Articles
Calculation Array Solar Panel Capacity of 50 kWP Pamulang University South Tangerang
Triyanto, Aripin;
Rozak, Ojak Abdul;
Aditya, Aditya
PROtek : Jurnal Ilmiah Teknik Elektro Vol 10, No 3 (2023): Protek : Jurnal Ilmiah Teknik Elektro
Publisher : Program Studi Teknik Elektro Universitas Khairun
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.33387/protk.v10i3.5795
Pamulang University is located in the South Tangerang area consisting of three buildings and 6 faculties and 5 of them are engineering faculties. Currently implementing Solar Panels is being carried out by the Faculty of Electrical Engineering, namely the application of new renewable energy sources. Installation of a solar power plant with a capacity of 50 KWP On-Grid is used as a provider of electricity for building lighting. The purpose of calculating the number of arrays is to determine the area and output power of the arranged solar panels. The problems faced before installation are the number of solar panels that will be arranged in the rooftop area, the amount of solar radiation and the output power. The use of research methods through the stages of calculation, monitoring, and standardization references was carried out for two weeks. The measuring instrument used in the research is the Seaward Solar Survey 200R, while the Global Solar Atlas (GSA) is used as a reference for insolation values in December 2022. The calculation results for the area of the array are 325.62 m², the PLTS electrical energy (EL) calculation is 393, 12 kWh, GSA of 6.14 kWh /m²/day, temperature correction factor (TCF) of 0.96, number of PLTS 102 solar panels with 6 PV strings, highest inverter output of 272.8 kWh and lowest value of 133.2 kWh
PERANCANGAN INSTALASI KELISTRIKAN UNTUK MENGHINDARI BAHAYA LISTRIK DAN SESUAI KETENTUAN STANDARISASI DI SMP NEGERI 1 TAJUR HALANG
Nurtiyanto, Woro Agus;
Triyanto, Aripin;
Jasir, Abib Dzaki Mu`Afa;
Palawa, Danur Kusuma;
Karyanto, Luthfi Rangga Putra;
Insani, Muhammad Fikri;
Athilla, Zidane Taqi
SWADIMAS: JURNAL PENGABDIAN KEPADA MASYARAKAT Vol 3, No 2 (2025): SWADIMAS EDISI JULI 2025
Publisher : Institut Teknologi dan Bisnis Swadharma
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.56486/swadimas.vol3no2.794
This activity aims to provide education related to the design and installation of electrical systems that not only prioritize safety aspects but also refer to applicable safety standards, such as the General Requirements for Electrical Installations (PUIL) 2011 and the Indonesian National Standard (SNI). The primary emphasis is placed on the importance of designing electrical systems that comply with technical standards to minimize the risk of electrical hazards. The evaluation of the implementation refers to the analysis of power requirements and technical regulations to ensure that the design meets standards, thereby improving user safety and ensuring long-term system reliability. Compliance with established safety procedures is a preventive measure against potential electrical system failures that are generally caused by design errors, use of inappropriate materials, or inadequate implementation of safety principles.Kegiatan ini bertujuan untuk memberikan edukasi terkait perancangan dan pemasangan sistem kelistrikan yang tidak hanya mengedepankan aspek keamanan, tetapi juga mengacu pada standar keselamatan yang berlaku, seperti Persyaratan Umum Instalasi Listrik (PUIL) 2011 dan Standar Nasional Indonesia (SNI). Penekanan utama diberikan pada pentingnya merancang sistem kelistrikan yang sesuai dengan standar teknis guna meminimalkan risiko bahaya listrik. Evaluasi pelaksanaan mengacu pada analisis kebutuhan daya dan regulasi teknis, dengan harapan bahwa penerapan desain yang sesuai standar akan meningkatkan keselamatan pengguna serta menjamin keandalan sistem dalam jangka panjang. Kepatuhan terhadap prosedur keselamatan yang telah ditetapkan menjadi langkah preventif terhadap potensi kegagalan sistem listrik yang umumnya disebabkan oleh kesalahan desain, penggunaan material yang tidak sesuai, maupun penerapan prinsip keselamatan yang tidak memadai.
RANCANG BANGUN MESIN COLD STORAGE DENGAN SISTEM KOMPRESI UAP BERBASIS IOT
Triyanto, Aripin;
Setiawan, Jan;
Sunardi, Sunardi;
Kurniawan, Agus
Transmisi: Jurnal Ilmiah Teknik Elektro Vol 27, No 2 April (2025): TRANSMISI: Jurnal Ilmiah Teknik Elektro
Publisher : Departemen Teknik Elektro, Universitas Diponegoro
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.14710/transmisi.27.2.101-108
Penyimpanan makanan dalam jangka panjang sering menghadapi permasalahan ketidakstabilan suhu yang disebabkan oleh kerusakan sistem atau human error. Ketidakstabilan suhu ini berdampak pada penurunan kualitas dan kelayakan makanan untuk dikonsumsi. Namun, sistem pendingin konvensional umumnya belum dilengkapi sistem monitoring real-time yang efektif, sehingga pengawasan kondisi suhu dan kelembaban tidak optimal. Untuk mengatasi permasalahan tersebut, penelitian ini mengusulkan rancangan mesin pendingin berbasis sistem kompresi uap yang dilengkapi fitur Internet of Things (IoT) sebagai sistem monitoring suhu dan kelembaban secara real-time. Proses penelitian meliputi perancangan dimensi, desain ruangan, serta pengujian kestabilan suhu dalam ruang penyimpanan makanan. Pemantauan suhu dilakukan menggunakan sensor yang terhubung ke platform IoT, sehingga data kondisi suhu dan kelembaban dapat diakses kapan saja. Hasil penelitian menunjukkan bahwa suhu minimum sebelum sistem beroperasi berkisar antara 31°C hingga 31,8°C. Setelah sistem bekerja, suhu rata-rata ruang penyimpanan dapat dijaga stabil di sekitar 5°C. Data hasil monitoring menunjukkan bahwa sistem mampu menjaga kestabilan suhu dengan baik serta mendukung efisiensi energi. Dengan penggunaan bahan bekas dalam konstruksi, sistem ini tidak hanya hemat biaya, tetapi juga memberikan solusi inovatif sebagai media pendingin makanan yang hemat energi dan ramah lingkungan.
Evaluasi Kelayakan Tahanan Isolasi Instalasi Listrik pada Rumah Tinggal dengan Usia Penggunaan 50 Tahun
M. Syekhurohim;
Aripin Triyanto;
Budiman
OKTAL : Jurnal Ilmu Komputer dan Sains Vol 4 No 04 (2025): OKTAL : Jurnal Ilmu Komputer Dan Sains
Publisher : CV. Multi Kreasi Media
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
Electrical installations used for more than 50 years often experience a decline in quality and pose various safety risks, such as fires, electric shocks, and damage to electrical equipment. This study aims to analyze the feasibility of electrical installations in residential homes that have been used for more than 50 years, as well as determine the need for revitalization to improve the safety and reliability of the electrical system. The research method was conducted through a quantitative approach with field surveys and technical measurements. Insulation resistance measurements were performed to assess the quality of cable insulation. The collected data includes the physical condition of cables, connectors, protective components, grounding systems, and electrical load distribution. The measurement results before revitalization showed that the insulation resistance values varied between 0.5 MΩ to 0.9 MΩ, all of which were below the minimum feasibility standard of 1 MΩ according to PUIL 2011. After revitalization, the measurement results showed a significant increase with insulation resistance values reaching 2.0 MΩ to 2.5 MΩ, ensuring that all rooms now meet the minimum feasibility standards. These findings emphasize the importance of revitalization to extend the lifespan of electrical installations and reduce safety risks. This research provides practical recommendations for homeowners and electrical technicians to conduct regular inspections and revitalization of aging electrical installations to ensure the safety and efficiency of the electrical system.
Revitalisasi Water Level Control Tandon Air Dan Perapihan Tempat Wudhu Yang Rusak Di Mushola Nurul Yaqin Desa Sindang Laut Banten
Sunardi;
Triyanto, Aripin;
Muchib, Abdul;
Dinandro Neno, Rafael;
Syahfitri Hermansyah, Adelia;
Zulfa Adam, Rio
AMMA : Jurnal Pengabdian Masyarakat Vol. 4 No. 7 : Agustus (2025): AMMA : Jurnal Pengabdian Masyarakat
Publisher : CV. Multi Kreasi Media
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
The revitalization of the water level control system and the renovation of the ablution area are strategic efforts to improve the quality of worship facilities at Mushola Nurul Yaqin, Sindang Laut Village, Banten. The previous water control system was inefficient, leading to water wastage and unstable supply, while the damaged ablution area reduced comfort and safety for worshippers. This activity aimed to redesign an automatic water control system using sensors and a microcontroller, as well as to renovate the ablution infrastructure using more durable and functional materials. The implementation results showed that the system could regulate water levels efficiently and in real-time, while the improved ablution facilities provided greater comfort for users. This project has had a positive impact on efficient water management, enhanced worship services, and supports the sustainability of religious facilities within the community.
Design and Implementation of Grounding System for 100 kWP On-Grid Solar Power Plant in Pamulang University Environment
Darmawan, Yusron Dwi;
Rozak, Ojak Abdul;
Triyanto, Aripin
PROtek : Jurnal Ilmiah Teknik Elektro Vol 12, No 3 (2025): Protek : Jurnal Ilmiah Teknik Elektro
Publisher : Program Studi Teknik Elektro Universitas Khairun
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.33387/protk.v12i3.9704
The grounding system in a Solar Power Plant installation has an important role as a safeguard against external disturbances such as overcurrent and overvoltage due to lightning strikes or internal disturbances. Considering that solar modules are installed in open areas and at certain heights, the grounding system is crucial to protect equipment and personnel. This study discusses the design of a 100 kWp On-Grid PLTS grounding system at Pamulang University, including external lightning rod planning using the Early Streamer Emission (ESE) method with the NFC 17-102 standard and the rolling sphere calculation method based on IEC 62305-3. The calculation results show that the lightning rod protection radius in building B is 117.79 meters with a lightning rod height of 6 meters. The initial grounding resistance value of 11.6 Ω was obtained from a single vertical electrode 3 meters deep. To achieve a resistance value below 5 Ω according to the PUIL 2011 standard, equipotential bonding between floors and between electrodes is required. This research is expected to be a reference in designing lightning protection and grounding systems for PLTS installations in the Pamulang University environment.
Serial Communication Reliability Testing in Dynalite Lighting Control with Adjustable Voltage Levels
Hadikusuma, Ridwan Satrio;
Triyanto, Aripin;
Nuryana, Muhammad Risqi
Jurnal Edukasi Elektro Vol. 9 No. 2 (2025): Jurnal Edukasi Elektro Volume 9, No. 2, November 2025
Publisher : DPTE FT UNY
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.21831/jee.v9i2.89562
This research presents the reliability testing of serial communication in Dynalite lighting control systems with adjustable voltage levels. The study began with the design and implementation of a DALI-based topology, followed by practical installation and measurement of output voltages at different control levels (10%, 20%, 40%, 80%, and 100%). The results confirmed that the output voltage correlated proportionally with the configured percentage level, demonstrating stable driver performance in regulating lamp brightness. Furthermore, comparative testing at different baud rates, namely 9600bps and 115200bps, was conducted to evaluate communication stability. The findings revealed that 9600bps provided higher reliability and minimal error, while 115200bps offered faster response but with a higher risk of instability. These results emphasize the importance of selecting appropriate voltage and baud rate configurations to ensure both efficiency and robustness in lighting control systems.
SOSIALISASI PEMODELAN OPTIMALISASI INSTALASI DENGAN PRAKTIK DEMONSTRASI BERDASARKAN DATA STATISTIK KEMAJUAN TEKNOLOGI DI KAWASAN UNIVERSITI MALAYSIA TERENGGANU
Triyanto, Aripin;
Rozak, Ojak Abdul;
Bakar, Maharani Abu;
Pratama, Dian;
Irsalinda, Nursyiva;
Syafariani, Fenny
Abdi Laksana : Jurnal Pengabdian Kepada Masyarakat Vol 4 No 3 (2023): Abdi Laksana : Jurnal Pengabdian Kepada Masyarakat
Publisher : LPPM Universitas Pamulang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.32493/abdilaksana.v4i3.36095
Dalam setiap penggunaan peralatan yang berhubungan dengan sistem kelistrikan perlu adanya pemahaman dan pengetahuan khusus agar tidak terjadi kerusakan peratalan maupuan kecelakaan bagi manusia. Tahapan dalam mengetahui dan memahami sistem instalasi listrik dapat melalui bentuk sosialisasi, praktek demonstrasi ataupun menggunakan gambar layout dari suatu instalasi listrik. Pelaksanaan kegiatan dalam memberikan informasi tentang sistem kelistrikan dalapt dilakukan dengan suatu kegiatan yang biasa disebut Pengabdian Kepada Masyarakat (PkM). Dalam implementasinya kegiatan PkM dapat dilakukan oleh internal suatu perguruan tinggi secara mandiri atau dapat pula dilakukan melalui media kolaborasi bersama beberapa Institursi Perguruan Tinggi dalam bentuk Implementasi Agreement sebagai bentukan implementasi kerjasama yang telah terjalin. Dalam pelaksanaannya PkM ini dikemas dalam bentuk penyampaian bahan sosialisasi dengan tujuan untuk menjalin kolaborasi antar Instituri Perguruan Tinggi Nasional maupun Internasional dalam hal ini melibatkan dari pihak Universitas Pamulang (UNPAM) Universitas Ahmad Dahlan (UAD), Universitas Komputer Indonesia (UNIKOM) sebagai bagian dari Intitusi Perguruan Tinggi Nasional dengan pihak Universiti Malaysia Terengganu (UMT) sebagai perwakilan dari Institusi Perguruan Tinggi Internasional. Tujuan utama dari kegiatan PkM untuk audien adalah untuk memperkenalkan instalasi listrik, bahaya kecelakaan kerja yang berhubungan dengan kelistrikan dan mengetahui bentuk instalasi kelistrikan yang digunakan dalam skala rumah tinggal, perkantoran dan building atau Industri. Adapuan Metode yang digunakan dalam kegiatan PkM yaitu dengan sharing knwoledge mengenai sistem kelistrikan atau bahaya listrik pada skala perumahan, perkantoran dan building atua Industri.
IMPLEMENTASI PEMBUATAN SISTEM ATS (AUTOMATIC TRANSFER SWITCH) PLN KE INVERTER DI MAJELIS DZIKIR JL. AMD POCIS BABAKAN
Triyanto, Aripin;
Marfin;
Edwar mualim
Abdi Laksana : Jurnal Pengabdian Kepada Masyarakat Vol 5 No 2 (2024): Abdi Laksana : Jurnal Pengabdian Kepada Masyarakat
Publisher : LPPM Universitas Pamulang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.32493/abdilaksana.v5i2.39535
Majelis dzikir merupakan suatu tempat atau perkumpulan yang dibangun untuk senantiasa mengingat kepada Allah SWT. Sebuah tempat yang digunakan untuk pekumpulan orang-orang yang menyebut dan mengucapkan kalimat ALLAH SWT. Terdapat beberapa peralatan pendukung untuk keberlangsungan kegiatan Manaqib/dzikir, salah satu diantaranya adalah penerangan yang digunakan untuk membantu kegiatan manaqib dilaksanakan di malam hari. Terdapat kesulitan dalam melangsungkan kegiatan apabila minim penerangan ataupun terdampak pemadaman listrik yang disebabkan oleh perbaikan dan pemeliharaan gardu listrik atau disebabkan karna habisnya token listrik. Melihat dan evaluasi dari hal tersebut, kami selaku team Pengabdian Kepada Masyarakat dari Fakultas teknik Prodi Teknik Elektro Universitas Pamulang berniat untuk memberikan solusi terhadap fasilitas yang dimiliiki oleh warga sekitar agar warga dapat berkegiatan dengan lebih minim gangguan seperti pemadaman listrik yang disebabkan kehabisan token atau terdampak pemadaman. Solusi permasalahan tersebut adalah dengan membuat sistem Automatic Transfer Switch (ATS) merupakan sebuah sakelar yang bekerja secara otomatis. Pada saat sumber listrik (PLN) terputus atau sedang dalam perbaikan, maka sakelar akan berpindah ke sumber listrik lainnya yaitu dari baterai lalu dihubungkan ke inverter untuk dikonversi menjadi listrik AC. Penggunaan metode yaitu dengan membuat simulasi pemadaman sementara dan mengalihkan sumber tegangan listrik ke baterai dan inverter untuk menggantikan sumber PLN. Hasil yang didapatkan yaitu mempunyai indikasi berupa Emergency Lamp sehingga kegiatan yang dilaksanakan dapat berjalan dengan lancar tanpa ada kendala saat terjadi permasalah supply listrik dari PLN. Luaran kegiatan yang dicapai yaitu dengan menerbitkan laporan akhir kegiatan PkM serta kegiatan yang dilakukan pada jurnal nasional yang terindeks Sinta.
Studi Performa Panel Surya 100 WP Menggunakan Software Homer Di Universitas Pamulang
simanjuntak, Refor mangasi;
Triyanto, Aripin
Jurnal Elektro Vol 17 No 2 (2024): Jurnal Elektro: Oktober 2024
Publisher : Prodi Teknik Elektro, Fakultas Teknik Unika Atma Jaya Jakarta
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.25170/jurnalelektro.v17i2.5884
Studies on designs and systems for solar panels are currently continuing to be developed. One application is to design a Homer-based solar power generation system (PLTS) with a solar panel capacity of 100 Wp and analyze the system performance at different loads. This research was conducted to determine the amount of power that solar panels can produce, load consumption, and determine a suitable system configuration to meet electricity needs at different loads. The method used is design, determining parameters on the homer and creating a simulation with loading. The research results show that the amount of power that can be produced by solar panels is 75,2kWh/year and can meet electricity needs at different loads. It is hoped that this research can be a solution to optimize the use of solar energy on a small scale and support renewable energy programs in Indonesia.