Analysis of Damage to Caringin Cikukulu Road, Sukabumi District Using the Pavement Condition Index (PCI) Method Paikun, Paikun; Perkasa, Rahmat Wisnu
ASTONJADRO Vol. 13 No. 3 (2024): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v13i3.15035

Abstract

Sukabumi Regency has a very important role in moving the economic and social wheels of society, so it needs to be supported by good flexible pavement conditions. Conditions based on Bina Marga 2020 data show that there are several roads that are heavily damaged in several sub-districts of Sukabumi Regency. Poor implementation, inappropriate planning, excessive traffic loads and standing water on the road surface are the causes of road damage, so to find out this requires a road damage analysis. For this research using the Pavement Condition Index (PCI) method. The results of this research show that the level of damage to all road surfaces studied according to the PCI method was taken from the average value of each STA, namely, the Caringin Cikukulu road section 62.25. So that the damage that has occurred to the road section does not become worse, it is necessary to immediately take repair action on the damaged units, so that it does not cause further damage. The choice of location for the author's research on the Caringin Cikukulu road was chosen because according to 2020 Bina Marga data the road was badly damaged.
ROAD GEOMETRIC FEASIBILITY IN ROAD SAGARANTEN – TEGALBULEUD KM.BDG 175 + 100 Paikun, Paikun; Andriani SP, Reffy W; Destaman, Faldi; Winardi, Dede
ASTONJADRO Vol. 10 No. 1 (2021): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v10i1.4213

Abstract

The Sagaranten-Tegalbuleud road is a provincial road, with its geographic and topographic conditions quite complicated, the terrain quite difficult, causing not all areas to be well connected, and the reason for the low level of accessibility of this area. Therefore, determining the road geometry is an important part of driving comfort. Geometric planning focuses on horizontal and vertical alignments so that it can fulfill the basic functions of the road that provide optimal traffic flow comfort according to the planned speed. A re-survey was conducted to obtain geometric data on existing roads that did not comply with DGH standards, then it was re-planned. The results of the analysis are three bends with the Spiral-Circle-Spiral type, namely bend 9, bend 10 and bend 11 with RC = 17 m, and the slope is determined for the vertical geometrical alignment of the road. The results of this research analysis can be used as a reference for improving geometric roads so that accessibility between regions can be increased.
DETERMINING ROAD HANDLING ACCORDING TO THE LEVEL OF DAMAGE USING SURFACE DISTRESS INDEX (SDI) METHOD Paikun, Paikun; Suminar, Elis; Irawan, Aldi; Bahri, Saiful
ASTONJADRO Vol. 10 No. 1 (2021): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v10i1.4265

Abstract

Roads that have been functioned are in good condition, slightly damaged, moderately damaged, and heavily damaged, therefore road maintenance is needed. Road maintenance uses costs, and the available costs are often insufficient to carry out road repairs as a whole, so it is necessary to determine the priority scale of road repairs. The Surface Distress Index (SDI) method is a method used by the DGH to determine the level of road damage, furthermore as a basis for determining the priority scale for road repairs. Along 2.25 km of Jalan Merdeka 1, Sukabumi City, it is the sampling location for the study to determine the condition of road damage. Each investigation point is determined to be 200 m long, starting from the initial STA 0 + 000 - 0 + 200 to the last STA 2 + 200 - 2 + 250. The results showed that the road conditions consisted of moderately damaged, lightly damaged to heavily damaged, so it needed maintenance at STA 0 + 000 - 0 + 400, it needed rehabilitation at STA 0 + 400 - 1 + 800 and STA 2 + 200 - 2 + 250 , as well as need reconstruction at STA 1 + 800 - STA 2 + 200. The results of this study can be used as a basis for determining road handling by policymakers.
TRAFFIC ACCIDENT POINT ANALYSIS, ON PRIMARY ARTERIAL ROAD-SUKABUMI DISTRICT Paikun, Paikun; Faris, Wahyudi; Rozandi, Ardin
ASTONJADRO Vol. 10 No. 2 (2021): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v10i2.4842

Abstract

The increasing number of residents every year causes the need for transportation to also increase, this also occurs on the Sukabumi-Bogor Primary Arterial Road which is a road with a fairly high volume of traffic flow, in addition because the industrial center and tourism sector are located right on the national road, Insufficient geometric roads caused by the increasing number of vehicles is also a factor that affects the high number of traffic accidents along the Cibadak – Bogor Road. The purpose of this study was to analyze the characteristics of the accident-prone areas (blackspots) on the Jl. Surya Kencana, Pamuruyan Village, Cibadak District - Jl. Raya Ciutara, Pondok Kaso Landeuh Village, Parungkuda District. The method used in this study is the EAN (Equivalent Accident Number) method and the Cussum (Cumulative Summery) method. From the results of the weighting using the EAN method, it was identified that STA 1, STA 4, STA 5, and STA 6 were blackspots. Meanwhile, the Cussum method identified STA 1, STA 4, STA 5, STA 6, and STA 9 as blackspots. The right type of handling for accident-prone locations from the observations, among others, is making a thunder strip facility close to the zebra cross area to reduce vehicle speed and installing a safety fence on the shoulder of the road so as to minimize road crossings that directly cross the road without using zebra cross facilities.
LABOR PRODUCTIVITY RATING MODEL FOR LIGHT BRICK WALL INSTALLATION IN RESIDENTIAL PROJECTS Paikun, Paikun; Fatimah, Cici; Nugroho, Nadhya Susilo; Kusmana, Dody
ASTONJADRO Vol. 10 No. 2 (2021): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v10i2.4998

Abstract

Management on a construction project is something that cannot be ignored, because without construction management a project will be difficult to run according to expectations in the form of cost, time, quality and the success or failure of a construction project depends on the effectiveness of resource management. One way that can be done to achieve project objectives is to increase work productivity. This study aims to determine the productivity of labor in the installation of lightweight brick walls based on facts in housing projects. Labor productivity by analyzing the LUR value and productivity rating then becomes the regression analysis data to produce the model. The data search was carried out by direct observation to the field and conducting unstructured interviews with workers in the field. The resource persons are workers as artisans and workers who are experts in the work of installing light brick walls. This productivity measurement uses the productivity rating method, where worker activities are classified into 3 things, namely Essential contributory work, Effective work, and not useful. The results of the analysis show that the productivity of light brick wall installation workers based on the fact has higher productivity than the SNI labor coefficient. To calculate the labor productivity of installing lightweight brick walls, then the model from the results of this study can be used. The results of the evaluation of the model to predict labor productivity for installing lightweight brick walls have an average accuracy of 99.34%, so the model can be declared accurate.
Analysis of the Compressive Strength of Concrete from Brick Wall Waste as a Concrete Mixture Paikun, Paikun; Anugrah Amdani, Selfin; Arie Susanto, Daniel; Saepurrahman, Dewa
ASTONJADRO Vol. 12 No. 1 (2023): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v12i1.8145

Abstract

Every building renovation or building reconstruction often occurs demolition of the wall. The demolition of this wall becomes construction waste therefore it is necessary to experiment with using wall waste to become a productive material. This research is an experiment in making concrete using wall waste. The wall waste used is in the form of rubble from the ruins of a red brick wall. The compression test method refers to the 1974:2011 SNI regulations on concrete. In this test, the focus is on the maximum compressive strength of concrete that can be produced in the sample. Each sample of the test object is divided into three groups, each group has three test objects. The first group is a sample of pure concrete, fine aggregate 100% concrete sand. The second group is a fine aggregate experimental concrete sample containing 25% wall waste, and the third group contains 50% wall waste. The test object is in the form of a concrete cylinder with a diameter of 150 mm and a height of 300 mm. Concrete testing is carried out at the age of 7 days, 14 days, and 28 days. The results of this study provide information that red brick wall waste can be recycled into concrete material so that it does not become construction waste. It is known that the compressive strength of concrete using additional wall waste as fine aggregate meets the requirements of structural concrete quality and can improve the quality of concrete. Furthermore, it is hoped that the wall waste can be reused as an added material to the concrete mixture in building construction activities or other construction using concrete.
Management of Artesian Wells at Bumi Purnawira Housing Sukabumi City with Water Distribution Application Jatmika, Bambang; Paikun, Paikun; Resdiawan, Wisnu
ASTONJADRO Vol. 12 No. 1 (2023): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v12i1.8187

Abstract

The problem of clean water supply to meet the needs of the community is the main obstacle experienced by residents of Bumi Purnawira housing. Water management is completely left to the residents starting from installation of pipes to each house, installation of water meters, calculation of the cost of water usage per cubic meter, as well as administration and maintenance of the artesian well. Some problem that arise include: frequent miscalculation of cost to be paid; monthly meter recapitulation records in the form of paper prone to damage and data lost; meter recapitulation records is only kept by the treasurer, so if the residents want to know the history of meter records and the payment, they have to see the treasurer; the meter's monthly status is vulnerable to manipulation whether done by the residents or the treasurer; There is often a discrepancy between the financial recapitulation recorded and the physical cash; and financial expenditures are sometimes not properly recorded, so that it triggers the discrepancy between the recorded amount and the physical cash. Seeing the existing reality, an idea to make an application for the management of artesian well administration has arisen. The initial step is to form two teams, namely the development team and the socialization team. The development team is responsible for developing the management system of the artesian well's administration and finance. Meanwhile, the socialization team is responsible for conducting the socialization and the application training. The result of this project is an application and socialization that can help both the administrators and the residents in managing the administration and finance of the artesian well.