Claim Missing Document
Check
Articles

Found 9 Documents
Search

Perhitungan Struktur Rangka Batang Menggunakan Metode Titik Buhul Pada Jembatan Way Mamua Desa Hitu Rudi, Daud; Frans, Pieter Laurens; Kakaly, Sulastri
Jurnal Penelitian Multidisiplin Bangsa Vol. 1 No. 4 (2024): September
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v1i4.58

Abstract

Jembatan Way Mamua terletak di Dusun Mamua, Kecamatan Leihitu, Kabupaten Maluku Tengah. Jembatan ini memiliki struktur rangka batang tipe Warren truss. Struktur rangka utamanya terdiri dari batang horizontal atas, batang horizontal bawah dan batang diagonal. Pada setiap batang struktur rangka utamanya memiliki dimensi penampang baja yang sama dan juga berbeda yang dapat diketahui dari berat komponen masing-masing profil dan dimensi penampangnya. Tujuan dari penelitian ini adalah untuk mendimensi penampang rangka batang baja  Way Mamua menggunakan metode titik buhul, menganalisis gaya-gaya batang yang bekerja pada struktur rangka jembatabn serta merencanakan sambungan baut pada jembatan Way Mamua. Dari hasil analisis dimensi penampang batang bawah dengan gaya batang maksimum sebesar 11862,87 kN dapat menggunakan profil baja Profil Baja WF 419 x 407 x 30,61 x 49,23 kN, batang bawah dengan gaya batang maksimum 10234,23 kN, menggunakan Profil Baja WF 387 x 397 x 20,83 x 33,35 kN batang diagonal, gaya batang maksimum sebesar 5048,55 kN, menggunakan Profil Baja WF 375 x 374 x 16,76 x 33,35 serta jumlah baut yang dipakai untuk gaya batang maksimum sebesar 11862,87 kN, sebanyak 46 baut, dipasang 2 baris, jarak antar baut 95mm dan jarak antar baut ke tepi 50mm.
KINERJA OPERASIONAL SIMPANG TAK BERSINYAL BATU MERAH - MARDIKA Maitimu, Anthoneta; Wairatta, Frets Axl; Kakaly, Sulastri
JURNAL SIMETRIK Vol. 14 No. 2 (2024)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v14i2.2776

Abstract

Simpang tak bersinyal Batu Merah-Mardika Kota Ambon perlu di analisis tingkat kinerja operasionalnya. Kapasitas dasar jalan, perilaku lalu lintas, volume arus lalu lintas, beragam jenis kendaraan, hambatan samping yang tinggi, pertumbuhan perekonomian maupun perniagaaan menjadi penyebab utama kemacetan sering terjadi. Untuk mengetahui kinerja opersional simpang maka perlu dilakukan penelitian atau analisis pada simpang tak bersinyal Batu Merah – Mardika Kota Ambon .Data yang dibutuhkan dalam penelitian ini adalah data arus lalu lintas, hambatan samping, kecepatan,geometrik jalan serta jumlah penduduk. Data kemudian dianalisis menggunakan MKJI (Manual Kapasitas Jalan Indonesia) Tahun 1997 dan MS Excel. Berdasarkan hasil analisis data, dapat diketahui Jl. Jenderal Sudirman – Jl. Kesatrian pada jam puncak pada hari Rabu 31 Juli 2024 pukul 17.00 – 18.00 WIT memiliki DS = 2.16 dengan Qtot = 5573 C= 2575 dengan hambatan samping yang sangat tinggi serta kecepatan rata-rata 11.76 km/jam dan Jl. Rijali – Jl. Mutiara pada jam puncak 17.00 – 18.00 WIT dengan DS= 2.14 per arus lalu lintas 5585 smp/jam dan kapasitas sebesar 2613 serta hambatan samping yang sangat tinggi. Faktor yang mempengaruhi kinerja operasional simpang adalah tingginya hambatan samping, besarnya volume arus lalu lintas dari kapasitas simpang yang tersedia, banyaknya pelanggaran lalu lintas seperti melawan arah dan parkir pada badan jalan. Kata kunci : Rekayasa Lalu Lintas, Simpang Tak Bersinyal, Derajat Kejenuhan
Pengaruh Karakteristik Tenaga Kerja Terhadap Produktivitas Kerja Pada Proyek Pembangunan Gedung Baru Madrasah Ibtidaiyah Negeri 5 Kabupaten Maluku Tengah Saleh, Arsana; Serang, Rudi; Abdin, Maslan; Matitaputty, Apri Adam; Kakaly, Sulastri
Jurnal Penelitian Multidisiplin Bangsa Vol. 1 No. 6 (2024): November
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v1i6.77

Abstract

Produktivitas kerja adalah salah satu faktor utama dalam kesuksesan suatu proyek konstruksi. Salah satu faktor yang memiliki potensi besar dalam mempengaruhi produktivitas kerja adalah karakteristik tenaga kerja. Karakteristik tenaga kerja mencakup berbagai aspek seperti tingkat kedisiplinan, lingkungan, keterampilan, dan faktor lain yang terkait dengan individu yang bekerja dalam suatu proyek konstruksi. Pada pembagunan Gedung Ruang Kelas Baru Madrasah Ibtidaiyah Negeri 5 Maluku Tengah masalah yang yang terjadi  yaitu para tenaga kerja yang sering datang terlambat, keterbatasan lokasi proyek, dan kurangnya keterampilan para pekerja.Dari ketiga faktor di atas  berpengaruh terhadap proyek kontruksi yang di kerjakan. Tujuan dari penelitian ini untuk Menganalisis hubungan yang signifikan antara karakteristik tenaga kerja terhadap produktivitas kerja dan Menganalisis pengaruh karakteristik tenaga kerja terhadap produktivitas kerja pada proyek pembangunan Gedung Ruang Kelas Baru Madrasah Ibtidaiyah Negeri 5 Maluku Tengah. Penelitian  Proyek Pembangunan Gedung Ruang Kelas Baru  Madrasah Ibtidaiyah Negeri 5 Maluku Tengah yang berlokasi di Jln.Panditalow-Tulehu, Kecamatan Salahutu kabupaten Maluku Tengah, Provinsi Maluku. Berdasarkan hasil analisis karakterisitk tenaga kerja memiliki Hubungan yang signifikan terhadap produktivitas (Y), dengan nilai variabel kedisiplinan (X1) yaitu sebesar 23,2 %, variabel faktor lingkungan sebesar 18,3 %, dan variabel keterampilan (X3) sebesar 16,7 %. Dengan demikian variabel kedisiplinan (X1) memiliki pengaruh yang lebih dominan terhadap variabel Y. sedangkan pengaruh karakteristik tenaga kerja terhadap produktivitas kerja sebesar 0,582 atau 58,2% dan sisahnya sebesar 41,8% dipengaruhi oleh variabel lain yang tidak di uji dalam penelitian ini.
Pengaruh Pengawasan Terhadap Pekerja CV. Souhuru Indah Pada Proyek Pembangunan SPAM Dan Jaringan Perpipaan Di Desa Tawiri, Kecamatan Teluk Ambon Leklioy, Fito Rivaldo; Serang, Rudi; Langi, Jeffrey Payung; Matitaputty, Apri Adam; Kakaly, Sulastri
Jurnal Penelitian Multidisiplin Bangsa Vol. 1 No. 6 (2024): November
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v1i6.78

Abstract

Dalam rangka mencapai tujuan suatu organisasi, fungsi pengawasan merupakan unsur yang penting demi kelangsungan dan pertumbuhan organisasi yang bersangkutan. Pengawasan terhadap jaringan perpipaan adalah suatu proses yang melibatkan pemantauan dan pengelolaan sistem pipa.Tujuan utama dari pengawasan ini adalah untuk memastikan kinerja yang aman, efisien, dan berkelanjutan dari jaringan perpipaan, pengawasan ini melibatkan serangkaian kegiatan untuk mengidentifikasi potensi masalah, mencegah kegagalan, dan merespons situasi darurat. Pada Penelitian ini Penulis menggunankan metode penelitian Kuantitatif,yakni metode penelitian yang berfokus pada pengumpulan dan analisis data berdasarkan angka. Hal ini diperlihatkan penulis dengan melakukan penyebaran Kuisioner berisia variabel X (Pengawasan) dan Variabel Y (Pekerja) kepada  responden  yang hasilnya akan diolah dengan menggunakan SPSS V.26. Metode analisis data dimulai dari uji validitas, uji reliabilitas, analisis regresi linear berganda untuk menentukan uji hipotesis yaitu uji t dan uji f,uji Koefisien Determinasi, Uji Dominan (Koefisien Determinasi Parsial). Hasil Penelitan diperoleh Pengaruh Pengawasan terhadap pekerja pada CV.Souhuru Indah Pada Proyek Pembangunan Spam Dan Jaringan Perpipaan Di Desa Tawiri, Kecamatan Teluk Ambon memiliki yang dimana disebabkan oleh 3 Faktor Pengawasan dengan nilai pengaruh,yaitu:Faktor standar Opersaional (X1) sebesar 70,6%, Faktor  Manajemen (X2) sebesar 46,1%, Faktor manusia (X3) sebesar 63,3% yang dimana ntuk Faktor Pengawasan X1 dan X3 memiliki nilai korelasi yang kuat karena mimiliki nili R Square > 50% sedanagn X2 memiliki korelasi yang lemah karena <  50% Dan faktor yang paling dominan dilihat dari hasil nilai koefisien beta tertinggi yaitu ada pada Pengaruh Pengawasan Faktor Standar Operasional dengan nilai beta sebesar (50.5%) atau (0.505), berpengaruh dominan terhadap produktivitas Pekerja.
Pengaruh Beban Kendaraan Terhadap Kerusakan Perkerasan Ruas Jalan Mr. Chr. Soplanit Kota Ambon Suneth, Rika Abisa; Siahaya, Vera Th. C.; Kakaly, Sulastri
JURNAL MULTIDISIPLIN ILMU AKADEMIK Vol. 1 No. 6 (2024): Desember
Publisher : CV. KAMPUS AKADEMIK PUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61722/jmia.v1i6.3287

Abstract

Mr. Chr. Soplanit Rumah Tiga Road Section has road damage that is quite disruptive to traffic activities due to the presence of a company that causes heavy vehicles to pass by. The activity of heavy vehicles such as trontons operated by PT. Trisamudra will pass four to five times every day at certain times ranging from 21.00 - 24.00. In addition to trontons, there are also goods trucks, pick-ups, and large trucks that pass 10-15 times to distribute Gas and other Goods. The survey conducted for 3 days of observation Monday, Wednesday and Saturday starting at 06.00 - 24.00 showed the highest volume on Saturday, namely 27,996 vehicles per day per 2 directions and the lowest volume on Wednesday, namely 24,334 vehicles. The average volume of vehicles is 26,388 vehicles per day per 2 directions. From the results of the values ​​obtained in the LHR calculation, it can be concluded that the Mr Chr Soplanit road section is included in high traffic with the number of LHRs greater than 10,000/day.
Analisis Saluran Drainase Pengendali Limpasan Permukaan Ruas Jalan Dusun Telaga Piru Kabupaten Seram Bagian Barat Tuhelelu, Juraidah Lili Yanti; Hamkah, Hamkah; Kakaly, Sulastri
JURNAL MULTIDISIPLIN ILMU AKADEMIK Vol. 2 No. 1 (2025): Februari
Publisher : CV. KAMPUS AKADEMIK PUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61722/jmia.v2i1.4017

Abstract

In the drainage channel analysis of the Telaga-Piru Hamlet section in West Seram District, West Seram Regency, Maluku Province. The research location road is 3 km long and 4 m wide. This surface runoff is caused by high intensity rain, so that the Telaga Piru road has a damaged surface, some of which is even covered by sediment and water that is carried onto the road. From the results of the 10 year return period calculation, the design rainfall was 192.518 mm, with an average water requirement of 125 liters and a water usage time of 24 hours/day from the water requirement discharged each day, namely 85% with population plant presentations of 0,21% peryear. So that the population of telaga hamlet in 2029 was 659 people/person.Then the discharge that enters the channel is 0,006 m³/hour/day. So the results of the analysis of the amount of runoff entering the Telaga Hamlet road section, Qᵣ = 0.522 m³/second and Qₛ = 0.527 m³/second, show that the channel on the Telaga Hamlet road section can accommodate the runoff discharge.
Analisis Perbandingan Biaya dan Waktu Pekerjaan Antara Box Culver Convensional dan Box Culver Pra Cetak Pada Proyek Pembangunan Jalan Oma – Wassu Pulau Haruku Hattu, Glen Michell; Lewakabessy, Godfried; Kakaly, Sulastri
JURNAL ILMIAH NUSANTARA Vol. 2 No. 1 (2025): Jurnal Ilmiah Nusantara
Publisher : CV. KAMPUS AKADEMIK PUBLISING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61722/jinu.v2i1.4107

Abstract

In the thesis research analysis of the comparative cost and time of work between conventional box culverts and precast box culverts in the Oma – Wassu Road Construction Project, Haruku Island, there are two concrete work methods used, namely the conventional method and the precast method. If it is in the field, printing or casting area is needed, but if it is done in a factory, it does not require land, but requires transportation, transportation. For precast construction, the implementation is faster than conventional construction because the production process can be carried out simultaneously with the implementation of the structure.Through this study, an analysis of the cost and time required for Box Culvert work will be carried out to determine the level of efficiency and effectiveness between the conventional method and the precast method, as a reference for consideration and input for companies in making decisions related to project implementation methods. Through this study, an analysis of the cost and time required for Box Culvert work will be carried out to determine the level of efficiency and effectiveness between the conventional method and the precast method, as a reference for consideration and input for companies in making decisions related to project implementation methods. From the results of the research on the cost budget comparison plan that has been carried out, it can be concluded, first, that the cost for the implementation of conventional box culvert work is Rp. 200,154,452,000, while for the implementation of precast box culvert work is Rp. 1,520,908,000. The second is for the implementation time of conventional concrete box culvert work on the Oma – Wassu Road Construction Project for mobilization for 9 weeks plus Divisions 3 and 7 for 2 weeks, then the total is 11 weeks of work and the implementation of pre-cast box culverts is 15 weeks of work.
Evaluasi Saluran Drainase dan Rencana Anggaran Biaya Ruas Jalan Sumeith Pasinaro – Watui Kabupaten Seram Bagian Barat Hattu, Alfredo Yefta; Hamkah, Hamkah; Kakaly, Sulastri
Jurnal Penelitian Multidisiplin Bangsa Vol. 2 No. 5 (2025): Oktober
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v2i5.602

Abstract

Saluran drainase pada ruas jalan Sumeith Pasinaro - Watui yang tentunya mempengaruhi aktivitas di wilayah ini akibat longsor yang sering terjadi, menyebabkan banjir dan aliran air, sehingga saluran drainase tidak mampu menampung aliran air hujan. Dalam evaluasi saluran drainase pada ruas jalan Sumeith Pasinaro - Watui, tujuan utamanya adalah untuk menentukan volume aliran air, agar dapat merencanakan dimensi saluran dan menganalisis berapa anggaran yang dibutuhkan dalam evaluasi saluran drainase. Metode penelitian yang digunakan adalah metode pengumpulan dan analisis data yang terdiri dari data primer dan data sekunder, yang kemudian dianalisis menggunakan metode Log Pearson Tipe III dan Gumbel berdasarkan analisis hidrologi, kemudian mengevaluasi saluran yang ada dengan volume aliran yang direncanakan, dan memperkirakan anggaran biaya dengan menggunakan AHSP 2022. Berdasarkan hasil perhitungan debit aliran permukaan pada ruas jalan Sumeith Pasinaro - Watui sebesar 0,337 m³/detik dan debit saluran sebesar 0,066 m³/detik, sehingga ditemukan bahwa saluran drainase tidak dapat menampung debit aliran permukaan. Oleh karena itu, dalam perancangan ulang dimensi saluran drainase dengan panjang 250 m, lebar atas saluran 2 m, lebar bawah saluran 1,5 m, dan tinggi saluran 1,1 m dengan debit saluran 0,372 m³/det, ditemukan bahwa dimensi saluran baru dapat menampung debit aliran permukaan. Dan nilai Anggaran Biaya Rencana adalah Rp 492.594.000
Perencanaan Saluran Drainase Untuk Mengurangi Limpasan Permukaan Jalan Pada Ruas Jalan Dusun Tapinalu – Ulatu Desa Luhu Kecamatan Huamual Belakang Loklomin, Nur Alda; Betaubun, Renny James; Kakaly, Sulastri
Jurnal Penelitian Multidisiplin Bangsa Vol. 2 No. 5 (2025): Oktober
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v2i5.603

Abstract

Jalan di dusun Tapinalu – Ulatu adalah jalan yang terdapat di desa Luhu, Ruas jalan ini menghubungkan antara dusun – dusun Huamual lainnya. Ada beberapa titik yang sudah memiliki saluran drainase, sedangkan pada sebagian besar titik belum memiliki saluran drainase. Ini menjadi sebuah permasalahan, seiring berjalannya waktu terjadi genangan air di jalan pada saat curah hujan yang tinggi, akan menjadi faktor yang mempengaruhi struktur jalan, upaya yang dilakukan yaitu dengan melakukan perencanaan saluran drainase. Metode penelitian yang digunakan adalah metode pengumpulan dan analisis data. Jenis data dalam penelitian ini adalah data primer dan sekunder, kemudian dianalisis menggunakan metode Log Person III berdasarkan analisa hidrologi dan analisa hidrolika serta perencanaan berdasarkan besarnya debit saluran eksisting. Berdasarkan hasil perhitungan untuk kala ulang 10 tahun diperoleh curah hujan rencana sebesar 326,587 mm, dengan presentase pertumbuhan penduduk sebesar 0,04% pertahun sehingga jumlah penduduk Dusun Ulatu di tahun 2029 adalah 1.629 jiwa. Dari hasil analisa jumlah debit limpasan (Qr) yang masuk pada saluran drainase Ruas Jalan Dusun Tapinalu – Ulatu adalah 0,089 m³/detik, dan untuk debit saluran (Qs) drainase adalah 1,486 m³ detik. Dari hasil perencanaan dimensi saluran diperoleh lebar bagian atas 58 cm, lebar dasar saluran 40 cm, dan  ketinggian saluran 74 cm.