Development Of Risk-Based Audit Method Standard For Stadium Project Using Design And Build Contract To Minimize Dispute Based On Inspectorate Perpective Ferdinand, Joshua; Putro, Anggoro; Latief, Yusuf
International Journal of Science, Technology & Management Vol. 4 No. 1 (2023): January 2023
Publisher : Publisher Cv. Inara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46729/ijstm.v4i1.721

Abstract

Construction projects have been developing from the management side year by year. One of the problems that government has been facing government construction projects over the years is the duration of the procurement process that takes too long which is hard to be implemented if the project is urgent in terms of time. This creates the urgency to seek the solutions to the problem of how to shorten the time of the procurement process. The design and build integrated contract method that unites the planning and implementation process simultaneously is able to answer these problems and shorten the procurement time of government construction projects. However, there are many disputes faced by construction projects that use integrated design contracts postproject, one of which comes from the Government Internal Supervisory Apparatus (APIP) or commonly called the Inspectorate. This is because there are several different standard between the inspectorate and the owner or contractor that has been used in the process of government construction projects Audit. This study aims to identify the standards of the audit process of the Inspectorate, analyze the risks that cause disputes, and to develop standards for risk-based audit methods for design and build-based construction projects in order to minimize disputes that occured from the inspectorate side of perspective.
Analysis of Relation Between Risk-Based Work Breakdown Structure (WBS) on Integrated Design and Construction Works of Design and Build Contract on Mechanical and Electrical Works of High Rise Building for Improving Safety Performance Feronica Damanik, Mariana; Latief, Yusuf; Nugroho, Danang Budi
International Journal of Science, Technology & Management Vol. 4 No. 4 (2023): July 2023
Publisher : Publisher Cv. Inara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46729/ijstm.v4i4.860

Abstract

The construction industry has had the highest accident rate worldwide for decades. Identifying risks as early as feasible during the pre-construction or design phase is essential to preventing construction accidents. To generate a structured list of risks, a Work Breakdown Structure (WBS) is used to identify risks. Although numerous studies have proposed using Work Breakdown Structure (WBS) to identify risks, no one has analyzed the relationship between Work Breakdown Structure (WBS) and risk to reduce construction accidents. Consequently, this study aimed to investigate the impact of Work Breakdown Structure (WBS) risk during the design and construction phases on construction safety performance. The analysis of relationships will be conducted using statistical methodologies. The study's findings will demonstrate that Work Breakdown Structure (WBS) risk affects construction safety performance.
Development Of Risk-Based Audit Method Standard For Stadium Project Using Design And Build Contract To Minimize Dispute From Construction Management Point Of View Alvian Sutekat, Ega; Putro, Anggoro; Latief, Yusuf
International Journal of Science, Technology & Management Vol. 4 No. 4 (2023): July 2023
Publisher : Publisher Cv. Inara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46729/ijstm.v4i4.863

Abstract

The Design and Build method have been widely used in government projects in recent years. The construction of a sports stadium is one type of project that uses an integrated contract. Design and build, which is considered to have high complexity and is urgent, so the use of the Design and Build method is expected to provide a solution in the implementation of the project. However, in implementing the integrated design and construction contract, there are still many disputes from stakeholders involved such as Inspection of Work Results. This study aims to identify the factors that cause dispute in the Design and Build project and develop a Standard for Inspection of Work Results from the perspective of Construction Management. The results of the study indicate the factors causing the dominant risk-based dispute as well as corrective action in the form of standard inspection of work results on construction projects.
Development Of Risk-Based Work Breakdown Structure (WBS) Standards For Integrated Design And Construction Phase On Design-Build Method Of Architectural Works Of High-Rise Building To Improve Construction Safety Performance Andina Ganesdhi, Gabby; Latief, Yusuf; Budi Nugroho, Danang
International Journal of Science, Technology & Management Vol. 4 No. 4 (2023): July 2023
Publisher : Publisher Cv. Inara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46729/ijstm.v4i4.896

Abstract

Design-build methods are one of the options in carrying out the construction of high-rise buildings with a high level of uncertainty from design phase to construction, which also affects the safety performance of the project itself. Therefore, a prevention standard for a high-risk event is needed based on project activities. This research was prepared using a descriptive qualitative method with expert validation process through Delphi method and completed with a questionnaire survey to conduct a risk assessment. The output in this research is a development of risk-based standard work breakdown structure for architectural work, which generated from 39 high level risk. Based on the results of the mapping of preventive and corrective actions at high-level risks, 5 types of WBS development can be carried out at levels 3 to 6 of the WBS to prevent and minimize the impact of risk so that safety performance could be improved. The novelty in this research lies in the form of design-build project delivery activities which has not been widely discussed in previous work breakdown structure research and risk identification based on the activities listed on the WBS.
Co-Authors Abdur Rohim Boy Berawi Achirwan Achirwan Alin Veronika Alin Veronika Alin Veronika, Alin Alvian Sutekat, Ega Alwan Muhammad Naufal Amalia Dwi Purnamasari Andina Ganesdhi, Gabby Andreas Wibowo Ardiyanto, Fahreza Astrid Dwi Lestari Ayomi D. Rarasati Ayu Herzanita Bambang Trigunarsyah Bambang Trigunarsyah Bambang Trigunarsyah, Bambang Batara Sirait Budi Nugroho, Danang Dameria Lady Hertina Lumban Raja Dhia Tsuraya Nisrina Diana Rohmatul Fitria Djoko M Hartono Dyah Ayu Pangastuti Eddy Subiyanto Edhi Tri Budi Soesilo, Edhi Tri Budi Febriansyah, Eki Hikmah Ferdinand, Joshua Feronica Damanik, Mariana Ginting, Yan Hasiholan, Yosua Togar Hidayanti, Ranti Hidayawanti, Ranti Idi Namara Ilmi Azhara, Ulya Imran H. Mohammad Ineswari Syifa Hayuningtiyas, Ineswari Syifa Ismeth Abidin Ismeth Abidin Ismeth Abidin, Ismeth Ismeth S. Abidin Ismeth S. Abidin, Ismeth S. Isti Surjandari Jade Sjafrecia Petrociany Janrivai Adiman Silalahi Karim, Rully Andhika Kurniawati, Eva Andrian Laksono , Naufal Budi Laksono, Naufal Laksono, Naufal Budi Leni Sagita Riantini Leni Sagita Riantini, Leni Sagita Leni Sagita Supriadi, Leni Lestari, Astrid Dwi Luh Putu Ratna Sundari Lusiana Indarwati M. Fanshurullah Asa M. Fanshurullah Asa, M. Fanshurullah Machfudiyanto, Rossy Armyn Mohammed Ali Berawi Muhammad Rachmat Muhammad Yusuf Mulyono, Bagjo Naufal Budi Laksono Naufal Budi Laksono Novika Candra Fertilia Nugroho, Danang Budi Pangastuti, Dyah Ayu Paulus Setyo Nugroho Perdana Miraj Pondaag, Reynard Putika Yussi Putro, Anggoro Rahayu S. Arifin, Rahayu S. Rahman, Deansa Agya Rarasati, Ayomi Dita Ratih Fitriani Renti Odor Siahaan Retyaning Utami Retyaning Utami, Retyaning Rika Anggraini Rohmatul F, Diana Sagita Riantini Supriadi, Leni Saleh, Toha Saputro, Danang Eko Setyo Sarwanto Moersidik Silalahi, Janrivai Adiman Sitorus, Mido Ester Sutjiningsih M, Dwita Toha Saleh Triasa Maryadini Utami, Retyaning Puji Vincent Gaspersz Wisnu Isvara, Wisnu Yussi, Putika Zaman, Alvian Amaly Fasha Najmu