Produktivitas Pekerja pada Pekerjaan Pembesian Balok pada Pembangunan Gedung Kantor PX. X di Surabaya Malik, Ariansyah; Beatrix, Michella
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 3 (2025): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i3.44469

Abstract

Successful construction management can be seen from the achievement in managing construction projects that are completed on time as planned. In this research project does not calculate worker productivity, there is no target for each work item, only the final target of the project and this project does not have calculations related to labor productivity, which results in an impact on the achievement of work targets. Therefore, researchers conducted research with the aim of knowing the productivity value of labor. This research was conducted at the office and house building construction project of PT X located at Jl. Komering, Darmo, Wonokromo sub-district, Surabaya. The result of the research is the value of labor productivity on the construction project of the office building and the house of PT X is classified as an effective or satisfactory category, obtained the average value of LUR on beam concreting work of 81.52% morning time and 76.33% afternoon time.
Penerapan BIM 3D pada Pekerjaan Struktur RSUD Dr. Iskak Tulungagung Permana, Alung Nanda; Sutriono, Bantot; Beatrix, Michella
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 4 (2025): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i4.50808

Abstract

Conventional Bill Of Quantity (BOQ) often faces inaccuracies in estimating structural work volumes due to limited detail and potential human error. This study aims to analyze the accuracy of quantity take off (QTO) using Building Information Modeling (BIM) through Autodesk Revit 2024 in the RSUD Dr. Iskak Tulungagung project. Research data included working drawings (shop drawings) and BOQ, which were modeled in 3D to generate structural work volumes from foundation to roof levels. The analysis revealed notable differences between the conventional method and Revit, with concrete volumes differing by 71.31 m3 or 9.46%, and reinforcement volumes differing by 267.981 kg or 4.51%. These findings confirm that Revit provides more detailed and consistent volume estimations, thereby enhancing project planning reliability while reducing manual calculation error.
ANALISIS KEPUASAN PENGGUNA TERHADAP PEMELIHARAAN DAN PERAWATAN FASILITAS GEDUNG A UNIVERSITAS MUHAMMADIYAH LAMONGAN DENGAN METODE IPA Reyga Aditya Mahendra; Beatrix, Michella; Triana, Masca Indra
Jurnal Teknik AMATA Vol. 5 No. 2 (2024)
Publisher : Politeknik Amamapare

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55334/jtam.v5i2.335

Abstract

Pembangunan gedung bertingkat di Indonesia terus meningkat, menjadikan kepuasan pengguna indikator penting dalam menilai kinerja bangunan. Di sektor pendidikan, kepuasan pengguna berpengaruh besar pada produktivitas dan hubungan sosial. Penelitian ini mengevaluasi kepuasan pengguna Gedung A Universitas Muhammadiyah Lamongan untuk mengidentifikasi area perbaikan, mengoptimalkan alokasi sumber daya, dan meminimalkan biaya perawatan. Penelitian ini menggunakan data primer diperoleh melalui observasi lapangan dan kuisioner kepada 100 responden civitas akademika melalui Google Form, dengan uji validitas dan reliabilitas pada instrumen. Data diolah menggunakan metode Importance Performance Analysis (IPA) dengan bantuan perangkat lunak SPSS. Hasil menunjukkan rata-rata tingkat kesesuaian (TKi) sebesar 82,26%, dengan atribut plafon sebagai prioritas utama 77,78%.
Analisis Faktor Keterlambatan Waktu Pelaksanaan Proyek Jalan Nasional di Jawa Timur Affrilia Khusnul Khotimah; Beatrix, Michella
Jurnal Teknik Sipil Vol. 15 No. 2 (2022): Desember 2022
Publisher : Faculty Of Engineering University 17 August 1945 Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56444/jts.v15i2.317

Abstract

Terdapat beberapa faktor yang dapat mempengaruhi keterlambatan dalam pelaksanaan suatu proyek, seperti pembangunan jalan nasional di Jawa Timur. Pentingnya untuk melakukan analisis terhadap faktor yang dapat menyebabkan keterlambatan proyek tersebut. Penelitian ini bertujuan untuk mengidentifikasi inti permasalahan yang menyebabkan keterlambatan dalam pelaksanaan suatu proyek dan memberikan penjelasan secara rinci tentang mengatasi masalah yang terjadi pada proyek. Berdasarkan dari analisis, penyebab yang paling mempengaruhi terjadinya keterlambatan pada proyek jalan nasional di Jawa Timur adalah aspek eksternal dan force major. Aspek ini merupakan faktor-faktor yang tidak dapat diantisipasi dan dihindari, seperti cuaca buruk, kebakaran, dan bencana alam. Aspek lingkup  dokumentasi pekerjaan (kontrak) juga memiliki pengaruh signifikan terhadap terjadinya keterlambatan proyek. Masalah yang terkait dengan lingkup pekerjaan dan dokumentasi yang tidak jelas dapat menyebabkan keterlambatan proyek. Aspek sistem organisasi, koordinasi, dan komunikasi serta aspek sistem inspeksi, kontrol, dan evaluasi juga memil iki pengaruh yang signifikan terhadap terjadinya keterlambatan proyek. Masalah yang terkait dengan sistem organisasi, koordinasi, dan komunikasi serta sistem inspeksi, kontrol, dan evaluasi dapat menyebabkan terjadinya keterlambatan proyek. Nilai probabilitas persentase untuk setiap aspek tersebut secara berurutan adalah 25%, 19%, 19%, dan 19%. Kata kunci: keterlambatan proyek, faktor keterlambatan, probabilitas,  
Analisis percepatan waktu menggunakan metode Crashing pada Proyek CWI-02 ITS Surabaya Yahya, Fandy Ahmad Amiruddin; Beatrix, Michella
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.38803

Abstract

In the implementation of construction projects, the measure of project success can be seen from the timely completion time at minimal cost without forgetting the quality of the work. This study aims to determine the duration of the project after acceleration and to know the cost after acceleration. This research was conducted on the CWI-02 ITS Surabaya project. According to the results of existing data in the field, the project has a delay of 8.8879%, so the way to overcome the delay is one of them using the Crashing method, with the alternative of adding working hours and adding labor. The results of the calculation by adding working hours for 4 hours obtained the project duration to 291 or 0.01% faster than the total project of 294 days, then there was a change in the total project cost of Rp. 3,622,264,104.66 or 0.0057% greater than the total project cost. While the calculation results with alternative labor additions obtained the project duration to 292 or 0.0068% faster than the total project duration, then there was a change in the total project cost to Rp. 3,600,758,240.47 or 0.03% greater than the total project cost.
Faktor Utama Penghambat Penerapan Manajemen Risiko Biaya pada Pelaksanaan Proyek Konstruksi Gedung Bertingkat di Surabaya dengan Menggunakan Metode AHP Fuzzy Tia Herlina Sugiharto; Michella Beatrix
Prosiding Seminar Nasional Ilmu Teknik Vol. 2 No. 2 (2025): Desember: Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v2i2.44

Abstract

The implementation of risk management is an important method that is carried out in order to identify risk factors that may arise during the implementation of the project. However, the implementation of risk management still faces some obstacles in its implementation. Therefore, this study aims to analyze the barriers to the implementation of risk management in construction projects in Surabaya. A total of 80 respondents filled out questionnaires from construction service providers including contractors and consultants. Respondents involved include professional experts such as Project Managers, Site engineers, Site managers, implementers, estimators, General Managers and Company Directors. Data processing using fuzzy AHP method as a data processing tool and decision making. The results of the study revealed that the main factors that can hinder the implementation of cost risk management are inaccurate cost estimates (Y4) with the highest weight of 0.433, lack of quality Control (Qc) supervision criteria (Y5) is ranked second with a weight of 0.288, poor coordination between stakeholders (owner,contractor and consultant) (Y1) is ranked third with a weight of 0.274, lack of risk management training (Y3) is ranked fourth with a weight of 0.005, and some, old age) (Y2), the work can not be done according to the work drawings (Y6), limited skilled human resources (Y7), materials not according to specifications (Y8), improper initial cost estimation (Y9), late progressive payment from the owner (Y10) ranked fifth jointly because it has an equivalent weight value of 0.These findings conclude that accurate cost estimation (Y4) is very important in construction projects because it becomes the main basis in budget planning, decision making, and risk management.
Penerapan Metode AHP-Fuzzy untuk Mengukur Pemahaman Penyedia Jasa Konstruksi terhadap Sistem E-Tendering di Kota Surabaya Fahreza Irghi Budi Saputra; Michella Beatrix
Prosiding Seminar Nasional Ilmu Teknik Vol. 2 No. 2 (2025): Desember: Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v2i2.45

Abstract

E-Tendering is an electronic-based procurement method that integrates all parties involved in construction projects through a digital platform, simplifying communication, document exchange, and transactions from the initial stage to project completion. The primary objective of implementing E-Tendering in the construction sector is to improve efficiency and transparency in the procurement process of goods and services. However, construction service providers often face obstacles in E-Tendering, such as limited technological proficiency, administrative errors that may disqualify bids, and technical issues like internet connectivity and platform system reliability. Therefore, this research aims to identify the barriers and level of understanding of E-Tendering among construction service providers in Surabaya. A total of 51 respondents were selected using snowball sampling, based on their participation in the E-Tendering system. Data processing in this study employed a quantitative approach using the Fuzzy AHP method to analyze the criteria and sub-criteria related to understanding and obstacles in participating in electronic construction service tenders (E-Tendering). The results of the analysis of service providers’ understanding of the E-Tendering system using the AHP method showed a λmax value of 9.09, a Consistency Index (CI) of 0.01, and a Consistency Ratio (CR) of 0.007. The CR value, which is far below the threshold of 0.10, indicates that the respondents’ assessments are consistent, meaning that the pairwise comparison results of the nine criteria can be considered valid and reliable.
Faktor Dominan Keterlambatan pada Proyek Konstruksi Gedung Bertingkat di Surabaya dengan Metode Relative Importance Index (RII) Ninda Qurmaulia Dhani; Michella Beatrix
Prosiding Seminar Nasional Ilmu Teknik Vol. 2 No. 2 (2025): Desember: Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v2i2.50

Abstract

Delays in high-rise building construction projects in Surabaya are a crucial issue as they can significantly affect cost, quality, and project completion schedules. This reserach intends to identify the dominant factors contributing to project delays using the Relative Importance Index (RII) method, considering both frequency and impact aspects. Data were obtained from 80 valid respondents who hold strategic roles in construction project implementation, such as Project Managers, Site Managers, Site Engineers, Estimators, Field Supervisors, General Managers, and Company Directors. The analysis results indicate that in terms of frequency, the dominant factors are unfavorable weather conditions (RII = 0.750), labor shortages (RII = 0.743), and design changes during construction (RII = 0.735). Meanwhile, in terms of impact, the dominant factors are delays in material delivery (RII = 0.780), labor shortages (RII = 0.770), and substandard material quality (RII = 0.740). These findings emphasize that labor shortage consistently influences project delays in both frequency and impact, while weather and material factors show different patterns between occurrence and consequence. All dominant factors were classified into the High-Medium category, indicating that they should be prioritized in project risk management.
Kesiapan Pekerja Terhadap Impelementasi Transformasi Digital Pada Proyek Konstruksi Di Kota Surabaya Indirani, Dwi Novita; Beatrix, Michella
PROSIDING SENADIKA : Seminar Nasional Akademik Vol 1 No 1 (2024): PROSIDING SEMINAR NASIONAL AKADEMIK (SENADIKA) 2024
Publisher : PROSIDING SENADIKA : Seminar Nasional Akademik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Di era digital saat ini, teknologi telah menjadi alat yang dapat memenuhi sebagian besar kebutuhan, termasuk dalam dunia bisnis. Kemajuan teknologi digital telah membawa perubahan signifikan di berbagai bidang. Tingginya permintaan sumber daya manusia di sektorteknologi informasi mendorong banyak pihak untuk beralih ke digital. Transformasi Digital merupakan proses perubahan yang direncanakan dan dilaksanakan secara aktif, yang dipengaruhi oleh teknologi digital. Tak dapat dipungkiri bahwa Transformasi Digital telah memberikan manfaat bagi para pengusaha di sektor konstruksi di setiap tahap proyek. Hal ini berkontribusi pada peningkatan kolaborasi, mempercepat proses desain dan konstruksi, serta mengoptimalkan pemeliharaan bangunan. Oleh karena itu, penelitian ini bertujuan untukmengetahui prosentase pekerja konstruksi yang siap terhadap penerapan Transformasi Digital di Kota Surabaya. Penelitian ini menggunakan data kuantitatif dengan metode statistik regresi linier sederhana untuk menganalisis variabel bebas dan terikat yang berkaitan dengan Transformasi Digital. Data akan dikumpulkan melalui kuesioner yang disebarkan kepada responden konstruksi, konsultan, dan kontraktor proyek konstruksi di Kota Surabaya. Dari hasil penelitian didapatkan nilai prosentase pekerja konstruksi yang siap menerapkan Transformasi Digital di Kota Surabaya sebesar 0,12%.
Analisis Faktor Pengaruh Implementasi Digital Twins pada Proyek Konstruksi di Kota Surabaya Sulistyo, Wanda Ardhani; Beatrix, Michella
PROSIDING SENADIKA : Seminar Nasional Akademik Vol 1 No 1 (2024): PROSIDING SEMINAR NASIONAL AKADEMIK (SENADIKA) 2024
Publisher : PROSIDING SENADIKA : Seminar Nasional Akademik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Digital Twins adalah teknologi canggih yang telah mengubah industri dengan meniru hampir semua aspek barang, proses, atau layanan. Teknologi ini dapat mereplikasi semua yang ada di dunia fisik ke dunia digital. Teknologi Digital Twins (DT) mendeteksi dan memecahkan masalah fisik dengan cepat, merancang dan membangun produk yang lebih baik, serta merealisasikan nilai dan keuntungan lebih cepat dari sebelumnya. Model Digital Twins dapat digambarkan dalam dunia virtual dalam empat dimensi: geometri, fisika, perilaku, dan aturan. Oleh karena itu, penelitian ini bertujuan untuk menganalisis penerapan Digital Twins di Kota Surabaya. Penelitian ini menggunakan data kuantitatif dengan menggunakan metode statistik regresi linier berganda untuk menganalisis beberapa variabel independen dan dependen yang berkaitan dengan Digital Twins. Data yang digunakan dalam pengolahan adalah kuesioner yang disebarkan kepada responden, konsultan, dan kontraktor seperti project manager, site engineer, dan site manager di Kota Surabaya. Dari hasil penelitian, diperoleh bahwa 17% terdapat faktor pengaruh yang mempengaruhi penerapan Digital Twins.