Claim Missing Document
Check
Articles

Found 33 Documents
Search

Penguatan Peran Anggota Masyarakat Dalam Perencanaan, Penganggaran dan Penilaian Hasil Pembangunan Desa Gunawan, Randi; Gultom, Muhammad Husin; Ajinar; Akhyari; Suhaeri; Syahrizal; Iskandar; Sabri
Kawanad : Jurnal Pengabdian kepada Masyarakat Vol. 1 No. 1 (2022): March
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/kjpkm.v1i1.8

Abstract

Law Number 6 June 2014 Village development plans must be carried out in a participatory manner, including the entire community, including sensitive groups (minorities, diverse, women, and the poor). The development carried out by the village is intended to be truly beneficial for all residents. So far, most villages in Indonesia have not been able to carry out legal missions. This is evidenced by the existence of a complete village without entangling the community with a transparent development plan. In addition, there are villages that try to involve the community through the “musrenbangdes” mechanism, but not all community components are invited to the “musrenbangdes”. As a result of non-participatory development planning, the benefits of village development are not felt by all levels of society, so the development program is not successful. The USK staff conducts training on village development planning, budgeting, and evaluation of village development results in Payakameng Village as an effort to realize a participatory village development plan. Representatives from all levels of the village community (village residents, administrators of social organizations, village government) participated in these activities. In this training, it is necessary to implement a participatory village development plan so that all residents can feel the results of development.
Penerapan Aplikasi Administrasi Microsoft Office Pada Para Operator Pendidikan Anak Usia Dini (PAUD) di Kecamatan Syiah Kuala Kota Banda Aceh Zainuddin; Saiful; Masri; Putra, T. Edisah; Machmud, M. Nizar; Suhaeri; Akhyar; Suriadi; Devi Sara, Ira; Malahayati, Nurul
Kawanad : Jurnal Pengabdian kepada Masyarakat Vol. 2 No. 2 (2023): October
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/kjpkm.v2i2.171

Abstract

Early childhood education (PAUD) is very important to prepare an educated generation for the nation and state, and the role of early childhood educators (PAUD) is very important in the development of students. Educators need to go beyond traditional learning by providing learning innovations that utilize information technology, including the ability to master the latest information technology. The focus of the Community Service Program (PKM) is to improve   the quality of human resources (HR) of PAUD organizers in Syiah Kuala District, Banda Aceh Province in the field of information technology, so that they are able to support the management of learning and educational activities. In improving the quality of kindergarten teaching staff in the field of information technology is related to supervision management and making daily learning implementation plans (RPPH). With a system that allows teachers to quickly resolve administrative problems, it is hoped that they can use their time to further develop their knowledge and skills regarding PAUD administrative problems.
Penerapan Energi Terbarukan sebagai Sumber Energi Masyarakat Nelayan Lam Awe Aceh Besar Suhaeri; Zulfadhli; Bachtiar, Dandi; Ali, Nurdin; Arhami; Pradinata, Edy; Alfisyahrin; Syukriyadin; Syukri , Mahdi
Kawanad : Jurnal Pengabdian kepada Masyarakat Vol. 3 No. 1 (2024): March
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/kjpkm.v3i1.207

Abstract

This report describes efforts to implement renewable energy technologies as a solution to meet the energy needs of the fishing community in Lam Awe, Aceh Besar. A community engagement approach was used to integrate renewable energy technologies into the daily lives of the fishing community. The study includes the process of identifying community needs, selecting appropriate technologies, and implementing renewable energy solutions. Research methods included participatory surveys, training sessions, and mentoring to ensure active participation and deep understanding from the local community. The results indicate that the implementation of renewable energy can enhance energy access, reduce operational costs, and support environmental sustainability in coastal areas. This report contributes to the context of sustainable technology application for fishing communities, highlighting the importance of collaboration between academics, practitioners, and communities in developing sustainable energy solutions.
Rehabilitasi Sistem Pompa Irigasi untuk Menjamin Ketersediaan Air pada Lahan Pertanian di Gampong Limpong, Kecamatan Darussalam Ali, Nurdin; Suhaeri; Husaini; Arhami; Putra, T. Edisah; Aulia, Udink; Syahriza; Bakhtiar, Dandi; Sabri
Kawanad : Jurnal Pengabdian kepada Masyarakat Vol. 3 No. 2 (2024): October
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/kjpkm.v3i2.226

Abstract

The rehabilitation of irrigation pumps plays a crucial role in ensuring sufficient water availability for rice fields in Gampong Limpong, Darussalam District. A significant challenge faced by farmers in this region is the malfunctioning of irrigation pumps, which leads to suboptimal water distribution. This issue directly affects agricultural productivity and the welfare of farmers. Through rehabilitation efforts, damaged pumps are either repaired or replaced with more efficient units. The rehabilitation process involves the identification of damages, repair of key components, and operational trials to verify optimal pump performance. Results from this initiative indicate a more stable availability of irrigation water, thereby enhancing crop yields for farmers. This rehabilitation not only offers technical solutions but also fosters active community involvement in maintaining the sustainability of the irrigation system. Consequently, this program contributes positively to the development of the agricultural sector in Gampong Limpok.
Perbaikan Tegangan dengan Menggunakan Kapasitor Bank 25 MVAR pada Gardu Induk Banda Aceh Suriadi; Azmi, Saddam; Gapy, Mansur; Ali, Masri; Arhami; Ibrahim, Masri; Suhaeri; Nasution, Elvy Sahnur
Journal of Engineering and Science Vol. 2 No. 1 (2023): January-June 2023
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v2i1.118

Abstract

The Nagan Raya coal-fired power plant in Aceh, Indonesia, serves as a major supplier of electricity to the region's power grid. However, the power generation unit of the plant, which supplies reactive power to the subsystem, often experiences disturbances that cause voltage values in the Banda Aceh substation system to decrease. This decrease in voltage can be detrimental to the quality of power supplied to the consumers. To address this issue, a capacitor bank with a capacity of 25 Mvar was installed at the end of 2016. The capacitor bank was successful in increasing the voltage value at the substation and proved to be an effective solution. However, with the anticipated growth in load in the coming years and the possibility of future disturbances in the power generation unit, it has been proposed that an additional capacitor bank unit with the same capacity be installed to further enhance the voltage quality at the Banda Aceh substation. To assess the feasibility of this proposal, simulations were carried out using ETAP 12.6.0 software. The simulation results show that the addition of a 25 Mvar capacitor bank unit would lead to an increase in the substation voltage value of around 5-6 KV. This increase in voltage would help to maintain the quality of power supplied to the consumers and ensure that the power grid remains stable even in the event of disturbances in the power generation unit. Overall, the proposed installation of an additional capacitor bank unit would be a cost-effective solution to enhance the voltage quality at the Banda Aceh substation and ensure the stability of the power grid. This solution could be adopted by other power plants facing similar issues in maintaining voltage quality in their power grid systems.
Analisis Efek Pelat Berpori pada Serat Tanaman Ekor Kucing (Typha Latifolia) terhadap Koefisien Penyerap Suara Masri; Suhaeri; Arhami; Machmud, Mohd. Nizar; Masri, M. Faris Aufa
Journal of Engineering and Science Vol. 2 No. 1 (2023): January-June 2023
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v2i1.163

Abstract

This study aims to determine the value of the sound absorption coefficient of cat tail fiber (Typha latifolia) with the effect of weight and pore size resistance of the test sample plate. In this case the researchers made 6 test samples where each sample consisted of cat tail fibers weighing 50 grams and 75 grams with a diameter of 110 mm and a thickness of 20 mm, the test samples were arranged in layers with aluminimum plate resistance which had a pore size of 1 mm, 1.5mm, and 2.5 mm. Tests were conducted using the impedance tube transfer function method (ISO 10534-2:1998) at frequencies of 1/1 octave (125 Hz, 250 Hz, 500 Hz, 1000 Hz, 2000 Hz, 4000 Hz and 8000 Hz). The test results show that the sound absorption value at each frequency of each sample is relatively different. At a frequency of 125 Hz - 250 Hz the best sound absorption was obtained in the test sample with a pore size of 1 mm 75 g, at a frequency of 500 Hz the best sound absorption was obtained in the test sample with a pore size of 1.5 mm 75 g, at a frequency of 1000 Hz - 8000 Hz the best sound absorbing coefficient value occurred in the test sample with a pore size of 1 mm 75 g. From the graph it can be concluded that the pore size of the aluminum plate and density in each test sample can affect the sound absorption value.
Inovasi Teknologi Pemanas Kumparan sebagai Solusi Berkelanjutan dalam Proses Pembakaran Bata untuk Mengatasi Dampak Lingkungan Negatif Masri; Suhaeri; Noviana, Dwi; Azhar
Journal of Engineering and Science Vol. 2 No. 1 (2023): January-June 2023
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v2i1.164

Abstract

This research aims to design and develop coil heater technology as an alternative heat source to replace wood in the brick-firing process. The research methodology involves the design of an efficient and environmentally friendly coil heater and its implementation in the brick production process. In this study, the performance of the coil heater is analyzed to ensure that the generated heat is sufficient for the brick-firing requirements. The research findings indicate that coil heater technology is capable of providing the necessary heat to achieve optimal temperatures in the brick-firing process. Furthermore, the use of this coil heater technology successfully reduces dependence on wood as the primary fuel source. The implementation of coil heater technology in the brick-making industry is expected to make a positive contribution to the environment and the sustainability of natural resources. This research stimulates innovation in the development of alternative technologies that can reduce carbon footprints and improve the overall efficiency and sustainability of brick production processes.
Penelitian Efek Penggunaan Grid Tie Inverter pada Sistem Hibrid dengan Solar Panel dan Diesel Suhaeri; Masri; Azhar; Saifuddin
Journal of Engineering and Science Vol. 2 No. 1 (2023): January-June 2023
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v2i1.166

Abstract

The distribution system of electrical power begins from generation and is transmitted to the load, namely consumers. In this distribution, it must be effective, efficient, and reliable. The amount of electrical power reaching the load is not the same as the amount of power generated due to voltage drop or power losses. This research aims to determine the magnitude of power losses in the medium-voltage distribution network located in Pasar Aceh. The research method employed is the analysis and simulation calculation method using ETAP 12.6 software. The study analyzes power losses due to load imbalance in the JTR distribution substation of Pasar Aceh. Based on the analysis results, the load imbalance in the Pasar Aceh substation has led to power losses. The power losses in the Pasar Aceh substation, specifically at the Side Transformer of Pasar Aceh, are 0.77% with a load imbalance of 16.33%. For the second transformer in the BNI 46 area, the power losses are 0.98% with a load imbalance of 30.33%, and for the transformer in the BLKG KOTTY area, the power losses are 1.17% with a load imbalance of 50.33%. Therefore, the larger the percentage of load imbalance in an electrical distribution network, the greater the resulting power losses.
Eksperimen Pengaruh Kecepatan Pada Diameter Nozzle 2,5 mm dalam Proses Laser Cutting Masri; Suhaeri; Machmud, M. Nizar; Zainuddin; Saifuddin; Azhar
Journal of Engineering and Science Vol. 2 No. 2 (2023): July-December 2023
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v2i2.168

Abstract

This experimental study examines the impact of speed variations on the 2.5 mm nozzle diameter in low-carbon steel laser cutting. The primary objective is to optimize the roundness of the cut by considering cutting speed factors. Through a series of experiments conducted on low-carbon steel plates measuring 200 mm x 200 mm, utilizing a 2.5 mm nozzle diameter with speed variations of 2, 3, and 4 m/minute, the research measures roundness quality using a digital caliper. Results indicate that cutting speed influences roundness quality, with the lowest deviation observed at a speed of 2 m/minute and the highest at 3 m/minute. The study also highlights that increased cutting speed and the use of a larger nozzle require higher gas pressure.
Fatigue Performance of Sugar Palm Fibre-Reinforced Thermoplastic Polyurethane Composites with Varying Fibre Content Bachtiar, Dandi; Siregar, Januar Parlaungan; Suhaeri; Masri; Zulfadhli
Journal of Engineering and Science Vol. 4 No. 1 (2025): June
Publisher : Yayasan Kawanad

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56347/jes.v4i1.267

Abstract

This study investigates the fatigue behavior of sugar palm fibre (SPF)-reinforced thermoplastic polyurethane (TPU) composites with varying fibre contents (10 wt%, 20 wt%, and 30 wt%). The composites were fabricated using extrusion followed by hot press moulding. Tensile tests were conducted in accordance with ASTM D638 to determine the ultimate tensile strength (UTS), and fatigue tests were performed under stress levels of 80%, 70%, 60%, and 50% of the UTS, following ASTM D7791. The results indicate that an increase in fibre content leads to a reduction in both tensile strength and fatigue life, likely due to poor interfacial bonding and fibre agglomeration. Fatigue life was found to be significantly higher at lower stress levels across all fibre contents. These findings provide valuable information about the potential and limitations of SPF/TPU composites for applications involving cyclic loading, particularly in lightweight and sustainable material applications