Claim Missing Document
Check
Articles

Found 34 Documents
Search

ANALYSIS OF FIRE FIGHTING PUMP PERFORMANCE USING SNI 03-6570-2001 STANDARD ON SELF-CONTAINED HYDRANTS Abdurrahman Auf; Agung Wahyudi Biantoro; Dedik Romahadi; Amat Chaeroni
International Journal of Innovation in Mechanical Engineering and Advanced Materials Vol. 5 No. 2 (2023)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/ijimeam.v5i2.20898

Abstract

Self-controlled hydrants are fire protection systems located in residential areas that function for early fire extinguishing. In a fire protection system, the pump plays an important role in supplying water from the reservoir to the end point of the installation. Fire pumps must always be in optimum condition and accordance with applicable standards. This study aims to analyze pump performance at current conditions in self-contained hydrants in the Palmerah District and then compare it with the performance that pumps should have in ideal conditions according to SNI 03-6570-2001 standards. The method used is a quantitative descriptive analysis method by comparing the current condition of the pump with applicable standards and conducting a direct survey of the location of the installed fire pump. The measuring instruments used in the study were a pressure gauge, control box, and pitot gauge. The results obtained through testing and calculating pump performance The pump installed on the self-contained hydrant in actual conditions with a total head of 86.62 m produces a flowrate of 0.0189 m3/s at 2800 RPM and can flow a maximum flowrate of 0.0284 m3/s with a head of 66.94 m while in ideal conditions with approximately the same speed and total pump head of 88.83 m, The pump produces a flow rate of 0.0473 m3/s and can produce a maximum flowrate of 0.0710 m3/s with a head of 71.81 m and when shut-off (Q = 0) at actual and ideal conditions produces a same total pump head 94.10 m. However, the pump in actual conditions can flow a minimum flowrate required of 0.040 m3/s with a pressure required of 350 kPa at 3000 RPM with a total pump head of 108.52 m. Thus, the pump must operate heavier due to the higher total head to deliver the required minimum flow rate and pressure.
Application of Occupational Safety And Health To The Construction Project of A Building For Indonesian Migrant Workers In Penang, Malaysia Agung Wahyudi Biantoro; RB Abdul Majid; D Vidayanti; A Hidayat; S Hidayat; Z Citra
International Journal Of Community Service Vol. 5 No. 3 (2025): August 2025 (Indonesia - Rusia - Malaysia)
Publisher : CV. Inara in Colaboration with www.stie-sampit.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51601/ijcs.v5i3.883

Abstract

The increase in workplace accidents among migrant workers in Pinang, Malaysia, is alarming, with reports indicating a significant rise in injuries, particularly in the construction sector. The low implementation of Occupational Health and Safety (K3) standards contributes to this issue, as many workers lack adequate training and face unsafe working conditions, leading to higher risks of accidents. Many migrant workers do not receive sufficient Occupational Health and Safety (K3) training before starting their jobs, leaving them unaware of potential hazards and safety protocols. The construction sector often exposes workers to hazardous environments, including inadequate personal protective equipment (PPE) and non-compliance with safety standards. Through community service efforts by a team of Civil Engineering lecturers from Universitas Mercu Buana, who possess expertise and OHS certification, it is hoped that a safer and healthier working environment will be created for Indonesian migrant workers in Pinang, Malaysia. After the outreach and training sessions, a total of 21 participants (construction workers) shared their opinions about the PKM KLN activity, in which they rated the level of expectation (importance) at 77% and performance (satisfaction) at 81%.
Pengaruh Pelaksanaan Konstruksi, Proses Konstruksi Hijau, Praktik Perilaku Hijau dan Rantai Pasok Hijau terhadap Kinerja Bangunan Gedung Hijau Dudi Subur rahman; Agung Wahyudi Biantoro
Teras Jurnal : Jurnal Teknik Sipil Vol 16 No 2 (2026): Teras Jurnal (September 2026)
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v16i2.1430

Abstract

Abstrak   Penelitian ini bertujuan untuk mengetahui perhitungan nilai BGH pada pembangunan gedung GIK UGM serta meninjau studi terdahulu mengenai evaluasi bangunan hijau. Penelitian ini menggunakan metode deskriptif untuk menjelaskan penerapan konsep bangunan hijau dalam proyek tersebut. Selama sepuluh tahun terakhir, terdapat lebih dari 1.000 studi yang membahas topik BGH dan evaluasi bangunan hijau. Berdasarkan penelusuran menggunakan aplikasi Publish or Perish dan Google Scholar serta Crossref dengan rentang waktu 10 tahun, ditemukan rata-rata 19,50 sitasi per tahun, dengan produktivitas peneliti mencapai setidaknya dua makalah per tahun. Selanjutnya, dilakukan pemetaan topik yang disajikan dalam bentuk grafik. Hasil penilaian BGH terhadap pembangunan GIK UGM menunjukkan bahwa proyek tersebut telah memenuhi kriteria BGH sesuai dengan indikator yang ditetapkan. Pembangunan GIK UGM memenuhi kriteria *Greenship*, khususnya pada indikator EEC, WC, IHC, dan BEM, yang tercermin melalui konservasi energi dan air, pengelolaan kualitas bangunan, serta penerapan manajemen keselamatan kerja. Hasil penilaian BGH berdasarkan kriteria Greenship menunjukkan bahwa pembangunan tersebut telah sesuai dengan ketentuan yang berlaku.   Kata kunci: green building, greenship, BGH method     Abstract   This study aims to know calculation BGH values on development GIK UGM building and review study previously discussed about evaluation building green.  This research use type study descriptive that explains about utilization theme green building in this research. The results during tens year final there is more of 1000 studies that discuss about BGH theme and evaluation building green. Results search theme building green with utilise Publish or Perish app and Google Scholar website and crossref with set time search for 10 years, researchers get results of 19.50 cited papers per year and every researchist at least make two papers per year. Further more done mapping the themes presented in form graph. Results BGH assessment on implementation the construction of GIK UGM shows that development has fulfil BGH criteria according with the indicators that have been set. The development of GIK UGM meets part BGH's achievements with criteria greenship especially on indicator EEC, WC, IHC, and BEM, are shown through conservation energy and water, management quality buildings, as well as implementation management safety Work.  Results BGH assessment with criteria greenship show that development has in accordance with applicable criteria​   Keywords: green building, greenship, BGH method,
Pengaruh Pelaksanaan Konstruksi, Proses Konstruksi Hijau, Praktik Perilaku Hijau dan Rantai Pasok Hijau terhadap Kinerja Bangunan Gedung Hijau Dudi Subur rahman; Agung Wahyudi Biantoro
Teras Jurnal : Jurnal Teknik Sipil Vol 16 No 2 (2026): Teras Jurnal (September 2026)
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v16i2.1430

Abstract

Abstrak   Penelitian ini bertujuan untuk mengetahui perhitungan nilai BGH pada pembangunan gedung GIK UGM serta meninjau studi terdahulu mengenai evaluasi bangunan hijau. Penelitian ini menggunakan metode deskriptif untuk menjelaskan penerapan konsep bangunan hijau dalam proyek tersebut. Selama sepuluh tahun terakhir, terdapat lebih dari 1.000 studi yang membahas topik BGH dan evaluasi bangunan hijau. Berdasarkan penelusuran menggunakan aplikasi Publish or Perish dan Google Scholar serta Crossref dengan rentang waktu 10 tahun, ditemukan rata-rata 19,50 sitasi per tahun, dengan produktivitas peneliti mencapai setidaknya dua makalah per tahun. Selanjutnya, dilakukan pemetaan topik yang disajikan dalam bentuk grafik. Hasil penilaian BGH terhadap pembangunan GIK UGM menunjukkan bahwa proyek tersebut telah memenuhi kriteria BGH sesuai dengan indikator yang ditetapkan. Pembangunan GIK UGM memenuhi kriteria *Greenship*, khususnya pada indikator EEC, WC, IHC, dan BEM, yang tercermin melalui konservasi energi dan air, pengelolaan kualitas bangunan, serta penerapan manajemen keselamatan kerja. Hasil penilaian BGH berdasarkan kriteria Greenship menunjukkan bahwa pembangunan tersebut telah sesuai dengan ketentuan yang berlaku.   Kata kunci: green building, greenship, BGH method     Abstract   This study aims to know calculation BGH values on development GIK UGM building and review study previously discussed about evaluation building green.  This research use type study descriptive that explains about utilization theme green building in this research. The results during tens year final there is more of 1000 studies that discuss about BGH theme and evaluation building green. Results search theme building green with utilise Publish or Perish app and Google Scholar website and crossref with set time search for 10 years, researchers get results of 19.50 cited papers per year and every researchist at least make two papers per year. Further more done mapping the themes presented in form graph. Results BGH assessment on implementation the construction of GIK UGM shows that development has fulfil BGH criteria according with the indicators that have been set. The development of GIK UGM meets part BGH's achievements with criteria greenship especially on indicator EEC, WC, IHC, and BEM, are shown through conservation energy and water, management quality buildings, as well as implementation management safety Work.  Results BGH assessment with criteria greenship show that development has in accordance with applicable criteria​   Keywords: green building, greenship, BGH method,