Articles
Perbandingan Performasi Metode Johnson dengan Heuristik Multi Tujuan Ditinjau dari Makespan Total Flow Time dan Iddle Time
Garside, Annisa Kesy
Jurnal Teknik Industri Vol 3, No 2 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (3260.975 KB)
|
DOI: 10.22219/JTIUMM.Vol3.No2.163-172
This researchtd es to implementa methodo f rnachines chedulingfo r flow shopc alledMulti ObjectiveH euristicT. o makee asiera pplicationin attainingjo b sequencteh atm achinem ustdo alongw ith makespavna lue,l otal flow time, andi dle time,t hen a softwareis made Next, wemakea iomparisono f machines chedulingre sultp erformancbee tweenM ulti objectiveH euristicMethoda ndl ohnsonM ethodi f viewedf iom makespavna lue,t otalf low time,a ndi dlet ime. Fromthe resulto f researchc oncludedth at heuristic with multi objectivesm ethods howst he solutionsflow timet otalf ewert hanJ ohnsonm ethod
Penerapan Distribution Requirement Planning (DRP) pada Central Warehouse PT. Coca Cola Amatil Bottle Pandaan
Garside, Annisa Kesy
Jurnal Teknik Industri Vol 2, No 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (4526.767 KB)
|
DOI: 10.22219/JTIUMM.Vol2.No1.47-58
This research has a good to plan the product delivery schedule from central ware house to each ware house and from ware house to PT. Coca Cola outlet to minimize the holding number of product. To plan this schedule we implement DRP (Distribution Requirement Planning) method. With using the product demand data, lead time of delivery, holding cost and release cost, also BOD (Bill of Distribution). Then analysis them using DRP software to find the shipping schedule. After implementing DRP method PT. Coca Cola can decrease about RP 7.205.761.500,00 for 8 week.
Penjadwalan Produksi Dengan Algoritma Heuristik Pour (Studi Kasus: Konveksi One Way – Malang)
Sulaksmi, Andri;
Garside, Annisa Kesy;
Hadziqah, Fithriany
Jurnal Teknik Industri Vol 15, No 1 (2014): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (282.336 KB)
|
DOI: 10.22219/JTIUMM.Vol15.No1.35-44
“One Way Convection†is a garment company which produces many kinds of t-shirt based on the customer’s order. In order to fulfill the order, the company applies role of First-Come First-Serve for scheduling the order production sequence. This role is often disadvantageous for the order with short process time because if it is dispatched after the order with long process time, then it will take longer in queue and causes the completion time of all order to be longer. This research aims to schedule t-shirt’s sequence operation in “One Way Convection†company by using Pour heuristic algorithm so that completion time becomes shorter and order fulfillment can be accomplished on-time. The steps in this methodology consist of collecting data, calculating standard time and total process time according to the order, scheduling using initial method proposed by company, scheduling using Pour heuristic algorithm, and comparing makespan of both approaches. According to the Pour Heuristic method, saving is obtained in makespan as 8.09 hours or 19.25% compared with initial method proposed by company.
Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)
Rachman, Hamim;
Garside, Annisa Kesy;
Kholik, Heri Mujayin
Jurnal Teknik Industri Vol 18, No 1 (2017): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (260.174 KB)
|
DOI: 10.22219/JTIUMM.Vol18.No1.86-93
Pembangkit Listrik Tenaga Uap (PLTU) PT Indo Pusaka Berau is a PLN work unit that provides electricity to consumers. The problem of the company is the frequent damage to boiler engine components. The company uses corrective maintenance system. On the problem, it is necessary to develop a machine maintenance system with Reliability Centered Maintenance (RCM) approach. The objective of the study was to select a boiler system maintenance action based on the RCM method and component replacement interval to minimize Total Minimum Downtime (TMD). Results of data processing RCM method, component in category Condition Directed (CD) is El Bow component. Components in Time Directed category (TD) are gland seal steam and check valve. Components in the Time Directed category are calculated for component replacement intervals on TMD criteria. The calculation result from component replacement interval was obtained 37 days for gland seal steam component and 58 days for check valve component. The proposed treatment of RCM method can reduce downtime by 11.33% of the company's maintenance methods.
Analisa Alogaritma Layout Heuristik untuk Meminimasi Total Material handling dalam Perencanaan Tata Letak Fasilitas
Garside, Annisa Kesy
Jurnal Teknik Industri Vol 3, No 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (3834.34 KB)
|
DOI: 10.22219/JTIUMM.Vol3.No1.22-32
This research has goal to compare there alternative layout performances CRAFT,MULTIPLE, and BLOCPLAN. Using the problem of layout which include forward flow material and fordward backward flow material can be found result : Multiple Algoritm has total distance and material cost minimally but the problems that have lower departement,CRAFT algoritm can be used better than MULTIPLE algoritm because almost gives the same result with easier input process.
Integrasi Analytic Hierarchy Process dan Goal Programming Dalam Pemilihan Pemasok
Garside, Annisa Kesy;
Juan, Martina
Jurnal Teknik Industri Vol 14, No 2 (2013): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (369.857 KB)
|
DOI: 10.22219/JTIUMM.Vol14.No2.192-201
Considering that raw material cost could reach 70% of product cost, supplier selection process was become important consideration to improve the efficiency of procurement department. The supplier selection process was multi-criteria problem involving qualitative and quantitative factors. UD Virgo Bersinar was one of fruit chips manufacturer located in Malang. The company often experienced shortage of jackfruits which interrupt production process. Thus, it was necessary to choose its supplier by considering company’s criteria and order allocation of selected supplier. This research would integrate supplier weight from Analytic Hierarchy Process and Preemptive Goal Programming model to determine priority of supplier and order quantity to the supplier. The model was formulated to achieve two objective functions, namely maximizing total value of purchasing and minimizing total cost of purchasing, by considering capacity of supplier and fulfillment of jackfruit. By running goal programming model, it was concluded that supplier from Semarang would supply 7.5 ton of jackfruit in November 2013-Januari 2014 and deficiency of needs would be supplied by supplier from Tajinan.
Perancangan Website Sebagai Media Promosi Dan Penjualan Pada Home Industry Abon
Dewi, Shanty Kusuma;
Garside, Annisa Kesy
Jurnal Teknik Industri Vol 15, No 2 (2014): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (2317.909 KB)
|
DOI: 10.22219/JTIUMM.Vol15.No2.170-181
Marketing activity which is performed by a home industry of abon namely Lestari Jaya Pangan currently is not completely well established. Selling activity is conventionally run through offering the product to stores, market and also through retailer. Its affects the sale to be limited only nearby region of Malang. Promotion strategy also limited by using brochure and participating either local or national fair which is organized by goverment. In order to tackle the issue, the website is needed to be designed to support marketing and selling activity of its product particularly abon. website is designed by using oneline selling system with content management system (CMS) opencart. Through the website, marketing activity is more effective and able to increase income.
Perencanaan Kanban Card Controller (KCC) dalam Pengendalian Tingkat Produksi Guna Meminimalisasi Kekurangan dan Kelebihan Produksi
Garside, Annisa Kesy
Jurnal Teknik Industri Vol 1, No 1 (2000)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (3842.301 KB)
|
DOI: 10.22219/JTIUMM.Vol1.No1.20-30
This  research  has  aim to plan  Kanban  Control  Card  (KCC)  in production  rate  controlling some  products  as:  Office  Table  (MTK),  Tower  Chest  Four  Flours  (TC-4),Tower   Chest  Six Flours (TC-6),  Simple Table  (MD).In this  research  we  need  data  such as  :  production  demand  data  history, production  lead time,  demand  forecasting  and  production  data  base  from demand  history  (  25  weekly  periodic), then  forecast  demand  in periodic  26 tli  using  Time  series  method  with  Trend  Analysis  in  a second periodic.Using  MRP  logic,  forecasting  result  account  to result  Planed  Order  Release (PORs)  for each work  station.  From  the data analysis  can be found  :     the number  ofKanban   Card in each work station  of production  devision   and the  second  is  less  maximum  inventory  value  than   inventory value using  MRP,  so TIT is  proved  not efective  in a fluctuative  production  rate.
A Cluster-First Route-Second Heuristic Approach to Solve The Multi-Trip Periodic Vehicle Routing Problem
Garside, Annisa Kesy;
Laili, Nabila Rohmatul
Jurnal Teknik Industri Vol 20, No 2 (2019): August
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (346.527 KB)
|
DOI: 10.22219/JTIUMM.Vol20.No2.172-181
This paper discusses periodic vehicle routing problems that allow vehicles to travel on multiple trips in a single day. It is known as the Multi-Trip Periodic Vehicles (MTPVRP) Problem Route. Cluster-first route-second (CFRS) heuristics to solve MTPVRP was proposed in this study. In phase 1, customers were divided into clusters using the formulation of integer programming. Phase 2 determined the route of the cluster and verifies that the total journey time to visit the trips does not exceed the working hours of the vehicle. The implementation of the heuristic CFRS to solve the real problem faced by the LPG distributor shows that the procedure could provide a better routing solution.
Perancangan Sistem Informasi Manajemen untuk DistribuTion Requirement Planning
Garside, Annisa Kesy
Jurnal Teknik Industri Vol 2, No 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (3108.322 KB)
|
DOI: 10.22219/JTIUMM.Vol2.No2.128-137
A cigaretec ompanyP, T. DjagungP adio fteng ot fouble or problemin distributionth eirproduct especially in acuracy of product delivery that cause lost sale. One of method that can beusedt o makea good deliverys cheduleis usingD istributionR equiremenPt lanning.lt makest heinformation of delivery schedule from factory to distribution or from distributor to company canbe fastly done and have high accuracy. It means that the company need a InformationManagement System ( SIM ).This research'sa ims in to designS IM and DRP in PT. DjagungP adi using thesemethod( systemt)h ef actoryc ans aveh oldingc ostl ack of productc osto f DjagungP adip roducta sDjagungP adi" hijau" andD jagungP adi" kuning" from Rp 1.782.900,0t0o Rp 867.300,00fo r amontha ndn o morel acko f productin distributions ystem.