Claim Missing Document
Check
Articles

ANALISA KESEIMBANGAN LINTASAN PERBANDINGAN METODE RPW DENGAN REGION APPROACH DALAM PEMBUATAN BATIK PRINTING DI “SEKAR JATI STAR” Sobir Farid, Muhammad; Rahmawan Wira Ghani, Sulung
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 1 No 01 (2021): September
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v1i01.1827

Abstract

This Sekar Jati Star Written Batik is a type of company that is still an SME or Home Industry with a wholesale production type or every time you receive orders, and the Sekar Jati Star Batik UKM is a company that adheres to a job shop because of the variety of products or different motives with different flow patterns. different too, so this industry practice research carries the topic of line balancing using the RPW method and the Region Approach, namely to find out that the production line balance problem occurs most in the assembly process compared to the manufacturing process. Continuous movement is most likely achieved by manual assembly operations when several operations can be divided by a short duration in the batik printing process so that the distribution of tasks can be evenly distributed so that jams can be avoided. After calculating the RPW method, the results of the number of stations in the initial condition are 5 and the RPW method 5, the balance delay in the initial conditions is 39.2% with the RPW method to 18.0%, the efficiency of the initial condition system is 60.8% with the RPW method 82%, Output Production Initial conditions 16 meters / day with the RPW method 31 meters / day. Then the calculation of the Region Approach method results in the number of work stations 5, Balance Delay 96%, and for work efficiency 0.0376 or 4%.
ANALISIS PRODUKTIVITAS DENGAN METODE OBJECTIVE MATRIX (OMAX) DI HOME INDUSTRI X Basori, Fitra Ilman; Muflihah, Nur; Ghani, Sulung Rahmawan Wira; Afiatna, Fatma Ayu Nuning Farida
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 1 No 2 (2022): Februari
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v1i2.2320

Abstract

Perusahaan mengalami tidak tercapainya target produksi pada tahun sebelumnya. Hal ini membuat peneliti ingin melakukan pengukuran produktivitas untuk perusahaan, karena sebelumnya belum ada pengukuran produktivitas pada pabrik. Dalam pengukuran produktivitas kali ini peneliti menggunakan metode Objective Matrix (OMAX). Dalam pengolahan datanya peneliti menghitung nilai rasio tiap periode, nilai bobot, nilai level 0-3-10, nilai selain level 0-3-10, Indikator Performansi (IP), dan Indeks. Tujuan penelitian ini agar dapat mengetahui analisis dan pengukuran produktivitas pada home industri ini dan menemukan solusi untuk perbaikan berdasarkan hasil yang ditemukan. Dalam analisis menggunakan diagram Pareto didapat bahwa untuk mencapai dampak perbaikan 80% maka ditentukan rasio-rasio yang harus segera diperbaiki, yaitu rasio 2, 4, dan 6. Hal ini dapat ditingkatkan dengan berbagai usulan, yang pertama meningkatkan skill para tenaga kerja, dan mengupayakan para tenaga kerja dapat bekerja saat produksi bekerja, kemudian yang kedua melakukan proses maintenance secara rutin, lalu memberi alat penyedot suhu panas, untuk faktor mesin bisa membeli alat otomatis sehingga dapat mempercepat proses percetakan, dan menjalin hubungan dengan supplier bahan baku sehingga dapat memberikan bahan baku yang berkualitas.
PERANCANGAN DAN PENGEMBANGAN PRODUK MESIN PERONTOK BULU AYAM DENGAN MENGGUNAKAN METODE KANSEI ENGINEERING Akmal, Muh.; Ghani, Sulung Rahmawan Wira
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 1 No 2 (2022): Februari
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v1i2.2323

Abstract

Mesin perontok bulu ayam merupakan alat yang dapat digunakan untuk mencabut bulu ayam secara otomatis tanpa harus menggunakan cara manual. Namun masih banyak produsen ayam potong di daerah Gudo yang menggunakan cara tradisional dalam proses pencabutan bulu ayam yang dapat mempengaruhi efisiensi dan produktifitas ayam. Penelitian ini menggunakan pendekatan metode Kansei Engineering (Rekayasa Kansei) untuk memadukan kansei (perasaan serta emosi) dengan keahlian ilmu rekayasa. Tujuan dari penelitian ini adalah merancang dan mengembangkan alat perontok bulu ayam agar lebih efisien. Hasil kuesioner dari responden kemudian diuji menggunakan uji validitas yang didapatkan ada 10 kata kansei word yang valid. Data yang valid kemudian diuji dengan uji reliabilitas dengan hasil 10 kata kansei word yang reliabel dikatakan reliabel karena nilai Cronbach's Alpha 0,880 > rtabel 0,444. Pengujian selanjutnya menggunakan uji KMO dengan hasil Angka test Bartlett 0,517 serta nilai MSA keseluruhan > 0,5 dan signifikansi dibawah 0,05, maka variabel bisa digunakan untuk penyebaran kuesioner Semantic Differential II. Kuesioner dari responden kemudian diolah menggunakan analisis Conjoint dan Multivariat dengan hasil yang didapatkan ada 8 sampel desain produk dimana sampel produk pertama yang terpilih sebagai usulan desain mesin perontok bulu ayam dengan spesifikasi bentuk persegi panjang, bahan besi, sistem penggerak mesin bor dan berukuran kecil.
Perancangan Ulang Tata Letak Fasilitas Laboratorium Pabrik Gula Dengan Metode Computerized Relationship Layout Planning(CORELAP) (Studi Kasus PT Kebun Tebu Mas) Imam Putra Utama; Andhika Mayasari; Sulung Rahmawan Wira Ghani; Minto
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 2 No 1 (2022): September
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v2i1.3242

Abstract

PT Kebun Tebu Mas is a manufacturing company that produces white crystal sugar for the community, and refined sugar for industrial needs. In the sugar manufacturing industry, it is necessary to design the layout of the facility, especially in the laboratory section, it aims to make the work more effective and create an efficient transfer distance of the analysis process, with the hope that quality control can be carried out optimally. The obstacle faced by the laboratory of PT Kebun Tebu Mas is the layout design of the facilities which is not neatly arranged. The purpose of this research is to design an improved layout using the CORELAP method. The laboratory of PT Kebun Tebu Mas has 16 main facilities to analyze 13 core parameters, in quality control. The research was conducted using the CORELAP construction method, where qualitative data will be converted to quantitative data, as a basis and description for designing the layout of the facility. The results of this study are able to minimize the distance of 84 meters, so that the analysis process becomes more effective, where the displacement distance in the initial layout is 206.5 meters while the displacement distance in the improved layout is 122.5 meters, so that distance efficiency is 40.7% and time efficiency is 55. ,24%.
Student Entrepreneurship Cluster as The Implementation Response of University Entrepreneurship Program (A Case Study of Engineering Faculty Students of Unhasy Tebuireng) Sulung Rahmawan Wira Ghani; Meriana Wahyu Nugroho
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 2 No 1 (2022): September
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v2i1.3323

Abstract

Abstract This research was carried out to identify the characteristics of entrepreneurship carried out by students of the engineering faculty of Unhasy. The elements of cluster grouping are based on the entrepreneurial activities before becoming a student of the engineering faculty. This is to identify whether the activities have changed or not in terms of continued entrepreneurship after becoming a student at Unhasy. The processing of the data obtained shows that the program Entrepreneurship in the engineering faculty is identified based on: the alignment of the entrepreneurship program of Unhasy with implementation, the implementation of entrepreneurial practices, the entrepreneurship infrastructure that they have and want, the way to learn entrepreneurship, and the response to implementation of the Unhasy entrepreneurship program. From these variables, it shows in general that students of Unhasy's engineering faculty has been running entrepreneurship and survived until now at around 39%.
Pengambilan Keputusan Dalam Pemilihan Tempat Peletakan Alat di Laboratorium Teknik Industri Berdasarkan Keterbatasan Ruang dengan Metode AHP Tri Aji Wicaksono; Andhika Mayasari; Sulung Rahmawan Wira Ghani
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 2 No 2 (2023): Februari
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v2i2.3737

Abstract

Industrial engineering laboratory is an important component in a high-level learning in industrial engineering study program. The university wants a correct and proper layout for the placement of various kinds of learning support tools and practicums in the laboratory for Industrial Engineering students. There are 3 laboratory rooms, namely the Manufacturing Industry Laboratory, the Service Industry Laboratory, and the Industrial Integration System Laboratory. The research focused on the placement of laboratory equipment within the limited space available. This study aims to determine the priority criteria and alternative placement of the best laboratory equipment. The method used is AHP-TOPSIS, the AHP method is used for weighting the assessment criteria, while the TOPSIS method is used to sort the location of various laboratory equipment. The researcher determined that there were 4 criteria, namely the dimensions of the tool, the level of danger, maintenance, and the mobility of the tool. The conclusion that can be drawn is that the AHP-TOPSIS method can be used as a decision-making framework in selecting the right place for laying various laboratory equipment. Placement of tools that have the criteria of tool dimensions with heavy mass and mobility of tools that are often moved are placed in the Manufacturing Industry Laboratory.AHP, TOPSIS, laboratory, decision making
ANALISIS IMPLEMENTASI BUDAYA 5S DALAM PENATAAN LABORATORIUM TEKNIK INDUSTRI UNIVERSITAS HASYIM ASY’ARI Ardi Setiawan; Sulung Rahmawan Wira Ghani
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 2 No 2 (2023): Februari
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v2i2.3738

Abstract

Industrial engineering is an engineering field that includes the knowledge of design, repair, and manufacture integrated systems consisting of people, raw materials, information, equipment, and energy. The laboratory is used to complete the observed research, especially industrial problems in the industrial engineering department. Based on previous research, as many as 62.5% of lecturers found it difficult to store laboratory equipment in the workspace and 81.25% suggested to rearrange the layout of the laboratory. This study aimed to design the layout of laboratory equipment by using the 5S method. The first step to do the research was reducing laboratory activities, initial identifying of laboratory layouts, grouping the machines and tools, designing the laboratory layouts, implementing 5S, and evaluating new designs by using the Self-Assessment Form. The resulting layout is in accordance with the 5S principle, the design of the wardrobe is relatively small, and the design adapts to the space and equipment stored. The results then showed that 5S performance data in the laboratory before the implementation was 0.71 which in the fair rating category, and after the application of 5S the average score becomes 1.5 which in the excellent rating category. However, it shows that there is two-fold increase before the implementation 5S method.
EVALUASI KESELAMATAN DAN KESEHATAN KERJA PADA PRAKTIKUM TEKNIK INDUSTRI UNIVERSITAS HASYIM ASY’ARI DENGAN METODE JOB SAFETY ANALYSIS Mochamad Dwi Rizky Dharmawan; Sulung Rahmawan Wira Ghani
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 2 No 2 (2023): Februari
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v2i2.3739

Abstract

Every year, the number of accident cases in Indonesia has been increased. The latest data in 2018 showed that there were 157,313 cases involving work accidents. In the fact, the laboratory is a place or room equipped with equipment for conducting experiments (investigations and so on). The manufacturing process of one of the practicums by using a machine can cause noise that is not appropriate with Occupational Safety and Health (K3) and the place is also inseparable from the potential dangers or even the risk of work accidents from the tools and practicum materials for the practitioner. There were efforts to prevent and minimize the work accidents in the laboratory, one of which is by applying the Job Safety Analysis (JSA) method and increasing the knowledge of K3 (Occupational Health and Safety). The purpose of this study is to know the application of JSA and the knowledge of K3 of work accidents in the Hasyim Asy'ari University laboratory. The method of this researcher was that identifying and analyzing the risks that occur. The results showed the sequence of work, potential hazards and control efforts made from each hazard. In short, the application of this method hopefully able to make the practitioner aware of the dangers that occur if they do not comply with the JSA (Job Safety Analysis) that has been made previously.
study Desain & Implementasi BUSINESS INTELLIGENCE pada suatu maskapai penerbangan (laporan penelitian magang MSIB) Guruh Sukmo; Sulung Rahmawan Wira Ghani
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 2 No 2 (2023): Februari
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v2i2.3740

Abstract

Satisfying service is a priority for airlines so airlines compete to create comfort. In addition, flights also affect external matters because the airline needs to minimize errors which often occur. To overcome this, it is necessary to monitor the performance of airlines. One method used is the application of a business intelligence system which can provide reporting dashboards that can provide interactive data analysis information. The amount of data from flight traffic stored in the data warehouse becomes very useful if managed properly to get various kinds of hidden insights. With the implementation of business intelligence, the data can be utilized so it becomes a tool in making decisions for the development and improvement of air traffic and the impact of air traffic. The object of this research used raw data from public data. This research method used the Business Intelligence Roadmap (BIR). The results of the study made 3 dashboards: the first dashboard showed a pattern which was almost the same as the total delay data in 3 consecutive years. This was due to a high proportion of weather conditions in America. The second dashboard depicted a positive correlation between airplane visits and economic growth. The third dashboard indicated the number of flights that were frequently used by passengers as a standard reference that the need for and comfort for aircraft facilities because the quality of service provided by the airline was very important for consumers who used flight services.
ANALISIS KESELAMATAN DAN KESEHATAN KERJA DENGAN PENDEKATAN ERGONOMI STUDI KASUS CAHYA SETYA TROPHY Muchamad Afif Abdulloh; Nur Muflihah; Minto; Sulung Rahmawan Wira Ghani
INVANTRI (Inovasi Dan Pengelolaan Industri) Vol 2 No 2 (2023): Februari
Publisher : Teknik Industri, Fakultas Teknik, Universitas Hasyim Asy'ari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/invantri.v2i2.3741

Abstract

Cahya setya trophy is a small manufacturing industry that produces trophies, vandels, acrylics, etc. In this small industry in the warehouse, there is still a lack of awareness to use personal protective equipment and a work method that can cause Musculosketal disorders. This study aims to analyze K3 from the Cahya setya trophy warehouse using observation methods, Nordic Body Map, RULA and REBA. The observation method was used for the initial step of the study and the Nordic Body Map was used to find a sample as a research from the RULA, REBA method. The results of work safety observations found that the dangerous action if not wearing shoes was the worst possibility that it could cause the employee's feet to bruise, and not using gloves was the worst possibility that the hands could be scratched. The results of the occupational health analysis using the REBA method, the bent position got a final score of 8, the duct tape process squat position got 9 scores, both positions had an action level of 3, and the packaging squat position got a score of 12 with an action level of 4, which means there is a very high risk and this position is very dangerous, then change action is needed, The results of the RULA method in the packaging squat position, the duct tape squat got a score of 6 which had an action level of 3 and the bent position got a score of 7 which had an action level of 4. From the results of these calculations, all work methods require action to change work methods, if changes in work methods are not immediately carried out, it can trigger Musculosketal disorders and lack of comforted at work.