ANALISIS EKONOMI TEKNIK INVESTASI PROYEK (STUDI KASUS PADA HOTEL ZODIAK LAMPUNG) diwantari, windy putri; Kustiani, Ika; Siregar, Amril Ma'ruf
Jurnal Rekayasa Sipil dan Desain (JRSDD) Vol. 4 No. 4 (2016): Edisi Desember 2016
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v4i4.517

Abstract

Investor yang berinvestasi dalam suatu proyek pasti berharap agar mendapat keuntungan dari investasinya.  Oleh karena itu, sebelum memulai suatu investasi, hendaknya dilakukan suatu studi kelayakan untuk menilai apakah investasi yang akan ditanamkan layak atau tidak. Dalam penelitian ini, kelayakan investasi hotel hanya ditinjau berdasarkan aspek ekonomi teknik.  Parameter yang digunakan untuk meninjau investasi yaitu menggunakan metode Net Present Value (NPV), Benefit to Cost Ratio (BCR), Internal Rate of Return (IRR), Payback Period (PP) dan Break Even Point (BEP). Analisis kelayakan proyek ini dibuat dalam 8 (delapan) buah skenario. Setiap skenario memiliki variasi pada tingkat inflasi, faktor kekosongan kamar dan sumber dana.  Hasil analisis kelayakan investasi yang paling menguntungkan adalah skenario pertama, yang mengasumsikan sumber dana investasi berasal dari modal sendiri dengan faktor kekosongan kamar sebesar 25%, tingkat inflasi 10%, tingkat suku bunga 7,5% per tahun dan rate of return sebesar 10%.  Sementara itu, skenario lainnya menunjukkan bahwa setiap skenario tersebut tidak dapat memenuhi satu parameter atau lebih.  Kata kunci : Studi kelayakan, Net Present Value (NPV), Benefit Cost Ratio (BCR), Internal Rate of Return (IRR), Payback Period (PP), Break Even Point (BEP).
Simulasi Penggunaan Program Geostudio Slope/W 2007 dalam Menganalisis Stabilitas Lereng Dengan Jenis Tanah Lempung Berpasir pada Kondisi Tidak Jenuh, Kondisi Jenuh Sebagian, dan Kondisi Jenuh pentawan, yota; Afriani, Lusmeilia; Siregar, Amril Ma'ruf
Jurnal Rekayasa Sipil dan Desain (JRSDD) Vol. 5 No. 2 (2017): Edisi Juni 2017
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v5i2.686

Abstract

Landslide is a natural disaster that often occurs in Lampung Province, particularly in WestLampung regency. The sliding occurs due to an increase in soil pore water stress in the rainyseason. Based on the research on the slopes, there is a safety factor value that can be used as areference for the degree of slope stability. One method to analyze the value of slope safety factoris by using the Geostudio Slope / W 2007 program.In this study, some cross sections of slope were simulated with 4 different water table conditions.The required soil properties index are: cohesion, c; natural angle of repose, φ; and unit weight ofdensity, γ .The analysis result shows that slope transversal cut shape have influence on slope stability. Theanalysis results on slopes with saturated conditions have a safety factor value of <1.25 and areclassified on unsafe slopes. In the unsaturated condition the whole simulation is classified as astable slope with a safety factor value> 1.25. Based on the analysis result, it can be inferred thatthe slope has insecured status. Thus, it is suggested to conduct such actions in order to preventlandslide.Key words : soil, slope stability, safety factor, geostudio slope/w.
ANALISIS RISIKO PEMBANGUNAN KONSTRUKSI JALAN TOL TAHAP KONSTRUKSI MENGGUNAKAN METODE SOFT SYSTEM METHODOLOGY (SSM) STUDI KASUS : JALAN TOL TRANS SUMATERA SEKSI 2 SIDOMULYO-KOTABARU (Sta. 39+400 - Sta. 80+000) Fanhar, Maulyda Nur Annisa; Kustiani, Ika; Siregar, Amril Ma'ruf
Jurnal Rekayasa Sipil dan Desain (JRSDD) Vol. 5 No. 4 (2017): Edisi Desember 2017
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v5i4.772

Abstract

Proyek pembangunan jalan tol tidak pernah lepas dari berbagai masalah baik teknis maupunmasalah non teknis. Masalah ini disebabkan berbagai macam faktor yang dianggap sebagai risikoproyek konstruksi. Risiko-risiko tersebut akan sangat mempengaruhi kinerja proyek danmengakibatkan kerugian baik dalam hal biaya, mutu, dan waktu, yang menentukan keberhasilansebuah proyek. Oleh karena itu, tujuan dari penelitian ini adalah untuk mengidentifikasi danmenganalisis risiko yang mungkin terjadi pada studi kasus proyek secara kualitatif yangdikuantitatifkan menggunakan metode Soft System Methodology (SSM) pada studi kasus ProyekPembangunan Jalan Tol Trans Sumatera Bakauheni-Terbanggi Besar seksi II Sidomulyo –Kotabaru (Sta. 39+400 – Sta. 80+000). Penelitian ini dilakukan dengan menggunakan teknikpurpose sampling untuk mengumpulkan data dari enam responden. Metode analisis data yangdigunakan pada penelitian ini adalah Uji Risiko Probabilitas, Uji Risiko Konsekuensi, dan SoftSystem Methodology (SSM). Dapat disimpulkan bahwa risiko kendala pada pembebasan lahanmerupakan risiko yang paling ekstrim yang menghambat kelancaran pada proyek Jalan Tol TransSumatera Bakauheni-Terbanggi Besar.
Analisis Ekonomi dan Finansial Shortcut Tegineneng - Tarahan Siagian, Andre Jonathan; Purba, Aleksander; Siregar, Amril Ma'ruf
Jurnal Rekayasa Sipil dan Desain (JRSDD) Vol. 6 No. 3 (2018): Edisi September 2018
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v6i3.843

Abstract

Feasibility Analysis is an appropriate analysis of parameters to determine a successful implemented project or not. Feasibility analysis is divided into two parts economic and financial analysis that both affect the feasibility of a project. The purpose of this study is to determine the costs incurred in a railway shortcut project, to analyze delay times before and after a railway shortcut, and to find out which railway shortcut project meets the economic and financial feasibility requirements. In this study, an analysis of the economic and financial feasibility and summarize the economic viability benefits of the Tegineneng - Tarahan shortcut project was conduct. A project is declared feasible or not by doing comparison with the feasibility method that is NPV> 0, BCR> 1, PP faster than the specified time, IRR> capital cost, and PI> 1. This study uses full occupancy rate with discount rate of 5% , 10%, and 15%, respectively.Based on the results obtained in terms of economic feasibility analysis that investment evaluation does not qualify due to the amount of benefit is too small so that economic analysis is not feasible. The aspect of financial feasibility analysis and analysis by summing the two financial and economic benefits is eligible so that the Tegineneng - Tarahan shortcut project is categorized as feasible. Keyword : Economic Feasibility, Financial Feasibility, Feasibility Method
Analisis Ekonomi Teknik Investasi Proyek Regulating Dam Way Sekampung Wira Tama, Ahmad Ega; Kustiani, Ika; Siregar, Amril Ma'ruf
Jurnal Rekayasa Sipil dan Desain (JRSDD) Vol. 6 No. 4 (2018): Edisi Desember 2018
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v6i4.1096

Abstract

Limpasan air yang mengalir dari hilir Bendungan Batu Tegi menuju Bendung Argoguruh terbuang percuma ke laut pada saat musim hujan, namun pada saat musim kemarau terjadi kekurangan air. Oleh sebab itu maka diperlukan sebuah regulating dam di antara Bendungan Batu Tegi dan Bendung Argoguruh. Dalam penelitian ini, kelayakan investasi regulating dam hanya ditinjau dari aspek ekonomi Teknik. Parameter yang digunakan untuk meninjau kelayakan investasi yaitu menggunakan metode Net Present Value (NPV), Benefit Cost Ratio (BCR), Internal Rate of Return (IRR) dan Payback Period (PP) dengan 6 skenario yang berbeda tingkat inflasi dan discount rate nya. Dari 6 skenario yang dibuat, menunjukan nilai NPV seluruhnya bernilai positif, IRR yang lebih besar dari discount rate nya, BCR yang lebih dari 1, serta PP yang kurang dari umur ekonomis bangunan. Skenario terbaik menunjukan nilai NPV sekitar 52 Trilyun Rupiah. Dalam skenario juga didapatkan BCR paling tinggi sebesar 40.44, serta IRR sebesar 31.79% dan PP pada tahun ke 4. Dengan demikian maka dapat disimpulkan proyek pembangunan Regulating Dam Way Sekampung dinilai layak dari aspek ekonomi.
Analisis Investasi Rekayasa Proyek Springhill Condotel Lampung Aini, Nur Syahidah; Kustiani, Ika; Siregar, Amril Ma'ruf
Jurnal Rekayasa Sipil dan Desain (JRSDD) Vol. 7 No. 1 (2019): Edisi Maret 2019
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v7i1.1101

Abstract

Pada masa sekarang, apartemen tidak hanya menjadi hunian pribadi tetapi juga sebagai investasi. Karena itu terjadi permintaan apartemen dalam bentuk kondominium hotel. Springhill condotel Lampung adalah condotel pertama yang dibangun di Bandar Lampung. Investasi Springhill Condotel Lampung memerlukan analisis kelayakan memastikan pengembalian investasi. Pada penelitian ini, studi kelayakan hanya dinilai dari aspek finansial dengan menggunakan beberapa parameter penilaian investasi yaitu NPV (Net Present Value), BCR (Benefit Cost Ratio), IRR (Internal Rate of Return), dan PP (Payback Period). Analisis dibuat dalam 9 (sembilan) buah skenario. Skenario ini divariasikan berdasarkan tingkat-tingkat inflasi dan prediksi-prediksi penjualan. Skenario yang paling layak yaitu pada tingkat inflasi 7% dan prediksi penjualan dengan metode trend linier. Seluruh skenario menunjukan bahwa nilai NPV, BCR dan PP layak. Namun seluruh skenario menunjukan bahwa nilai IRR di bawah tingkat bunga.  Kata kunci : Studi kelayakan, Kondotel, Net Present Value (NPV), Benefit Cost Ratio (BCR), Payback Period (PP), Internal Rate of Return (IRR)
Analisis Risiko Proyek Konstruksi Studi Kasus Bendungan Way Sekampung Paket 2 Dengan Metode Failure Mode and Effect Analysis dan Domino Aftortu, Muhammad Rizqika; Kustiani, Ika; Siregar, Amril Ma'ruf
Jurnal Rekayasa Sipil dan Desain (JRSDD) Vol. 6 No. 4 (2018): Edisi Desember 2018
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v6i4.1109

Abstract

The Way Sekampung Dam construction project is one of the major projects in the province of Lampung. There are several risk involved in the construction of the project. According to Project Management Body of Knowledge (PMBOK), the risks contain in a project can be controlled through risk management. The purpose of this research is to identify and analyze the highest risks in the Way Sekampung Dam package 2 construction project. The data was gathered through a questionnaire that was developed based on previous similar studies. The respondents was recruited based on a purposive sampling method. Based on Failure Mode and Effect Analysis (FMEA) method, it can be concluded three highest occupational risk, namely concrete work in diversion building, tunnel excavation and dewatering work. Subsequently, a fishbone analysis was carried out to determine the basic risk factors. After that a Domino method was utilized to find out the response and efforts to handle those risk.