cover
Contact Name
Unang arifin
Contact Email
bcsbm@unisba.ac.id
Phone
+6282118633944
Journal Mail Official
bcsbm@unisba.ac.id
Editorial Address
UPT Publikasi Ilmiah, Universitas Islam Bandung. Jl. Tamansari No. 20, Bandung 40116, Indonesia, Tlp +62 22 420 3368, +62 22 426 3895 ext. 6891
Location
Kota bandung,
Jawa barat
INDONESIA
Bandung Conference Series: Business and Management
ISSN : -     EISSN : 22828253     DOI : https://doi.org/10.29313/bcsbm.v2i1
Core Subject : Economy,
Bandung Conference Series Business and Management (BCSBM) menerbitkan artikel penelitian akademik tentang kajian teoritis dan terapan serta berfokus pada Manajemen dan Bisnis dengan ruang lingkup Adjusted Exponential Smoothing, Bauran Produk, Capital Adequacy Ratio, Crash Program, Critical Path Method (CPM), Diagram Preventive, Diferensiasi Produk, Economic Order Quantity (EOQ), Harga, Internet Banking, Ishikawa, Kepuasan Kerja, Keputusan Pembelian, Keuntungan Maksimal, kualitas pelayanan, Lingkungan Kerja, Loan to Deposit Ratio, loyalty consumers, manajemen proyek, Manajemen Rantai Pasok, Matriks SCOR, Metode Hungarian Peramalan, metode lintasan kritis (CPM) brand image, metode Service quality, Metode Simpleks, Mixed-Product Proyek, model Kano network planning, Non Performing Loan Pelayanan Jasa, Pemeliharaan, perputaran persediaan dan piutang, Production Process, Profit, proyek pembangunan, Purchase Of Raw Materials, Rantai Pasok, return on investment, SCOR Kinerja, Service Quality, Simplex Method, Turnover Intention Kinerja, Waktu dan Biaya, Optimal Penugasan Kerja. Prosiding ini diterbitkan oleh UPT Publikasi Ilmiah Unisba. Artikel yang dikirimkan ke prosiding ini akan diproses secara online dan menggunakan double blind review minimal oleh dua orang mitra bebestari.
Articles 1 Documents
Search results for , issue "851-860" : 1 Documents clear
Analisis Manajemen Persediaan Menggunakan Metode Klasifikasi Always Better Control (ABC) dan Metode Economic Order Quantity (EOQ) pada Produk Peralatan Konstruksi (Studi Kasus Pada PT.XYZ) Tiana Khiswatul Ismaiyah; Tasya Aspiranti; Umari Abdurrahim Abi Anwar
Bandung Conference Series: Business and Management 851-860
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsbm.v6i2.25443

Abstract

Abstract. PT XYZ is a construction equipment rental company that determines procurement quantities based on inventory conditions and customer demand. This study aims to analyze inventory control and determine item priorities and economical procurement quantities. The methods used were ABC analysis and a modified Economic Order Quantity (EOQ), with data collected through observation, interviews, and documentation. The ABC analysis classified Fixed Clamps as category A, 2-Meter Pipes as category B, and 2-Meter Asibas as category C. Meanwhile, the modified EOQ calculation resulted in economical procurement quantities of 3,922 Fixed Clamps, 2,007 units of 2-Meter Pipes, and 927 units of 2-Meter Asibas. ABC analysis can be used to determine inventory control priorities, while the modified EOQ provides a reference for procurement quantities after the need for additional items has been identified. The application of both methods is expected to support more systematic inventory control at PT XYZ while considering item availability, item condition, and rental demand. Abstrak. PT XYZ merupakan perusahaan penyewaan peralatan konstruksi yang menentukan jumlah pengadaan berdasarkan kondisi persediaan dan permintaan penyewa. Penelitian ini bertujuan menganalisis pengendalian persediaan serta menentukan prioritas barang dan jumlah pengadaan yang ekonomis. Metode yang digunakan adalah analisis ABC dan Economic Order Quantity (EOQ) modifikasi dengan data yang diperoleh melalui observasi, wawancara, dan dokumentasi. Hasil analisis ABC menunjukkan bahwa Clamp Mati termasuk kategori A, Pipa 2 M kategori B, dan Asiba 2 M kategori C. Sementara itu, perhitungan EOQ modifikasi menghasilkan jumlah pengadaan ekonomis sebanyak 3.922 unit Clamp Mati, 2.007 unit Pipa 2 M, dan 927 unit Asiba 2 M. Analisis ABC dapat digunakan untuk menentukan prioritas pengendalian, sedangkan EOQ modifikasi menjadi acuan jumlah pengadaan setelah kebutuhan penambahan barang diketahui. Penerapan kedua metode tersebut diharapkan dapat membantu PT XYZ melakukan pengendalian persediaan secara lebih terukur dengan tetap mempertimbangkan ketersediaan, kondisi barang, dan permintaan penyewaan.

Page 1 of 1 | Total Record : 1