Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Teslink : Teknik Sipil dan Lingkungan

Model prediksi limbah oli (B3) kendaraan 5 tahun yang akan datang di Kabupaten Sukabumi Budiman, Dana; Suswendi, Sandi; Paikun
Jurnal TESLINK : Teknik Sipil dan Lingkungan Vol 3 No 2 (2021): September 2021
Publisher : Universitas Nusa Putra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52005/teslink.v3i2.27

Abstract

ABSTRACT The increasing of a transportation that is increasingly sped up from year to year which causes an increase in a motorized vehicle which will have an impact on the increase in vehicle waste that is released by the vehicle. The waste that is released is oil waste (B3) which is dangerous if it is not managed properly by the community and government. B3 waste is the residue from the processing of raw materials containing hazardous and toxic materials which due to their nature and / or concentration can directly pollute and damage the environment, as well as endanger the environment, health, the survival of humans and other living creatures. The results of this study can find out about the amount of vehicle waste issued throughout the Sukabumi district and predict the amount of vehicle waste in the next 5 years using the modeling prediction formula Yc = a + bX. Keywords: Vehicles, hazardous waste, prediction of vehicle waste, Prediction Model
Implementasi Building Information Modeling (BIM) Pada Proyek Perumahan Paikun IPM; Ardin Rozandi; Dana Budiman; Indra Ramdani; Kornienko Elena Vladimirovna
Jurnal TESLINK : Teknik Sipil dan Lingkungan Vol 4 No 1 (2022): Maret 2022
Publisher : Universitas Nusa Putra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52005/teslink.v4i1.105

Abstract

The development of the construction industry is changing very quickly. This is evidenced by the many construction projects being built in Indonesia, such as buildings, roads, bridges, etc. However, the delay in the development process is still an obstacle that must be resolved, one of which is the delay in the design process, even according to previous research, the delay based on the shop drawing process is 22%. Therefore, how to overcome delays due to the shop drawing process. Can the process of making shop drawings be more efficient? To minimize delays caused by the shop drawing design, the author will conduct research to create designs using drawing applications. By integrating Building Information Modeling (BIM) several image applications which will then be combined with estimation data and project scheduling data. Many of these applications are found on the internet, but the integration applications that I will use include Vico Office for 3D, 4D, and 5D analysis, Sketchup for architectural design, Autodesk Revit for electrical design, Tekla Structure for structural design and SAP 2000 for structure analysis. It can be concluded from this study that time efficiency can be found in making project designs and can minimize delays caused by design and planning by 30% compared to the results of design and planning that do not use the concept of integration of Building Information Modeling (BIM)