Claim Missing Document
Check
Articles

Found 24 Documents
Search

Pelatihan Teknik Teknik Proteksi Instalasi Listrik Sebagai Upayah Pembinaan UMKM Kelom Geulis Tasikmalaya dalam Bidang Keselamatan Kerja Hiron, Nurul
JATI EMAS (Jurnal Aplikasi Teknik dan Pengabdian Masyarakat) Vol 3 No 2 (2019): JATI EMAS (Jurnal Aplikasi Teknik dan Pengabdian Masyarakat)
Publisher : Dewan Pimpinan Daerah (DPD) Forum Dosen Indonesia JATIM

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (409.07 KB) | DOI: 10.36339/je.v3i2.187

Abstract

This program is a service for the Tasikmalaya home industry community in implementing technology for Community Development (IbBM) presented by LPPM-PMP of Siliwangi University. The partner in this program is a home industry that produces typical Tasikmalaya footwear made from wood waste known as ?kelom geulis?. This home industry is located in Tasikmalaya, West Java province. The problem of partners found in the field is the high electricity consumption caused by lack of electrical installation protection systems skill and knowledge. The solution offered in this program is training of protection installation of electrical sistem. The target of the trainning is employee and owners of partmer. The results of this program, through training and focus group discussions, after testing with 15 questions from the training participants, it was found that the partners had very little understanding in understanding electricity protection for small industries. After the training, there is 60% progress increasing rate of knowledge and skill of participants from the initial ability before the partners attend training and coaching.
INTERNET OF THINGS (IoT) BASED SCALES FOR DYNAMIC LOADS WITH WEIGHT FORECASTING FEATURE Silviani, Veni; Hiron, Nurul; Nursuwars, Firmansyah Maulana Sugiartana
Journal of Energy and Electrical Engineering Vol 5, No 1: Oktober 2023
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/jeee.v5i1.6017

Abstract

A scale is a measuring instrument used to measure the weight of an object. The current weighing system has not been able to identify the item being weighed and has not been able to save the weighting data automatically, in this study a weighing system was developed that can identify the load using RFID and can store the weighing data in a web browser so that there is no manipulation of the weighing data. and the system is able to predict the results of weighing the load with a linear regression method to determine the growth of the weight object. The microcontroller used is Arduino Uno and the weight sensor used is a half bridge type load cell. From the sensor accuracy test with a load weight of 0.90 Kg, 12.95 Kg, 55.42 Kg, 125.95 Kg, the highest error occurred when the load was 0.90 Kg while the lowest error was at 55.45 Kg. the object of a moving load is difficult to produce the same weight in the first measurement and so on. Testing the accuracy of predictions is evidenced by the MSE value of 0.0017 and MAPE of 0.0742%, which means that the prediction using the linear regression method is classified as very good.
OPTIMASI KINERJA SISTEM PEMBANGKIT LISTRIK HYBRID Nurmela, Nurmela; Hiron, Nurul
Journal of Energy and Electrical Engineering Vol 1, No 1: Oktober 2019
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (372.9 KB) | DOI: 10.37058/jeee.v1i1.1189

Abstract

Pulau Karimunjawa hingga saat ini belum mendapatkan layanan listrik dari PLN, sebagai gantinya suplai listrik diperoleh dari PLTD. Salah satu kekurangan dari PLTD adalah Biaya Pokok Pembangkitan (BPP) operasional yang besar, yaitu mencapai Rp. 6500/kWh pada tahun 2018. Pada artikel ini, mengusulkan solusi pengurangan biaya BPP melalui diversifikasi energi, yaitu gabungan dari PLTS dan PLTD. Metode yang diusulkan adalah analisis LCOE dan BPP untuk mendapatkan nilai optimasi secara ekonomi, kemudian melalui simulasi, ditentukan komposisi skenario yang tepat untuk sistem kelistrikan Karimunjawa dan analisis performa sistem dari skenario yang dipilih. Hasil dari analisis, diperoleh bahwa Biaya Pokok Pembangkitan (BPP) dapat ditekan melalui penetrasi PLTS. Hasil analisi menunjukan kinerja sistem setelah penetrasi PLTS, terjadi perbaikan optimalisasi sistem tenaga, di antaranya losses menjadi 1%, aliran daya, short circuit ratio, serta kondisi intermittency ketika iradiasi turun dari 100% ke 25% frekuensi sistem minimum 49.5 Hz.
MODIFIKASI MOTOR BRUSHLESS DC MENJADI GENERATOR SINKRON MAGNET PERMANEN FLUKS RADIAL PUTARAN RENDAH Ramdhany, Dhea Gemilang; Hiron, Nurul; Busaeri, Nundang
Journal of Energy and Electrical Engineering Vol 3, No 1: Oktober 2021
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/jeee.v3i1.3447

Abstract

Penelitian pembangkit listrik terus berkembang seiring meningkatnya kebutuhan energi listrik. Pemanfaatan sumber energi terbarukan seperti tenaga angin, tenaga air, tenaga gelombang laut serta tenaga arus laut memerlukan generator listrik putaran rendah tanpa eksitasi tambahan untuk dapat menghasilkan energi listrik. Generator sinkron magnet permanen (PMSG) merupakan generator yang medan eksitasinya dihasilkan oleh medan magnet permanen. Generator ini memiliki keunggulan dapat beroperasi pada putaran rendah serta tinggi memiliki tingkatan efisiensi yang lebih baik dibanding dengan generator induksi. Penggunaan PMSG bisa didapat dengan memanfaatkan motor BLDC mesin cuci bekas tipe satu tabung. Spesifikasi motor BLDC tipe outer rotor memiliki kumparan stator berbentuk roda gigi berinti besi berjumlah 36 coil dengan wiring 1 x 12 coil 3 fasa, terdiri 90 lilitan tiap coil dengan diameter penampang kawat 0,8 mm, berbahan alumunium dengan jenis belitan concentrated. Rotor memiliki 12 batang magnet permanen berbahan Barium ferrite (BaO 6Fe2O3). Secara konstruksi motor BLDC dan PMSG memiliki sebuah kemiripan dimana pada bagian rotornya terdapat magnet permanen, sehingga motor BLDC dapat dipertimbangkan untuk diaplikasikan sebagai generator. Hasil pengujian generator dari BLDC dapat membangkitkan daya listrik sebesar 855 VA pada kecepatan putar 1300 RPM, tegangan kerja generator sebesar 200 VAC fasa-netral, 350 VAC fasa-fasa dengan efisiensi sebesar 68,2 % .
ANALISIS KONSERVASI ENERGI PADA SISTEM PENCAHAYAAN DAN SISTEM PENDINGIN DI KANTOR SEKRETARIS DAERAH KABUPATEN GARUT Illahi, Sirli Nursabandi; Priatna, Edvin; Hiron, Nurul
Journal of Energy and Electrical Engineering Vol 1, No 2: APRIL 2020
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (656.3 KB) | DOI: 10.37058/jeee.v1i2.820

Abstract

Energy conservation in lighting systems and cooling systems aims to obtain optimal operation of energy usage without changing the function of the building, comfort and productivity of occupants, as well as considering aspects of environmental friendliness and cost. The results of observations in D and E buildings of the Garut Regional Secretary Office, almost all the rooms have lighting that does not appropriate the standard and humidity relative that exceeds the comfort factor of people in the room based on SNI. Based on the background of the problem, this study aims to look for conservation opportunities in lighting systems and cooling systems. The method used is an energy audit by calculating IKE, measuring the intensity of lighting and measuring temperature and humidity in some rooms. Based on the analysis results, the average IKE values in buildings D and E which are 1,1 kWh/m2/month and 2,54 kWh/m2/month are included in the highly efficient category based on Minister of Energy and Mineral Resources Regulation No. 13/2012. The energy conservation opportunity in this research is to redesign the artificial lighting system by replacing conventional TL lamps into LEDs and a total power of 2301,3 watts, then simulated in the DIALux software to get the assumption of average lux in accordance with the standard payback period of 4,5 years . For the cooling system, recalculating the heat load in occupied rooms is recommended for the replacement of air conditioners in conditioned rooms and the addition of AC in rooms that have not been conditioned with AC inverter and generated 6760 watts of power with a payback period of 27 months.Keywords: Energy Audit, Energy Consumption Intensity (IKE), Energy Conservation, Lighting Systems, Cooling Systems
ANALISIS POTENSI PELUANG PENGHEMATAN KONSUMSI ENERGI DI BRITS HOTEL KARAWANG Wirawan, Wirawan; Hiron, Nurul; Busaeri, Nundang
Journal of Energy and Electrical Engineering Vol 2, No 1: Oktober 2020
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/jeee.v2i1.2141

Abstract

Perhitungan nilai Intensitas konsumsi energi (IKE) pada bangunan Brits Hotel Karawang dilakukan dengan menghitung penggunaan konsumsi energi listrik yang berdasarkan data historis pemakaian energi dalam kurun waktu tertentu yang dibagi dengan luas bangunan. Hasil perhitungan IKE tersebut dibandingkan dengan standar konsumsi energi listrik untuk bangunan hotel berdasarkan Permen ESDM No.13 tahun 2012 tentang penghematan pemakaian energi listrik. Jika nilai IKE tidak sesuai standar maka dilakukan perhitungan peluang hemat energi (PBE) yang dibatasi pada perhitungan ulang kebutuhan daya pencahayaan pada sistem pencahayaan dan perhitungan ulang kebutuhan kapasitas AC pada sistem tata udara. Berdasarkan hasil dari penghitungan nilai IKE yang berdasarkan data historis penggunaan energi listrik pada kurun waktu September 2017 sampai dengan September 2018 didapatkan nilai IKE sebesar 178,44 kWH /  tahun. Sedangkan target IKE per satuan luas yang dikondisikan untuk perhotelan yang berdasarkan Peraturan Menteri ESDM No.13 Tahun 2012 adalah 300 kWH/ tahun. Maka IKE Brits Hotel Karawang lebih kecil daripada target IKE listrik atau dapat dikatakan pemakaian energi listrik di Brits Hotel Karawang sudah efisien. Akan tetapi perhitungan ulang kebutuhan daya pencahayaan dan juga perhitungan ulang kapasitas AC tetap dilakukan dan dari hasil perhitungan tersebut didapatkan hasil pengurangan penggunaan konsumsi energi listrik di Brits Hotel Karawang.Kata Kunci : Intensitas Konsumsi Energi, Sistem Pencahayaan, Sistem Tata udara, Peluang Hemat Energi
PERENCANAAN SISTEM PEMBANGKIT LISTRIK DENGAN SUMBER ENERGI TERBARUKAN (HOMER) DI DAERAH PESISIR PANTAI PANGANDARAN Akbar, Abil Wali; Hiron, Nurul; Nadrotan, Nidar
Journal of Energy and Electrical Engineering Vol 1, No 1: Oktober 2019
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (672.815 KB) | DOI: 10.37058/jeee.v1i1.1191

Abstract

Kecamatan Pangandaran merupakan kawasan yang berada pada dataran rendah yang dekat dengan pantai terletak daerah paling selatan Pangandaran, Utara : Kabupaten Ciamis, Barat : Kabupaten Tasikmalaya, Selatan : Samudera Hindia, Timur : Kabupaten Cilacap tepatnya yaitu 7°41'56.4"S (Lintang Selatan) 108°39'25.2"E (Bujur Timur) dan merupakan daerah wisata utama di Kabupaten Pangandaran. Terdiri dari delapan desa dengan luas wilayahnya sebesar 344,072 hektar dengan kepadatan penduduk mencapai 20.417 kepala keluarga. Wilayah Pangandaran memiliki potensi energi baru terbarukan yaitu energi matahari, energi angin dan energi gelombang laut berdasarkan data yang didapat dari National Aeronautics and Space Administration (NASA) dan Badan Meteorologi, Klimatologi dan Geofisika (BMKG) dengan rata-rata radiasi matahari 4,6 kWh/m2/hari, kecepatan hembusan angin 4,42 m/s dan kecepatan gelombang laut 30,49 m/s, maka dengan bantuan software HOMER Energy dapat dilakukan perencanaan sistem pembangkit listrik berbasis hybrid. Homer adalah perangkat lunak yang digunakan untuk mendesain sebuah sistem energi. Homer bekerja berdasarkan 3 hal, yaitu simulasi, optimasi, dan analisa sinsitifitas, dapat diketahui kombinasi power sistem yang paling efektif, efisien dan optimal.
PENENTUAN WAKTU DAN METODE IMPLEMENTASI VOLTE PADA JARINGAN LTE (STUDI KASUS DI TELKOMSEL) Tikupasang, Enov; Hiron, Nurul; Taufiqurrahman, Imam
Journal of Energy and Electrical Engineering Vol 2, No 2: April 2021
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/jeee.v2i2.2889

Abstract

Teknologi 4G LTE diimplementasikan untuk meningkatkan kualitas dan speed layanan data, image perusahaan, dan interoperability dengan operator lain. Penelitian ini menganalisis VoLTE sebagai alternatif layanan voice di atas jaringan LTE dengan keterbatasan bandwidth frekuensi, tetapi kontribusi layanan voice yang masih tinggi pada studi kasus di Telkomsel. Penggunaan VoLTE merupakan tahapan selanjutnya setelah voice CS fallback. Tujuan dari penelitian ini adalah membangun sebuah model untuk menilai kelayakan implementasi  VoLTE  dengan berbagai skenario waktu dan metode teknologi dalam rangka menurunkan nilai risiko dari implementasi LTE, sehingga dapat menentukan waktu dan metode yang tepat bagi implementasi fitur layanan VoLTE pada jaringan LTE dengan dua cara yaitu sistem SRVCC (Single Radio Voice Call Continuity) atau langsung pada sistem PS handover. Metoda penelitian yang digunakan adalah komplementer atau triangulation dengan ilmiah dan alamiah, dengan menggunakan statistik regresi, variabel acak berlainan, perhitungan bandwidth, dan nilai bisnis. Disamping itu untuk menghitung nilai risiko dari probabilistik ketidakpastian, maka digunakan analisis sensitivitas dan analisis risiko melalui simulasi Monte Carlo. Hasil yang diharapkan adalah optimalisasi dan efisiensi penggunaan bandwidth serta pembuktian hipotesis tentang studi kelayakan proyek implementasi layanan VoLTE.
IMPLEMENTASI ARDUINO PADA ALAT TENUN MENDONG SEMI OTOMATIS Riyadi, Galih Slamet; Hiron, Nurul; Chobir, Abdul
Journal of Energy and Electrical Engineering Vol 3, No 2: 30 April 2022
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/jeee.v3i2.4632

Abstract

Mendong merupakan salah satu bahan kerajinan anyaman tikar, untuk membuat tikar mendong perlu dianyam terlebih dahulu dengan Alat Tenun Mendong  Konvensional (Tustel). Penganyaman menggunakan Alat Konvensional membutuhkan ± 3 jam untuk 1 meter anyaman. Sehingga seringkali muncul keluhan pegal-pegal di sekitar tangan dan kaki para pengrajin mendong. Perancangan Alat Tenun Mendong Semi Otomatis ini menggunakan Arduino sebagai pusat kendali, serta membutuhkan beberapa Sensor Proximity sebagai Input dan Motor DC sebagai penggerak. Mendong dimasukkan kedalam celah benang yang terbentuk oleh mekanik anyam menggunakan alat yang bernama Toropong. Satu batang mendong pada Toropong dipegang oleh tangan Operator, kemudian  Toropong dikeluarkan, sehingga batang mendong tersebut tertinggal dalam celah benang. Pergerakan tangan dan Toropong ini dibaca oleh Sensor Photoelectric Proximity sebagai Input, lalu Motor Anyam bergerak dan akan dihentikan oleh Proximity Induktif. Setelahnya, Motor Press aktif dan menggerakan Mekanik Press lalu memadatkan mendong yang telah dimasukkan tadi. Siklus ini berulang sampai 30 kali perulangan, ketika mencapai 30 kali perulangan Motor Gulung menyala dan akan menggulung anyaman ±10 cm agar anyaman tidak menumpuk dan mengganggu proses penganyaman berikutnya. Dengan menerapkan sistem Semi Otomatis pada Alat Tenun Mendong diharapkan akan meningkatkan kualitas serta kuantitas hasil produksi serta proses produksi lebih singkat daripada menggunakan alat tradisional.
ANALISIS INTEGRASI PEMBANGKIT LISTRIK HYBRID DI WILAYAH DAERAH PANTAI TASIKMALAYA SELATAN MENGGUNAKAN APLIKASI HOMER Fathurrachman, Mohammad Ghiyast; Busaeri, Nundang; Hiron, Nurul
Journal of Energy and Electrical Engineering Vol 3, No 2: 30 April 2022
Publisher : Teknik Elektro Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/jeee.v3i2.3744

Abstract

Cipatujah terletak dibagian selatan Kabupaten Tasikmalaya yang berhadapan dengan Samudera Hindia. Hasil yang diperoleh dengan simulasi menggunakan HOMER, perencanaan sistem pembangkit listrik hybrid on grid di Pesisir Pantai Kecamatan Cipatujah memiliki potensi energi yang dapat digunakan sebagai sumber energi listrik yang berasal dari panel surya dan turbin gelombang air laut terhubung jaringan PLN dengan total produksi 15-18 MW /tahun pemasok terbesarnya ada di pembangkit listrik tenaga gelombang laut sistem OWC sebesar 11.316.329-13.809.704 kWh/Tahun