Claim Missing Document
Check
Articles

Found 22 Documents
Search

FAKTOR DETERMINASI KOMUNIKASI EFEKTIF DI PROYEK KONSTRUKSI DARI PERSPEKTIF MULTIPLE STAKEHOLDERS Martalius Peli; Wahyudi P. Utama; Dwifira Y. Jumas; Zulherman Zulherman; Sesmiwati Sesmiwati; Vivi Ariani; Fielda Roza; Putranesia Thaha
Jurnal Studi Komunikasi dan Media Vol 26 No 2 (2022): JURNAL STUDI KOMUNIKASI DAN MEDIA
Publisher : BPSDMP Kominfo Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17933/jskm.2022.4896

Abstract

Persoalan komunikasi juga menjadi masalah serius proyek konstruksi di Indonesia. Kegagalan komunikasi efektif di proyek konstruksi menghasilkan distribusi informasi yang tidak tepat. Konsekuensinya, mutup ekerjaan tidak sesuai bestek, keterlambatan dari jadwal pelaksanaan, peningkatan biaya, dan bermuara padaber kurangnya kepuasan pemberi kerja. Tujuan penelitian ini adalah untuk mengidentifikasi dan menilai faktor determinasi terhadap komunikasi efektif di proyek konstruksi dari perspektif berbagai pemangkukepentingan. Penelitian ini menggunakan pendekatan kuantitatif dengan metode survei kuisioner untuk pengumpulan data. Dari hasil studi literatur, 31 unsur komunikasi efektif di proyek konstrsuksi berhasil diidentifikasi. Kuisioner didistribusikan kepada pemangku kepentingan di proyek konstruksi yang terdiri dari pemilik proyek, kontraktor, konsultan, akademisi dan pemasok konstruksi di Sumatera Barat. Seterusnya data yang terkumpul dianalisis dengan metode analisis komponen prinsip (principle component analysis). Hasilnya adalah terdapat tiga faktor penentu komunikasi efektif di proyek konstruksi di Sumatera Barat, yaitufaktor individual dan organisasi kerja (6 variabel), faktor kejelasan informasi dan tanggung jawab (6 variabel), dan faktor lingkungan kerja dan teknologi (4 variabel). Penelitian ini juga merekomendasikan pengukuran hubungan ketiga faktor dengan cara analisis faktor konfirmatori untuk penelitian dimasa akan datang.
Indikator Penyebab Praktik Korupsi Pada Industri Konstruksi Di Sumatera Barat vivi ariani; Dwifitra Y. Jumas; Wahyudi P. Utama; Wenny W. Wahyudi
Rekayasa Sipil Vol. 17 No. 1 (2023): Rekayasa Sipil Vol. 17 No. 1
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2023.017.01.3

Abstract

The main objective of this research is to identify and analyze indicators of the causes of corrupt practices in the construction sector in West Sumatra. Research methodology used descriptive statistics and inferential statistical analysis used in the test is Cronbach's Alpha. The results of Cronbach's Alpha test can be seen in the value in the Corrected Item-Total Correlation column for the number of variables as many as 30 can be seen in r table 0.361. This is also supported by Cronbach's alpha value of 0.960. The indicator that causes corruption in the first rank is the existence of tender evaluations that do not meet the criteria (X9). Conclusion in this research are 10 variables (out of 30 variables) indicators of the causes of corrupt practices in construction projects in West Sumatra.
PERINGKAT FAKTOR PENYEBAB YANG MEMPENGARUHI TERJADINYA KLAIM DARI KONTRAKTOR KE OWNER PADA PROYEK KONSTRUKSI DI KOTA PADANG Vivi Ariani
Rang Teknik Journal Vol 2, No 1 (2019): Vol. 2 No. 1 Januari 2019
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (290.305 KB) | DOI: 10.31869/rtj.v2i1.1000

Abstract

Abstrak Penelitian ini mempresentasikan hasil survei tentang penentuan peringkat faktor yang mempengaruhi terjadinya pengajuan klaim oleh penyedia jasa berdasarkan pengalaman dan pemahaman yang dimiliki atas tuntutan yang menjadi tanggung jawab pemilik proyek (pengguna jasa) pada proyek-proyek swasta dan pemerintah di Kota Padang. Penelitian ini bertujuan untuk mengidentifikasi faktor penyebab terjadinya tuntutan/klaim pada proyek konstruksi. Adapun pelaksanaan penulisan artikel ini diorganisasikan sebagai berikut: Pertama kajian literatur terkait klaim konstruksi dipaparkan dan diikuti dengan penyebab terjadinya pengajuan klaim yang dilaksanakan oleh penyedia jasa. Selanjutnya adalah analisis dan diskusi dan diakhiri oleh konklusi dan rekomendasi. Metodologi penelitian ini didesain bentuk penelitian kuantitatif dengan penyebaran survey kuesioner kepada praktisi industri konstruksi untuk menjawab tujuan penelitian. Pengumpulan data survey kuesioner  dilakukan kepada stakeholder proyek konstruksi di Kota Padang, meliputi pemilik proyek (owner), konsultan perencana, konsultan pengawas dan kontraktor. Teknik analisa data dilakukan dengan menggunakan statistik deskriptif yaitu: rata-rata (mean) dan standar deviasi. Mean digunakan untuk mengetahui nilai rata-rata dari jumlah respon untuk tiap jawaban yang tersedia. Selanjutnya berdasarkan mean dan standar deviasi ditetapkan rangking masing-masing pernyataan. Analisa dilanjutkan dengan menghitung natural cut off point untuk mereduksi peringkat/rangking. Dari hasil analisa, diperoleh 12 faktor (dari 28 faktor)  penyebab terjadinya klaim konstruksi oleh kontraktor terhadap pemilik proyek. Luaran penelitian diharapkan dapat membantu manajer proyek untuk mempermudah proses pengajuan dan efisiensi keberhasilan klaim proyek konstruksi.  Kata kunci: Klaim, Proyek Konstruksi, Kontraktor dan Pemilik
IDENTIFIKASI PENYEBAB TIMBULNYA PENGAJUAN KLAIM KONSTRUKSI DARI PENYEDIA JASA KE PENGGUNA JASA DI KOTA PADANG Vivi Ariani; Fielda Roza; Embun Sari Ayu
JURNAL REKAYASA Vol 12 No 1 (2022): Jurnal REKAYASA
Publisher : Fakultas Teknik Sipil dan Perencanaan. Universitas Bung Hatta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37037/jrftsp.v12i1.113

Abstract

Klaim dalam industri konstruksi merupakan masalah yang dapat mengacu kepada permohonan terhadap pertambahan biaya dan pertambahan waktu serta memicu terjadinya perselisihan antara penyedia jasa ke pengguna jasa. Tujuan yang ingin dicapai dalam penelitian ini adalah untuk mengidentifikasi faktor penyebab timbulnya klaim pada proyek konstruksi oleh penyedia jasa ke pengguna jasa. Metodologi penelitian dalam penelitian ini adalah penelitian kuantitatif dengan penyebaran survey kuesioner kepada praktisi industri konstruksi khususnya kepada stakeholder proyek konstruksi untuk menjawab tujuan penelitian. Pengumpulan data survey kuesioner dilakukan kepada stakeholder proyek konstruksi di Kota Padang, meliputi pemilik proyek (owner), konsultan perencana, konsultan pengawas dan kontraktor. Teknik analisa data dilakukan dengan menggunakan statistik deskriptif yaitu: rata-rata (mean) dan standar deviasi. Mean digunakan untuk mengetahui nilai rata-rata dari jumlah respon untuk tiap jawaban yang tersedia. Dari hasil analisa, diperoleh 28 faktor penyebab terjadinya klaim konstruksi oleh penyedia jasa ke pengguna jasa. Luaran penelitian diharapkan dapat mempermudah proses pengajuan klaim proyek konstruksi.
MENINGKATKAN KEUNGGULAN KOMPETITIF PERUSAHAAN PERENCANA DI PASAR GLOBAL: Sebuah Kajian Literature Roza, Fielda; Peli, Martalius; Khadavi, Khadavi; Ariani, Vivi
SIGMA TEKNIKA VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v7i1.6097

Abstract

Rapid change in global marketplace offers formidable challenges to firms in the construction industry. Firms need to understand the nature of internal and external environment and apply competitive strategy that suits the firms‟ objectives to keep an edge over competition. Offering professional service in the industry, Construction firms are different than product-based industry in terms services provided, relationship between firm-client and competing style with the existing and new firms. How do Construction firms compete and what strategies are suitable for them? There are four competitive strategies such as cost leadership, focus, differentiation and growth to enhance the ways of competing style. How does the competitive strategy chosen impact the business performance? A success of any strategy adopted is determined by the performance of the firm. Thus, this paper stressed that for a Construction firm to maintain their competitive advantage, they need to relate the company performance with the competitive strategy adopted.
Kerangka Pengembangan dan Kepemimpinan Budaya Mutu dalam Konstruksi di Indonesia: Tinjauan Studi Literatur Peli, Martalius; Ariani, Vivi; Khadavi, Khadavi; Roza, Fielda
Jurnal Talenta Sipil Vol 7, No 2 (2024): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i2.511

Abstract

Leadership is an indispensable element in the process of initiating and maintaining the development of a quality culture in a construction organization. Leadership can create an appropriate environment to provide maximum comfort to group members to improve performance and productivity. Strong leadership from top management is essential in developing and maintaining a quality-based culture in an organization that acts as a catalyst for the implementation of Total Quality Management (TQM). This paper aims to discuss the conceptual framework of how leadership can help change the quality culture in an organization. The discussion was carried out using a literature review of the concepts of Quality, Culture and Leadership and Organizational Culture. Analysis of the study was carried out on cultural changes and the role of leadership in developing a quality culture. The results of the study show that organizations need to shift from their current culture to a TQM culture that focuses on quality as the main strategy. Furthermore, thirteen important cultural dimensions can be identified that contribute to the successful implementation of TQM, where most of these dimensions are related to leadership. The proposed Quality Culture Development and Leadership Framework in Construction in Indonesia can be a model for developing a quality culture in construction organizations through effective leadership, so that construction organizations can use it creatively to minimize inconsistencies and conflicts.
Analisis Pengaruh Kompetensi Manajer Proyek terhadap Keberhasilan Proyek Kontruksi Transportasi Jalan Rel di Sumatera Bagian Barat Vianda, Rendi; Jumas, Dwifitra; Anif, Bahrul; Peli, Martelius; Fuadi, Al Busyra; Ariani, Vivi
Jurnal Talenta Sipil Vol 7, No 2 (2024): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i2.588

Abstract

The role of a project manager is a crucial factor that influences project success. To achieve project success, it is necessary to have project managers who possess the appropriate competencies to carry out their tasks. Respondents in this study are individuals who are directly involved and responsible for the implementation of railway projects in West Sumatra Province, totaling 61 people. Data collection was done by administering questionnaires to the research respondents. The data analysis used descriptive analysis to summarize and describe the data, while multiple linear regression was used to understand the relationship between independent variables (knowledge, skills, attitudes, behavior) and dependent variables (project success). Based on the analysis results, it can be concluded that factors such as knowledge, skills, attitudes, and behaviors have a significant impact on the success of railway projects in West Sumatra. The skill factor of project managers is the most dominant factor influencing the level of project success, with a contribution of 23.8%.
Optimasi Pemeliharaan Jalan: Model Pengambilan Keputusan Multi-Kriteria untuk Prioritas di Kabupaten Pasaman, Sumatera Barat Jumas, Dwifitra; Ariani, Vivi; Rita, Eva; Sesmiwati, Sesmiwati; Rozaan, Aufaa
Jurnal Teknik Sipil Vol 31 No 3 (2024): Jurnal Teknik Sipil - Edisi Desember
Publisher : Institut Teknologi Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.5614/jts.2024.31.3.10

Abstract

Jalan merupakan prasarana transportasi yang penting dalam pertumbuhan pembagunan social dan ekonomi. Karena keterbatasan dana, maka perlu menentukan prioritas perbaikan jalan. Agar penanganan jalan berjalan optimal, diperlukan kriteria yang menjadi prioritas utama untuk dipertimbangkan dengan seksama.Pemilihan kriteria yang tepat merupakan aspek yang perlu dikaji karena kondisi dan kebutuhan setiap daerah akan prioritas perbaikan dan peningkatan jalan akan berbeda. Pendekatan analisa yang digunakan pada penelitian ini adalah Multi-Criteria Decision Making (MCDM) dengan mengunakan expert choice. Dalam penelitian ini, hirarki AHP yang digunakan adalah hirarki fungsional yang terdiri dari 3 level yaitu tujuan (level 1), kriteria (level 2) dan sub kriteria (level 3).Kuesioner disebarkan pada 19 responden untuk menemukan bobot kriteria dan subkriteria yang menjadi prioritas pemeliharaan ruas jalan di Kabupaten Pasaman, Provinsi Sumatera Barat. Dari 6 kriteria dan 23 sub kriteria, setelah dilakukan analisis dengan mengunakan Expert Choice, terdapat 5 kriteria dan 19 sub-kriteria yang memenuhi persyaratan nilai CR 0,1. Dalam menetapkan urutan kegiatan pemeliharaan jalan di Kabupaten Pasaman, bobot diberikan pada beberapa faktor, seperti kerusakan jalan (30,90%), aspek ekonomi (19,70%), kebijakan (18,10%), lalu lintas (16,00%), dan tata guna lahan (9,60%). Hasil dari model ini selanjutnya di aplikasikan kepada 12 ruas jalan yang membutuhkan pemeliharan.
ESTIMASI BIAYA PROYEK KONSTRUKSI GEDUNG OLEH QUANTITY SURVEYOR (STUDI KASUS: PEKERJAAN STRUKTUR ATAS PROYEK APARTEMENT THE ACCENT JAKARTA) Ariani, Vivi; Peli, Martalius; Fitri, Dinni Fadhilah
JURNAL TEKNIK SIPIL Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v7i2.10078

Abstract

Abstract : Cost Estimating of the upper structure on each construction project is usually done by the civil engineer or architect. However, as the development of science, new professions such as Quantity Surveyor have shifted the task of civil engineering or architects in making cost estimates. The QS profession is a profession that has the ability to analyze the cost and practical components of theproject's physical construction work in a successful way so as to apply its analytical results in solving the problems typical for each project. The case study of this research is the top structural work on the accent Apartments built on an area of 3,300 m2 with a building area of 27,000 m2. Research methodology by literature study and The Accent volume calculation using standard measurement method (SMM), while for unit price partly taken from the reference of PU Permen 2007. From the analysis of volume calculation and unit price analysis, the total cost of the structural work top of Rp. 51,162,851,482.23 with the price per m2 is 2.084,412.47 / m2. Duration of implementation is for 16 months. For cash flow, cash in consists of a 10% down payment, 5% retention, monthly employment progress minus downpayment and retention, and an office cash loan of Rp.6,000,000,000.00 in which the cash is Rp.2,000,000,000.00 per month.Keywords : cost estimating, quantity surveyor, volume, upper structure, ApartementAbstrak: Estimasi biaya pekerjaan struktur atas pada setiap proyek konstruksi biasanya dilakukan oleh civil engineer atau arsitek. Namun, seiring berkembangnya ilmu pengetahuan, profesi baru seperti Quantity Surveyor telah menggeser tugas civil engineering atau arsitek dalam melakukan estimasi biaya. Studi kasus penelitian ini adalah pekerjaan struktur atas pada Apartemen The Accent yang dibangun pada lahan seluas 3.300 m2 dengan luas bangunan 27.000 m2. Metodologi penelitian dilakukan dengan cara studi literatur dan melakukan perhitungan volume menggunakan standar measurement method (SMM), sedangkan untuk harga satuannya sebagian diambil dari acuan Permen PU 45/PRT/M/2007. Dari hasil analisa perhitungan didapat total biaya keseluruhan pekerjaan struktur atas sebesar Rp. 51,162,851,482.23 dengan harga per m2 nya adalah 2,084,412.47/m2. Durasi pelaksanaan adalah selama 16 bulan. Untuk cash flow, cash in terdiri atas uang muka sebesar 10%, retensi sebesar 5%, progress pekerjaan bulanan dikurangi uang muka dan retensi, dan peminjaman kas kantor sebanyak Rp.6,000,000,000.00 yang mana cairnya dana adalah sebesar Rp.2,000,000,000.00 per bulannya.Kata kunci : Estimasi biaya, Quantity Surveyor, Volume, Struktur atas, Apartemen
STUDI TENTANG FAKTOR-FAKTOR YANG MEMPENGARUHI HASIL BELAJAR MAHASISWA PADA MATAKULIAH ESTIMASI 1 PROGRAM STUDI TEKNIK EKONOMI KONSTRUKSI (STUDI KASUS: ANGKATAN 2016) Ariani, Vivi; ., Sesmiwati
Educational Building: Jurnal Pendidikan Teknik Bangunan dan Sipil Vol. 5 No. 2 DES (2019): EDUCATIONAL BUILDING
Publisher : Jurusan Pendidikan Teknik Bangunan Fakultas Teknik Universitas Negeri Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24114/ebjptbs.v5i2 DES.16145

Abstract

ABSTRAKPenelitian ini dilatarbelakangi dengan ditemuinya masalah dalam hal perolehan nilai mahasiswa pada matakuliah Estimasi 1. Sesuai data perolehan nilai akhir, diketahui jumlah mahasiswa yang memperoleh nilai A pada semester genap 2014/2015 hanya 1 orang, semester genap 2015/2016 sebanyak 1 orang, semester genap 2016/2017 tidak ada yang memperoleh nilai A dan semester genap 2017/2018 sebanyak 2 orang. Dari data tersebut penulis memiliki kepentingan untuk mengetahui faktor apa saja yang mempengaruhi rendahnya hasil belajar mahasiswa pada matakuliah Estimasi 1 dan seberapa besar tingkat  keberhasilan belajar mahasiswa. Jenis penelitian ini adalah deskriptif, karena penelitian ini akan mengungkapkan faktor-faktor yang mempengaruhi rendahnya hasil belajar mahasiswa pada matakuliah Estimasi 1 dan tingkat keberhasilan belajar mahasiswa (persentase) dengan responden adalah mahasiswa angkatan 2016 sebanyak 148 orang. Teknik pengambilan sampel adalah dengan menggunakan Total Sampling, karena seluruh mahasiswa prodi Teknik Ekonomi Konstruksi angkatan 2016 dijadikan sampel penelitian. Pengumpulan dan analisa kuesioner dilakukan dengan menggunakan Microsoft Excel dan program SPSS 20.00. Berdasarkan analisa dengan natural cut off point diperoleh hasil bahwa Faktor Metode Belajar: gaya belajar yang bervariasi (X7) menduduki posisi nomor satu (rangking 1). Sedangkan berdasarkan persentase faktor nilai persentase jumlah item yang terbentuk, Faktor Tipe Metode Belajar (X10) merupakan faktor yang paling mempengaruhi karena mempunyai nilai persentase sebesar 81.9%Kata Kunci: Estimasi 1, Hasil Belajar Mahasiswa, Teknik Ekonomi KonstruksiAbstractThis research is motivated by finding problems in terms of obtaining student scores in the Estimation course 1. In accordance with the final score data, it is known that the number of students who received an A in the 2014/2015 semester was only 1 person, 1 semester even 2015/2016, 1 semester 2016/2017 no one received an A grade and even semester 2017/2018 there were 2 people. From these data the authors have an interest in knowing what factors influence the low student learning outcomes in Estimation 1 course and how much the level of student learning success. This type of research is descriptive, because this study will reveal the factors that influence the low student learning outcomes in Estimation 1 subject and the level of student learning success (percentage) with respondents are 2016 class of 148 students. The sampling technique is to use Total Sampling, because all students of the 2016 Economics Construction Engineering study program are used as research samples. Questionnaire collection and analysis was carried out using Microsoft Excel and the SPSS 20.00 program. Based on the analysis with the natural cut-off point, the result is that the Learning Method Factor: varied learning styles (X7) occupies the number one position (ranking 1). While based on the percentage of factors the percentage of the number of items formed, Factor Type Learning Method (X10) is the most influential factor because it has a percentage value of 81.9%.Keywords: Estimation 1, Construction Economics Engineering, Student learning outcomes