Penilaian Resiko dan Perencanaan Jadwal Inspeksi Boiler dengan Metode Risk Based Inspection di PT Indonesia Power UBP Semarang Rifda Ilahy Rosihan; Diana Puspitasari Puspitasari; Rani Rumita
Industrial Engineering Online Journal Volume 3, Nomor 1, Tahun 2014
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Boiler merupakan salah satu mesin yang penting dalam industri pembangkit listrik. Fungsi boiler yakni mengubah air menjadi uap yang kemudian digunakan untuk menggerakkan turbin untuk menghasilkan energi listrik. Boiler pada PT. Indonesia Power UBP Semarang diketahui seringkali mengalami kerusakan berupa kebocoran pipa. Akibat dari kebocoran pipa mengakibatkan timbulnya resiko berupa bahaya kebakaran dan mengakibatkan mesin tidak dapat beroperasi. Untuk mengurangi adanya kegagalan dan mengurangi tingkat resiko pada boiler dibutuhkan suatu perencanaan inspeksi yang melihat dari tingkat resikonya. Teknik penjadwalan inspeksi yang sesuai dengan kondisi boiler adalah Metode Risk Based Inspection. Resiko dapat diartikan dalam dua hal yakni kemungkinan kegagalan dan konsekuensi kegagalan. Kemungkinan kegagalan didasarkan pada jenis kerusakan yang terjadi pada peralatan. Karena boiler pada unit ini mengalami kerusakan berupa korosi thinning, maka dilakukan perhitungan berupa penjumlahan dari sembilan modul Technical Module Subfactor pada peralatan dengan melihat nilai dari laju korosi pada peralatan. Nilai kemungkinan kegagalan pada pipa adalah “1” Konsekuensi kegagalan didasarkan pada luas area yang terkena dampak akibat adanya kebocoran boiler. Perhitungan ini didasarkan pada sistem deteksi, sistem isolasi, tekanan, dan suhu pada peralatan. Pada pipa boiler, nilai konsekuensi kegagalannya adalah “C”. Hasil dari perhitungan konsekuensi dan kemungkinan kegagalan adalah peringkat resiko pada pipa boiler, yaitu medium risk. Setelah itu, menentukan rencana inspeksi yang optimal pada pipa boiler. Untuk menentukan perencanaan waktu inspeksi pada boiler menggunakan standar DNV (Det Norske Veritas). Jadwal inspeksi yang sesuai dengan tingkat resiko pada pipa dan standar DNV adalah 2 tahun. The Boiler is one of the important machines in the power plant. Boiler functions is turning water into steam which is then used to drive a turbine to produce electrical energy. Boiler at PT. Indonesia Power UBP Semarang known often suffered damage in the form of a pipe leak. As a result of leakage pipes result in a risk of fire hazard, and result in the machine cannot operate. To reduce the presence of failure and reduce the level risk of the boiler, it need inspection planning that viewed from the level of risk levels and equipment inquiries. Inspection scheduling techniques that comply with the conditions of the boiler is Risk Based Inspection method. Risk can be defined in two things, there are the possibility of failure and the consequences of failure. The possibility of failure based on the type of damage that occurs in the equipment. Because the boiler on these units suffered damage in the form of corrosion thinning, then carried out the calculation of the sums of nine modules Technical Module Subfactor on equipment by looking at the value of the rate of corrosion on equipment. The value of the possibility of failure on the pipe is “1” Consequence of failure based on the affected area due to the leakage of boilers. This calculation is based on a system detection, System isolation, pressure, and temperature on the equipment. On the pipe of the boiler, the consequences of failure are “C”. The result of the calculation of consequences and likelihood of failure is risk rank on the boiler pipes, that is medium risk. After that, determining optimal inspection plans on the boiler pipes. To determine the time planning of inspections on boilers by using DNV (Det Norske Veritas) standard. Inspection planning based on the level risk of the pipes and DNV standard is 2 years.
PERENCANAAN PRODUKSI AGREGAT PRODUK FLOORING PADA PERUM PERHUTANI INDUSTRI KAYU BRUMBUNG Dwi Rizkiyani; Rani Rumita
Industrial Engineering Online Journal Vol 5, No 1 (2016): wisuda januari Tahun 2016
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (605.5 KB)

Abstract

Tujuan perencanaan produksi adalah menyusun suatu rencana produksi untuk memenuhi kebutuhan total seluruh produk atau permintaan pada waktu yang tepat dengan menggunakan sumber-sumber daya yang tersedia. Perencanaan produksi di dalam perusahaan merupakan dasar untuk mencapai kesuksesan. Perum Perhutani Industri Kayu Brumbung merupakan perusahaan yang bergerak di bidang pengolahan kayu hutan serta kegiatan usaha lainnya baik di dalam maupun luar negeri. Dalam perencanaan produksinya, perusahaan belum menerapkan sistem perencanaan produksi yang baik sehingga optimalisasi proses produksinya tidak tercapai. Tujuan dari penelitian ini adalah memberikan usulan peramalan permintaan produk flooring untuk 33 periode ke depan, menyusun agregat planning dan merencanakan produksi periode bulan  Oktober 2014 sampai dengan September 2015, dan menghitung Rough Cut Capacity Planning (RCCP). Peramalan dilakukan dengan beberapa metode yang menggambarkan pola data konstan dan metode peramaalan yang terbaik adalah 3-CMA. Metode transportasi land digunakan untuk menghitung rencana agregat, dimana demand hasil peramalan dapat dipenuhi dengan menggunakan reguler time dan overtime. Selanjutnya dari hasil perhitungan RCCP, semua kebutuhan dapat dipenuhi dengan kapasitas yang ada sehingga perhitungan demand dapat dikatakan valid.    AbstractThe purpose of the production planning is composing to meet the needs of the total products or demand at right time by using resources available. Production planning in a company is the basis for achieve success. Perum Perhutani Industri Kayu Brumbung is company processing of forest wood and other business activities in the country and overseas. In production planning, the company not apply planning system production of good so optimzation the process production is not sufficient. The purpose of this research is provide suggestions forecasting demand flooring product for the 33 the period forward, composing agregrat palnning and was planning to production the period October 2014 until September 2015, and calculute Rough Cut Capacity Planning (RCCP). Forecasting accomplished by some method of describing pattern data constant and a method of forecasting best part is 3-CMA. Transportation-land method used to calculate agregrat planning, where demand the result of forecasting could be met by using reguler time an overtime. Furthermore,  the calculation on RCCP, all the needs could be met with the capacity that and calculation demand it can be said valid. 
Usulan Perancangan Fasilitas Kerja untuk Mengurangi Muscolotal Disorder pada Pekerja Pembuat Jeli Rumput Laut (Studi Kasus pada UKM Padepokan Suket Segoro, Ketileng – Semarang) Bayu Adi Taufan; Purnawan Adi Wicaksono; Rani Rumita
Industrial Engineering Online Journal Volume 1, Nomer 1, Tahun 2012
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Padepokan Suket Segoro yang berlokasi di Ketileng Semarang merupakan sebuah Usaha Kecil Menengah (UKM) memproduksi minuman jeli rumput laut. Di tempat ini terdapat postur kerja yang tidak ergonomis yaitu pada saat pemindahan kontainer yang berisi jeli. Hasil Nordic Body Map menunjukkan bahwa 100% mengalami nyeri pada otot pinggang mereka, sebanyak 85,7% mengeluhkan rasa nyeri muncul pada punggung dan leher, sementara sebanyak 71,4% mengalami keluhan pada bahu kanan, bahu kiri dan tangan. Selain untuk mengangkat kontainer berisi jeli, sebuah alat juga diperlukan untuk memindahkan peralatan lain pada saat melakukan proses produksi diluar rumah produksi. Perancangan dimulai dari mengidentifikasi kebutuhan pekerja terhadap alat bantu, menghitung gaya kompresi yang muncul dan menghitung nilai REBA yang muncul pada postur awal, kemudian dengan menggunakan analisa ergonomi REBA di analisa postur tubuh akhir yang muncul pada alat usulan. Dan dengan bantuan software CATIA, dilakukan visualisasi terhadap alat hasil perancangan akhir. Hasil analisis REBA terhadap postur awal para pekerja menghasilkan nilai 9 untuk dua postur kerja yang diamati, yaitu pengangkatan kontaier dengan dua pekerja dan pengangkatan kontainer dengan satu orang pekerja.hal ini berarti tindakan harus segera dilakukan untuk mencegah cedera pada pekerja, Setelah dilakukan perancangan didapatkan hasil akhir REBA turun menjadi 2 yang untuk masing-masing postur yang diamati, dalam tabel keputusan REBA hal ini berarti belum perlu dilakukan tindakan karena postur pekerja cenderung aman. Hasil perhitungan biomekanika pada postur awal menunjukan adanya gaya kompresi berlebihan yang muncul pada bagian perut pekerja yaitu sebesar 1104.203 N pada postur pengangkatan dengan satu orang pekerja dan 1877.696 N pada postur pengangkatan dua orang pekerja. Pada postur akhir kedua gaya ini berhasil di eliminasi dan dikonversi menjadi gaya dorong sebesar  untuk postur kerja dengan metode 1 dan  untuk postur kerja dengan metode 2.  Located at Ketileng Semarang, Padepokan Suket Segoro is a small and medium Industry (UKM) which produces seaweed Jelly drink. There is an irrelevant ergonomics working posture when moving a container fully loaded with seaweed jelly glasses. The result of Nordic body Map shows that 100% workers suffer illness in their waist muscle, as much as 85.7% workers suffer pain appears in their back and neck, while 71.4% workers feel uncomfortable on their right and left shoulders including hands. Not only to lift and move the containers, a tool to help workers is also needed to move other facilities when the production is held out from the production house. The design process starts from identifying the workers’ need of an assistant tool; calculating the compression force and analyzing REBA score for current postures. Biomechanical analyses on both current and final postures are needed for the next step, continued by REBA analysis for final postures. At the end, software called CATIA will be used to visualize the final to the proposed tool as well as the postures. REBA analysis on current postures generate the score 9 on REBA score on both 2 postures of lifting. These mean an action needs to be done to prevent injuries. REBA score for final posture with proposed tool reduced drastically from 9 to 2. The score 2 on REBA Decision table means there is no necessary to do an action for these postures because it is safe. The result of biomechanical calculation on current postures shows there is a compression force appears on workers’ stomach (1104.203 N on a single lifting and 1877.696 on double lifting). The final postures convert from lifting to pushing, this also leads the elimination of compression force, but pushing force appears for 254.86 N for the first method and 296.736 for the second method. 
ANALISIS PENGARUH BAURAN PEMASARAN 7P TERHADAP KEPUTUSAN PEMBELIAN KONSUMEN (STUDI KASUS PT. POS INDONESIA KPC SURABAYA SELATAN) Amelinda Sudarto; Rani Rumita
Industrial Engineering Online Journal Vol 4, No.1 Tahun 2015
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (438.829 KB)

Abstract

PT. Pos Indonesia merupakan salah satu badan usaha milik negara yang diberi tugas oleh pemerintah Indonesia menyelenggarakan usaha perposan atau persuratan. Seiring dengan perkembangan jaman menyebabkan timbulnya pesaing sejenis, maka PT. Pos Indonesia mengeluarkan jasa baru dibidang keuangan yaitu POSPAY. POSPAY (Post Payment). POSPAY adalah layanan online payment point untuk melakukan transaksi pembayaran tagihan, setoran dan penarikan tabungan mitra kerja PT. Pos Indonesia. Pada tahun 2013 terjadi penurunan pendapatan, dimana pendapatan ini baru terpenuhi sebesar 30% dari target pendapatan. Penurunan pendapatan juga diiringi oleh penurunan penjualan yang disebabkan oleh konsumen yang tidak tetap, sehingga perusahaan harus aktif dibidang pemasaran. Untuk pemasaran jasa terdiri dari 7 bauran yaitu bauran pemasaran product, price, promotion, place, people, process dan physical evidence. Pemasaran jasa ini nantinya akan mengarah terhadap keputusan pembelian konsumen POSPAY. Analisis pengaruh dilakukan dengan menggunakan metode regresi linier berganda. Dimana koefisien dari hasil regresi berfungsi sebagai penentu variabel mana yang paling dominan mempengaruhi keputusan pembelian POSPAY. Hasil penelitian menunjukkan bahwa terjadi pengaruh bauran pemasaran 7P terhadap keputusan pembelian yaitu hasil uji F sebesar 10.964 dengan variabel physical evidence yang paling dominan. AbstractPT. Pos Indonesia is one of the state-owned enterprises were given the task by the Indonesian government is to undertake postal or correspondence. Along with the development led to the emergence of similar competitors, PT. Pos Indonesia issued a new field of financial services, namely POSPAY. POSPAY (Post Payment). POSPAY is an online service payment point for bill payment transactions, deposits and savings withdrawals partner PT. Pos Indonesia. In 2013 a decline in revenue, which this revenue is met by 30% of the target revenue. The decrease in revenues was also accompanied by a decline in sales caused by consumers who are not fixed, so the company must be active in the field of marketing. For service marketing mix that consists of 7 marketing mix product, price, promotion, place, people, process and physical evidence. Marketing services would eventually lead to consumer purchasing decision POSPAY. Analysis of the effect is done by using multiple linear regression method. Where the coefficients from the regression function as a determinant of where the most dominant variable influencing purchasing decisions POSPAY. The results showed that there was the influence of the marketing mix 7P to the purchasing decision is the result of 10 964 F test with variable most dominant physical evidence.
ANALISA KUALITAS PELAYANAN UNTUK MENINGKATKAN KEPUASAN PELANGGAN MENGGUNAKAN DIMENSI SERVQUAL DAN MODEL KANO (STUDI KASUS PT TELKOM,PRODUK SPEEDY DI SEMARANG) Sindhu Pradipta; Hery Suliantoro; Rani Rumita
Industrial Engineering Online Journal Volume 1, Nomer 1, Tahun 2012
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT Telkom Speedy who kind of Speedy product is Telecommunications Company who engaged in Internet service that uses only one cable line in Indonesia, which means it must be able to meet all the needs of customers. It can be said that the ministry is a direct or indirect interaction in which customers can provide an assessment of the quality of products and services offered by Speedy. Speedy received various suggestions from customers about the lack of quality of services provided, which can degrade the image of Speedy in the eyes of society because of the expected service is not met. Should it be triggered by Speedy products to evaluate the quality of service, and make improvements in order to achieve customer satisfaction. One dimension to analyze the quality of service is the Service Quality. This approach is an indicator to determine the quality of service. In addition the method used in this study is Kano. This method has the purpose of categorizing the attributes of products and services based on how well the product / service is able to satisfy customer needs. This model is used in activities such as identifying customer needs, determining the functional needs, concept development and analysis of competitive products. Based on the analysis of the Kano model to categorize its attributes obtained after nine variables that more priority is entered in the category of Attractive and does not exclude the category of One-dimensional, because this category deserve to be upgraded as well, although the preferred attractive category. Then for the category of Must-be sufficiently preserved because it is the basis of a necessity of the companies have these attributes. The above can be said that quality is not good so that speedy service at the proposed improvements to service quality is to deepen understanding of what speedy employees become customer requirements with training conducted by the Speedy
Usulan Tindakan Pencegahan Risiko Kecelakaan Kerja Dengan Menggunakan Metode Hazard Identification, Risk Assesment, Risk Control (HIRARC) (Studi Kasus di departmen produksi GI PT. FUMIRA, Semarang) Sadam Samsudin; Dyah Ika Rinawati; Rani Rumita
Industrial Engineering Online Journal Volume 2, Nomor 3, Tahun 2013
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. FUMIRA memiliki permasalahan kecelakaan kerja selama 5 tahun terakhir, terutama di area produksi GI (Galvanizing Iron) dengan total kecelakaan sebanyak 67 kasus dari tahun 2007-2011. Hal ini menunjukan bahwa kecelakaan kerja yang mengakibatkan luka ringan sebanyak 39%, luka sedang sebanyak 57% dan luka berat sebanyak 4%. Untuk mencegah risiko/ bahaya kecelakaan kerja dapat  melakukan identifikasi potensi bahaya, menentukan peringkat risiko dan mengetahui sumber-sumber yang berpotensial terjadinya risiko kecelakaan kerja. Identifikasi potensi (sumber) bahaya ini dilakukan dengan mencatat semua langkah-langkah tiap aktifitas yang terjadi pada departemen produksi GI di PT. FUMIRA dengan menggunakan pendekatan tahapan manajemen risiko atau  Hazard Identification, Risk Assessment, Risk Control (HIRARC) dengan alat bantu identifikasi bahaya mengunakan job safety analysis (JSA) sehingga didapat total bahaya sebanyak 123 risk events dan yang berpotensi terjadi yaitu sebanyak 43 risk events. Potensi bahaya yang memiliki nilai Risk  Priority Indeks (RPI) tertinggi  adalah tergores seng RPI yaitu 15. Usulan  yang sesuai dengan potensi bahaya adalah Safe Operating Procedure (SOP), mengunakan alat pelindung diri (APD), good housekeeping dan melakukan perawatan pada mesin.    PT. FUMIRA have accident problems during the last 5 years, especially in the area of production of GI (Galvanizing Iron) with total accidents by 67 cases from the year 2007 to 2011. This shows that the accident which resulted in minor injuries as much as 39 %, 57% moderate injuries and severe injuries as much as 4 %. To prevent the risk / hazard accidents can perform hazard identification, risk rank and determine potential sources of the risk of accidents. Identify potential ( source ) This is done by noting the danger of all the steps of each activity that occurs in the production department of GI in PT. FUMIRA using a risk management approach to the stages or Hazard Identification, Risk Assessment, Risk Control ( HIRARC ) with hazard identification tools using Job Safety Analysis ( JSA ) in order to get as many as 123 total hazard and potential risk events occur as many as 43 risk events. Potential hazards that have a value of Risk Priority Index ( RPI ) is etched zinc highest RPI of 15. The proposal is in accordance with the potential hazard is Safe Operating Procedure ( SOP ), use personal protective equipment ( PPE ), good housekeeping and perform maintenance on the machine.
PERENCANAAN KEBIJAKAN OVERHAUL DAN ANALISIS PENGADAAN MESIN STANDBY PADA MESIN HOIST CURING UTARA DAN SELATAN PLANT I-8 (STUDI KASUS PT. WIJAYA KARYA BETON BOGOR) Aditya Wiratama Putra; Susatyo Nugroho W P; Rani Rumita
Industrial Engineering Online Journal Vol 4, No 4 (2015): Wisuda Oktober Tahun 2015
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (667.655 KB)

Abstract

Wika Beton merupakan bagian dari Divisi PT Wijaya Karya (Persero) Tbk yang memproduksitiang beton dan komponen pracetak lain. Salah satu mesin yang mempunyai peran vital dan sering mengalami kerusakan di lapangan adalah hoist curing dengan kapasitas 10 ton. Untuk mengetahui kebijakan overhaul yang diterapkan PT Wijaya Karya Beton   pada hoist maka diperlukan analisis sistem perawatan dengan metode preventive – corrective maintenance. Sedangkan untuk mengetahui kebijakan pengadaan hoist  yang diterapkan PT Wijaya Karya Beton diperlukan analisis sistem perawatan dengan metode standby machine menggunakan distribusi  poisson  karena  data  yang  diambil  berupa  data  rata  –  rata  kerusakan  dengan frekuensi yang jarang terjadi.   Kerusakan yang  terjadi pada hoist curing selama periode Januari 2011 -November 2013 sebanyak 289 hoist baik yang mengganggu produksi secara langsung maupun tidak, dengan rata – rata kerusakan hoist perbulan sebanyak 8 hoist. Menggunakan formulasi preventive mainetanance, didapat biaya   kebijakan preventive mainetanance/overhaul  mencapai  titik  optimalnya  pada  bulan  ke  19,    dengan  biaya  Rp1.430.585  per  bulan  atau  Rp  27.181.115/overhaul.  Sedangkan  analisis     menggunakan formulasi standby machine merekomendasikan   PT Wijaya Karya Beton Pabrik Bogor membutuhkan hoist kapasitas 10 ton dalam kondisi standby sebanyak 2 hoist.  
ANALISIS PENYEBAB CACAT KAIN DENGAN MENGGUNAKAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) DAN FAULT TREE ANALYSIS (FTA) Agus Yuni Kristanto; Rani Rumita; Sriyanto Sriyanto
Industrial Engineering Online Journal Vol 5, No 1 (2016): wisuda januari Tahun 2016
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (375.412 KB)

Abstract

PT Damatex is a company engaged in the fabrics manufacturing from the yarn industry. The production process was conducted on the preparation, weaving section, and parts inspection part. Production failure experienced by company is still high at 4.29% of total production while the company’s defect target is 1.30%. Until now the company quality control is still not maximized because of the high failure experienced by the company. Thus, it is necessary to evaluate the ongoing production process. On this research, it uses Failure Mode and Effect Analysis (FMEA) method and Fault Tree Analysis (FTA) to identify and analyze the failure. FMEA method is for determining and multiplying severity, occurrence and detection in order to obtain the value of the RPN. The highest RPN value that occurs in PT Damatex namely the failure modes of failed dropper operation with the value 294. The value of the RPN is a priority that needs corrective treatment. FTA method is used to determine the root cause of the failure. Causes of failure are divided into two failures : operator (human error) and machine. Failures happened to these problems are mostly caused by the operator because the operator is very influential in the engine performance.  ABSTRAKPT Damatex merupakan perusahaan yang bergerak dalam bidang industry pembuatan kain dari benang. Proses produksi yang dilakukan meliputi bagian persiapan, bagian pertenunan dan bagian inspeksi. Kegagalan produksi yang dialami oleh perusahaan masih tinggi yaitu sebesar 4,29%  dari total produksi sedangkan target cacat yang diinginkan perusahaan sebesar 1,30%. Hingga saat ini pengendalian kualitas yang dilakukan perusahaan masih belum maksimal karena kegagalan yang dialami perusahaan masih tinggi. Dengan demikian perlu dilakukan evaluasi terhadap proses produksi yang berlangsung. Dalam penelitian ini menggunakan metode Failure Mode and Effect Analysis (FMEA) dan metode Fault Tree Analysis (FTA) untuk mengidentifikasi dan menganalisa kegagalan yang terjadi. Metode FMEA untuk menentukan dan mengalikan tingkat keparahan, kejadian dan deteksi sehingga diperoleh nilai RPN. Nilai RPN paling tinggi yang terjadi pada PT Damatex yaitu pada moda kegagalan dropper gagal operasi dengan nilai 294. Nilai RPN terbesar merupakan prioritas yang perlu dilakukan tindakan korektif.Metode FTA digunakan untuk mengetahui akar penyebab kegagalan yang terjadi. Penyebab kegagalan dibedakan menjadi dua yaitu kegagalan yang disebabkan oleh operator (human error) dan kegagalan karena mesin.Kegagalan yang terjadi pada permasalahan ini sebagian besar disebabkan oleh operator karena operator sangat berpengaruh dalam kinerja mesin.
Analisis Identifikasi Bahaya Kecelakaan Kerja Menggunakan Job Safety Analysis (JSA) Dengan Pendekatan Hazard Identification, Risk Assessment And Risk Control (HIRARC) di PT. Charoen Pokphand Indonesia- Semarang Pandu Martino; Dyah Ika Rinawati; Rani Rumita
Industrial Engineering Online Journal Vol 4, No.2 Tahun 2015
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (197.324 KB)

Abstract

PT. Charoen Pokphand Indonesia dalam proses produksi memiliki berbagai macam potensial bahaya keselamatan dan kesehatan kerja. Dari tahun 2013-2010 terdapat 25 kasus kecelakaan kerja yang dapat diklasifikasikan menjadi tiga jenis bahaya berdasakan dampak keparahan kecelakaan kerja yaitu terdapat 12 kasus kecelakaan ringan, 11 kasus kecelakaan sedang dan 2 kasus kecelakaan berat. Hal ini dapat terjadi karena perusahaan tersebut belum mampu mendeteksi semua potensi bahaya kecelakaan kerja yang ada dalam perusahaan. Dalam mendeteksi semua potensi bahaya kecelakaan kerja perlu adanya identifikasi bahaya Job safety analysis (JSA) teknik ini bermanfaat untuk menidentifikasi dan menganalisa bahaya dalam suatu pekerjaan. Penilaian risiko menggunakan metede semi kuantitatif dengan menggunakan risk matrik yang menyatakan level risiko yang dimiliki setiap langkah pekerjaan meliputi level sangat tinggi, tinggi, sedang, dan ringa. Pada risiko sangat tinggi ditemukan 1 potensi bahaya yaitu risiko tabrakan baik dengan orang, objek atau pun benda maupun kendaraan dalam pengoprasian forklift, untuk risiko tinggi ditemukan 7 potensi bahaya yaitu risiko menghirup debu material, kebisingan, mata terkena material halus, terbakar saat pengelasan, tergores peralatan yang tajam, material mudah terbakar dan luka akibat terjepit pallet.  Sedangkan, untuk pengendalian risiko menggunakan eliminasi,substitusi, pengendalian teknis, pengendalian administratif dan APD. 
Perancangan Sistem Penilaian Kinerja Karyawan pada Operator DivisiCorrugated Carton BoxBerbasis Human Resources Scorecard dan Kompetensi Spencer Bintang Rachvadani Dzakwan; Susatyo Nugroho Widyo Pramono; Rani Rumita
Industrial Engineering Online Journal Vol 9, No 3 (2020): WISUDA PERIODE JULI TAHUN 2020
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakPT. X merupakan perusahaan yang berjalan di bidang produk konversi yang digunakan sebagai kemasan untuk berbagai macam produk dengan Corrugated carton box sebagai produk unggulannya. Para operator dari divisi produsi mengeluhkan sistem pemberian insentif perusahaan yang kurang adil dikarenakan hanya berdasarkan pencapaian target produksi divisi bukan dari pencapaian prestasi masing –masing karyawan. Sistem penilaian kinerja yang digunakaan saat ini masih belum dapat dijadikan sebagai dasar pemberian insentif oleh perusahaan karena hanya dipandang sebagai formalitas saja dengan proses penilaian yang masih subyektif dan indikator penilaian yang tidak jelas dan terukur. Penelitian ini bertujuan merancang sistem penilaian kinerja yang lebih objektif dan terukur sehingga dapat dijadikan sebagai dasar pemberian insentif karyawan. Proses perancangan indikator penilaian kinerja dilakukan dengan kombinasi metode Human Resources Scorecard dan Kompetensi Spencer kemudian diolah menggunakan metode AHP untuk menentukan bobot prioritas penilaian antar indikator. Berdasarkan hasil penjabaran visi, misi, dan strategi perusahaan didapatkan 18 KPI untuk menilai prestasi kerja individu dan 16 sub kriteria kompetensi untuk menilai kompetensi para operator produksi. Pada penelitian ini dihasilkan 3 macam formpenilaian prestasi kerja individu masing –masing untuk operator departemen produksi, QC, dan Maintenancedan 1 formpenilaian kompetensi untuk operator ketiga departemen. Nilai akhir kinerja karyawan didapatkan dengan menggabungkan penilaian prestasi kerja individu dan kompetensi karyawan. Nilai akhir tersebut kemudian dijadikan dasar sebagai sistem pemberian insentif yang baru.Kata kunci: AbstractPT.X is a company that engaged in corrugated carton box product packaging conversion as their main business model. The operators from their production division claimed that their company incentive system is unfair because it only evaluated division works overall achievement not from workers individual achievement. Their current work assessment system can’t be used as the basis of company incentive giving because it was viewed only as a formof formality with their evaluation process is still subjective and their assessment indicators are still unclear and unmeasured. This study has an objective to design a more objectified and measured work assessment so it can be the new base as a company work incentive giving system. The process of designing the new work assessment indicator system will be using a combination of Human Resource Scorecard and Spencer Competence methods, then the results will be analyzed further using AHP to determine the prioritized weight between indicators. Based on the company’s vision, mission, and strategy it was obtained 18 KPI to evaluate individual work achievement and 16 competence sub-criterion to assess individual production operator's competence. In this study, it was obtained three kinds of individual work achievement assessment forms for each operator in the department of production, QC, and Maintenance, and one competence assessment formfor each department’s operators. The final personal’s work score is obtained from combining individual work achievement and personal’s competence. Those final scores then will be the basis of the new company incentive giving system.
Co-Authors Abdurrobi Hanifa Abhimta, Yodha Wasi achmad rachim Adinda Nurussakinah Aditya Bonavasius Purba Aditya Ridwan Wicaksono Aditya Wiratama Putra Aditya Wiratama Putra Afrizal Putranto Agita Pandu Widanti Agus Yuni Kristanto Aisyah, Wahyu Nur Alfarel, Reihan Damario Amelia Kumala Amelinda Sudarto Andini, Anggita Realiza Andriyani, Atika Annisa Rahmawati Arbelinda, Karina Arief Budhiman Aries Susanty Aryssa, Venuschavicino Bambang Purwanggono Bayu Adi Taufan Benraen Pirogo Berutu, Jehezkiel Lolo Sataki Bintang Rachvadani Dzakwan Dentista Puspitawangi Dewanto, Dhuta Tyrone Dewi, Nadia Cynthia Diana Puspita Sari Dinar Ratna Widhia Dwi Rizkiyani Dyah Ika Rinawati Esty Anjelia Pertiwi Gea Fariyanti Novita P Haryo Santoso Heru Prastawa Hery Suliantoro Hutami Nuke Ardani Ida Mawar Dewi Khalis Riyangga Kurniawan Kurniawan Luh Nyoman Widyastuti M Hagi Hamirsa Mahachandra, Manik Manik Mahachandra Manindo Simanjuntak Marga Harjadiputra Martin Lilik A Melani Nurmufidah MOHAMMAD FAHD, MOHAMMAD Nadia Azhari Setyorini Naniek Utami Handayani Nia Budi Puspitasari Ningsih Marpaung Noor Charif Rachman Oktaviani Hadiati Putri Oktian Fajar Abdillah Oriza Wahyu Utami Pandu Martino Panji Maulana Aditya, Panji Maulana Purnawan Adi Wicaksono Putri, Ketut Utari Mustika Qaanita Yuuha M Raditya Rahman Ratna Purwaningsih Riana Pratiwiningrum Rifda Ilahy Rosihan Riko Agisdihan Afifi Sadam Samsudin Sari Veronica Jantitya Sindhu Pradipta Sri Hartini Hartini Sriyanto Sriyanto Susatyo Nugroho W P Susatyo Nugroho W P Susatyo Nugroho W.P. Susatyo Nugroho Widyo Pramono Wicaksono, Aditya Ridwan Wisnu Wardhana Yedida Christa Pujianti Yuanita Sesariana, Yuanita Zainal Fanani Rosyada