Dampak Kenaikan Harga Solar Non Subsidi Terhadap Harga Satuan Pekerjaan Riska, Tiara Jeneri; Suraji, Akhmad; Ophiyandri, Taufika
Ranah Research : Journal of Multidisciplinary Research and Development Vol. 6 No. 6 (2024): Ranah Research : Journal Of Multidisciplinary Research and Development (Septemb
Publisher : Dinasti Research

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38035/rrj.v6i6.1122

Abstract

Penelitian ini bertujuan untuk mengetahui bagaimana pengaruh kenaikan BBM terhadap harga satuan pekerjaan yang menggunakan alat berat. Dampak dari kenaikan BBM itu sendiri akan berdampak langsung kepada penggunaan alat berat dalam pengerjaan proyek konstruksi, dengan menganalisa harga satuan pekerjaan yang menggunakan alat berat berdasaran analisa biaya produktivitas alat berat per jam (sewa alat berat) dengan menggunakan analisa sensitivitas metoda regresi. Metode penelitian ini adalah deskripstif kuantitatif karena penelitian ini mendeskripsikan hasil riset berupa angka persentase dan statistik. Teknik pengumpulan data pada penelitian ini hanyalah berupa data sekunder dengan dokumentasi maupun yang bersifat kuantitatif. Hasil penelitian ini adalah item pekerjaan galian proyek jalan ini memiliki nilai persentase kenaikan tertinggi pada harga satuan pekerjaan sebesar 19,65% untuk kenaikan solar non subsidi sebesar 40%. Nilai T hitung yang menggunakan metoda regresi untuk analisa sensitivitas terbesar terdapat pada proyek jalan terdapat pada item pekerjaan galian (mekanis), pada proyek SDA pekerjaan mobilisasi dan demobilisasi alat berat dan pada proyek gedung juga pekerjaan mobilisasi alat berat. Disimpulkan bahwa proyek jalan memiliki hubungan yang sangat signifikan antara kenaikan BBM dan biaya proyek konstruksi karena pada proyek jalan menggunakan banyak jenis alat berat.
Identifikasi Faktor Penting Dalam Manajemen Material Pelaksanaan Pekerjaan Konstruksi Jalan Lidya, Vivi Nalty; Ophiyandri, Taufika; Hidayat, Benny
Ranah Research : Journal of Multidisciplinary Research and Development Vol. 6 No. 6 (2024): Ranah Research : Journal Of Multidisciplinary Research and Development (Septemb
Publisher : Dinasti Research

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38035/rrj.v6i6.1123

Abstract

Penelitian ini bertujuan untuk mengindentifikasi proses dan menyusun hirarki fakto penting manajemen material untuk pekerjaan konstruksi jalan. Proyek jalan berbeda dengan proyek gedung, salah satu yang membedakan proyek jalan adalah jumlah material yang dibutuhkan sangat besar, material terbesar berada pada item pekerjaan timbunan. Sehingga dibutuhkan manajemen material dalam konstruksi jalan yang memegang peranan penting dalam menjamin kelancaran dan kualitas proyek. Penelitian ini menggunakan metode kualitatif yang dipakai dengan wawancara mendalam dan untuk pengolahan data menggunakan content analisis serta kuantitatif menggunakan kuesioner yang diolah dengan analytical hierarchy process. Hasil penelitian menunjukan pemilihan material yang ditunjukkan oleh nilai bobot sebesar 31%, hal ini menunjukkan faktor pemilihan material berpengaruh penting dalam proses manajemen material yang juga berdampak terhadap keberhasilan proyek konstruksi sebesar 56%,= berpengaruh terhadap keberhasilan pelaksanaan pekerjaan konstruksi jalan. Selanjutnya faktor penting kedua pada proses manejemen material adalah menjaga persediaan material 16% menunjukan proyek konstruksi yang tepat waktu. Faktor penting ketiga hasil penelitian ini adalah pemilihan pemasok material sebesar 13% menunjukan biaya yang murah dengan mutu yang bagus dengan mempertimbangkan pemasok material yang akan dipilih. Dapat disimpulkan bahwa manajemen material yang efektif dapat meningkatkan kualitas dan hasil akhir proyek konstruksi jalan.
PENGEMBANGAN JULO-JULO DALAM MENINGKATKAN EKONOMI PEDAGANG PASAR SANGKUMPAL BONANG KOTA PADANGSIDIMPUAN Replita, Replita; Effendi, Nursyirwan; Ophiyandri, Taufika; Miko, Alfan; Hardana, Ali
Jurnal Masharif al-Syariah: Jurnal Ekonomi dan Perbankan Syariah Vol 10 No 2 (2025)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30651/jms.v10i2.25795

Abstract

Penelitian ini bertujuan untuk menganalisis dampak pengembangan Julo-Julo dalam meningkatkan ekonomi pedagang di Pasar Sangkumpal Bonang, Kota Padangsidimpuan. Julo-Julo merupakan sebuah inovasi platform digital yang dirancang untuk membantu pedagang pasar tradisional dalam pemasaran, transaksi, dan manajemen operasional. Metode penelitian yang digunakan adalah pendekatan campuran (mixed methods) dengan pengumpulan data melalui observasi, wawancara, dan kuesioner terhadap 50 pedagang. Hasil penelitian menunjukkan bahwa penggunaan Julo-Julo memberikan dampak positif yang signifikan, di antaranya: (1) peningkatan pendapatan pedagang sebesar 83,33%, (2) kepuasan pedagang yang tinggi, terutama dalam hal pemasaran digital dan efisiensi transaksi, (3) peningkatan jumlah konsumen sebesar 100%, dengan kontribusi besar dari konsumen online, serta (4) faktor utama peningkatan pendapatan adalah pemasaran digital dan transaksi digital. Namun, terdapat beberapa tantangan yang perlu diatasi, seperti kurangnya literasi digital dan ketersediaan jaringan internet yang tidak stabil
Evaluation of the Implementation of Payments for Building Construction Projects using APBD Funds According to Contract Law Mardhiyah, Agil Resfani; Hidayat, Benny; Ophiyandri, Taufika
CIVED Vol. 12 No. 1 (2025): March 2025
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.683

Abstract

Late payment is a common problem that often occurs in construction projects and can hinder project completion. Previous studies have stated that factors that influence late payment include the financial condition of the project owner and poor business management as well as delays in payment by the project owner and others. Previous studies only discussed the factors that cause late payment. This study aims to identify factors that influence late payment and find solutions to overcome them. The research method used is qualitative with in-depth interviews with parties involved in construction projects, such as PPK and Contractors. Data were processed using interview transcripts and analyzed with thematic analysis to identify emerging patterns or themes. The results of the study indicate that the procedures for implementing payments have been regulated in contracts and related regulations. Factors that cause late payment include poor communication, administrative negligence, empty regional treasury, and unclear regulations. The proposed solution is to conduct training for HR and hold daily or weekly meetings involving all related parties. This research is expected to contribute to increasing payment efficiency in construction projects. This study has limitations, namely the lack of quantitative data and local context, limited samples, focusing on internal factors.
Evaluation of Development Projects on Special Allocation Funds Sources for the Pariaman City Self-Help Housing Program Setia, Rhama Budi; Ophiyandri, Taufika; Suraji, Akhmad
CIVED Vol. 12 No. 1 (2025): March 2025
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.685

Abstract

This study evaluates the success rate of the program (target accuracy, satisfaction, and community self-reliance) of the special allocation fund (DAK) self-help housing assistance in Pariaman City, a coastal area with a majority of low-income residents and many uninhabitable houses. This program is part of the government's efforts to overcome poverty and deal with slum areas, as stipulated in the Minister of PUPR Regulation No. 7 of 2022. Previous studies may have only focused on one or two dimensions. This study uses a mixed method of quantitative and qualitative. Quantitative data were collected through a questionnaire with a Likert scale to measure target accuracy, satisfaction, and community self-reliance. Qualitative data were collected through in-depth interviews with beneficiaries and related parties to understand their context and experiences related to the program. Data were analyzed quantitatively using descriptive statistics and qualitatively using thematic analysis. The results showed that the program was right on target (more than 80% of respondents gave the highest score), the level of satisfaction was high (more than 70% of respondents gave a score of 4 or 5), and community participation was very good (84.29% of beneficiaries were involved in house construction on average). These findings provide strong empirical evidence of the success of the DAK self-help housing assistance program in Pariaman City. The local government can use the results of this study to strengthen the DAK self-help housing assistance program, for example by increasing budget allocation or expanding the reach of the program.
Risk Analysis of Project Owners As Actors in the Procurement of Government Goods and Services in Construction Work Adrian, Arief; Hidayat, Benny; Ophiyandri, Taufika
CIVED Vol. 12 No. 1 (2025): March 2025
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v12i1.725

Abstract

In the implementation of PBJP construction work, potential risks that can affect the achievement of PBJP goals, namely producing the right goods/services according to the budget, but this has still not been researched in the Agam Regency area. Therefore, this study aims to identify and analyze the risks that can occur to Project Owners/Owners (PBJP) in the implementation of construction in the area. The risk identification method was carried out through a pilot survey of project owners as well as previous literature studies. Meanwhile, the risk assessment was carried out using a questionnaire distributed to PBJP actors, referring to the Australian/New Zealand Risk Management standard (AS 4360). Risks are grouped based on their risk levels at various stages, namely planning, procurement, selection, election implementation, and handover. The results of the risk assessment showed that there were no risks with extreme categories, but there were 10 risks with high categories, 53 risks with medium categories, and 1 risk with low categories. The results of this study are expected to contribute to the development of construction risk management policies and practices in the Agam Regency area, as well as provide new insights in research related to PBJP in other areas that have similar characteristics.
A Contractor Strategies in Concurrent Multi Construction Project Management Fadli, Jefriyan; Suraji, Akhmad; Ophiyandri, Taufika
Menara: Jurnal Teknik Sipil Vol. 20 No. 2 (2025): Menara : Jurnal Teknik Sipil
Publisher : Teknik Sipil, Fakultas Teknik Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/jmenara.v20i2.54298

Abstract

Industri konstruksi menghadapi tantangan dalam mengelola beberapa proyek secara bersamaan atau Concurrent Project Management (CPM), terutama bagi kontraktor kecil-menengah yang memiliki keterbatasan dalam sumber daya. Pengelolaan tenaga ahli, keuangan, peralatan, dan material menjadi faktor krusial dalam menentukan keberhasilan proyek multi. Penelitian ini bertujuan untuk menganalisis strategi kontraktor dalam CPM untuk memastikan efisiensi dan efektivitas dalam pelaksanaan proyek. Metode penelitian yang digunakan adalah pendekatan kualitatif dengan wawancara semi-terstruktur terhadap dua kontraktor kecil-menengah, CV.Malaya Cipta Nusa dan CV.Putyra Swarna Dwipa, yang mengelola lima proyek konstruksi secara bersamaan di Kabupaten Batang Hari. Data yang diperoleh dianalisis secara tematik untuk mengidentifikasi strategi yang diterapkan dalam pengelolaan sumber daya. Hasil penelitian menunjukkan bahwa strategi utama dalam CPM meliputi rotasi tenaga kerja antar proyek untuk mengoptimalkan produktivitas, fleksibilitas dalam alokasi dana guna menjaga kelancaran arus kas, penyewaan peralatan berat sebagai langkah efisiensi biaya, serta pemanfaatan sisa material antar proyek untuk mengurangi pemborosan. Meskipun strategi ini efektif, tantangan tetap ada, seperti keterbatasan tenaga ahli, risiko keuangan akibat penggunaan dana lintas proyek, serta perlunya pengawasan ketat terhadap peralatan dan material. Oleh karena itu, implementasi sistem manajemen berbasis teknologi dan pengawasan yang lebih ketat direkomendasikan untuk meningkatkan efisiensi dan efektivitas pelaksanaan proyek multi konstruksi bagi kontraktor.
The IDENTIFIKASI TUGAS DAN TANGGUNG JAWAB SERTA PERMASALAHAN KONSULTAN PENGAWAS DI SUMATERA BARAT Helmi, Yusvina; Hidayat, Benny; Ophiyandri, Taufika
Menara: Jurnal Teknik Sipil Vol. 20 No. 2 (2025): Menara : Jurnal Teknik Sipil
Publisher : Teknik Sipil, Fakultas Teknik Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/jmenara.v20i2.54331

Abstract

Pembangunan infrastruktur di Indonesia terus mengalami pertumbuhan yang pesat, didukung oleh alokasi anggaran yang terus meningkat, mencapai Rp 422,7 triliun pada tahun 2024. Konsultan pengawas memiliki peran strategis dalam memastikan proyek konstruksi berjalan sesuai dengan spesifikasi, waktu, dan anggaran yang telah ditetapkan. Namun, praktik di lapangan menunjukkan berbagai kendala seperti kurangnya koordinasi dengan masyarakat, pelaporan yang tidak konsisten, dan dokumentasi yang tidak lengkap. Penelitian ini bertujuan untuk mengevaluasi kesesuaian tugas konsultan pengawas dengan Kerangka Acuan Kerja (KAK) dan mengidentifikasi permasalahan yang dihadapi. Pendekatan kualitatif digunakan dengan wawancara semi-terstruktur terhadap 10 konsultan pengawas di Sumatera Barat. Hasil penelitian menunjukkan bahwa sebagian besar tugas konsultan pengawas telah dilaksanakan dengan baik, dengan rata-rata pencapaian 83,64%-100%. Namun demikian, masih terdapat permasalahan pada beberapa tugas seperti koordinasi dengan masyarakat (50%), penggunaan identifikasi (20%), dan pelaporan bahan yang ditolak serta dokumentasi berita acara penyerahan (10%) yang memerlukan perbaikan. Masalah-masalah ini berpotensi mengurangi efektivitas pengawasan dan menghambat keberhasilan proyek. Penelitian ini merekomendasikan untuk meningkatkan koordinasi sosial, digitalisasi pelaporan, dan standarisasi dokumentasi untuk mendukung keberhasilan proyek konstruksi.
Pengembangan Julo-Julo dalam Meningkatkan Ekonomi Pedagang Pasar Sangkumpal Bonang Kota Padangsidimpuan Replita, Replita; Effendi, Nursyirwan; Ophiyandri, Taufika; Miko, Alfan; Hardana, Ali
Jurnal Masharif al-Syariah: Jurnal Ekonomi dan Perbankan Syariah Vol 10 No 2 (2025)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30651/jms.v10i2.25795

Abstract

Penelitian ini bertujuan untuk menganalisis dampak pengembangan Julo-Julo dalam meningkatkan ekonomi pedagang di Pasar Sangkumpal Bonang, Kota Padangsidimpuan. Julo-Julo merupakan sebuah inovasi platform digital yang dirancang untuk membantu pedagang pasar tradisional dalam pemasaran, transaksi, dan manajemen operasional. Metode penelitian yang digunakan adalah pendekatan campuran (mixed methods) dengan pengumpulan data melalui observasi, wawancara, dan kuesioner terhadap 50 pedagang. Hasil penelitian menunjukkan bahwa penggunaan Julo-Julo memberikan dampak positif yang signifikan, di antaranya: (1) peningkatan pendapatan pedagang sebesar 83,33%, (2) kepuasan pedagang yang tinggi, terutama dalam hal pemasaran digital dan efisiensi transaksi, (3) peningkatan jumlah konsumen sebesar 100%, dengan kontribusi besar dari konsumen online, serta (4) faktor utama peningkatan pendapatan adalah pemasaran digital dan transaksi digital. Namun, terdapat beberapa tantangan yang perlu diatasi, seperti kurangnya literasi digital dan ketersediaan jaringan internet yang tidak stabil
DAMPAK KENAIKAN HARGA SOLAR NON SUBSIDI TERHADAP HARGA SATUAN PEKERJAAN Riska, Tiara Jeneri; Akhmad Suraji, Akhmad; Ophiyandri, Taufika
RADIAL : Jurnal Peradaban Sains, Rekayasa dan Teknologi Vol. 12 No. 1 (2024): RADIAL : Jurnal Peradaban Sains, Rekayasa dan Teknologi
Publisher : Universitas Bina Taruna Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37971/radial.v12i1.452

Abstract

Kenaikan BBM ini berdampak secara langsung maupun tak langsung terhadap biaya konstruksi. Dampak dari kenaikan BBM itu sendiri akan berdampak langsung kepada penggunaan alat berat dalam pengerjaan proyek konstruksi, dengan menganalisa harga satuan pekerjaan yang menggunakan alat berat berdasaran analisa biaya produktivitas alat berat per jam (sewa alat berat) dengan menggunakan analisa sensitivitas metoda regresi hasil penelitian ini disimpulkan bahwa proyek jalan memiliki hubungan yang sangat signifikan antara kenaikan BBM dan biaya proyek konstruksi karena pada proyek jalan menggunakan banyak jenis alat berat, selain itu pada item pekerjaan galian proyek jalan ini memiliki nilai persentase kenaikan tertinggi pada harga satuan pekerjaan sebesar 19,65% untuk kenaikan solar non subsidi sebesar 40%. Nilai T hitung yang menggunakan metoda regresi untuk analisa sensitivitas terbesar terdapat pada proyek jalan terdapat pada item pekerjaan galian (mekanis), pada proyek SDA pekerjaan mobilisasi dan demobilisasi alat berat dan pada proyek gedung juga pekerjaan mobilisasi alat berat.