Faktor-faktor Kunci Penerapan Bangunan RISHA pada Proyek Penanganan Pasca Bencana Gempa di Cianjur Kamal Komaludin; Anton Soekiman; Chandra Afriade Siregar
Jurnal Talenta Sipil Vol 9, No 1 (2026): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v9i1.1151

Abstract

The implementation of Simple Healthy Instant Houses (RISHA) as a temporary or permanent housing solution after an earthquake has become a strategic choice for the Indonesian government. RISHA is designed to be built quickly, affordably, and earthquake-resistant. However, in its implementation, there are various challenges that hinder the effectiveness and efficiency of the implementation of this system. The purpose of this study is to identify and evaluate the main obstacles in the implementation of RISHA buildings in post-earthquake rehabilitation projects, including technical, social, and institutional aspects. This study uses a qualitative method with a case study approach focused on the earthquake-affected area in Cianjur Regency. The results of the study indicate that the main challenges include limited understanding of the local community and workforce regarding the RISHA modular system, the availability of materials and structural components at the disaster site, limited training time, and lack of coordination between stakeholders. In addition, the cultural and architectural preferences of the local community also affect the level of acceptance of the RISHA building model. Thus, a more comprehensive and participatory approach is needed in the implementation of RISHA in order to increase its effectiveness as a sustainable post-disaster solution.
ffgfdg Maman Taryaman; Anton Soekiman; Chandra Afriade
Teknika Vol. 20 No. 2 (2025): Oktober
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/teknika.v20i2.12089

Abstract

Building Information Modeling (BIM) semakin banyak digunakan dalam industri konstruksi untuk meningkatkan efisiensi proyek. Penelitian ini menganalisis implementasi BIM pada tahap konstruksi melalui studi kasus Proyek Jalan Tol Serang–Panimbang Seksi 3 di Banten. Metode yang digunakan adalah pendekatan kuantitatif dengan penyebaran kuesioner kepada PPK, Konsultan Supervisi, dan Kontraktor. Hasil menunjukkan bahwa BIM sudah diintegrasikan dalam proyek, namun masih terdapat hambatan seperti biaya tinggi, keterbatasan SDM, dan kurangnya dukungan. Evaluasi dengan indikator kinerja (KPI) dari Ditjen Bina Marga menunjukkan proyek memenuhi kelengkapan dokumen dan regulasi. Studi ini merekomendasikan peningkatan pelatihan, fasilitas, dan kebijakan, termasuk pemanfaatan Common Data Environment (CDE) sebagai platform kolaborasi digital. Keberhasilan BIM bergantung pada kolaborasi lintas disiplin, dukungan kebijakan, dan kesiapan teknologi serta SDM.