januari 2008
Publisher : Department of Civil Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (115.986 KB)

Abstract

The Term of Reference (TOR) is the first stage in the technical assistance life cycle and then following by tender for consultant assistane and then technical consultancion and the last stage Final Hand Over (FHO). For evaluate the consultancy services performance, technical audit need be designed. Analytical hierarchy process (AHP) will be use to designed the evaluation form. Criteria elements in life cycle technical assitence will be structured and take the weight. The comparison of eigenvalue matricts is collected from respondence which has competency. The analysis outcomes that’s the consultant asistence performance consist of to component which the document and the consultancy services with eigenvector (0.515, 0.485) which means that the document which has a more importace weight in evaluation (51,5%). Describing of document existency consist of contain of Term Of Reference/TOR, procedure of supplied consultancy agent, contract document, project organization, auction committee with eigenvector (0.379, 0.192, 0.237, 0.124, 0.068). It means the contain of the Term of Reference/TOR has the most importance weigth in evaluation (37,9%). Describing of the work of reference frame/TOR consist of background picture, purpose and intention, work scope, facility and data of the project owner, kinds and quantity report, qualification of the personal expert, the certainty of the operational consultancy agent with eigenvector (0.123, 0.127, 0.198, 0.083, 0.155, 0.202, 0.112). It means qualification of the personal expert has the most importance weigth (20,2%). Describing of the consultancy agent supplied procedure consist of announcement, participant registration, taking of auction document, clarification meeting/aanwyzing, input document and opening of bargain, evaluation of bargaining, definited winner, the announce of winner, appointed winner with eigenvector (0.080, 0.060, 0.064, 0.068, 0.186, 0.214, 0.147, 0.101, 0.081). It means the bargaining evaluation has the most importance weight. The conducting of consultancy agent consist of the expert and assistant, aspect of time and schedule, the aspect of cost, kinds of report, office instrument and equipment with eigenvector (0.394, 0.179, 0.217, 0.134, 0.076). It means the expert and assistant has the most importance weigth.
STRATEGI PEMBANGUNAN MANDARIN ORIENTAL RESORT KUTA SELATAN KABUPATEN BADUNG Nyoman Martha Jaya; Dewa Ketut Sudarsana; I Made Cahya Subhita
JURNAL SPEKTRAN Vol 8 No 2 (2020): VOL. 8 NO. 2, JULI 2020
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAK Perkembangan ilmu pengetahuan dan teknologi yang semakin cepat, dimana pertumbuhan dan perkembangan disebabkan oleh kebutuhan akan sarana dan prasarana yang memadai. Hal ini juga terjadi di Indonesia dimana perkembangan terjadi di bidang konstruksi baik dari segi disain maupun metode konstruksinya. Pemilihan strategi pembangunan sangat penting, karena pemilihan metode yang tepat sangat berpengaruh dengan hasil yang akan dicapai, dimana pemilihan metode tepat dan baik dapat diukur dari kinerja biaya, mutu, dan waktu. Pada pembangunan Mandarin Oriental Resort, PT. Bali Ragawisata selaku owner pada tahap konstruksinya menggunakan metode design and build. Sebelum dilakukan tahap konstruksi untuk mengurangi kerugiaan karena keterlanjuran penanaman modal, maka perlu dilakuknan analisis studi kelayakan. Analisis studi kelayakan pada resort ini akan menganalisis aspek pasar, aspek legalitas, aspek teknis, dan aspek finansial. Pada analisis aspek pasar untuk resort ini dikatakan layak karena masih memiliki peluang sebesar 3.482 kamar untuk tahun 2018. Analisis pada aspek legalitas yaitu kepemilikan dokumen-dokumen pelegalan perusahaan karena berhubungan dengan perizinan dan sebagai bukti kepatuhan terhadap hukum. Analisis pada aspek teknis menunjukan layak dimana KDB sebesar 47% dari persyaratan minimum 60%, KLB dengan nilai 21.465 m2 lebih rendah dari syarat yang ditetapkan sebesar 33.408 m2, nilai KDH 19% sudah melebihi batas maksimum 30%, dan Kebutuhan lahan parkir sebesar 33% dimana sudah melebihi syarat minimum 30%. Untuk analisis aspek finansial menunjukan hasil layak dimana nilai Net Present Value sebesar Rp. 292.137.054.746,00, Benefit Cost Ratio sebesar 1,223, Interal Rate of Return 18,236% dimana lebih besar dari nilai nilai MARR 13%, Discounted Payback Period Rp. 18.906.074.093,00, BEP pada tahun ke 9 bulan 8, nilai sisa dari bangunan dan tanah sebesar Rp. 22.660.800.000,00 dan pada analisis sensitivitas pada kondisi penurunan pendapatan sebesar 10 % dan kenaikan operasional 10% proyek dikatakan tidak layak. Hasil dari wawancara, observasi, dan telaah dokumen bahwa pemilihan strategi pembangunan yang di terapkan owner pada proyek Mandarin Oriental Resort dengan metode design and build memiliki keuntungan dari sisi biaya, mutu dan waktu
MANAJEMEN RISIKO TERHADAP PELAKSANAAN PROYEK KONSTRUKSI HOTEL DI KAWASAN SARBAGITA I Nyoman Martha Jaya; Dewa Ketut Sudarsana; Gusti Ayu Kade Intan Wiratni
JURNAL SPEKTRAN Vol 7 No 1 (2019): Vol. 7, No.1, Januari 2019
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (275.621 KB)

Abstract

RISK MANAGEMENT DURING IMPLEMENTATION OF HOTEL CONSTRUCTION PROJECT AT SARBAGITA AREA ABSTRACT Construction project is an unique project and constrained by cost, quality and time. During construction project implementation, problems are frequently occur that affect toward cost, quality and time. Therefore according to such matter, it is considerably necessary to conduct research concerning risk management. Risk management include risk identification, risk analysis, risk acceptance distribution, risk mitigation and risk ownership. This research was conducted through interview with expert parties in hotel construction project implementation at Sarbagita (Denpasar, Badung, Gianyar, and Tabanan) region. This research aimed to identify and determine risk acceptance level, determine dominant risk, conduct mitigation action and risk ownership allocation. Total risks identified in this research were 37 risks that consist of 19 risks according to literature and 18 new finding risks. Dominant risk in this research were 28 risks, classified into 19 undesirable risks and 9 unacceptable risks. Both risks frequently occur in upper structure work. The most frequent risk sources occur in undesirable and unacceptable risks were technical risk. Technical risk in unacceptable risk were difference between picture and actual field, inaccurate scheduling, picture problems from planner and material specification discontinuation. Technical risk in undesirable risk were mainly tools mobilization delay, working hours limitation, quality and specification inconsistency and material discontinuation. Mitigation action mostly performed in technical risk were such as communication escalation between involved parties and organization structure improvement and project administration. Largest risk ownership allocation were in contractor side. These were due to contractor as the most responsible party in construction project implementation.
EVALUASI RISIKO PROYEK PEMBANGUNAN GEDUNG RSIA PURI BUNDA TABANAN - BALI I Kadek Bayu Wira Perdana Putra; Anak Agung Diah Parami Dewi; Dewa Ketut Sudarsana
JURNAL SPEKTRAN Vol 9 No 2 (2021)
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRAN.2021.v09.i02.p04

Abstract

The project implementation process from planning to implementation sometimes encounters problems ranging from cost, quality and time. In the implementation process, there are obstacles, namely the soil conditions in the image do not match the actual conditions and the architectural work undergoes a design change, because the previously planned floor plan does not match the desired function. These problems lead to the need for additional costs and additional time for project completion. This study aims to identify, assess risk acceptance to determine dominant risk, mitigate risk and determine risk ownership that will be obtained as a result of these problems. The study used a qualitative descriptive method. Data were collected by means of brainstorming, interviews, observations and questionnaires. Questionnaires were distributed to 28 respondents. The results show that there are 40 valid risk identifications. There are 10 unacceptable risks and 21 undesirable risks which include dominant risk and 9 acceptable risks that do not require mitigation measures. Mitigation is carried out with 3 types of actions, namely by reducing, transferring and holding risks. The dominant risk is unacceptable, namely the occurrence of design changes more than once. Mitigation is done by ensuring the design is approved by all parties involved or who have an interest in the design to be carried out such as the owner or management of the hospital so that the design is in accordance with the desired function so that there is no design change more than once. The allocation of ownership of the largest risk is the responsibility of the contractor, namely the risk of financial problems to the contractor. The dominant risk impact on the additional cost and time added to this work has a major impact on the technical and project aspects. The total amount of additional costs is Rp. 10,825.600.000,- and the total additional time is 117 days on the project.
MANAJEMEN RISIKO PEKERJAAN PEMELIHARAAN BANGUNAN DINDING PENAHAN TANAH (DPT) DAN CHECK DAM TUKAD BADUNG DI KOTA DENPASAR I Gede Indra Mahardika; I Dewa Ketut Sudarsana; I Putu Gustave Suryantara Pariartha
JURNAL SPEKTRAN Vol 9 No 1 (2021)
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRAN.2021.v09.i01.p05

Abstract

Pemeliharaan bangunan dinding penahan tanah (DPT) dan Check Dam ini menjadi bagian yang penting mengingat fungsi bangunan tersebut sangat berpengaruh pada kelancaran aliran sungai Tukad Badung yang memiliki daerah-daerah pemukiman padat penduduk. Penelitian bertujuan mengidentifikasi, memberi penilaian i serta menentukan penerimaan risiko, menentukan risiko dominan dan memberikan mitigasi serta kepemilikan risiko untuk risiko dominan yang akan diperoleh. Studi menggunakan metode deskriptif kualitatif. Brainstorming dan kuesioner dipilih sebagai teknik pengumpulan data, dimana responden sebanyak 24 orang dan dipilih secara purposive sampling. Diperoleh 38 identifikasi risiko valid, dengan 16 risiko dari hasil penelitian terdahulu dan 22 risiko berdasarkan brainstorming dengan pihak-pihak yang terlibat. Hasil penilaian dan penerimaan risiko terdiri dari 12 risiko unacceptable dengan 1 jenis tindakan mitigasi yang dilakukan yaitu dengan cara mengurangi dampak, dan 26 risiko undesirable dengan 2 jenis tindakan mitigasi yang dilakukan yaitu dengan cara mengurangi dampak dan menghindari risiko tersebut. Risiko dominan unacceptable adalah sulitnya akses masuk bagi alat berat yang akan digunakan selama pelaksanaan proyek karena akses jalan masuk yang kecil ke lokasi. Mitigasi dilakukan pada risiko dominan tersebut dengan Melakukan pendekatan dengan aparat desa dan masyarakat di wilayah Tukad Badung untuk membantu mencarikan dan memberi akses jalan masuknya alat berat yang digunakan. Pengalokasian kepemilikan risiko terbanyak menjadi tanggungjawab kontraktor sebanyak 23 risiko. Dampak risiko dominan terhadap biaya dan waktu pada pekerjaan pemelihaaraan ini berdampak besar pada aspek teknis dan proyek. Total jumlah pembengkakan biaya sebesar 32.316.200 rupiah dan total keterlambatan waktu selama 41 hari pada proyek.