cover
Contact Name
Juliana Fisaini
Contact Email
j.fisaini@usk.ac.id
Phone
+6281377412304
Journal Mail Official
jurnaltekniksipil@usk.ac.id
Editorial Address
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala Jl. Syech Abdurrauf No. 7 Darussalam, Banda Aceh 23111
Location
Kab. aceh besar,
Aceh
INDONESIA
Jurnal Teknik Sipil
ISSN : 20889321     EISSN : 25025295     DOI : http://dx.doi.org/10.24815/jts.v12i2.30788
Core Subject : Engineering,
Jurnal Teknik Sipil (Journal of Civil Engineering) Universitas Syiah Kuala is a scientific journal, published by Civil Engineering Department, Faculty of Engineering, Universitas Syiah Kuala. It is aimed at disseminating research results related to civil engineering fields, where readers of the journal are expected from civil engineering researchers/scientists, students in related fields, engineers, and practitioners in this field. Jurnal Teknik Sipil (Journal of Civil Engineering) Universitas Syiah Kuala publishes the scientific articles in area of civil engineering, as follows. Structural Engineering, Water Resources Engineering, Transportation Engineering, Geotechnical Engineering, Construction Engineering & Management, Urban Planning Geospatial and Geomatics Engineering, and Ocean Engineering
Articles 355 Documents
ANALISA BANGKITAN PERGERAKAN PADA KAWASAN LAMPULO KOTA BANDA ACEH Suriyadi Suriyadi; Renni Anggraini; Azmeri Azmeri
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Urban development is a series that can not be separated from the overall development activities in the framework of space and time. Increasing population Lampulo district, district of Kuta Alam, Banda Aceh has increased the movement of traffic flows towards and out of the area. Increased movement occurs primarily from 06.00 to 08.00 am, noon 13:30 pm to 14:30 pm, afternoon from 17.00 to 19.00. A trip generation modeling stage that estimates the number of movements originating from Lampulo district. This study aims to find out about trip generation patterns in the region Lampulo, and to determine the most dominant mode of transportation used to pattern Lampulo of trip in the region, which is reviewed by a mandatory activity, maintenance, and discretionary. Observations carried out on people in the area Lampulo, through questionnaires as many as 93 families. The results showed that the factors affecting the movement of activity mandatory requirement is the number of family members working (X5). The resulting regression model is Y1 = - 0.500 + 1,750X5. Factors affecting the movement needs of maintenance activity is the number of family members of the school (X6). The resulting regression model is Y2 = 1.388 + 0,500X6. Factors affecting the movement needs of discretionary activity is the number of cars in the family (X4) and the number of family members of the school (X6). The resulting regression model is Y3 = 0.838 + 0,419X4 + 0,189X6. Factors affecting the movement needs of all events is the number of motorcycles in the family (X3) and mileage (X7). The resulting regression model is Y = 2,215 + 0,479X3 + 0,051X7. The dominant mode of transportation in the movement of the mandatory activities, maintenance, and discretionary in Lampulo region is the mode of motorcycles.Abstrak: Kegiatan pembangunan kota merupakan suatu rangkaian yang tidak dapat dipisahkan dari kegiatan pembangunan secara keseluruhan dalam rangka ruang dan waktu. Meningkatnya jumlah penduduk kawasan Lampulo, Kecamatan Kuta Alam, Kota Banda Aceh telah meningkatkan pergerakan arus lalulintas menuju dan keluar kawasan. Peningkatan pergerakan terjadi terutama mulai pukul 06.00 s/d 08.00 WIB, siang hari pukul 13.30 WIB s/d 14.30 WIB, sore hari mulai pukul 17.00 s/d 19.00 WIB. Bangkitan pergerakan merupakan tahapan pemodelan yang memperkirakan jumlah pergerakan yang berasal dari kawasan Lampulo. Penelitian ini bertujuan untuk mengetahui tentang pola bangkitan perjalanan dalam kawasan Lampulo, serta untuk mengetahui moda transportasi yang paling dominan digunakan terhadap pola bangkitan perjalanan dalam kawasan Lampulo, yang ditinjau berdasarkan aktivitas mandatory, maintenance, dan discretionary. Observasi dilakukan pada penduduk di kawasan Lampulo, melalui penyebaran kuesioner sebanyak 93 KK. Hasil penelitian menunjukkan bahwa faktor yang mempengaruhi kebutuhan pergerakan dari aktivitas mandatory adalah jumlah anggota keluarga yang bekerja (X5). Model regresi yang dihasilkan adalah Y1 = - 0,500 + 1,750X5. Faktor yang mempengaruhi kebutuhan pergerakan dari aktivitas maintenance adalah jumlah anggota keluarga yang sekolah (X6). Model regresi yang dihasilkan adalah Y2 = 1,388 + 0,500X6. Faktor yang mempengaruhi kebutuhan pergerakan dari aktivitas discretionary adalah jumlah mobil dalam keluarga (X4) dan jumlah anggota keluarga yang sekolah (X6). Model regresi yang dihasilkan adalah Y3 = 0,838 + 0,419X4 + 0,189X6. Faktor yang mempengaruhi kebutuhan pergerakan dari semua aktivitas adalah jumlah sepeda motor dalam keluarga (X3) dan jarak tempuh (X7). Model regresi yang dihasilkan adalah Y = 2,215 + 0,479X3 + 0,051X7. Moda transportasi dominan pada pergerakan pada aktivitas mandatory, maintenance, dan discretionary di kawasan Lampulo adalah moda sepeda motor.
KINERJA JALAN BANDA ACEH–KRUENG RAYA BERDASARKAN VOLUME LALU-LINTAS DAN GEOMETRIK JALAN Adia Saputra; Sofyan M. Saleh; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 4, No 3 (2015): Volume 4, Nomor 3, Mei 2015
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: National Road Banda Aceh-Krueng Raya is a primary arterial road which is very crucial role in economic growth in the district of Aceh Besar, Aceh province. This study took place in Jalan Banda Aceh-Krueng Raya, divided into 2 (two). Segment I of kajhu Area trails in the area Kajhu (Sta. 6 + 000 s / d Sta. 8 + 000) with the condition of the road shoulder is still using aggregate pavement class B. Segment II, Road area Ladong (Sta. 22 + 000 s / d Sta. 24 + 000) with the condition of the road shoulder which has been using asphalt pavement. This study aimed to determine the performance of the road in Segment I and Segment II which is indicated by the value of Degree of Saturation (DS). Predicting the performance of the road on the first segment by segment II in the next 5 years, if there is no change in capacity in thaspsecord segment, and to determine the effect of the road surface flatness on the extent of damage on the way to the performance of the Segments I and Segment II. Studies using the method of Indonesian Highway Capacity Manual (MKJI) in 1997 showed the performance of the road in the first segment with the highest DS value of 0.617 with the level of service in C. As for the second segment with the highest DS value of 0.175 and the level of service A. Prediction of performance in the road 2019 if without any increase in capacity that is no treatment/action (do nothing), the first segment with a DS value of 1.1 included in the service level F, which is no longer eligible for the way out of town, while the prediction performance on the road segment II in 2019 with a DS value of 0.3 is still eligible classified level of service B. based on the research, it can be explained that the parameter of the road on both segments can influence the hardness of the road, such as the level of the unsmooth of the road surface.Keywords : Road Performance, PredictionAbstrak: Jalan Nasional Banda Aceh – Krueng Raya merupakan jalan arteri primer yang sangat berperan penting dalam pertumbuhan ekonomi di Kabupaten Aceh Besar, Provinsi Aceh. Seiring dengan pertumbuhan ekonomi maka akan menyebabkan Perubahan Tata Guna Lahan didaerah tersebut, sehingga aktivitas di daerah tersebut meningkat. Hal ini akan berpengaruh terhadapkinerja pelayanan  ruas jalan yang secara otomatis akan berpengaruh terhadap pengguna jalan. Penelitian ini mengambil lokasi di Jalan Banda Aceh – Krueng Raya yang terbagi atas 2 (dua batasan). Segmen I yaitu di daerah Kajhu (Sta. 6+000 s/d Sta. 8+000) dengan lebar badan jalan 7 meter dan kondisi bahu jalan masih menggunakan perkerasan agregat kelas B. Segmen II yaitu di daerah Ladong (Sta. 22+000 s/d Sta. 24+000) dengan lebar badan jalan 7 meter dan kondisi bahu jalan yang telah lapisan aspal tipis (latasir). Penelitian ini yang bertujuan: (1). Menentukan kinerja jalan pada Segmen I dan II yang ditunjukan dengan nilai Derajat Kejenuhan (DS), (2). Prediksi kinerja jalan pada tahun 2019, jika tidak ada perubahan kapasitas jalan (do nothing) pada kedua segmen tersebut. Hasil penelitianmenunjukkan bahwa kinerja jalan pada Segmen I dengan nilai DS tertinggi 0,62 tingkat pelayanan jalan C. Hasil penelitian pada segmen II menunjukkan bahwa kinerja jalan dengan nilai DS tertinggi 0,18 dan tingkat pelayanan jalan A. Prediksi Kinerja jalan pada tahun 2019 jika tanpa ada peningkatan kapasitas maka Segmen I dengan nilai DS 1,1 dan termasuk ke dalam tingkat pelayanan jalan F, dimana sudah tidak lagi memenuhi syarat untuk jalan luar kota, prediksi kinerja jalan pada Segmen II pada tahun 2019 jika tanpa ada peningkatan kapasitas dengan nilai DS 0,3 dan masih memenuhi syarat yang tergolong tingkat pelayanan jalan B. Berdasarkan hasil penelitian dapat dijelaskan bahwa kinerja jalan pada Segmen I nilai DS 0.62 hampir mendekati standar kejenuhan jalan yaitu 0,75 dan untuk Segmen II nilai DS 0,18 tingkat pelayanan jalan A.Kata kunci : Kinerja jalan,  Prediksi
PENERAPAN SISTEM ACR-PCR DALAM PROSES EVALUASI STRUKTUR PERKERASAN BANDAR UDARA: STUDI KASUS PERKERASAN LENTUR BANDAR UDARA SULTAN ISKANDAR MUDA Taufiq, Luthfi Chaliqi; Darma, Yusria; Salmannur, Alfi; Asyifa, Cut Nella
JURNAL TEKNIK SIPIL Vol 12, No 1 (2023): Volume 12 Nomor 1 Mei 2023
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v12i1.31690

Abstract

ICAO (International Civil Aviation Organization) baru saja menerbitkan sistem rating kekuatan struktur perkerasan bandar udara yang baru menggunakan metode ACR-PCR (Aircraft Classification Rating - Pavement Classification Rating) yang menggantikan sistem ACN-PCN (Aircraft Classification Number - Pavement Classification Number). Sistem ini direncanakan secara penuh diterapkan oleh seluruh negara anggota ICAO pada tahun 2024. Penelitian ini menguraikan evaluasi terhadap struktur perkerasan Bandar Udara Sultan Iskandar Muda menggunakan sistem ACR-PCR dibantu dengan program FAARFIELD 2.0 dan ICAO-ACR. Dengan sistem ini nilai rating perkerasan ditentukan menggunakan prinsip Mekanistik-Empirik (ME) yang mempertimbangkan respon struktur perkerasan dan estimasi jumlah lintasan izin dengan model kerusakan tertentu. Berdasarkan analisis yang dilakukan diperoleh nilai PCR 1149 F/D/W/T dan 2433 F/D/W/T masing-masing berdasarkan kerusakan retak lelah pada lapis beraspal dan deformasi permanen pada lapis tanah dasar. Diketahui pula lapis beraspal merupakan lapis kritis dengan nilai CDF 1.
STUDI KEDALAMAN GERUSAN LOKAL PADA PILAR JEMBATAN SIMPANG SURABAYA KRUENG ACEH, BANDA ACEH Eldina Fatimah
JURNAL TEKNIK SIPIL Vol 3, No 1 (2013): Jurnal Teknik Sipil Volume 3, Nomor 1, September 2013
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Simpang Surabaya Bridge positioned at coordinates 5033'38” LU and 95019'4,1'' BT is located at Kuta Alam sub-district of Banda AcehMunicipality. The bridge was built across the river Krueng Aceh with ± 100 meters long with pillars to support the bridge. Pillars were in the river, resulting in narrowing the river cross section that led to disturbing river flow. Changes in flow velocity caused a scour around the pillars, so it is necessary to study local scour depth on the pillars. There are two types of pillars that existed. One type is located at the upstream side with Cylinder Group-shaped pillars (circular combination type) having the width of one meter and four meters long, while at the downstream part, the pillar type is round pillar-shaped nose with the width and length of one meter and three meters respectively. The aim of this research is to determine the scouring effect on the pillars based on data taken in 2008 and data from current measurement. While theactual local scour depth around the pillars were measured using instrument Qliner where the river was divided into two meters wide per section.Measurement data then is shown in the form of contour and cross section. From field measurement, it is found that the scouring depth at the upstream of the pillar is 0.88m whereas sedimentation occurred at the downstream part of the pillar. By using the measurement data on 2008 and compared with the meassured data, it is found that the Simpang Surabaya pillars were scoured noticeably and need to be protected. From the calculation, the pillars should be protected using riprap with a diameter of 0.945 meters.
KAJIAN PENINGKATAN INTENSITAS TANAM PADA D.I. BARO RAYA SUB D.I. BARO KANAN Zubaidah, Zubaidah; Yulianur, Alfiansyah; Azmeri, Azmeri
JURNAL TEKNIK SIPIL Vol 1, No 4 (2018): Volume 1 Special Issue, Nomor 4, Februari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i4.10065

Abstract

Abstract: Baro Raya irrigation area is one of the technical irrigation, source of water for Baro Raya irrigation Channel is Krueng Baro that intercepted through a weir Filter Down (weir Tyrool), with a total area of 11.855 ha irrigation. The purpose of this study were: 1) to find out the large volume / dependable flow that available at the weir, 2) to find out the amount of crop water needs for each alternative, 3) to find out the extents optimum plant that can be irrigated by the available water, 4) by reviewing the dam water balance based on cropping planned, is expected to provide an overview of alternative water balance is obtained. The method used in this research were data collection and data analysis to know dependable flow, water irrigation, cropping pattern and cropping intensity. The existing condition shows that the cropping pattern of rice-paddy-grains, normally cropping intensity in the study area ranged from only a maximum of 183%-231%, with a probability of irrigation water supply capability of MT 1 (rice) 52-84%, MT 2 (rice) 55-71% and MT 3 (pulses) 76-100%, while the study by modifying the cropping pattern into a rice-paddy / crops-rice and accompanied by the water delivery system by rotation, irrigation area Baro Raya Right that has acreage of 8927 ha can be irrigated as a whole even with cropping intensity to a maximum of 300%, with alternative cropping pattern 6 that MT1 (rice, 1 group), MT2 (rice, 2 groups) and MT3 (crops, 1 group), with planting begins in October the 2nd week, these alternatives are the best, classification is only done on MT 2, which is as much as two groups with the type of planting the same namely rice, this condition will minimize social conflict because there is no rotation of the water supply level group, because probability ability of water sources ranging between 84-100%.Abstrak: Daerah irigasi Baro Raya merupakan salah satu daerah irigasi teknis, Sumber air untuk jaringan irigasi Baro Raya adalah Krueng Baro yang disadap melalui sebuah Bendung Saringan Bawah (Bendung Tyrool), dengan luas areal irigasinya 11.855 Ha. Tujuan penelitian ini adalah : 1) Dapat diketahui besarnya volume/kapasitas andalan yang tersedia pada bendung, 2) Dapat diketahui besarnya kebutuhan air tanaman untuk masing-masing alternatif, 3) Dapat diketahui luasan tanaman optimal yang dapat diairi berdasarkan air yang tersedia, 4) Dengan melakukan kajian neraca air bendung berdasarkan pola tanam yang direncanakan, diharapkan dapat memberikan gambaran keseimbangan air dari alternatif yang diperoleh. Metode yang digunakan pada penelitian ini adalah metode pengumpulan data dan analisis data untuk mengetahui debit andalan, kebutuhan air irigasi, pola tanam dan intensitas tanam. Kondisi eksisting menunjukkan bahwa dengan pola tanam padipadipalawija, secara normal intensitas tanam yang ada di lokasi studi maksimum hanya berkisar antara 183%-231%, dengan probabilitas kemampuan penyediaan air irigasi sebesar MT 1 (padi) 52-84%, MT 2 (padi) 55-71% dan MT 3 (palawija) 76-100%, sedangkan Kajian dengan cara memodifikasi pola tanam menjadi padi-padi/palawija-padi dan dengan diiringi sistem pemberian air secara rotasi, Daerah Irigasi Baro Raya Kanan yang mempunyai luas areal 8.927 ha dapat diairi secara keseluruhan bahkan dengan intensitas tanam maksimum sebesar 300%, yaitu dengan alternatif pola tanam 6 yakni MT1 (padi, 1 golongan), MT2 (padi,2 golongan) dan MT3 (palawija,1 golongan), dengan masa tanam dimulai pada bulan Oktober minggu ke-2, alternatif ini adalah yang terbaik penggolongan hanya dilakukan pada MT 2, yakni sebanyak 2 golongan dengan jenis tanam yang sama yakni padi, kondisi ini akan memperkecil konflik sosial karena tidak ada rotasi pemberian air ditingkat golongan, sebab probabilitas kemampuan sumber air yang terjadi berkisar antara 84-100%.
STUDI PERJALANAN PENUMPANG KAPAL BANDA ACEH – SABANG DENGAN MODEL CAUSAL Lela Kusuma; Renni Anggraini; Irin Caisarina
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Sabang as one of the national tourism destination in Aceh province promises a lot of beautiful panorama charm. Determination of Sabang as a tourist destination should be supported by an adequate fleet of ships both in quality and quantity. The Banda Aceh - Sabang trip is served by 2 (two) types of vessels, the government's slow ship (KMP BRR) and the private-owned vessel (KM Express Bahari 3B). The number of trips to Sabang has increased very rapidly in 2013, so the addition of 1 (one) fleet of fast boats (Express Bahari 9). Although there have been 3 (three) fleets that navigate this route, but prospective passengers often can not be served. In this research, we want to know (1) the factors that influence the demand of passenger ship from Banda Aceh - Sabang and (2) formulate a model through regression using Causal Model. This model is processed based on the primary data (questionnaires) are distributed and the filling is accompanied by surveyors. The survey consists of 2 (two) stages: pilot survey and main survey. The questionnaire data was then coded and then processed using SPSS 18.0 software using multiple linear regression. The model is formulated based on the best R2 and R criteria, taking into account significant F-Test and t-Test. Based on the data processing, the Causal Model of Banda Aceh - Sabang passenger travel request is Y = 3,134 - 0,250 X9 (travel time) + 0,203 X13 (ship mode used) - 0,166 X6 (residents). Based on this model, it is known that the factors influencing the demand of passenger trip of Banda Aceh - Sabang ship consists of 3 (three) factors, namely: travel time, the mode of ship used and the origin of the population.Abstrak: Sabang sebagai salah satu tujuan wisata nasional di Provinsi Aceh menjanjikan banyak pesona panorama indah. Penetapan Sabang sebagai destinasi wisata seharusnya didukung oleh armada kapal yang memadai baik dalam kualitas maupun kuantitas. Perjalanan Banda Aceh - Sabang dilayani oleh 2 (dua) jenis kapal, yaitu kapal lambat milik pemerintah (KMP BRR) dan kapal cepat milik swasta (KM Express Bahari 3B). Jumlah perjalanan menuju Sabang mengalami peningkatan yang sangat pesat pada tahun 2013, sehingga dilakukan penambahan 1 (satu) buah armada kapal cepat (Express Bahari 9). Walaupun telah ada 3 (tiga) armada yang melayari rute ini, namun calon penumpang kerap tidak dapat dilayani. Untuk itu dalam penelitian ini ingin diketahui (1) faktor-faktor yang berpengaruh terhadap permintaan penumpang  kapal dari Banda Aceh - Sabang dan (2) merumuskan suatu model melalui regresi memakai Model Sebab Akibat (Causal Model). Model ini diolah berdasarkan data primer (kuesioner) yang disebar dan pengisiannya didampingi oleh surveyor. Survei terdiri atas 2 (dua) tahapan yaitu pilot survey dan survey utama. Data kuesioner selanjutnya diberi koding dan kemudian diolah menggunakan software SPSS 18.0 memakai regresi linier berganda. Model dirumuskan berdasarkan kriteria R2 dan R yang terbaik, dengan mempertimbangkan nilai F-Test dan t-Test yang signifikan. Berdasakan hasil pengolahan data maka  dirumuskan Model Causal permintaan perjalanan penumpang Banda Aceh - Sabang adalah  Y  =  3,134 – 0,250 X9 (waktu berwisata) + 0,203 X13 (moda kapal yang digunakan) - 0,166 X6 (asal penduduk). Berdasarkan model ini diketahui bahwa faktor-faktor yang mempengaruhi permintaan perjalanan penumpang kapal Banda Aceh – Sabang terdiri dari 3 (tiga) faktor, yaitu: waktu berwisata, moda kapal yang digunakan dan asal penduduk.
ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA MASA PANDEMI COVID-19 DENGAN METODE BOWTIE ANALYSIS Alfarezi, Ivan Ahmad; Soetjipto, Jojok Widodo; Arifin, Syamsul
JURNAL TEKNIK SIPIL Vol 10, No 2 (2021): Volume 10 Nomor 2 November 2021
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v10i2.21923

Abstract

Pelaksanaan proyek pembangunan selalu memiliki risiko kecelakaan kerja. Penerapan kesehatan dan keselamatan kerja yang kurang dapat menimbulkan berbagai macam risiko kecelakaan kerja. Oleh karena itu, perlu dilakukan penelitian tentang analisis risiko dan kontrol mitigasi guna mengurangi risiko kecelakaan kerja. Penelitian ini bertujuan untuk mengetahui risiko dominan terkait Kesehatan dan Keselamatan Kerja pada masa pandemi Covid-19. Metode yang digunakan dalam penelitian ini adalah Bowtie Analysis karena metode ini tidak hanya mampu menilai risiko tetapi juga dapat memaksimalkan mitigasi dari faktor penyebab dan dampak yang ditimbulkannya. Hasil penelitian menunjukkan bahwa terdapat 5 risiko dominan yang disebabkan oleh 20 faktor penyebab dan menimbulkan 14 dampak risiko kecelakaan kerja. Risiko dominan tersebut meliputi sling crane putus, crane terbalik, pekerja terjatuh saat pemasangan scaffolding, pekerja terjatuh saat pengecatan dan pekerja terjatuh dari lift. Sedangkan risiko akibat pandemi Covid-19 hampir tidak mempengaruhi risiko dominan kecelakaan akibat kerja. Respon risiko yang dihasilkan dari penelitian ini terdapat 36 alternatif mitigasi agar risiko dapat dicegah dan diselesaikan.Kata kunci : K3, Risiko, Kecelakaan Kerja, Bowtie Analysis, Respon Risiko
ANALISIS KINERJA SIMPANG BERSINYAL DAN BERLENGAN EMPAT (STUDI KASUS SIMPANG BPKP, BANDA ACEH) Sofyan M. Saleh; Noer Fadhly; Ruhdi Faisal
JURNAL TEKNIK SIPIL Vol 1, No 3 (2012): Volume 1, Nomor 2, Mei 2012
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: BPKP intersection is located in Banda Aceh City. This intersection was modified from three approaches between T.P. Nyak Makam Street and T. Iskandar Street, to be four approaches intersection.  The new approaches is connected T.P. Nyak Makam Street to B. Aceh – Medan National road after finishing Santan Bridge. The objective of this study is to analyze the performance of four approaches junction with traffic signal. Video Camera was installed in the data collection then analyze with Indonesian Highway Capacity Manual (IHCM, 1997) and the result would be come out in graphs and tables. The result showed that at peak hour and the highest flow are from the North approaceh, South approaches, east approach, and West approache consecutively; 810 pcu/hour, 571 pcu/hour, 797 pcu/hour, and 870 pcu/hour. Meanwhile the capacity for the existing condtion for those four approaches are consecutively; 596 pcu/hr, 766 pcu/hr, 770 pcu/hr, and 557 pcu/hr. From these data of the existing condition then can be found that the average degree of saturation (DS) is 1,18 and average delay is 402,6 sec/pcu, with cyclus time 89 second. After adjusting the geometric of junction, the performance is getting better with increase in capacity all approaches namely; the North approaceh tobe 1093 pcu/hr, South approaches 771 pcu/hr, East approach 1076 pcu/hr, and West approache 1174 pcu/hr. The average DS for all approach become lower to 0,74, and the average delays to be 24,4 sec/pcu. After predicting 5 years later with average traffic grouth of 17,5% per year, so DS will be 1,66, it means that need to be evaluated.Keywords : Flow, capacity, degree of saturation, delay, cyclus time.Abstrak: Simpang BPKP terletak di Kota Banda Aceh, sebelumnya merupakan simpang berlengan tiga antara jalan T. P. Nyak Makam dengan jalan T. Iskandar. Setelah dibangunnya Jembatan Santan yang merupakan terusan jalan T. P. Nyak Makam menuju jalan Nasional B. Aceh – Medan di Desa Meunasah Manyang Aceh Besar, maka Simpang BPKP menjadi simpang berlengan empat. Penelitian ini bertujuan untuk menganalisa kinerja simpang berlengan empat yang diatur dengan sinyal lalu lintas. Pengumpulan data  dilakukan dengan menggunakan kamera video yang kemudian diolah menggunakan metode MKJI 1997 dan hasil yang didapat dalam bentuk tabel dan grafik. Hasil perhitungan jam puncak dengan arus tertinggi diperoleh pada lengan Utara, Selatan, Timur dan Barat masing-masing sebesar 810 smp/jam, 571 smp/jam, 797 smp/jam dan 870 smp/jam. Nilai kapasitas kondisi eksisting pada lengan Utara, Selatan, Timur dan Barat masing-masing sebesar 596 smp/jam, 766 smp/jam, 770 smp/jam dan 557 smp/jam. Nilai derajat kejenuhan rata-rata pada kondisi eksisting sebesar 1,18. Nilai tundaan rata-rata sebesar 402,6 det/smp. Waktu siklus eksisting yang disesuaikan sebesar 89 detik. Setelah dilakukan analisis dengan perubahan geometrik, kinerja simpang menjadi lebih baik ditandai dengan nilai kapasitas pada lengan Utara, Selatan, Timur dan Barat masing-masing sebesar 1093 smp/jam, 771 smp/jam, 1076 smp/jam dan 1174 smp/jam. Nilai derajat kejenuhan pada lengan Utara, Selatan, Timur dan Barat masing-masing sebesar 0,74. Nilai tundaan rata-rata sebesar 24,4 det/smp. Apabila diprediksi pertumbuhan kendaraan pertahun 17,5 %, maka untuk 5 tahun mendatang diprediksi simpang dengan perubahan geometrik memiliki nilai DS sebesar 1,66 untuk setiap lengan-lengan simpang.Kata kunci : arus lalu lintas, kapasitas, derajat kejenuhan, tundaan, waktu siklus.
UJI DURABILITAS CAMPURAN AC-WC MENGGUNAKAN KOMBINASI LIMBAH PLASTIK DAN ABU SERABUT KELAPA SEBAGAI FILLER Ondriani, Ondriani; Saleh, Sofyan M.; Isya, Muhammad
JURNAL TEKNIK SIPIL Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i3.10027

Abstract

Abstract: The cause of damage and strength reductionon highway flexible pavement isthe low strength and durability on the wear layer. To cope withthis problem, it is necessary to add some particular additivethat can increase the asphalt concrete performance. One of the additional material that can be used are plastic. Stone ash, cement and fly ash has been commonly used as a filler in asphalt mixture. But these kind of filler was hard to get and the price were relatively expensive. The coconut fiber ash wich has a specific grafity greater than asphalt is expected to be one alternative. This research aims to determine the influence of plastic wastecombination substitution into the asphalt pen. 60/70 and the use of coconut fiber ash as filler on AC-WC mixture performance. The plastic used in this research is polyethylene terephthalate, polypropylene and polystyrene. The early stages of this research is to find the optimum asphalt content (OAC). After OAC obtained, then the specimens were mixed without and with the combination substitution of plastic waste as much as 2.7%; 4.7%; 6.7% against the weight of asphalt on OAC + 0.5% with and without the coconut fiber ash as a filler. The study results showed the use of plastic waste combination and the coconut fiber ash can not improve the durability value. The highest value of durability obtained at 4.7% combination substitution of plastic waste, it was 77.53%, While the lowest was in substitution of 6.7% plastic waste combination with 38.27% coconut fiber ash as a filler. The duration value of AC-WC mixture with plastic waste combination substitution and the use of coconut fiber ash filler did not meet the requirement that is 90%.Abstrak: Penyebab kerusakan dan penurunan kekuatan perkerasan lentur jalan raya adalah rendahnya kekuatan dan keawetan di dalam lapisan aus. Untuk menanggulangi hal ini dibutuhkan suatu bahan tambah yang dapat meningkatkan lapis aspal beton. Salah satu bahan tambah yang dapat di gunakan adalah plastik. Abu batu, semen dan fly ash sudah biasa digunakan sebagai filler dalam campuran aspal. Tetapi, jenis filler tersebut susah didapatkan dan harganya relatif mahal. Abu serabut kelapa yang memiliki berat jenis lebih besar dari aspal, diharapkan dapat menjadi alternatifnya. Penelitian ini bertujuan untuk mengetahui nilai durabilitas campuran AC-WC menggunakan kombinasi limbah plastik dan abu serabut kelapa. Plastik yang digunakan pada penelitian ini adalah Polyethylene Terephthalate, Polypropylenedan Polystyrene. Tahap awal penelitian ini adalah mencari kadar aspal optimum (KAO). Setelah KAO didapat kemudian dilakukan pembuatan benda uji tanpa dan dengan substitusi kombinasi limbah plastik sebesar 2,7%; 4,7%; 6;7% terhadap berat aspal pada KAO + 0,5% tanpa dan dengan abu serabut kelapa sebagai filler. Hasil penelitian menunjukkan penggunaan kombinasi limbah plastik tidak dapat meningkatkan nilai durabilitas. Nilai durabilitas tertinggi didapat pada substitusi kombinasi limbah plastik 4,7% yaitu 77,53% sedangkan yang terendah terdapat pada subtitusi kombinasi limbah plastik 6,7% dengan filler abu serabut kelapa yaitu 38,27%. Nilai Durabilitas campuran AC-WC dengan substitusi kombinasi limbah plastik dan penggunaan abu serabut kelapa sebagai filler tidak memenuhi syarat yaitu 90%.
KARAKTERISTIK DAN DAYA DUKUNG TANAH UNTUK STRUKTUR PERLINDUNGAN PANTAI DI PANTAI KEDULUNGU, KABUPATEN TABANAN PROPINSI BALI Vivi Yovita Indriasari; Johan Risandi; Rudhy Akhwady
JURNAL TEKNIK SIPIL Vol 5, No 3 (2016): Volume 5, Nomor 3, Mei 2016
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract:In the planning of foundation coastal structures, soil test is very important. Soil test can be done directly in the field or through laboratory.  Field investigations were carried out here is: Cone penetration test performed for three (3) points to the location of the arrangement of the beach area. Drilling work for three (3) points to a depth of 3:00 meters respectively. Sampling in 1 (one) sample for each boring and sampling disturbed by 5 samples. Research SPT tests were performed for each interval of 2:00 meters. Posts on soil test for building planning Kedungu beach, Tabanan aims to provide an overview of the importance of soil mechanics testing in foundation design of coastal protection structures. From the calculations ,Ultimate Bearing Capacity of soil limit based on laboratory and direct testing at 1.659-6.865 kg / cm2. The calculation of the carrying capacity of the high ground so shallow foundation is sufficient for planning revetment structure.Keywords : Soil test, Bearing capacity, coastal protection structures, foundation, Tabanan BaliAbstrak:Pengujian penelitian tanah (soil test) mempunyai perananan penting dalam perencanaan pondasi bangunan pantai.Pengujian mekanika tanah dapat dilakukan secara langsung di lapangan atau melalui pengujian di laboratorium.Studi dilakukan di wilayah Pantai Kedungu yang merupakan area pembangunan struktur pelindung pantai.Tulisan ini bertujuan untuk memberikan gambaran kondisi tanah di area studi sebelum dilakukan pembangunan struktur.Penyelidikan lapangan yang dilakukan meliputi pekerjaan  sondir  sebanyak 3 (tiga)  titik danbor tanah(boring) sebanyak 3 (tiga) titik dengan kedalaman  masing-masing 3.00 meter. Lokasi sondir dan boring dipilih secara acak sepanjang rencana desain bangunan pantai yang telah tersedia.Dilakukan pengambilan 1 (satu) sampel tidak terganggu serta 5 sampel terganggu untuk tiap titik boring.Tes SPT dilakukan tiap interval 2.00 meter sampai mencapai nilai perlawanan konus sebesar 250 kg/cm2.Hasil perhitungan daya dukung ijin berdasarkan pengujian langsung dan laboratorium di dapat sebesar 1.659 – 6.865 kg/cm2 Dari perhitungan tersebut daya dukung tanah tinggi sehingga pondasi dangkal sudah cukup untuk perencanaan struktur revetment.Kata kunci : Penelitian tanah, daya dukung, struktur pelindung pantai, pondasi,  Tabanan Bali

Filter by Year

2011 2025


Filter By Issues
All Issue Vol 14, No 2 (2025): Volume 14 Nomor 2 November 2025 Vol 14, No 1 (2025): Volume 14 Nomor 1 Mei 2025 Vol 13, No 2 (2024): Volume 13 Nomor 2 November 2024 Vol 13, No 1 (2024): Volume 13 Nomor 1 Mei 2024 Vol 12, No 2 (2023): Volume 12 Nomor 2 November 2023 Vol 12, No 1 (2023): Volume 12 Nomor 1 Mei 2023 Vol 11, No 2 (2022): Volume 11 Nomor 2 November 2022 Vol 11, No 1 (2022): Volume 11 Nomor 1 Mei 2022 Vol 10, No 2 (2021): Volume 10 Nomor 2 November 2021 Vol 10, No 1 (2021): Volume 10 Nomor 1 Mei 2021 Vol 9, No 2 (2020): Volume 9, Nomor 2, November 2020 Vol 9, No 1 (2020): Volume 9 Nomor 1 Mei 2020 Vol 8, No 2 (2019): Volume 8, Nomor 2, November 2019 Vol 8, No 1 (2019): Volume 8, Nomor 1, Mei 2019 Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018 Vol 7, No 1 (2018): Volume 7, Nomor 1, Mei 2018 Vol 1, No 4 (2018): Volume 1 Special Issue, Nomor 4, Februari 2018 Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018 Vol 6, No 3 (2017): Volume 6, Nomor 3, Mei 2017 Vol 6, No 2 (2017): Volume 6, Nomor 2, Januari 2017 Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017 Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017 Vol 6, No 1 (2016): Volume 6, Nomor 1, September 2016 Vol 5, No 3 (2016): Volume 5, Nomor 3, Mei 2016 Vol 5, No 2 (2016): Volume 5, Nomor 2, Januari 2016 Vol 4, No 3 (2015): Volume 4, Nomor 3, Mei 2015 Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014 Vol 3, No 1 (2013): Jurnal Teknik Sipil Volume 3, Nomor 1, September 2013 Vol 2, No 2 (2013): Volume 2, Nomor 2, januari 2013 Vol 2, No 3 (2013) Vol 2, No 1 (2012): Volume 2, Nomor 1, September 2012 Vol 1, No 3 (2012): Volume 1, Nomor 2, Mei 2012 Vol 1, No 2 (2012): Volume 1, Nomor 2, Januari 2012 Vol 1, No 1 (2011): Volume 1, Nomor 1, September 2011 More Issue