Claim Missing Document
Check
Articles

ANALISIS RENCANA ANGGARAN BIAYA DAN DURASI PEKERJAAN PERKERASAN JALAN PADA PROYEK PENINGKATAN JALAN WEEKAPODA-DIKIRA KABUPATEN SUMBA BARAT DAYA Fajar, Chandra; Oetomo, Wateno
Jurnal Sains Riset Vol 13, No 2 (2023): September 2023
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM) Universitas Jabal Ghafur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47647/jsr.v13i2.1656

Abstract

ABSTRAKPerhitungan rencana angggaran biaya dilaksanakan dengan mendetail sehingga tidak terdapat kesalahan ketika proses pelaksanaan. Berhasil tidaknya sebuah protek dapat ditetetapkan oleh pihak yang menyediakan jasa guna melaksanakan penyelesaian pembangunan dengan optimal cepat, dan tepat, dengan pembiyaan yang optimal sesuai dengan standart pembiayaan konstruksi serta pemanfaatan bahan dengan kualitas yang baik.  Pada ruas jalan Weekapoda-Dikira Sumba Barat Daya hendak dilaksanakan rencana peningkatan kelas jalanan yakni dari kelas III pada kelas II dan pelebaran jalan, rumusan masalah penelitian ini adalah berapa besar volume hotmix, biaya serta durasi dalam penyelesaian proyek peningkatan perkersan jalan Weekapoda-Dikira Sumba Barat Daya, dengan tujuan menganalisis besar volume, biaya serta durasi. Langkah yang dilakukan dalam penelitian ini menghitung semua item pekerjan yang adalam proyek yang sedang dihitung dalam penyelesaian proyek sehingga mendapatkan hasil volume 1.558,13 ton, RAB pada proyek peningkatan jalan ke kelas II total harga Rp. 10.527.876.142.79. dengan durasi 240 hari kalender.Kata kunci: Rencana anggaran biaya, jalan, perencanaan
Analisis Prediksi Kondisi Kekerasan Jalan Raya menggunakan Aplikasi IRI untuk Penanganan Jalan (Studi Kasus: Ruas Jalan Nasional Kota Jalan Nasional Kota Ruas, Gresik-Sadang) Kogoya, Desmin; Nugroho, Laksono Djoko; Oetomo, Wateno
Jurnal Spesialis Teknik Sipil (JSpTS) Vol 5 No 2 (2024)
Publisher : Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/jspts.v5i2.12065

Abstract

Road pavement conditions will overcome the decline in service levels over time. The decline in the level of road services is characterized by the occurrence of damage to the structure of the pavement layer of the road and left in a long period of time it will be able to renew the level of the layer of security that can increase security, comfort, and smoothness in crossing. The purpose of this study is to analyze the influence of traffic, pavement structure and CBR on the value of road IRI and estimation of road pavement conditions in the next 10 years. The data used in this research are traffic load, CBR, rainfall and road pavement structure. The analysis was carried out using a method developed by IRI (International Roughness Index) to predict road conditions. Data collection was carried out by surveying road damage using the ROADROID application and (RCI) the Road Condition Index as preliminary data. This research will be applied to data collected from the national road network in East Java province, specifically the Bts national road section. Gresik City - Sadang. To facilitate analysis, the road segment is divided into 3 segments with the length of each km segment starting from Km 20 to Km 40. The results of data analysis show an increase in traffic load of 31% will result in an increase in IRI value of 0.061 m / km per year, a structural value of 11.32% resulting in an increase in IRI of 0.034 m / km per growth, based on a CBR of 38% resulting in an increase IRI value of 0.017 m / km per year. The predicted results of road pavement conditions on Km 40, 20 and 20 sections are minor damaged roads, for Km 20, 40 routine maintenance sections.
Sensitivity Analysis of Revenue Potential in The Evaluation of East Surabaya Hospital Investment Astasari, Arianti Widi; Oetomo, Wateno; Sajiyo, Sajiyo
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.32

Abstract

As one of the largest cities in Indonesia, the City of Surabaya has an obligation to provide excellent health services for its residents. It goes without saying that Surabaya City Government is required to provide a General Hospital that can receive referrals from the government-owned Community Health Centers. For this reason, the Surabaya City Government built the East Surabaya Hospital which is located in Rungkut Sub-District. East Surabaya Hospital is a strategic project that requires investment feasibility analysis. The East Surabaya Hospital investment feasibility analysis was done by applying the Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP) and Benefit Cost Ratio (BCR) parameters. After the feasibility analysis results were obtained, a sensitivity analysis was done on changes in management costs and the amount of health service levy rates for each Fees alternative. Based on the results of the investment feasibility analysis of 4 (four) Fees alternatives, there are 2 alternatives that can be concluded as worthy investments, which are alternative 1 and alternative 3. Meanwhile, alternative 2 and alternative 4 are not feasible since the NPV parameter shows negative values and the IRR value is lower than the MARR value. However, based on sensitivity analysis, alternatives 2 and 4 can be feasible if alternative 2’s service rate is increased by 13.2%, and alternative 4’s service rate is increased by 2.3%. The opposite applies in alternative 1 where the investment might become unfeasible if the service rate is reduced by more than 5.4% and alternative 3 might become unfeasible if the service rate is reduced by more than 2.5%.
ANALYSIS OF PASSENGER TERMINAL SERVICE QUALITY LEVEL AT BANYUWANGI AIRPORT Nugroho, Deden; Oetomo, Wateno; Marleno, Risma
International Journal of Social Service and Research Vol. 5 No. 2 (2025): International Journal of Social Service and Research
Publisher : Ridwan Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/ijssr.v5i2.1177

Abstract

Banyuwangi Airport has become an important air transportation facility in East Java, playing a strategic role as a gateway to leading tourist areas. This study aims to identify the current level of service quality of the passenger terminal at the airport, understand the factors that influence its performance, and develop evidence-based recommendations to improve service quality. A systematic research design was implemented, encompassing stages from problem identification to data analysis and report preparation. The primary objective was to identify aspects of terminal services needing improvement to enhance user satisfaction, guided by initial observations and literature reviews. The analysis of hierarchical processes (AHP) method was employed for data analysis, focusing on assessing criteria weights through pairwise comparisons to generate improvement recommendations. The results indicate that passenger satisfaction varies significantly across different types of facilities. Several concrete steps and strategic recommendations are proposed to enhance service quality and address the identified gaps.
Value Engineering Study on Drainage Channel Works on AW. Syahranie Road, Samarinda Sundari, Sundari; Oetomo, Wateno; Marleno, Risma
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 8 No 2: March 2025
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v8i2.3261

Abstract

Flooding on roads still often occurs in several cities, especially densely populated cities. If the problem of flooding is not resolved, it can cause a bigger disaster that harms the local community, both property and lives. Jalan Aw. Syahranie Samarinda is one of the roads in Samarinda City that still often experiences flooding due to drainage channels that cannot accommodate or drain surface water. The purpose of this study is to analyze the application of Value Engineering in the Construction of the Jalan Aw. Syahranie Samarinda Drainage Channel. The solution method in this calculation uses Value Engineering Analysis. Value Engineering Analysis is carried out when the Budget Plan (RAB) is still being planned to get maximum results. This research method is carried out with five stages of Value Engineering, namely the information stage, the function analysis stage, the creative stage, the evaluation stage and the presentation stage. The weight of each criterion uses the Zero-One Method. Zero-One Analysis Matrix Method The use of the zero-one method is carried out for weighting and assigning values ??to the criteria. From the analysis results obtained that the best alternative that can replace the initial implementation method on selected work items in concrete work is Ready Mix Concrete and Conventional Concrete using a mixer. The cost savings obtained are Concrete Work with the first alternative choice, namely Conventional Concrete using a mixer, has the highest weight with a ranking of 1 and a savings value of 9.86% or Rp 397,393,488. The total overall savings for the work in VE with the overall cost of the project for the initial plan is Rp. 16,751,587,077 while the overall cost of the project after Value Engineering is Rp 16,354,193,589. With the cost saved being Rp 397,393,487.76 or 2.75% of the total project.
Feasibility Study of Investment in Clean Water System of Tirta Tuah Benua Drinking Water Company, East Kutai, Sangatta City Suparjan, Suparjan; Oetomo, Wateno; Marleno, Risma
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 8 No 2: March 2025
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v8i2.3262

Abstract

Clean water is water that is used for daily needs and becomes drinking water after being boiled first. The distribution system is a system that is directly related to consumers, which has the main function of distributing water that has met the requirements to all service areas. In addition to the problem of the clean water supply system, the problem of the capacity of the clean water treatment system (IPA) is also an obstacle with the continued growth of the population in the future. The need for clean water that meets health standards continues to increase every year, which is also experienced by Sangatta City which is in line with the increase in population and public awareness of health. Based on the background of this problem, the title of this study is Feasibility Analysis of Investment in the Clean Water System of Perumda Air Minum Tirta Tuah Benua Kutai Timur Sangatta City. The solution method in this calculation for the Feasibility Investment Analysis uses the Net Present Value (NPV) method, the Break Event Point (BEP) method. From the results of the analysis, it was obtained that the NPV value was Rp 29,586,543,082 (NPV> 0). So the investment in developing the production capacity and clean water network of Perumda Air Minum Tirta Tuah Benua, Kaliorang District, is feasible to continue. A positive NPV value or greater than (> 0) indicates that the income is greater than the invested value. The return value is obtained in the 9th year, marked by the accumulation of minus profits becoming positive after the 9th year. This explains that the investment in replacing the clean water distribution network of Perumda Air Minum Tirta Tuah Benua, Kaliorang District is feasible to run, because there is a return on investment as evidenced by the BEP value for 9 years.
Cost Control Analysis with Earned Value Method in the Construction Work of Improving the Drainage Channel on the Dr. Soetomo Road, Samarinda, East Kalimantan Atros, Pahridal; Oetomo, Wateno; Marleno, Risma
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 8 No 2: March 2025
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v8i2.3263

Abstract

Dr. Soetomo Street drainage channel in Samarinda often experiences flooding during the rainy season. With the existing puddles, it will disrupt the activities of the surrounding community. If the puddle problem is not resolved, it can cause a bigger disaster that harms the local community. If the puddle problem is not resolved, it can cause a bigger disaster that harms the local community, both property and lives. Dr. Soetomo Street is one of the roads in Samarinda City that still often experiences puddles due to drainage channels that cannot accommodate or drain surface water. This research was conducted with the intention of controlling costs using the earned value method. The research method with calculations and analysis using the Earned Value Analysis Concept. The project cost performance did not match the budgeted costs in the 14th week, the costs incurred were Rp. 6,728,308,349 with an actual weight of 59.25%. The calculation of the CPI value <1 from week 1 to week 12. This means that the project from week 1 to week 14 cost more than planned or the project was more wasteful. At the end of the review period, namely week 12, the estimated total final project cost was Rp. 6,728,308,349, taken from the EAC value. If the tendency of the project performance condition is the same as at the end of the review, namely week 12, the estimated value does not exceed the project plan cost of Rp. 4,750,000,000.
Feasibility Analysis of Clean Water System Investment of Tirta Tuah Benua Drinking Water Company, East Kutai, Kaliorang District Rahmawati, Rini; Oetomo, Wateno; Marleno, Risma
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 8 No 2: March 2025
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v8i2.3264

Abstract

Water is a very vital natural resource and is needed to determine the sustainability of life of all living things on this earth. The problem faced is that the clean water system to residential areas is not smooth, to overcome this, a good clean water distribution network and good clean water system management are needed and are able to serve the clean water needs of residents in the area. In order to realize this, a fairly large investment is needed. One of them is by implementing company investment in the form of increasing the capacity of the raw water supply system. Based on the background mentioned, the title of this study is Feasibility Analysis of Clean Water System Investment at Perumda Air Minum Tirta Tuah Benua Kutai Timur, Kaliorang District. The solution method in this calculation for Feasibility Investment Analysis uses the Net Present Value (NPV) method, the Internal Rate of Return (IRR) method. From the results of the analysis, it was obtained that the NPV value was IDR 4,627,419,730 (NPV> 0). So the investment in developing production capacity and clean water networks at Perumda Air Minum Tirta Tuah Benua, Kaliorang District, is feasible to continue. A positive NPV value or greater than (>0) indicates that the income is greater than the invested value. The IRR value obtained is 15.50% > 10% (the minimum expected interest rate), so the investment in developing the production capacity and clean water network of Perumda Air Minum Tirta Tuah Benua, Kaliorang District is feasible to be implemented.
Life Cycle Cost Concept in Maintenance of Office Building of Karhutla Workshop Uptd Kphp Berau Barat Rusmin, Rusmin; Oetomo, Wateno; Marleno, Risma
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 8 No 2: March 2025
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v8i2.3265

Abstract

In Indonesia, Building Maintenance Guidelines have been stipulated in the Regulation of the Minister of Public Works No. 24/PRT/M/2008 concerning Guidelines for Building Maintenance and Care. The construction of the office building of the KARHUTLA workshop of UPTD KPHP Berau Barat is certain to increase every year, of course it must be followed by good and planned management, not only construction costs but there are important costs that need to be considered as a reference for managers to run and operate the building, namely planning the future costs of the building itself including operational costs, maintenance costs and replacement. The Life Cycle Cost (LCC) method is one part of the building management and maintenance strategy. From the background of the problem, a study was conducted entitled Analysis of Maintenance Based on Life Cycle Cost in the Office Building of the KARHUTLA Workshop of UPTD KPHP Berau Barat. The solution method in this calculation is for Investment Feasibility Analysis using Initial Cost Analysis, Operational Cost Analysis, Maintenance and Care Cost Analysis, Demolition Cost Analysis. From the results of the analysis, it was obtained that there were three groups that compiled the Life Cycle Cost analysis plan for the UPTD Berau Barat workshop building, namely, initial construction costs, operational costs, maintenance costs and demolition costs. The initial construction cost of the UPTD Berau Barat workshop building cost Rp2,515,780,000.00 (48%), operational costs of Rp870,000,000.00 (17%), maintenance and care costs of Rp1,601,275,363.86 (30%), demolition costs of Rp251,178,000.00 (5%). The total Life Cycle Cost of the UPTD Berau Barat workshop building for 25 years is Rp5,234,233,363.86. In operational costs, the largest cost is the utility cost of Rp540,000,000.00 (62%) followed by employee salary costs of Rp330,000,000.00 (38%). In terms of maintenance costs, the largest costs are architectural costs of Rp. 1,433,035,692.66 (92%), followed by mechanical & electrical costs of Rp. 123,719,815.22 (8%).
Pengaruh Kepemimpinan dan Kerja Sama Terhadap Kinerja Tim Proyek Erection Equipment & Fabrication Piping Sea Water Reverse Osmosis 5 Wilmar Putra, Ahmad Ferdiansyah Pratama; Oetomo, Wateno
Jurnal Teknik Sipil MACCA Vol. 10 No. 2 (2025): Jurnal Teknik Sipil MACCA (JUNI 2025)
Publisher : Universitas Muslim Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33096/3gxrpv66

Abstract

Pengelolaan sumber daya manusia dalam proyek konstruksi merupakan tantangan kompleks yang membutuhkan perhatian khusus. Studi ini bertujuan untuk mengkaji dampak gaya kepemimpinan serta efektivitas kerja sama tim yang diarahkan oleh manajer proyek terhadap kinerja tim dalam pelaksanaan proyek Erection Equipment & Fabrication Piping Sea Water Reverse Osmosis 5 Wilmar yang dilaksanakan oleh PT Sampoerna Alam Samudra. Penelitian menggunakan metode kuantitatif dengan kuesioner berbasis data primer. Temuan penelitian memperlihatkan adanya dampak signifikan diantara kepemimpinan dan kinerja tim dengan nilai t 3.483 > t pada 0.05 dan signifikansi 0.001 < 0.05. Demikian pula, kerja sama juga memengaruhi kinerja tim dengan nilai t 2.881 > t pada 0.05 dan signifikansi 0.006 < 0.05. Uji F menunjukkan dampak gabungan dari kepemimpinan dan kerja sama terhadap kinerja tim adalah 11.285 dengan signifikansi 0.000. Nilai determinasi sebesar 0,283 menunjukkan bahwa kepemimpinan dan kerja sama memengaruhi kinerja tim sebesar 28,3%, sedangkan 71,7% dipengaruhi variabel lain. Kesimpulannya, efektivitas kepemimpinan dan kerja sama berkontribusi terhadap pencapaian target proyek sesuai time schedule, sehingga peran pemimpin dalam mengawasi tenaga operasional menjadi faktor penting dalam kesuksesan proyek konstruksi.
Co-Authors ., Rudiansyah Agus Firmanda, Yocky Ar Rasyied, Syahrur Rahman ARI SUSANTO Ariyanti, Menik Astasari, Arianti Widi At Taufan, Salman Atros, Pahridal Az Zahra, Karunia Bonny, Apde Budy Wiryawan Cahyono, Bagus Denastyan Agpenta Putra, Videla Didik Purnomo, Didik Djoko Nugroho , Laksono Dozier, Alpha Dwi Budi Santoso Dwi Purnomo Eriansyah, Ferdho Esti Wulandari Fadjarwati, Indah Fairuz Rahman, Refa Fajar, Chandra Fathony Maulidy, Ahmad Gede Sarya, Gede Hadi, Suprapto Hariyanto, Tri Perwira Harris, Oscar Hartatik, Nurani HARTAWAN, DEDY SUGI Helmy Darjanto, Helmy Herry Widhiarto, Herry Hudyantoro, Hudyantoro Ibnu Khaldun Ikko Bagus Ismanto Indah Purwanty, Kharisma Irfan, Ahmad Irniawan, Dodik Irwanto, Aditya Jadmiko, Fikri Koespiadi Kogoya, Desmin Laksono Djoko Nugroho Laksono Djoko Nugroho Lestari, Agustin Dwi Mahendra, Muhammad Yusuf Marleno, Risma Michella Beatrix Miftakhul Arifin Muhammad Wahyudi Muhammadun, Haris Nashrullah Arifin, Isyraq Nugraha, Coki Adianta Nugroho, Deden Patanduk, Apriyanto Iring Prasetiyo W., Arif Prasetyo, Djoko Puntodewo, Setyasto Putera, Rendra Pramana Putra, Ahmad Ferdiansyah Pratama Putra, Harisa Ramadhani Putranto, Vyonita Rafi, M . Rahadian, Deni Rahman, Medio Duddian Wahyu Ramadhani, Ardhi Rini Rahmawati, Rini Rival Sibuea, Josep Rizky Haris, Ahmad Rosyid, Rizal Rusida, Dukha Rusmin Rusmin S Siswanto Sajiyo , Sajiyo Sajiyo Sajiyo, Sajiyo Sari, Anindya Novita Septoraharjo, Eko Rony Setyawan, Dhimas Triadi Setyo, Mayogo Siswanto Sri Wiwoho Mudjanarko, Sri Wiwoho Sugiharto, Arif Sundana, Hari Sundari Sundari suparjan suparjan Umarwoko Daniarto, Cornelius Wulandari , Esti