ANALISIS SAMBUNGAN PURUS (TONGUE AND GROOVE JOINTS) PADA DINDING PANEL BETON RINGAN STYROFOAM Anthony Wisselly; Widodo Kushartomo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.21667

Abstract

In this research, styrofoam lightweight concrete panel walls were used with dimensions (1000 mm x 500 mm x 60 mm) connected using a purus connection. This connection is used because the setting time is faster and the application is easier than concrete panel joints in general. The tests carried out in this study were flexural strength tests. This test consisted of 2 variations of test objects, including wall panels with 50% and 70% styrofoam usage. Based on the results of the panel wall flexural strength test, 50% styrofoam panel wall joints can withstand loads of up to 560 kg with a maximum deflection of 1,98 mm, while 70% styrofoam panel wall joints can withstand loads of up to 240 kg with a maximum deflection of 0,98 mm. The pattern of damage on panel wall joints styrofoam 50% occurs in the middle of the span then spreads to the side of the panel wall. While on the panel wall joints styrofoam 70% occurred on the side of the panel wall but the connection was not broken. Abstrak Penelitian ini menggunakan dinding panel beton ringan styrofoam dengan ukuran (1000 mm x 500 mm x 60 mm) disambung menggunakan sambungan purus. Sambungan tersebut digunakan karena waktu setting yang lebih cepat dan pengaplikasian yang lebih mudah daripada sambungan panel beton pada umumnya. Pengujian sambungan pada penelitian ini menggunakan metode pengujian kuat lentur. Benda uji terdiri dari 2 variasi, yaitu panel dinding beton yang ditambahkan proporsi styrofoam sebesar 50% dan 70%. Berdasarkan hasil pengujian kuat lentur dinding panel, sambungan dinding panel styrofoam 50% dapat menahan beban hingga 560 kg dengan lendutan maksimal sebesar 1,98 mm, sedangkan sambungan dinding panel panel styrofoam 70% mampu menahan beban hingga 240 kg dengan lendutan maksimal sebesar 0,98 mm. Pola kerusakan pada sambungan dinding panel styrofoam 50% terjadi di tengah bentang kemudian menjalar ke sisi samping dinding panel. Sedangkan pada sambungan dinding panel styrofoam 70% terjadi di sisi samping dinding panel namun sambungan tidak patah.
SIFAT MEKANIS BETON RINGAN DENGAN STYROFOAM SEBAGAI MEDIA PEMBENTUK UDARA Jonathan Andryanto; Widodo Kushartomo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.21668

Abstract

Concrete is one of the most used materials in construction. Due to the weight of the concrete is quite heavy, lightweight concrete is invented. One method for making lightweight concrete is to fill or blow air in the mortar. One of the components that can be utilized in this method is by adding styrofoam to the concrete mixture. Because styrofoam doesn't interact with or react during the hydration process between cement and water, styrofoam can be utilized as a filler material and the concrete will be lighter if air is added to the mixture by using styrofoam as the medium. Compressive strength, elastic modulus, flexural strength, and split tensile strength tests were performed in this study. The number of samples made was 6 cylindrical pieces and 3 beam-shaped pieces for each concrete variation. Types of variations in the percentage of styrofoam in this study were 0%, 50%, 60%, and 70%. The treatment of the test object is done by immersion. The values of split tensile strength, compressive strength, modulus of elasticity, and flexural strength will decrease when the volume of styrofoam in the concrete mixture increases due to pore volume increase. Abstrak Beton adalah sebuah bahan atau material yang umum digunakan dalam konstruksi bangunan. Karena massa beton yang cukup berat, maka teknologi beton ringan ditemukan. Pembuatan beton ringan dapat dibuat dengan metode pengisian atau peniupan udara ke dalam adukan atau mortar. Pembuatan beton ringan dengan metode ini dapat dilakukan dengan menambahkan material styrofoam ke dalam campuran beton.  Styrofoam dapat digunakan sebagai material pengisi (filler), karena styrofoam tidak mengganggu atau tidak ikut bereaksi pada proses hidrasi antara semen dan air. Penggunaan styrofoam sebagai media untuk memasukkan udara ke dalam campuran beton akan menghasilkan beton yang lebih ringan. Pengujian yang dilakukan dalam penelitian ini adalah kuat tarik belah, kuat lentur, kuat tekan, serta modulus elastisitas. Sampel dibuat sebanyak 6 buah berbentuk silinder dan 3 buah berbentuk balok untuk setiap variasi beton ringan styrofoam. Jenis variasi persentase styrofoam yang diuji pada penelitian ini adalah 0%, 50%, 60%, dan 70%. Proses curing benda uji dilakukan dengan metode perendaman. Nilai modulus elastisitas, kuat tekan, kuat tarik belah, dan kuat lentur akan menurun pada saat persentase styrofoam dalam campuran beton bertambah yang diakibatkan oleh kenaikan volume pori dalam beton.
PENGARUH SEMANGAT KERJA TERHADAP PROGRESS PADA PROYEK GUDANG SURYA GRAND CISOKA Carlos Chandra; Widodo Kushartomo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.23047

Abstract

The spirit at work is is a very important aspect in carrying out a construction activity. This morale can affect the length of time it takes to work on a project, if the lower the morale of the workers, the longer it will take to carry out the development project. This work spirit is closely related to the time spent on a construction project. This study aims to determine the effect of morale on the progress of project realization. This type of research uses data collection techniques carried out using observation and interviews conducted through question and answer between researchers and informants. The population in this study were workers who worked in the Surya Grand Cisoka warehouse development project and the samples taken for this study were 6 workers. The results of the case studies show that the morale of the workers has an important role or a very significant contribution to the progress of the realization of project development. The results of this study indicate that on average the morale of workers decreases because their wages are late for days. Abstrak Semangat kerja merupakan aspek yang sangat penting didalam menjalani sebuah kegiatan konstruksi. Semangat kerja ini dapat mempengaruhi lama waktu pengerjaan suatu proyek. Semakin rendah semangat kerja para pekerja maka semakin lama juga waktu yang dibutuhkan dalam melakukan proyek pembangunan tersebut. Semangat kerja ini sangat berkaitan dengan waktu pengerjaan sebuah proyek konstruksi. Penelitian ini bertujuan untuk mengetahui pengaruh semangat kerja pada progress realisasi proyek. Teknik pengumpulan data dilakukan menggunakan observasi dan wawancara antara peneliti dan narasumber. Populasi dalam penelitian ini adalah para pekerja yang bekerja di proyek pembangunan gudang Surya Grand Cisoka dan sampel yang diambil untuk penelitian ini sebanyak 6 orang pekerja. Hasil studi kasus menunjukan bahwa semangat kerja para pekerja mempunyai peran penting atau kontribusi yang sangat berarti bagi progress realisasi pembangunan proyek. Dari hasil penelitian ini menunjukan bahwa rata rata semangat pekerja menurun karena upah mereka yang telat berhari-hari.
APLIKASI TEKNOLOGI ULTRA HIGH PERFORMANCE CONCRETE (UHPC) DALAM PERKERASAN JALAN KAKU SEBAGAI UPAYA MEMPERBAIKI JALAN LINGKUNGAN PERUMAHAN Widodo Kushartomo
Jurnal Bakti Masyarakat Indonesia Vol. 6 No. 2 (2023): Jurnal Bakti Masyarakat Indonesia
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jbmi.v6i2.25775

Abstract

In this Community Service (PkM) activity, Tarumanagara University PkM team carried out PkM activities forPerumahan Banjar Wijaya RW 07 kelurahan Cipete, kecamatan Pinang, kota Tangerang. Housing residents haveproblems in the form of dif iculties in repairing their neighborhood roads which are often damaged. The PkM teamof ers partners a solution to make rigid pavement using Ultra High Performance Concrete (UHPC) Technology torepair damaged roads. Residents and the PkM team work together in repairing road damage with contributionsaccording to their abilities. The contribution of RW 07 residents in the implementation of PkM provided labor whilethe repair work was in progress, while the Untar PkM team contributed in preparing the mixed UHPC plan. ThePKM implementation method was carried out in several stages including coordination with residents, site surveys,coordination with the PkM team, preparation of a UHPC mix plan, determining the location of the road to be usedas a pilot, determining the day of casting, material preparation, casting, maintenance and handover. The repairedroad is a prototype or pilot with a size of 6.0 m x 6.0 m x 0.06 m. UHPC was made with a design quality of 50 MPa,15 cm slump and treatment method by watering for 3 days in the morning and evening. The results of road castingcan be completed within 5 hours using a manual mixer and the road can be passed by 4-wheeled vehicles after 3days.   ABSTRAK: Pada kegiatan Pengabdian kepada Masyarakat (PkM) ini, tim PkM Universitas Tarumanagara melaksanakankegiatan PkM Perumahan Banjar Wijaya RW 07 kelurahan Cipete kecamatan Pinang kota Tangerang. Wargaperumahan mempunyai persoalan berupa kesulitan dalam memperbaiki jalan lingkungannya yang sering mengalamikerusakan. Tim PkM menawarkan solusi kepada mitra untuk membuat perkerasan jalan kaku menggunakanTeknologi Ultra High Performance Concrete (UHPC) guna memperbaiki jalan yang rusak. Warga dan tim PkMbekerjasama dalam memperbaiki kerusakan jalan dengan kontribusi sesuai dengan kemampuannya. Kontribusiwarga RW 07 dalam pelaksanaan PkM menyediakan tenaga kerja selama pekerjaan perbaikan berlangsung,sedangkan tim PkM Untar berkontribusi dalam mempersiapkan rencana campuran UHPC. Metode pelaksanaanPKM dilakukan dalam beberapa tahapan meliputi koordinasi dengan warga, survey lokasi, koordinasi dengan timPkM, persiapan rencana campuran UHPC, penentuan lokasi jalan yang akan digunakan sebagai percontohan,penentuan hari pelaksanaan pengecoran, persiapan material, pelaksanaan pengecoran, perawatan dan serah terima.Jalan yang diperbaiki merupakan prototipe atau percontohan dengan ukuran 6,0 m x 6,0 m x 0,06 m. UHPC dibuatdengan mutu rencana 50 MPa, slump 15 cm dan metode perawatan dengan penyiraman selama 3 hari pagi dan sore.Hasil pengecoran jalan dapat diselesaikan dalam waktu 5 jam menggunakan molen manual dan jalan sudah dapatdilewati kendaraan roda 4 setelah berumur 3 hari.  
ANALISIS KAPASITAS PELAT BETON RINGAN MENGGUNAKAN APLIKASI MIDAS FEA Arles Octavianus Sintiawan; Widodo Kushartomo; Sunarjo Leman
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 3, Agustus 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i3.21670

Abstract

The use of concrete in a building has been well-known since the 1800s.  Many concrete models are new to the present and still growing, one of which is lightweight concrete. Lightweight concrete is the manufacture of ordinary concrete with the addition of styrofoam. The addition of styrofoam is useful as a cavity shaper, so the volume of concrete will increase without the addition of paste or other aggregates. The density of lightweight concrete that has been made is in the range of 1850 kg/m3-1900 kg/m3. After the Laboratorium was tested, we got a density of around 1373.5 kg/m3. The process of calculating the structure is also very developed to date. Many calculation methods used by experts in building design include the use of the Finite element method. This Finite element method is used for obtaining results that detail the behaviour of structures such as tensile strength, compressive strength, deformation, stress and others. In the study will be made an experiment to make a Laboratorium with lightweight concrete with wire mesh reinforcement with a diameter of 4 mm. after the testing process with manual test with Laboratorium tests and with the help of the Midas Finite Element Analyst application. The results of this test turned out to be the same when the load reached 800 kg of test objects in Midas FEA and Laboratorium tests were both destroyed, but the deformation results were quite far apart, this is happened because Midas could not detect certain materials with certain parameters in its application. Abstrak Penggunaan beton pada suatu bangunan sudah terkenal sejak 1800an dan terus berkembang sampai sekarang.  Banyak model-model beton yang baru untuk sekarang ini dan terus bertambah sampai sekarang salah satunya adalah beton . Beton ringan merupakan pembuatan beton biasa dengan tambahan styrofoam. Penambahan styrofoam ini berguna sebagai pembentuk rongga, sehingga volume beton akan bertambah tanpa tambahan pasta atau agregat lain. Massa jenis beton ringan yang telah dibuat oleh para ilmuwan adalah berkisar 1850 kg/m3-1900 kg/m3. Setelah proses pengujian selesai hasil yang kami dapatkan 1373.5 kg/m3. Proses Perhitungan struktur juga sangat berkembang sampai saat ini. Bayak metode perhitungan yang dipakai para ahli dalam perancangan bangunan salah satunya penggunaan metode finite element. Metode finite element ini berguna untuk mendapatkan hasil yang perilaku detail struktur seperti kuat tarik, kuat tekan, deformasi, tegangan dan lainnya. Pada penelitian akan dibuat percobaan membuat pelat dengan beton ringan dengan tulangan wiremesh dengan diameter 4 mm. setelah itu proses pengujian akan dibuat secara manual yaitu uji Laboratorium dan dengan bantuan aplikasi Midas Finite Element Analyst. Hasil dari pengujian ini ternyata sama pada saat beban mencapai 800 kg benda uji dalam Midas FEA dan uji Laboratorium sama-sama hancur, tetapi hasil deformasi yang berbeda cukup jauh, ini dikarenakan Midas tidak dapat mendeteksi bahan tertentu dengan parameter tertentu dalam aplikasinya.
ANALISIS PENERAPAN QUALITY CONTROL PADA PROYEK SKY HOUSE ALAM SUTERA TANGERANG Alberto Pandapotan Habeahan; Widodo Kushartomo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 3, Agustus 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i3.22990

Abstract

Practically, 20-40% of construction failures occur in the execution phase, whereby most of the risks depend on the performance of the contractor. Quality control is a system related to technical activities that are measured and controlled to ensure the results being produced conform to the specification. The purpose of this work is to study the implementation of quality control in construction companies in the construction project of Sky House apartment in Alam Sutera, such that it was observed whether the quality control had been implemented appropriately. In this study, the main information came from the field study, and the supporting data came from the interviews of quality assurance inspector from the contractor. The interview was to obtain the factual information about the quality assurance in the project. This study uses observation and information gathering from the site to investigate the quality control implementation of the Sky House Alam Sutera apartment project. Abstrak Dalam praktiknya, sekitar 20-40% kegagalan konstruksi terjadi pada tahap pelaksanaan dengan sebagian besar resiko kegagalan bergantung pada pekerjaan kontraktor. Kontrol kualitas adalah sistem yang terkait dengan operasi teknis, pengukuran dan kontrol untuk memastikan bahwa produk yang diproduksi memenuhi spesifikasi yang ditentukan. Tujuan dari makalah ini adalah untuk menyelidiki penerapan pengendalian kualitas di perusahaan konstruksi pada proyek pembangunan perumahan Sky House Alam Sutera sehingga dapat dilihat apakah penerapan kendali mutu tersebut diterapkan dengan baik. Dalam penelitian ini, informasi dasar diperoleh dari studi lapangan, sedangkan data sekunder diperoleh dengan mewawancarai pengawas mutu (dari pihak kontraktor). Tujuan wawancara yaitu untuk memperoleh keterangan faktual tentang pelaksanaan proyek di lapangan. Penelitian ini menggunakan metode pengamatan dan pengumpulan informasi dari lapangan untuk melakukan penelitian tentang konsistensi quality control dalam pelaksanaan proyek pembangunan perumahan Sky House Alam Sutera.
ANALISIS PERBANDINGAN EFEKTIFITAS BETON PELAT LANTAI DENGAN METODE BONDEK DAN KONVENSIONAL Marco Christian; Widodo Kushartomo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 3, Agustus 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i3.23016

Abstract

Slab construction in the building, especially those constructed from reinfoced concrete structures, require longer time and more expensive cost to be executed as their work volumes are relatively the largest compared to the other building elements. In the site execution, the concrete slab constructions require a form work and wooden supports or scaffolding. The technological advancement in the construction field encourages the innovations to enhance the construction method and its quality. One of the innovations is to replace a traditional method to a modern one as it can be done for the slab construction, which is to use a steel deck for the replacement of steel rebar and wooden form work. A case study based on multistory building project XXX in Central Jakarta area was conducted to compare the efficiency and effectivity on steel deck application in the slab construction. Data was collected from the list of material price and construction drawing of the project XXX. The results of the study conclude: (1) Duration of the slab construction using steel deck was 64 days and 95 days without steel deck, (2) The construction cost of the steel deck construction was Rp 8.717.212.500 and Rp 3.995.987.500 without steel deck, (3) The time difference between the two slab construction methods were 27 days in the duration and Rp 4.721.225.000 in the cost, (4) The percentage differences were 17% and 37% respectively from the two methods, (5) The steel deck construction is more efficient in terms of duration but it is more expensive then the one without steel deck construction (conventional method). Abstrak Konstruksi pelat lantai pada bangunan gedung, khususnya yang menggunakan struktur beton bertulang, membutuhkan waktu pengerjaan yang lama dan biaya besar karena volume pekerjaan yang relatif paling besar dibandingkan elemen struktur gedung lainnya. Dalam pelaksanaan di lapangan, pengerjaan konstruksi plat beton memerlukan bekisting dan penopang kayu atau perancah (scaffolding). Perkembangan teknologi pada dunia konstruksi mendorong adanya inovasi-inovasi guna meningkatkan metode and kualitas pekerjaan konstruksi. Salah satu inovasi tersebut yaitu mengganti cara tradisional dengan cara yang lebih modern seperti yang dapat dilakukan pada pengerjaan plat beton, yaitu dengan menggunakan bondek sebagai pengganti tulangan sekaligus bekisting yang sering terbuat dari kayu. Untuk membandingkan seberapa efektif dan efisien penggunaan bondek pada konstruksi plat beton, dilakukan penelitian berbasis studi kasus proyek gedung bertingkat XXX di kawasan Jakarta Pusat. Pengumpulan data diperoleh dari daftar harga bahan serta gambar kerja pada proyek gedung XXX. Dari hasil penelitian tersebut, dapat disimpulkan sebagai berikut: (1) Waktu yang dibutuhkan untuk menyelesaikan pekerjaan pelat lantai bondek sebesar 64 hari dan pelat lantai konvensional sebesar 95 hari, (2) Biaya pelaksanaan yang dibutuhkan untuk menyelesaikan pekerjaan pelat lantai bondek sebesar Rp 8.717.212.500 dan pelat lantai konvensional sebesar Rp 3.995.987.500, (3) Selisih perbandingan waktu dan biaya pelaksanaan antara pelat lantai bondek dengan pelat lantai konvensional sebesar 27 hari dan Rp 4.721.225.000, (4) Persentase perbedaan waktu dan biaya pelaksanaan antara pelat lantai bondek dengan pelat lantai konvensional sebesar 17% dan 37%, (5) Metode konstruksi pelat lantai yang efisien dari segi waktu yaitu menggunakan bondek tetapi relatif lebih mahal dari pada konstruksi plat lantai tanpa bondek.
ANALISIS EFEKTIFITAS PENGGUNAAN BATA RINGAN SEBAGAI PENGGANTI BATA MERAH PADA KONSTRUKSI GEDUNG BERTINGKAT Agustinus Eppendie; Widodo Kushartomo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 3, Agustus 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i3.23033

Abstract

The more advanced the era of technological development, the greater the requirements for effectiveness and efficiency in execution of projects. Materials used must therefore withstand these requirements. Light bricks can support the above requirements. In high-rise buildings, lightweight bricks chosen instead of red clinker. If you make  wall with light colored bricks, you can build a wall faster because it’s bigger than red bricks. For building walls, lightweight bricks are cheaper than red bricks, but their quality is better and they are more efficient than red bricks. Because the material of lightweight brick consists of the same mixture as concrete. This makes lightweight bricks more earthquake resistant than red bricks. When crafted, walls have a large area and affect the price percentage of the building itself. According to the title of this journal, the effectiveness of using lightweight bricks and red bricks in construction of skyscrapers was highlighted by choosing lightweight bricks as primary material for making the walls of skyscrapers. raise the This study was conducted using a literature search method to obtain the required data and information. The results of this study show that lightweight bricks are more effective and efficient than red bricks in constructing tall buildings. Abstrak Tuntutan terhadap efektivitas dan efisiensi dalam menyelesaikan proyek semakin meningkat sebagai akibat dari semakin tingginya biaya proyek konstruksi. Hal ini berpengaruh kepada pemilihan material sebagai bahan bangunan untuk menunjang efektivitas pekerjaan. Material bata ringan dapat dipilih sebagai pengganti bata merah dalam konstruksi gedung bertingkat, karena bata ringan dianggap mampu untuk menunjang produktivitas pekerjaan di proyek. Karena ukuran dinding bata ringan lebih besar dari pada ukuran batu merah, maka pekerjaan pembuatan dinding bisa dilakukan dengan lebih cepat serta dapat menurunkan biaya pekerjaan pembuatan dinding. Penggunaan bata ringan juga lebih efisien harganya yang relatif lebih murah dengan mutu yang setara dengan bata merah. Efisiensi harga tersebut diakibatkan oleh material pembuatan bata ringan tersusun yang terdiri dari campuran material mirip seperti beton namun memiliki berat yang lebih ringan sehingga cocok digunakan dalam konstruksi tahan gempa. Tulisan ini berisi hasil pengamatan selama melakukan kegiatan magang di proyek konstruksi yang disertai hasil analisis singkat dari data yang diperoleh selama magang. Hasil analisis ditunjang oleh studi pustaka. Hasil analisis mengkonfirmasi apabila penggunaan bata ringan lebih efektif dari segi biaya dan waktu pekerjaan dibandingkan dengan penggunaan bata merah.
PENILAIAN PENGGUNAAN PERANCAH BAGI KESELAMATAN DAN KESEHATAN KERJA Brian Mamahit; Widodo Kushartomo; Andy Prabowo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 3, Agustus 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i3.23034

Abstract

Multi-storey building construction work requires a good scaffolding to support people, materials and tools, as well as structures that are in accordance with the plan. The purpose of this study is to determine the extent of implementation of occupational health and safety manajement systems in construction projects. Along with the development of science and technology, the scaffolding tools produced are increasingly complex. The more complex the device used, the larger the size  potential hazard that may be and the greater the work accident caused if the handling and control is not carried out as well as possible. This shows that occupational safety and health issues cannot be separated from construction work activities as a whole. The method used in this study uses an observational and quantitative investigation method. This method tends to give more descriptive results. After data is collected, it is identified and analyzed. The analysis shows that the implementation of the framework design is  Thamrin Nine project, Central Jakarta, shows that it must be further improved when viewed from the applicable standards for occupational safety and health. Abstrak Dalam setiap pekerjaan konstruksi gedung bertingkat, selalu diperlukan perancah (scaffolding) yang berfungsi sebagai penopang bekisting maupun platform pekerja/tukang. Karena frekuensi penggunaan yang sangat tinggi, maka dilakukan pengamatan pada satu proyek konstruksi guna mengetahui sejauh mana efektifitas penggunaan perancah dalam mendukung manajemen kesehatan dan keselamatan kerja (K3). Pengamatan yang dilakukan menjadi metode kuantitatif untuk melakukan penelitian sederhana selama melakukan kegiatan magang dari program Merdeka Belajar Kampus Merdeka (MBKM) pada proyek gedung X di kawasan Jakarta Pusat. Pada proyek magang tersebut, diperoleh data penggunaan perancah untuk berbagai keperluan penunjang pekerjaan konstruksi yang menggunakan beberapa tipe perancah. Dari hasil pengamatan, diperoleh evaluasi sejauh mana penggunaan perancah pada proyek magang mendukung aspek K3 pada proyek konstruksi. Hasil evaluasi menunjukan perlu adanya peningkatan kualitas penggunaan perancah pada proyek magang untuk memenuhi aspek K3 dan meminimalisir kecelakaan kerja.
ANALISIS PENERAPAN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK X DI JAKARTA PUSAT Yosafat Kurnia Adi; Widodo Kushartomo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 3, Agustus 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i3.23050

Abstract

The construction industry has a high risk towards the work safety. According to data from BPJS Ketenagakerjaan, the rate of work accidents that occurred in Indonesia in 2021 was 234,270 cases and continues to grow until now. Those safety threats include falling from a high place, being trapped in building debris, getting hit by a project vehicle/heavy equipment, getting electrocuted, being hit by falling objects, being on fire, and getting contaminated by toxic elements (Consulnet, 2011). Accident is an event that cannot be planned, which can disrupt the work schedule such productivity loss because of injured workers, damaged equipments and ultimately, the overall production will be disrupted. Therefore, the purpose of this study is to analyze the implementation and constraints of the occupational health and safety (OHS) in the Thamrin Nine project in Central Jakarta. The method used in this analysis was a direct survey to the field and direct interviews with the staff in the X project. This project consists of 3 buildings with a total of 9 to 70 floors. The analysis of the application of OSH was developed based on the Practical Guidelines for Occupational Health and Safety in the construction sector. The results showed that the level of application of OHS in the aspects of: use of ppe (68%), emergency management (82.5%), structural work, scaffolding and stairs (84.4%), use of toxic materials (70%), hygiene and work safety (97.3%). The obstacle in implementing OHS is the culture of the workers who are not familiar with the application of the OHS system and different risk preferences. Abstrak Industri konstruksi memiliki tingkat resiko yang tinggi terhadap terjadinya kecelakaan kerja. Menurut data BPJS Ketenagakerjaan, jumlah kecelakaan kerja di Indonesia telah mencapai 234.270 kasus pada tahun 2021 dan pertumbuhannya terus berlanjut hingga saat ini. Risiko keselamatan di proyek antara lain jatuh dari ketinggian, terjebak di bangunan yang roboh, terbentur kendaraan proyek/alat berat, tersengat aliran listrik, tertimpa benda jatuh, terkena api, dan keracunan. Kecelakaan adalah kejadian tak terduga yang dapat mengganggu alur kerja dan mengakibatkan hilangnya produktivitas sebagai konsekuensi dari adanya pekerja yang terluka. Oleh karena itu, tujuan dari penelitian ini adalah untuk menganalisis implementasi dan keterbatasan pelayanan kesehatan kerja di Proyek XXX di Jakarta Pusat. Metode yang digunakan dalam analisa ini adalah melakukan survei langsung ke lapangan dan melakukan wawancara langsung terhadap staf yang ada di proyek X. Proyek ini terdiri dari 3 gedung dengan jumlah lantai 9 sampai 70 lantai. Analisis penerapan K3 yang diterapkan dikembangkan berdasarkan pedoman praktis untuk keselamatan dan kesehatan kerja dalam konstruksi. Hasil kajian menunjukkan bahwa derajat pelaksanaan K3 terdiri dari aspek-aspek sebagai berikut: penggunaan alat pelindung diri (68%), manajemen kondisi darurat (82,5%), pekerjaan konstruksi, perancah dan tangga (84,4%), penggunaan zat beracun (70%), kebersihan dan keselamatan kerja (97,3%). Kendala dalam penerapan K3 adalah budaya dan preferensi risiko yang berbeda dari pegawai yang terbiasa menerapkan sistem K3.