Claim Missing Document
Check
Articles

Found 6 Documents
Search
Journal : Sustainable Civil Building Management and Engineering Journal

Efektifitas Metode Job Instruction Training dan Visual Presentations dalam Pelatihan Tukang Bangunan Menerapkan Teknologi Ferosemen Gunasti, Amri; Sanosra, Abadi; Muhtar, Muhtar; Ipak Rahmawati, Erna
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2127

Abstract

Increasing the ability of builders to apply ferrocement technology as a building material is a very urgent activity. The use of visual presentations that represent Off the job training methods and job instruction training that represent On the job training as training methods for builders needs to be further investigated for their level of effectiveness. This research was conducted to measure the effectiveness of the two training methods using different tests. The aim of this research is to determine the effectiveness of the visual presentation method compared to job instruction training. The results of the research show that there are real differences in the indicators of skilled builders stripping plaster, skilled builders installing woven wire stands and knowing their sizes, skilled builders installing woven wire, skilled builders installing binding wire, understanding the sequence of implementation and understanding every detail. the size of each step in implementing ferrocement technology. The research results also stated that there was no difference in the ability indicators for Skilled Builders to Install Plaster using the Visual Presentations or Job Instruction Training methods.
Pengukuran Road User Satisfaction Index Jalan Jawa Kabupaten Jember Zainuddin Permana, Muhammad; Hamduwibawa, Rofi Budi; Gunasti, Amri
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2129

Abstract

Java Road is one of the roads located in Sumbersari District, Jember Regency, which is very busy and strategic, causing several problems, such as congestion, noise, traffic accidents and other things. Research on the level of satisfaction of Javanese road users is an urgent matter that must be done. The aim of this research is to analyze the level of importance and performance of Javanese roads. In this research, the basis for making the instrument was based on interviews with stakeholders and based on the RUSI (Road User Satisfaction Index) standard which had been used in previous research. The research results show that the Road User Satisfaction Index (RUSI) value on Javanese roads is 58.50. The RUSI value is in the range between 51-65.99 percent with quite satisfactory criteria.
Standarisasi Kinerja Waktu dan Biaya dengan Metode Earned Value pada Tahap Pekerjaan Struktur Proyek Agitiya Wahyu , Andre; Gunasti , Amri; Cahya Dewi , Ilanka
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2138

Abstract

The Jember Millennium Home Center Project experienced delays, because there was a difference between the costs that should have been spent not in accordance with the scheduled work performance and the difference here is negative. Therefore, research on cost index analysis and schedule performance index on the Jember Millennium Home Center project has no shortage of costs and the realization of completion work in the field is late. The purpose of this research is to calculate CPI and SPI. The method used in this research is Earned Value Analysis. The results showed that the Schedule Variant (SV) had a negative value of -Rp.30,940,091.57. While the value (CV) for 15 weeks has a positive value of Rp. 16,779,031.46, - from the difference in BCWP fees of Rp. 47,719,123 and ACWP Rp. 30,940,091, - means the project does not suffer losses.
Analisis Perbandingan Efesiensi Biaya dan Waktu pada Pondasi Sumuran dan Pondasi Tapak Pembangunan Gedung Tipikor Polda Aceh Putri, Sandifa; Gunasti, Amri; Alihudien, Arief
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 3 (2024): July
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i3.2149

Abstract

The foundation is a building structure located under the building. The foundation cannot be separated from the building structure because it is a structural part whose function is to transmit the load from the upper structure to the supporting soil layer beneath it to prevent collapse of the soil or settlement of the structural system. This research compares the costs and time required for pit foundation work with site foundations, with the aim of finding out whether the planned costs and implementation time have the same efficiency or not. The purpose of this research is to find out how much bearing capacity there is in the well and site foundations, how much costs are needed to plan the well and site foundations, and how long the implementation time is required. The method used in this research is a comparative study (Comparison). The comparative or comparison method is research that uses the technique of comparing an object with another object. The objects being compared, the comparative method is carried out to compare the similarities and differences of two or more facts and properties of the object being studied. From the calculation analysis, the bearing capacity of the well foundation was obtained at 1950 KN with a cost of IDR 469,046,724 and an implementation time of 78 days. Meanwhile, for the site foundation, the foundation bearing capacity was obtained at 451.11 KN at a cost of IDR 174,598,298 and a construction time of 56 days.
Pengendalian Proyek dengan Metode Earned Value pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember Eriyanti , Merlita; Kuryanto, Totok Dwi; Gunasti, Amri
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2151

Abstract

The rehabilitation of the D.I Sumber Nangka Irrigation Network takes 180 days or about 6 months to implement, with a budget of Rp. 4,077,964,693. In this study, the authors will analyze the data using the Earned Value method. Therefore, there is no shortage of research on the basic components of project work costs and the realization of completion of work in the field is not too late. The purpose of this research is to calculate the cost of BCWS, BCWP, and ACWP. The results of the D.I Sumber Nangka Irrigation Network Rehabilitation study, Kec. Ledokombo was completed in the 24th week with a total cost of Rp. 4,077,964,693. in the 1st week to the 24th week the fee used is Rp. 3,702,175,554.
Perbandingan Daya Dukung Tiang Pancang dengan Alat Berat Drop Hammer dan Hydraulic Static Pile Driver (HSPD) Ardiansyah, Moch. Edwin; Aliehudien, Arief; Gunasti, Amri
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2152

Abstract

The foundation is a base or bottom structure that can carry all the loads above it. Foundation bearing capacity and foundation settlement are very important for foundation planning. In the construction project for the Faculty of Agricultural Technology building at Jember Polytechnic, a recalculation analysis was carried out to compare the carrying capacity using two methods, namely HSPD and Drop Hammer. Soil bearing capacity is calculated based on Standard Penetration Test (SPT) data from 2 soil investigation points. Next, the soil bearing capacity is calculated using the Drop Hammer assumption. The research results show that there is a difference in the carrying capacity of HSPD and Drop Hammer. And the results can be carried out using 2 HSPD heavy equipment and a Drop Hammer at that location. In comparison, Drop Hammer and HSPD driving on a 25 x 25cm mini pile foundation can be carried out. And in the field you can use 2 heavy equipment simultaneously, namely HSPD for spun pile D 50 cm at the smallest permitted carrying capacity value of 68 tonnes at a depth of approximately 12 meters and drop hammer for mini piles at a permitted carrying capacity value of 40.94 tonnes at a depth of approximately 6 meters. However, if you use a drop hammer in areas near residents, don't forget to plan the trench work to reduce vibrations to the surrounding area.
Co-Authors A, Oky Yudi Abadi Sanosra Abadi, Taufan Abdillah , Muhammad Sevi Abelio Hidayatul Rohman Ach. Rofiqi Achmad Erfan Afandi Adi, Agung Septa Aditya Dimas Pratama Aditya Surya Manggala Adnan Oktar Yani Afandi, Achmad Erfan Agitiya Wahyu , Andre Agus Prasetyo Utomo Ahmad Ifan Fanandri Ahmad Ifan Fanandri Ahmad Syauqi Habibur Rohman Ahmad, R. Sultan Ainurrahman, Yoga Akbar Rangga Aprilianto Al Farisi, A. Wahid Aldi Nanda Pratama Putra Alfaries, M. Rifki Aliehudien, Arief Alwafi, Muhammad Rayhan Amar Ma’ruf Ana Mufarida, Nely Andariana, Yulia Andi Batara R. A Andreanto, Erwan Anisa Agustina Amartya Anisa Rizki Anita Wijayanti Aprilia, Aura Denis Apriliana, Ninda Rizki Ardhi, Nusantara Fathonisyam Putra Ardiansah, Rizal Ardiansyah, Moch. Edwin Ariany, Rizky Arief Alihudien Arief Alihudien, Arief Arif, Audry Yunus Asroful Abidin Azam Ibnu Sabil Azizah, Nur Jannah Bachtiar, Fatim Rosa Bagus, Wahyu Bakti, Budi Satria Beny Rafli Nurcahyo Budi Satria Bakti Budi, Galih Alnabawi Putra Amelinda Setia Cahya Dewi , Ilanka Cahyo Setyo Wibowo Cholid, Sabda Arsy Dafa Dwi Aditya Fahreza Damayanti, Asiska Fitria Bara Darma Setiawan, Orisanto Darma, Orisanto Desta, Senki Dewanto, Bimo Bayu Dhanial Hakim Fahrezi Dhimas Rizki Kurniawan Dian Wahyu Khaulan Noviato Diana, Feriska Dicky Juniar Dimas Adi Saputra Dimas Ardiansyah Dimas P, Aditya Dimas Prayuga Dini Fitrianti Dwi Bagus Prasetyo Dwi Cahya Wulan Septian Dwi, Ilanka Cahya Dyo Eka Affandi Ekawardani, Naeda Tamara Eko Budi Satoto Eko Suasmadi Eriyanti , Merlita Erna Ipak Rahmawati Ernandi, Titan Dani F.P., Ahmad Iqbal Fadhil Aditya Putra Vidiyanto Fais, Ahmad Nur Faisandra, Mariska Amalia Fajri, Gilang Faridhiya, Naufal Reza Felim, Felda Ferdi Yanuar, Setiyo Ferdika Yudha Pramana Firmansyah, Moh. Adi Fraya Ani Galih Alnabawi Putra Amelinda Setia Budi Ghefira Maydina Anjani H, Prames Aulia Sukma Hamduwibawa, Rofi Budi Hanafi Hanafi Haykal, Muhammad Helmi Herdhiansyah Herlambang, Toni Hilmi, Ahmad Iqbal Ika Priantari Ilanka Cahya Dewi Ilanka Cahya Dewi Ilyasa, Muhammad Indah Sofiyanti Romadona Ipak Rahmawati, Erna Iqbal F. P., Ahmad Irawati Irawati Irawati Irawati Isabella, Nurullah Iskandar Umarie Karim, M. Ainul Ken Anda Saka Wijaya Kevin Nanda Pratama Kia Candra K Kosjoko Kosjoko Kusuma, Moch Nur Hadi L, Adinda Fitriyah Laili, Januariya Levina Ardiningrum Hartadi M. Dimas Prayuga M. Rifki Alfaries M. Sevi Abdillah Mahardika, Savana Duwi Malatania, Lala Arum Manggala, Adhitya Surya Maudiani, Moh. Maulana Alan Alfan Zamani Maulana, Aqsal Fikrillah Maulana, Helmy Alif Mayanda, Bernicha Dwivani Meidlyana, Syafirna Melina, Nabila Milana Agustin Milya, Abidah Moch Reeza Moch Reyzal Pahlevy Mohammad Ahnan Edwan Aulana Mufarida, Nely Ana Muhammad Firmansyah, Muhammad MUHAMMAD FUAD Muhammad Hazmi Muhammad Irvan Fausi Muhtar Muhtar Muhtar Muhtar Muhtar Muhtar N, Yodick Febrian Nafila, Zakya Nanang Saiful Rizal Naylah Sofia Elmadjid Nely Ana Mufarida Ninda Rizki Apriliana P, Vania Yanuarita P Pamungkas, Satria Ardi Patricia Putri Bintari Pramana, Anselmus Henry Pramana, Ferdika Yudha Pratama P., Aldi Nanda Prayogi, Fahrur Prayogo, Prasetyo Eka Priyono, Pujo Pujo Priyono Putra, Arya Dzikrullah Akida Juliandana Putra, Dhian Wahana Putra, Mohammad Ridha Ardiansyah Putra, Muhammad Rifqi Arya Putra, Yogi Armanda Maulana Putri, Devina Amelia Eka Putri, Sandifa Putri, Sonia Rahma Fajar Putri, Tiara Ghayda Qurrotul Aini Rafi Eka Ramadhani Rafi Ramadhan Raharjo, Marcerio Tri Putra Rahmat Hidayatur Rofiqi Rajabi, Fahmi Ramadhani, Faqih Figo Reynanta Raditya Gumilang Rian Saillillah Rifta, Azzah Iftina Rizal , Nanang Saiful Rizal Aditya Rizqi, Putra Dwi Rosana, Manna Roshiyana, Szasza Nazafah Rosyidatul Auliya Rozikin, Alimul S, Raja Eko Dwi Sabda Arsy Cholid Safitriani, Alika Sang Angga Zeatama Afaer Saputra, Aditya Fernanda Raihan Sari Dewi Oktavianti, Wulandari Setiyo Ferdi Yanuar Shelina, Dyan Shodiqin, Dimas Herliandis Silvia Nur Jannah Sindy Septi Tri Nurdiana Siswoyo, Mochammad Rico Siti Mardiatul Sofia Ariyani Sofyan Rofi Soleh, Abdullah Robeid Suasmadi, Eko Taufan Abadi Taufan Abadi Tiara Puspita S Totok Dwi Kuryanto Trikusuma R., Dony Umarie, Iskandar Umarie, Winda Islamiyah Valensia, Imelda Veri Ardiansyah Veri Ardiansyah Vidiyanto, Fadhil Aditya Putra Wahyudi, Muhammad Nur Wardani, Qisti Yuli Wicaksana, Krisna Ary Yahya, Helmi Yanuar, Setiyo Ferdi Yoga Alvian Pratama Yoga Dwi Saputra Ari Sandi Zainuddin Permana, Muhammad Zakiyatul Afifah Zhulfikar, Muhammad