cover
Contact Name
Henriette D. Titaley
Contact Email
henriette.titaley@polnam.ac.id
Phone
+6282188099397
Journal Mail Official
henriette.titaley@polnam.ac.id
Editorial Address
Jl. Ir. M. Putuhena, Wailela-Rumah Tiga, Kota Ambon Provinsi Maluku
Location
Kota ambon,
Maluku
INDONESIA
Jurnal Agregate
ISSN : -     EISSN : 29645158     DOI : https://doi.org/10.31959/ja.v2i1
Core Subject : Engineering,
Jurnal Agregate adalah Jurnal yang memberikan informasi ilmiah tentang perkembangan ilmu pengetahuan dan teknologi bidang Struktur, Bahan Bangunan Dan Kegempaan, Teknik Sumber Daya Air, Transportasi, Management Konstruksi, Geoteknikal, Teknik Pantai Dan Tsunami.
Articles 139 Documents
FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK RENOVASI DAN PERLUASAN GEDUNG BALAI KARANTINA IKAN AMBON Legion Kopong; Nelda Maelissa; Henriette Dorothy Titaley
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1200

Abstract

Conatruction dealy is acommon problem Which frequently happens in construction industry. The purpose of this study was to indentity and categorize the delays causing factors greatly effecting the fish quarantine center building revavation and expansion project. The Fish quarantine center building renovation project was the object of this study motivated by delays. Futhermore, based on the secondary data obtained, time schedule is entirely used as the duration and normal cost of the project. Then, the Principal Compenent Analysis (PCA) method is applied to be able to find out the main factors causing dealys. Based on the results of the normality test and principal compenent analysis, the factors that effect the delay in the renovation and expansion of the Ambon Fish Quarantine Center Building were the material factors with a total variance of 57.575% including X1.1. Lack of construction materials, X1.2 Material changes in from, function, and specifications, X1.3 Delay in delivery of materials, X1.4 Damage to materials in storage, X1.5 Inccuracy of time.
ANALISA RISIKO PADA PROYEK PEMBANGUNAN GEDUNG AUDITORIUM IAIN KOTA AMBON Tisya Glorya Pelatta; Nelda Maelissa; Henriette Dorothy Titaley; Abraham Tuanakotta
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1202

Abstract

Risk management is an effort to manage risk comprehensively, planned, and structured in a good system to prevent unexpected risks. It may allow the management to expand results by identifiying and analyzing the risk to work accident in the Auditorium building project in a IAIN Ambon. Each  risk in the work phase must be assessed risk professionally. The assessment method used a risk assessment matrix sourced from NHS Highland, which adopted from AS/NZS 1360:2004 Risk Management. Primary data were obtained from interviews and questionnaires.   Furthermore , secondary data were collected through the company’s organizational structure and project work items. In addition, data analysis was carried out through validity and realiability test, and finally, a risk assessment was implemented. The results of this study showed that there were five risk factors; injured/stabbed by risk level of 20 work accident risk variabels, there was obvioposly one medium risk inculuded in the category high risk and 19 other variables involved in the medium risk included in the category high and 19 other variebles invoveld in the medium risk category. In consclusion,strategiees that can be carried out to prevent the risk regaarding to the classification of risk levels, namely elimination, substitution, administation, and personal protecetive Equipment (PPE).
PEMANFAATAN MATERIAL ALAM LOKAL DESA LAMDESAR TIMUR PULAU LARAT KABUPATEN MALUKU TENGGARA BARAT SEBAGAI BAHAN LAPIS PONDASI JALAN YANG DISTABILISASI DENGAN SEMEN Rosida Lestaluhu; Soumokil H. Johny; David Daniel M. Huwae
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Road infrastructure development in outermost and remote or limited areas is one of the current government's priority programs in realizing its vision and mission. However, along the way, there is limited availability of quality road materials according to specifications. So that the construction of road infrastructure requires high costs. Actually, there are quite a lot of local materials, such as granular materials in the form of a mixture of sand and stone (sirtu) and limestone or coral materials, but they cannot be used optimally for road pavement because they do not meet the specifications or requirements. often known as substandard local materials. Utilization of local materials such as in East Lamdesar Village can be used as an alternative to overcome the problem of road construction in that location. The problem is that the quality of the material at that location is not known whether it is in accordance with specifications (standard material) or below standard (substandard). For this reason, it is necessary to carry out a series of research in the laboratory, so that the properties of the material are known. By knowing the properties of the material so that it can be ascertained whether or not it can be used as a cement foundation layer for road pavement.  The research was conducted using experimental methods through laboratory testing. The results showed that local material stabilization with cement resulted in a high compressive strength value. The value of the compressive strength is higher according to the increasing percentage of cement content used. The results of the filter analysis test that entered the foundation layer gradation were 100% and the compressive strength value that met the requirements of special specifications with a cement content of 6% was 36.19 kg/cm2. Referring to the value of the resulting compressive strength (generally 25-40 kg/cm2) then the local material of East Lamdesar Village can be used as a class A foundation layer for road pavement, and for its use or application in the field, specifications are needed as recommended based on research results. this.  
ANALISIS PENGARUH KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA PEKERJA PADA PROYEK PEMBANGUNAN RUMAH SAKIT PRATAMA DESA HITU KABUPATEN MALTENG Ramona Fitra Sari Lating; Rudi Serang; Wellem Gaspersz; Delvia Rimesye Apalem; Abraham Tuanakotta
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1229

Abstract

Occupational Safety and Health (K3) is a science for anticipating, recognizing, evaluating and controlling hazards that arise in the workplace that can impact the health and welfare of workers. The risk of falling is the highest cause of accidents. The use of adequate safety equipment such as guardrails and helmets, as well as the implementation of security procedures such as inspection of non-permanent stairs and scaffolding can reduce the risk of accidents. occupational health on work performance (K3) in the Hitu Village Primary Hospital Development project. Analysis of the data used to calculate the analysis of the application of health and work to the project "Construction of the Hitu Village Pratama Hospital". f test. Based on the results of the analysis it was found that safety (X1) and health (X2) had a positive effect on work performance from the results of testing multiple linear regression analysis from the correlation table or partial correlation, where safety (X1) obtained a value of r = 0.766 with a significance of 0.000 < 0.05 Health (X2) obtained a value of r = 0.592 with a significance of 0.000 <0.05 For the Summary Regression Correlation Model (R) which simultaneously (together) between the variables Health (X1) and Safety (X2) , on Work Performance (Y) a value of r = 0.767 is obtained. Between the two aspects of safety and health on the work performance of the Hospital Development project Hitu Village Primary kit, the most dominant influence from the results of the partial test is the work safety aspect of 0.722 or 72.2%.
ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PEMBANGUNAN GEDUNG PASAR MARDIKA KOTA AMBON Welem Meturan; Lenora Leuhery; Henriette Dorothy Titaley
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1237

Abstract

Occupational Safety and Health (K3) is a science for the aticipacion recognizing,  evaluation and control of hazards that arise in the workplace that can have an impact on the welfare and health of workers. The risk of falling is the highest cause of accidents. The use of adequate safety equipment such as guardrails and helmets, as well as the implementation of security procedures such as non-permanent ladders inspection and scaffolding can reduce the risk of accidents.Data analysis was used to calculate the analysis of health and work application in the project "Construction of Hitu Village Primary Hospital". The techniques in data analysis in this study are validity test, reliability test, analytical descriptive, regression analysis test, coefficient of  Determination test, T - test and F test.The results of the analysis show that safety (X1) and health (X2) had a positive effect on work performance from the test results of multiple linear regression analysis from the correlation table or partial correlation, where safety (X1) obtained a value of r = 0.766 with a significance  0.000 <0.05. Health (X2) obtained a value of r = 0.592 with a significant 0.000 <0.05. For the value of the Summary Regression Model Correlation (R) which simultaneously (together) between the variables Health (X1) and Safety (X2), on Work Performance (Y) is r  = 0.767. Among the two aspects of safety and health on the work performance of the Hitu Village Primary Hospital Construction project, the most dominant influencing test results of the partial is the occupational safety aspect of 0.722 or 72.2%.
ANALISIS PENGARUH SUMBER DAYA MANUSIA TERHADAP ASPEK KINERJA PEKERJA PADA PROYEK PEMBANGUNAN GEDUNG LABORATORIUM TERPADU PENDUKUNG BLOK MASELA UNIVERSITAS PATTIMURA Siti Difinubun; Obednego Dominggus Nara; Maslan Abdin
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1252

Abstract

In this study which focuses on the four aspects studied, where for the main reason of being interested in aspects of human resources related to competence, motivation, loyalty and work discipline are general aspects that unwittingly exist in the worker himself and the worker is one of the triggers for the success of a construction project. These four aspects have an impact on the performance of workers, because the work does not reach the deadline. Thus, it gives rise to the desire to explore more deeply the reasons for work that does not reach the target and by increasing work time (overtime), because in the construction project of Masela Block Integrated Laboratory Supporting Buliding of Pattimura University has so many workers in their fields, it is felt that there is a slight delay due to the number of workers with the work itself. The study was conducted by distributing questionnaires for the distribution of questionnaires, the data analysis technique used was SPSS 26 software. Data analysis starts from validity test, reliability test, classical assumption test, namely normality test, descriptive analysis, multiple linear regression analysis and Relative Importance Index (RII) From the results of the analysis carried out on human resources on aspects of worker performance, multiple linear regression analysis shows that human resources have a positive and significant effect on worker performance, and the most dominant influence on the results of the RII calculation is the work discipline aspect, namely 0.820 or 82%, the second is the aspect, namely competency 0.411 or 41%, then the third aspect of motivational is 0.394 or 39% and the last is the loyalty aspect, namely 0.300 or 30%.
ANALISIS RISIKO PADA PROYEK PEMBANGUNAN GEDUNG LABORATORIUM TERPADU PENDUKUNG BLOK MASELA UNIVERSITAS PATTIMURA Nurhayati Maasily; Octovianus Jamlaay; Nelda Maelissa
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1280

Abstract

Risk management is an effort to manage risk in a comprehensive, planned and structured manner in a good system to prevent unexpected events. It allows management to improve results by identifying and analyzing the risk of work accidents that exist, namely the construction project of Masela Block Supporting Integrated Laboratory, Pattimura University. Each risk of the work phase must be assessed for professional risk management/control. The assessment method applied a risk assessment matrix sourced from NHS Highland which was adopted from AS/NZS 1360:2004 Risk Management. The secondary data obtained for this study consists of the company's organizational structure and project work items. Primary data obtained from observations in the field that is obtained by conducting interviews and distributing questionnaires. The data analysis carried out in this study was a variable test, namely Validity Test and Reliability Test. The next step was the application of risk assessment. The result of this study was that there were 4 risk factors, namely human resources, equipment and work materials, work methods, and working environment. The classification of the risk level from the 29 variables of occupational accident risk, there were two work risks that were included in the high-risk category and the other 27 risks were included in the medium risk category. Based on known risks, a strategy that can be carried out is obtained, namely risk control based on the classification of risk levels, namely Elimination, Substitution, Administration, and Personal Protective Equipment.
EVALUASI KINERJA SABO DAM SUNGAI WAIPIAH KABUPATEN MALUKU Henny Soplantila; Renny Betaubun; Penina Istia
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1306

Abstract

Sabo is a dam building with a roller built to prevent the dangers of floods and lava. Sabo Dam has enormous benefits. As a controller of forest erosion and agricultural areas and prevent the dangers of landslides. Sand materials and rocks stuck in Sabo can also be used by the community as a source of income, the problem is whether the condition of physical facilities. In this writing is a quantitative analysis method/ technique, where the data that needs to be calculated using the evaluation of the impact of damage to the Sabo Dam Dam Wai Pia building, evaluating water levels on sabo dam and evaluating sedimentation in sabo dams, the condition of flooding fluctuations in floods can Affecting the condition of Sabo Dam, and whether the sediment arising in the Sabo Dam shelter affects the height of the water level in Sabo Dam. With the aim of writing to know The results of the analysis are based on the results of the Sabo Dam performance and performance evaluation of the condition of the building is used to calculate the total score of the inspection results, the total item of the building condition, the total number of the largest score and the total score of the entire item and the level of damage in percent (%), the maintenance recommendations are determined based on the parameters and good conditions , if the damage rate is still below 10% of the initial construction conditions, the condition is slightly damaged, if the damage rate is 10% to below 20% of the initial conditions
ANALISIS KINERJA SALURAN SEKUNDER IRIGASI WAY PAMALI KECAMATAN LOLONGGUBA KABUPATEN BURU Mohammad Gazaly Tuanany; Isak Lilipory; Willem Gaspersz
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1334

Abstract

An efficient and effective irrigation canal management system greatly influences the distribution of water to the surrounding community and the agricultural sector. To maintain it, periodic maintenance and evaluation is required so that the physical condition of irrigation structures continues to function optimally. For this reason, this study aims to assess the performance of the Way Pamali secondary irrigation canal, Lolongguba District, Buru Regency, Maluku Province. This research uses PU Regulation No. 12/PRT/M/2015 as a guideline for data analysis. While the research data was obtained through direct field surveys by assessing the physical condition of irrigation construction buildings and the surrounding area. The results showed that there was damage to the wall and floor of the canal on the Left Section (BA.Ki) 4 and the Left Section (BA.Ki) 6. The results of the performance index assessment of the carrier channel infrastructure were 59.80% on sections Ba.Ki.4 and of 57.05% on section Ba.Ki.6 with the title of "bad" Physical Infrastructure of the Carrier Channel (Secondary Channel). The total funds required for the rehabilitation of the physical irrigation structures are Rp. 2,486,731,000.- (two billion four hundred eighty six million seven hundred thirty one thousand rupiah).  
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN GEDUNG RUSUN POLRES KABUPATEN SERAM BAGIAN TIMUR Parni Tomia; Selly Metekohy; Jeffrey Payung Langi
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1345

Abstract

This research was conducted to analyze the factors that affect labor productivity in the construction project of the Police flats building in the resort, East Seram Regency. In this study, there are four factors studied, namely management factors, technical factors, human factors and technical factors, which are related to labor productivity. Therefore, the workforce as one of the parties involved in construction projects in the field must be considered, especially the factors that affect labor productivity in the field, it is very important to know in order to increase productivity in construction projects. For this reason, it is very important to maintain labor productivity not to decline. The research was conducted by distributing questionnaires to 30 respondents. The method of data analysis starts from the validity test, reliability test, multiple linear regression analysis to determine the hypothesis test, namely the t test and f test. The data analysis technique used is SPSS software version 26. The results of the T test show that there are three independent variables that significantly influence the dependent variable (labor productivity), namely management variables with t count (2.801) > t table (2.05), technical factors with t count (2.385) > t table (2, 05), human factor with t count (3.705) > t table (2.05). Simultaneously the four independent variables affect the dependent variable where the value of F count (44.956) > F table (2.74). And the most dominant factor seen from the results of the highest beta coefficient value, namely the human factor with a beta value of (40.8%), has a dominant effect on labor productivity.