Analisis Manajemen Risiko Pada Proyek Pembangunan Perumahan Dukuh Permai di Kabupaten Karangasem, Bali: Identifikasi, Alokasi, dan Strategi Mitigasi I Gusti Ngurah Putu Dharmayasa; I Komang Agus Ariana; I Komang Mardiana; Putu Ariawan; Made Yeni Anggreni; I Gde Eka Dharsika
Jurnal Teknik Sipil Institut Teknologi Padang Vol 13 No 1 (2026): Jurnal Teknik Sipil Institut Teknologi Padang
Publisher : ITP Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21063/jts.2026.V1301.009-18

Abstract

Pertumbuhan penduduk di Kabupaten Karangasem, Bali, mendorong perkembangan proyek perumahan, di mana salah satunya adalah Perumahan Dukuh Permai. Penelitian ini menganalisis manajemen risiko proyek tersebut dengan fokus pada identifikasi, alokasi, dan strategi mitigasi risiko. Data dikumpulkan melalui observasi lapangan, wawancara mendalam dengan kontraktor, dan kuesioner terhadap 30 responden, serta studi dokumen dan regulasi terkait. Hasil penelitian mengidentifikasi 69 risiko yang diklasifikasikan ke dalam enam kategori: alam, desain, finansial/ekonomi, politik/hukum, konstruksi, dan lingkungan. Sebanyak 88,9% risiko tergolong sedang dan 10,1% berisiko kecil. Alokasi risiko dibagi secara proporsional: owner menanggung risiko eksternal, kontraktor mengelola risiko operasional, dan risiko finansial menjadi tanggung jawab bersama. Strategi mitigasi meliputi penerapan K3, APD, perjanjian dengan supplier, serta komunikasi intensif antar pihak. Penelitian ini menyimpulkan bahwa pendekatan manajemen risiko yang terstruktur dan kolaboratif essential untuk meminimalkan dampak negatif dan mendukung keberhasilan proyek.
Analysis of labor productivity in the installation of walls with lightweight bricks in the construction project of Sudamala Resort Ubud Pande Made Agus Krisnantara; Decky Cipta Indrashwara; I Komang Agus Ariana; I Ketut Nuraga
Priviet Social Sciences Journal Vol. 6 No. 2 (2026): February 2026
Publisher : Privietlab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55942/pssj.v6i2.1372

Abstract

Labor productivity is an important indicator for controlling time, cost, and quality in construction projects. The installation of lightweight brick walls requires a high level of efficiency; however, in practice, there is often a discrepancy between the actual productivity in the field and applicable standards. This study aims to analyze labor productivity in lightweight brick wall installation work and compare it with the standards set out in Regulation of the Minister of Public Works and Public Housing (Permen PUPR) Number 01 of 2022. The study was conducted on the Sudamala Resort Ubud construction project using direct observation and a work sampling approach. Observations were made for 14 working days during normal working hours to obtain data on the number of workers, effective working time, and volume of work produced. The data were analyzed to determine the productivity value and coefficient of workers, which consisted of foremen, master craftsmen, craftsmen, and laborers. The results of the study show that the average productivity of workers in the field is 18.175 m²/day for foremen, 19.123 m²/day for master craftsmen, and 18.546 m²/day for craftsmen and workers, with productivity coefficients of 0.055, 0.041, and 0.239, respectively. Compared to the standard of Permen PUPR 01 of 2022, there are differences in productivity values and coefficients in each labor category. These differences are influenced by the field conditions, workforce composition, and work implementation methods. 
Identification and control of Occupational Health and Safety (OHS) risks in the slope and drainage reinforcement project on the Paksebali – Selat Provincial Road Section I Nyoman Indra Kumara; I Gede Agus Suparta; I Komang Agus Ariana; I Gede Fery Surya Tapa
Priviet Social Sciences Journal Vol. 6 No. 3 (2026): March 2026
Publisher : Privietlab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55942/pssj.v6i3.1502

Abstract

The slope and drainage reinforcement project on the Paksebali–Selat Provincial Road section involves a relatively high potential for Occupational Health and Safety (OHS) risks due to excavation works, concrete casting, the use of heavy equipment, and hazardous working environment conditions. This study aims to identify extreme and high risks that may lead to work accidents and to determine appropriate OHS risk control measures for the project. The research method employed is a quantitative descriptive approach, with data collected through field observations, interviews, questionnaires, and documentation studies. Risk assessment was conducted based on the AS/NZS 4360 standard by multiplying the probability and severity levels, whereas risk control was analyzed using the Plan–Do–Check–Act (PDCA) cycle approach. The results indicated that the risks identified in this project fell into the extreme and high-risk categories, particularly in excavation works, road shoulder concrete casting, and heavy equipment mobilization. Potential hazards included landslides, being struck by equipment, and accidents caused by improper work methods. Risk control measures were implemented through improvements in work methods, enforcement of Personal Protective Equipment (PPE) usage, enhanced supervision, installation of safety signs, and the regular implementation of training and safety meetings. The application of appropriate risk control measures is expected to minimize workplace accidents and improve overall project safety performance.
Co-Authors Adie Wahyudi Oktavia Gama Anggreni, Ni Luh Jaya Ariawan, Putu Arif, Arif Arizal Firmansyah Atmaja, Gede Arya Kurnia Atmaja, I Gusti Ngurah Nyoman Tri Werdi Budiarnaya, Putu Darmayasa , I Gusti Ngurah Putu Decky Cipta Indrashwara Dewa Ayu Putu Adhiya Garini Putri Dewi, Kadek Martya Dhema, Florentina Detrin Erin Larasati Fany Hasbhi Noerangga Gil Soares da Costa, Teodósio Haditama, I Gusti Ngurah Hesa Respati Hernawan, Komang I Gde Eka Dharsika I Gede Agus Suparta I Gede Fery Surya Tapa I Gede Putu Wahyu Guna I Gusti Agung Ananda Putra I Gusti Ayu Cintya Wardani I Gusti Ngurah Darma Paramartha I Gusti Ngurah Nyoman Wismantara I Gusti Ngurah Putu Dharmayasa I Kadek Arta Wiguna I Komang Mardiana I Nengah Riana I Nengah Sidiana I Nyoman Indra Kumara I Putu Gede Diatmika I Wayan Yoga Baskara Ida Ayu Gd Dian Febby Mahadewi Ida Bagus Suryabrata Kadek Dwi Indra Widya Putra Kadek Pasek Pangestu Ketut Suarjana Krisnantara, Pande Made Agus Lestari Dewi, Ni Komang Ayu Tri Luh Putu Surya Widi Cipta Made Anom Dwiadnya Adipta Made Yeni Anggreni Messias Da Costa Boavida Ni Ketut Ana Erawati Ni Luh Putu Mas Suryantari Ni Putu Julianti Nindita, Ni Made Titania Indira Nuraga, Ketut Pande Made Agus Krisnantara Pangestu, Kadek Pasek Piantawa, Komang Pramaitha, Dewa Ayu Utari Pratiwi, Ni Made Widya Putra, Ida Bagus Angga Wijaya Putu , Ariawan Putu Ariawan Putu Ariawan Putu Indah Dianti Putri Ravika Nur Melinda Regina Ezzelif Herlambanga Riana, Nengah Saputra, I Komang Harsen Jimmy Sari Putri, Luh Putu Rina Sari, Yusra Aulia Sarmento, Raimundo Suparta, I Gede Agus Tantri Gita Parwati Teodósio Gil Soares da Costa Wahyu Guna, I Gede Putu Wibawa, I Nyoman Galang Sunada Wirawan, Ni Putu Mirah Sukmadewi Putri Wismantara, I.G.N.N.