cover
Contact Name
Wesli
Contact Email
wesli@unimal.ac.id
Phone
+62811671918
Journal Mail Official
teras.jurnal@unimal.ac.id
Editorial Address
Civil Engineering Department, Universitas Malikussaleh,Main Campus of Universitas Malikussaleh Jl. Medan-Banda Aceh, Cot Tengku Nie, Reuleut, North Aceh District, Aceh, Indonesia Email: teras.jurnal@unimal.ac.id
Location
Kota lhokseumawe,
Aceh
INDONESIA
Jurnal Teknik Sipil
ISSN : 20880561     EISSN : 25021680     DOI : https://doi.org/10.29103/tj.v16i2.1360
Core Subject :
Focus and Scope Teras Jurnal - Jurnal Teknik Sipil is a journal that communicates the results of research within the scope of civil engineering and scientific development as well as aspects of practitioners. The process of manuscript submission is open throughout the year. All submitted manuscript will be screened with double-blind peer review and editorial review before they are accepted to publish. Teras Jurnal receives a manuscript from the following area below civil engineering science and development with the interdisciplinary and multidisciplinary approach: Building Materials and Structures Constructions Technology Constructions Economy and Management Earthquake Engineering Environmental Engineering Renovation of Buildings Geotechnical Engineering Highway Engineering Hydraulic and Hydraulic Structures Road and Bridge Engineering Structural Engineering Surveying and Geo-Spatial Engineering Transportation Engineering Tunnel Engineering Urban Engineering and Economy Water Resources Engineering Urban Drainage
Arjuna Subject : -
Articles 441 Documents
ANALISIS ELEMEN HINGGA NONLINIER BALOK GESER BETON MEMADAT MANDIRI dan BETON MUTU TINGGI Mahmud Kori Effendi; Novi Rahmayanti
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.518

Abstract

Abstrak Indonesia merupakan negara yang rentan terhadap bencana gempa bumi. Banyak rumah atau gedung di Indonesia dibangun dengan menggunakan material beton bertulang. Kerusakan geser pada elemen beton bertulang tersebut sangat berbahaya, hal ini dikarenakan kerusakan ini terjadi secara tiba-tiba dan biasanya terjadi secara eksplosif. Analisis nonlinier elemen hingga tiga dimensi balok beton memadat mandiri dan beton mutu tinggi dengan pemadatan mekanis dilakukan dengan software MSC Marc/Mentat. Baja dimodelkan dengan tertanam di beton. Kriteria kegagalan Linier Mohr-Coulomb digunakan untuk beton dan Von Mises untuk baja tulangan. Hasil kurva hubungan beban-lendutan untuk kedua balok beton memadat mandiri dan beton mutu tinggi pemadatan mekanis hampir sama dengan hasil kurva eksperimen di daerah elastic, namun setelah melewati fase elastik, kurva analisis berbeda sedikit dengan kurva eksperimen. Hasil analisis teoritis kekuatan beton hampir sama dengan hasil analisis elemen hingga balok beton tanpa tulangan. Hasil analisis kontak juga memperlihatkan terjadi kontak dan perlepasan pada bidang kontak baja tumpuan beban dan tumpuan balok dengan beton. Kata kunci: beton memadat mandiri, mutu tinggi, elemen hingga, MSC Marc/Mentat  Abstract Indonesia is a country that is prone to earthquakes. Many houses or buildings in Indonesia are built using reinforced concrete material. Shear damage to reinforced concrete elements is very dangerous, because this damage occurs suddenly and usually occurs explosively. The nonlinear three-dimensional finite element analysis of self-compacting concrete beam and high strength concrete beam by mechanical compaction were carried out using the MSC Marc/Mentat software. Steel is modeled by being embedded in concrete. The Mohr-Coulomb Linear failure criterion is used for concrete and Von Mises for reinforcing steel. The results of the load- deflection curves for both self-compacting and mechanical compaction high-strength concrete beams are almost the same as those of the experimental curves in the elastic area, after elasticity, the analysis curve differs slightly from the experimental curve. The results of the theoretical analysis of the strength of the concrete are almost the same as the results of the analysis of the finite element concrete beams without reinforcement. The results of the contact analysis also showed that there was contact and detachment in the contact area of the load bearing steel and the beam support with the concrete. Keywords: self-compacting concrete, high strength, finite element, MSC Marc/Mentat
MITIGASI BANJIR STRUKTURAL MENGGUNAKAN MODEL HEC-RAS DAN GEO-STUDIO PADA WILAYAH SUNGAI TOBA-ASAHAN, SUMATERA UTARA Rian Mantasa Salve Prastica; Aditya Widyatmoko; Rezky Kurniawan
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.519

Abstract

Abstrak Permasalahan banjir menjadi isu utama di Indonesia dan di dunia. Strategi manajemen pengendalian banjir dapat berupa upaya mitigasi struktural dan non-struktural. Adanya perkembangan penelitian menyebutkan bahwa mitigasi non-struktural memiliki dampak yang baik dalam mereduksi banjir. Penelitian ini mengambil studi kasus di daerah studi yaitu Wilayah Sungai Toba-Asahan, tepatnya di Sungai Silau. Apakah mitigasi struktural dalam pengendalian banjir signifikan? Analisis kapasitas hidrolika menggunakan software HEC-RAS adanya penurunan limpasan banjir dari kondisi eksisting ke kondisi skenario normalisasi sungai. Begitu pula nilai safety factor lereng sungai pada lokasi tinjauan menggunakan software Geo-Studio yang naik sebesar 139%. Opsi usulan desain bendungan urugan juga dapat mereduksi banjir sebesar 24,83%. Sehingga, dapat disimpulkan bahwa mitigasi struktural signifikan dalam pengendalian banjir. Namun, mitigasi struktural tidak bersifat sustainable bagi pemangku kepentingan, sehingga perlu ada skenario simulasi menggunakan mitigasi non-struktural. Kata kunci: pengendalian banjir, mitigasi struktural, mitigasi non-struktural, flood routing  Abstract The problem of flooding is a major issue in Indonesia and in the world. Flood control management strategies can take the form of structural and non-structural mitigation measures. The development of research states that non-structural mitigation has a good impact in reducing flooding. This research took a case study in the study area, namely the Toba-Asahan River Basin, to be precise in the Silau River. Is structural mitigation in flood control significant? Analysis of hydraulic capacity using HEC-RAS software shows a decrease in flood runoff from existing conditions to river normalization scenario conditions. Likewise, the river slope safety factor value at the review location using Geo-Studio software increased by 139%. The proposed option for embankment dam design can also reduce flooding by 24.83%. Thus, it can be concluded that structural mitigation is significant in flood control. However, structural mitigation is not sustainable for stakeholders, so there needs to be a simulation scenario using non-structural mitigation. Keywords: flood management, structural mitigation, non-structural mitigation, flood routing
MODEL OPTIMALISASI FUNGSI PASAR TRADISIONAL DI KOTA BANDA ACEH (Studi Kasus Pasar Newtown Lamdom) Ibnu Sa'dan Sa'dan; N Fadhli; Ashfa Ashfa
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.521

Abstract

Abstrak Pasar tradisional adalah salah satu aspek yang dapat menunjang pertumbuhan ekonomi di Kota Banda Aceh. Pasar Tradisional Newtown Lamdom (PTNL) merupakan salah satu pasar tradisional di Kota Banda Aceh yang belum berfungsi sebagaimana mestinya, tidak ada satupun pedagang yang berjualan di sana. Penelitian ini bertujuan untuk mengetahui faktor-faktor apa saja yang memiliki pengaruh terhadap tidak optimalnya fungsi PTNL dan merumuskan strategi dalam meningkatkan pengelolaan PTNL. Strategi dalam mengoptimalkan fungsi pasar tradisional sudah diidentifikasi dengan menyebarkan kuesioner melalui observasi lapangan dan melalui google form, data kuesioner diolah menggunakan metode analisis regresi ordinal, kemudian akan diperoleh hasil penyebab tidak optimalnya fungsi pasar tradisional Newtown Lamdom selanjutnya, faktor-faktor tersebut dianalisis dengan menggunakan metode Focus Group Discussion (FGD). hasil dari serangkaian analisis yang dilakukan menunjukkan bahwa lokasi PTNL memiliki pengaruh 82,1%, sarana PTNL memiliki pengaruh sebesar 74,7% dan prasarana PTNL memiliki pengaruh sebesar 22,7% terhadap factor yang mempengaruhi tidak optimalnya fungsi PTNL, untuk dapat mengoptimalkan fungsi PTNL perlu menyiapkan lokasi dan sarana sesuai dengan kebutuhan pasar seperti ketersedian lahan parkir, tersedianya transportasi umum menuju pasar, air bersih, listrik dan ketersediaan bahan baku, selain itu juga perlu ditinjau aspek kebijakan pemerintah seperti melakukan sosialisasi kepada pedagang dan pembeli untuk dapat mengoptimalkan fungsi PTNL. Kata Kunci: Strategi, optimalisasi pasar, pasar tradisional, fungsi pasar  Abstract Traditional market is one of the supporting aspects for economic growth in Banda Aceh. Newtown Lamdom Market (PTNL) is one of traditional markets in Banda Aceh that has not been functioning properly from year to year as there is no single trader who sells there. This study aims to determine the factors causing the function of the traditional market is not optimal and to formulate the strategy in order to improve the management of Newtown Lamdom Traditional Market. The author identified the strategy in optimizing the function of traditional market by conducting field observation. The results of observation are then analyzed by using the Ordinal Regression Method to determine the factors causing the function of the traditional market are not optimal. Afterwards, those factors are analyzed through Focus Group Discussion (FGD) with the determined informants.  The results of series of analyses conducted show that the City Government of Banda Aceh is required to rehabilitate the Newtown Lamdom market buildings, equip the market facilities and infrastructure, provide raw material needs, and conduct socialization to traders and buyers in order to optimize the function of Newtown Lamdom Market. Keywords: Strategy, Market Optimization, Traditional Market, market function
PERENCANAAN SALURAN DRAINASE KAMPUS INSTITUT TEKNOLOGI SUMATERA Mashuri Mashuri; Ayudia Hardiyani Kiranaratri; Erik Satria
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.527

Abstract

Abstrak Sebagai kampus baru, pembangunan infrastruktur Institut Teknologi Sumatera (ITERA) disegala sektor terus dilakukan demi upaya menunjang proses pembelajaran, namun berdampak pada perubahan alih fungsi lahan sehingga daya resap air semakin berkurang dan limpasan air permukaan semakin meningkat, sehingga perlu dilakukan perencanaan drainase yang terintegrasi dengan pembangunan. Perencanaan drainase meliputi analisis curah hujan, pengukuran lapangan dan perhitungan dimensi saluran serta simulasi pada software HECRAS. Metode rata-rata aljabar digunakan untuk analisis curah hujan wilayah dengan distribusi log pearson III. Dimensi saluran berupa persegi dengan lebar 0,56 m dan tinggi 0,73 m. Adapun debit saluran 0,53 m3/det dengan metode rasional, sedangkan total biaya perencanaan drainase sepanjang 1282,1 m ini sebesar Rp. 1.107.523.000 (Satu Milyar Seratus Tujuh Juta Lima Ratus Dua Puluh Tiga Ribu Rupiah). Dengan terbangunnya drainase diharapkan mampu mengalirkan limpasan air permukaan yang terjadi. Kata Kunci: ITERA, Drainase, Debit, HEC-RAS  Abstract As a new campus, the infrastructure development of the Sumatera Institute of Technology (ITERA) in all sectors continues to support the learning process, however it has an impact on changes in land use so that water absorption capacity is decreasing and surface runoff is increasing, so it is necessary to carry out drainage planning that is integrated wit development. Drainage planning includes analysis of rainfall, field measurements and calculation of channel dimensions as well as simulations on the HECRAS. The aljabar method is used for the analysis of regional rainfall with a pearson III log distribution. The dimensions of the channel are square with widht of 0,56 m and height of 0,73 m. the channel discharge is 0,53 m3/s using the rational method. While total cost of drainage planning along the 1282,1 m is Rp 1.107.523.000, (one billion one hundred seven milion five hundred twenty three thousand rupiah). With the construction of the drainage is expected to be able to drain the surface runoff that occurs. Keywords: ITERA, Drainage, Discharge, HEC-RAS
EVALUASI PERANCANGAN ANGGARAN BIAYA DAN WAKTU MENGGUNAKAN METODE BIM Puteri Khodijatuz Zahro; Anik Ratnaningsih; Akhmad Hasanuddin
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.529

Abstract

Abstrak Universitas Jember yang sedang dalam masa pembangunan yang menyebabkan dibutuhkannya teknologi pendukung untuk proses yang dilakukan agar didapatkan hasil yang efisien sehingga dibutuhkan kinerja manajemen proyek yang memfasilitasi proses desain dan konstruksi yang lebih terintegrasi yaitu Building Information Modeling (BIM). Sebelumnya dikenal beberapa program bantu seperti AutoCAD, SAP, SketchUp 3D, Ms. Project dan program bantu lainnya yang penggunaannya hanya sebatas dalam satu jangkauan. Penggunaan BIM yang mengintegrasi gambar proyek, volume pekerjaan dan estimasi harga dapat mempermudah proses pengerjaan menjadi lebih singkat dan cepat. Oleh karena itu, pada penelitian ini dilakukan evaluasi antara penggunaan metode BIM dan metode konvensional pada Proyek Pembangunan Gedung Kuliah Fakultas Keperawatan Universitas Jember. Program bantu BIM yang dipakai adalah Autodesk Revit yang merupakan salah satu perangkat lunak yang membawa semua arsitektur, teknik, dan disiplin konstruksi ke dalam lingkungan pemodelan terpadu. Hasil dari Penelitian ini yaitu menghasilkan selisih biaya total untuk struktur dan arsitektur yaitu Rp242.638.340,10. Biaya yang berasal dari pemodelan Autodesk Revit lebih besar 5,33 % daripada metode konvensional proyek. Dan selisih pada penjadwalan dalam pelaksanaan pada pemodelan Autodesk Revit yaitu 15 hari lebih lama daripada metode konvensional. Kata Kunci: BIM, Autodesk Revit, Rencana Anggaran Biaya, Penjadwalan Proyek Abstract Universitas Jember, during this construction period, requires supporting technology for the process to obtain efficient results so it takes a project management performance that facilitates a more integrated design and construction process, namely Building Information Modeling (BIM). Previously known several auxiliary programs such as AutoCAD, SAP, SketchUp 3D, Ms. Projects and other assistance programs restricted to a single scope. The use of BIM that integrates project designs, workload and price estimates can make the process shorter and faster. Therefore, in this study a comparison was made between the use of the BIM method and the conventional method in the Lecture Building Project for the Faculty of Nursing, Universitas Jember. The BIM assistant program used is Autodesk Revit which is a software that brings all architecture, engineering, and construction disciplines into a unified modeling environment. The results of this study showed a total cost difference in structure and architecture of IDR 242,638,340.10. On the other hand, the Autodesk Revit modeling cost was greater than the conventional method with a percentage of 5.33%. Furthermore, the difference in the Autodesk Revit modeling implementation schedule is 15 days longer than the conventional method. Keywords: BIM, Autodesk Revit, Budget-Estimate Plan, Project Scheduling
Analisis Bangkitan Pergerakan Berdasarkan Location Quotient (LQ) di Kota Banda Aceh Arizal Arizal; Noer Fadhly; Sartiyah Sartiyah
Teras Jurnal : Jurnal Teknik Sipil Vol. 12 No. 1 (2022): Volume 12 Nomor 1, Maret 2022
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v12i1.531

Abstract

Abstrak Penelitian ini menganalisis bangkitan pergerakan yang terdiri dari pergerakan yang dibangkitkan berdasarkan location quotient di wilayah Kota Banda Aceh serta mengetahui variabel yang mempengaruhi bangkitan pergerakan. Data penelitian berupa data sekunder Badan Pusat Statistika dan data primer melalui kuesioner secara random sampling. Penentuan jumlah sampel menggunakan rumus slovin dan teknik analisis dengan regresi linier berganda. Hasil regresi model bangkitan dilakukan pada 3 kecamatan yang nilai LQ nya lebih besar dari 1 yaitu Kecamatan Kuta Alam, Syiah Kuala dan Ulee Kareng. Hasil analisis model bangkitan sektor perkantoran dan perekonomiaan di Kecamatan Kuta Alam, yang mempengaruhi bangkitan secara signifikan adalah jumlah kepemilikan kendaraan dan pemilihan moda yang berpengaruh secara negatif. Setiap kenaikan jumlah kendaraan dan pemilihan moda, maka akan mengurangi bangkitan. Sektor pendidikan di Kecamatan Syiah Kuala, hanya jumlah kepemilikan kendaraan yang mempengaruhi bangkitan secara positif. Artinya, setiap kenaikan jumlah kepemilikan kendaraan, maka akan bertambah bangkitan dan tarikan. Sektor permukiman di Kecamatan Ulee Kareng hanya pemilihan moda berpengaruh secara signifikan secara positif terhadap bangkitan. Artinya, setiap kenaikan pemilihan moda, maka akan bertambah bangkitan. Saran untuk pemerintah sesuai penelitian ini bisa menjadi acuan untuk peningkatan kapasitas jalan dan tata guna lahan untuk menghindari kemacetan. Kata Kunci: Model bangkitan, tarikan, location quotient (LQ), regresi linier berganda  Abstract This research analysis of trip generation which consist of trip generation based on location quotient in Banda Aceh City as well as knowing the variables that affect of the trip generation of the movement. The research data is secondary data from the Central Bureau of Statistics and primary data through questionnaires with random sampling. Determination of the number of samples using the Slovin formula and analysis technique with multiple linear regression. The regression results of the trip generation models conducted in 3 districts whose LQ value is greater than 1, namely Kuta Alam, Syiah Kuala and Ulee Kareng Districts. The results of the analysis of the generated model of the office and economy sector in Kuta Alam District, which affects the trip generation significantly is the number of vehicle ownership and the choice of mode which have a negative effect. Each increase in the number of vehicles and choice of mode will reduce trip generation. In the education sector in Syiah Kuala District, only the number of vehicle ownership has a positive effect on generation. This means that every increase in the number of vehicle ownership, there will be an increase in trip generation. The residential sector in Ulee Kareng District, only the choice of mode has a positive significant effect on trip generation. That is, every increase in the choice of mode, there will be an increase in trip generation. Suggestions for the government according to this research can be a reference for increasing road capacity and land use to avoid congestion. Key Words: Trip generation, location quotient (LQ) and regression linear multiple
EVALUASI RENCANA PEMASANGAN SENSOR STRUCTURE HEALTH MONITORING SYSTEM JEMBATAN PULAU BALANG II Juandra Hartono; Umi Khoiroh
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.549

Abstract

Abstrak Salah satu isu utama dalam setiap penerapan Structure Health Monitoring System (SHMS) jembatan bentang panjang khususnya jembatan Pulau Balang II adalah bagaimana membuat SHMS tersebut dapat diandalkan secara efektif. Penggunaan sensor yang terlalu banyak tidaklah efisien demi mendapatkan informasi yang selengkap-lengkapnya terkait kondisi jembatan. Tujuan utama riset ini adalah untuk menganalisia tipe sensor, posisi penempatan sensor dan jumlah sensor yang akan dipasang pada SHMS jembatan Pulau Balang sesuai kebutuhan sensor yang efektif dan efisien. Pengamatan SHMS meliputi lendutan dek, pylon serta tegangan dek, pylon. Metode penelitian berupa pengamatan langsung di lapangan, analisa data dan diskusi dengan stakeholder jembatan. Dari hasil analisis terdapat 13 jenis sensor yang sebaiknya dipasang pada SHMS Jembatan Pulau Balang dengan total kebutuhan sensor berjumlah 87 buah. Posisi penempatan sensor sebagian besar ada di pylon, kabel dan dek yang disesuaikan dengan tipe jembatan yaitu cable stayed. Untuk sensor gempa disarankan perlu dipasang hal ini dikarenakan wilayah tersebut memiliki seismistis paling rendah yang didominasi oleh tiga zona sesar utama yaitu sesar mangkalihat, sesar tarakan dan sesar maratus oleh karena itu Kalimantan bukanlah daerah yang bebas gempa bumi. Kata kunci: structural health monitoring system (SHMS), sensor, pylon, dek, cable stayed  Abstract One of the main issues in each application of Structure Health Monitoring System (SHMS) in long span bridge particularly Pulau Balang II Bridge is how to make the SHMS effectively dependable. The excessive use of sensors is inefficient in order to obtain complete information regarding the condition of the bridge. The main purpose of this research is to analyze the type of sensor, the position of the sensor placement and the number of sensors that will be installed on the SHMS structure of the Balang Island bridge according to the need for effective and efficient sensors. SHMS observations include deck deflection, pylon and deck stress, pylon. The research method is in the form of direct observation in the field, data analysis and discussions with bridge stakeholders. From the results of the analysis, there are 13 types of sensors that should be installed on the Balang Island Bridge SHMS with a total sensor requirement of 87 units. Most of the sensor placement positions are in the pylons, cables and decks that are adapted to the type of bridge, namely cable stayed. For earthquake sensors, it is recommended to install this because the area has the lowest seismicity which is dominated by three main fault zones, namely the Mangkalihat Fault, Tarakan Fault and Maratus Fault. Therefore, Kalimantan is not an earthquake-free area Keywords: structural health monitoring system (SHMS), sensor, pylon, deck, cable stayed
EVALUASI STANDAR JALUR EVAKUASI KEBAKARAN PADA BANGUNAN GEDUNG BERTINGKAT (Studi Kasus Gedung BAPPEDA Kabupaten Nagan Raya) Rahmat Djamaluddin; Zakia Zakia; Firzan Firzan; Aulil Fajri
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.551

Abstract

Abstrak Dampak negatif yang ditimbulkan dari bencana dapat berupa kerugian materiil maupun jiwa. Bencana tersebut dapat dicontohkan seperti banjir, gempa bumi ada pula bencana non alam seperti kebakaran. Penelitian ini bertujuan untuk mengetahui bagaimana kondisi standar jalur evakuasi kebakaran pada kantor BAPPEDA Kabupaten Nagan Raya, mengetahui apakah jalur evakuasi kebakaran pada kantor BAPPEDA Kabupaten Nagan Raya telah memenuhi standar. Data yang digunakan berupa data primer dan sekunder, yang diambil dengan cara penyebaran kuisioner, observasi dan pengamatan secara langsung. Pertanyaan melalui kuisioner diolah menggunakan software SPSS-23, sedangkan data hasil observasi dan pengamatan secara langsung, diolah melalui analisa deskripsi sesuai hasil lapangan. Hasil analisa menunjukkan bahwa semua pertanyaan valid memiliki nilai korelasi lebih besar dari nilai product moment/r tabel 0,632. Sedangkan metode penelitian yang digunakan adalah metode kuantitatif. Hasil evaluasi standar jalur evakuasi kebakaran pada Bangunan Gedung BAPPEDA Kabupaten Nagan Raya, belum sesuai standar Peraturan Menteri Pekerjaan Umum No.26/PRT/M/2008 tentang Persyaratan Teknis Sistem Proteksi Kebakaran Pada Bangunan Gedung dan Lingkungan bahwasanya penerapan peraturan sistem jalur evakuasi kebakaran masih pasif pada gedung BAPPEDA Kabupaten Nagan Raya untuk fungsi bangunan publik serta Kesesuaian fasilitas jalur evakuasi kebakaran yang tersedia pada bangunan gedung BAPPEDA Kabupaten Nagan Raya sangat sulit dilakukan evakuasi jika sewaktu waktu-waktu terjadi kebakaran Kata Kunci: Jalur evakuasi, bangunan gedung, metode kuantitatif, kuisioner   Abstract The negative impact can be in the form of material and life losses. The disaster can be exemplified as floods, earthquakes there are also non-natural disasters such as fire. Disaster is a phenomenon of human life that cannot be known exactly when it happened. This study aims to determine how the standard conditions of fire evacuation routes at the Nagan Raya Regency Bappeda office, find out whether the fire evacuation routes at the Nagan Raya Regency Bappeda office meet the standards. The data used in this study are primary and secondary data, data collection is done by observation and direct observation. While the research method used is a quantitative method. Results of the Standard Identification of Fire Evacuation Paths in Nagan Raya Regency Bappeda Building, according to Minister of Public Works Regulation No.26 / PRT / M / 2008 concerning Rescue Lines that the application of fire evacuation system regulations is still passive in Bappeda Building Nagan Raya Regency for public building functions as well as the suitability of fire evacuation route facilities available in the building of Bappeda Nagan Raya Regency, it is very difficult to evacuate if at any time there is a fire Keywords: Evacuation route, building, quantitative method, questionnaire
PERENCANAAN JARINGAN PERPIPAAN AIR MINUM MENGGUNAKAN APLIKASI WATERCAD V8-I Wesli Wesli; Fasdarsyah Fasdarsyah; Indra Kurniawan; Khairullah Yusuf; Said Jalalul Akbar; Maizuar Maizuar; Joni Arfiandi
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.554

Abstract

Abstrak Pelayanan kebutuhan air di wilayah IKK Bukit Oregon kurang memadai diduga jaringan pipa menjadi pokok masalahnya sehingga berdasar hal tersebut maka diperlukan evaluasi jaringan perpipaan air minum dan design dibuat dengan menggunakan software Aplikasi Watercad V8-I dan ingin diketahui seberapa besar kebutuhan debit pada proyeksi tahun 2030 termasuk kapasitas pompa dan jenis pipa transmisinya. Hasil pengamatan secara langsung di wilayah studi pada pelayanan terdapat permasalahan yang terjadi pada pipa transmisi, yaitu pipa dari intake (sumber air baku utama) menuju ke Instalasi Pengolahan Air (IPA) yang akan di distribusikan ke masyarakat. Permasalahan yang terjadi adalah pipa induk tersebut mengalami kebocoran akibat umur teknis pipa yang sudah tua. Meningkatnya jumlah penduduk sama halnya semakin meningkatnya pemenuhan akan kebutuhan air bersih. Permasalahan tersebut harus ditanggulangi dengan pergantian pipa dengan jenis dan diameter yang tepat serta kapasitas pompa yang sesuai hasil menggunakan software Watercad V8-i. Dari hasil perhitungan analisa pertumbuhan penduduk pada tahun 2030 dengan jumlah pelanggan 96.770 jiwa kebutuhan air mencapai 102,476 liter/detik. Sistem transmisi menggunakan sistem pompa dengan kapasitas terpasang 90 liter/detik. Jenis pipa yang dipakai untuk pipa transmisi menggunakan pipa HDPE dengan diameter 350 mm. Kata kunci: evaluasi, air bersih, perpipaan, pompa, Watercad V8-i   Abstract The service for water needs in the IKK Bukit Oregon area is inadequate, it is suspected that the pipeline network is the main problem, so based on this, it is necessary to evaluate the drinking water piping network and the design is made using the Watercad V8-I application software and wants to know how much the demand for discharge in the 2030 projection includes pump capacity and type of transmission pipe. The results of direct observations in the study area on the service there are problems that occur in the transmission pipe, namely the pipe from the intake (main raw water source) to the Water Treatment Plant (IPA) which will be distributed to the community. The problem that occurs is that the main pipe has a leak due to the technical age of the pipe which is old. The increasing population is the same as the increasing fulfillment of clean water needs. These problems must be overcome by changing the pipe with the right type and diameter and the pump capacity according to the results using the Watercad V8-i software. From the calculation results of population growth analysis in 2030 with the number of customers 96,770 people, water needs reach 102,476 liters/second. The transmission system uses a pump system with an installed capacity of 90 liters/second. The type of pipe used for the transmission pipe uses HDPE pipe with a diameter of 350 mm. Keywords: evaluation, clean water, piping, pump, Watercad V8-i 
APLIKASI TEKNIK LOT SIZING PADA PROYEK GEDUNG LABORATORIUM KEBENCANAAN UNIVERSITAS SYIAH KUALA Erwin Lingga; Mubarak Mubarak; Cut Zukhrina Oktaviani
Teras Jurnal : Jurnal Teknik Sipil Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v11i2.563

Abstract

Abstrak Salah satu faktor mempengaruhi kelancaran dalam pelaksanaan suatu proyek konstruksi adalah pengadaan material ke lokasi. Keterlambatan datangnya material konstruksi yang menyebabkan stockout persediaan material saat akan digunakan membuat pekerjaan menjadi tertunda. Hal ini secara tidak langsung dapat mempengaruhi total waktu pelaksanaan serta biaya proyek. Penentuan tingkat persediaan yang tepat dapat diaplikasikan dengan mengunakan metode Material Requirement Planning (MRP). Tujuan dari penelitian adalah untuk mengetahui ukuran pemesanan dan biaya pengadaan material yang paling efisien dari dua teknik lotsizing yaitu teknik Period Order Quantity (POQ) dan teknik Economic Order Quantity (EOQ) pada Gedung Laboratorium Kebencanaan Universitas Syiah Kuala (USK) di Kota Banda Aceh. Proses yang terdapat dalam MRP meliputi netting, lotting, offsetting, dan explosion. Metode MRP diterapkan pada proyek Gedung Laboratorium Kebencanaan USK, dengan menghitung jumlah kebutuhan material berdasarkan data Rencana Anggaran Biaya (RAB), Analisis Harga Satuan (AHS), dan jadwal pelaksanaan terhadap 28 (dua puluh delapan) material di lokasi proyek. Berdasarkan dari teknik yang dianalisa, teknik lotsizing yang menghasilkan biaya total paling ekonomis untuk semua material adalah teknik Periodic Order Quantity (POQ) dengan biaya sebesar Rp. 9.850.848.30, Sedangkan yang mempunyai biaya pengadaan material sangat tinggi ditunjukkan oleh teknik EOQ, Rp. 9.852.102.40, artinya biaya yang dikeluarkan lebih kecil yaitu Rp. 1.234.00 (97%). Kata Kunci: Gedung Universitas Syiah Kuala, Material Requirement Planning, Lotsizing, Period Order Quantity, Economic Order Quantity  Abstract One of the factors influencing the continuity running of a construction project is material procurement to the site. The delay in the arrival of construction materials which causes a stockout of material supplies when they will be used makes the work delayed. This can indirectly affect the total implementation time and project costs. by using the Material Requirement Planning method. The purpose of this study was to determine the order size and the most efficient material procurement costs from the two lotsizing inventory control techniques, namely the Period Order Quantity (POQ) and the Economic Order Quantity (EOQ) at Disaster Laboratory Building University of Syiah Kuala in Banda Aceh city. The processes contained in MRP is netting, lotting, offsetting, and explosion. The MRP method is applied to the Disaster Laboratory Building University of Syiah Kuala project, by calculating the amount of material needed based on the Budget Plan data, Unit Price Analysis, and the project schedule which includes its 28 materials. Based on the analyzed technique, the lotsizing technique that produces the most economical total cost for all materials is the Periodic Order Quantity (POQ) technique with a cost of Rp. 9,850,848.30, while those who have very high material procurement costs are indicated by the EOQ technique, Rp. 9,852.102.40, meaning that the costs incurred are smaller, namely Rp. 1.234.00 (97%). Keywords: Building University of Syiah Kuala, Material Requirement Planning, Lotsizing, Period Order Quantity, Economic Order Quantity

Filter by Year

2011 2026


Filter By Issues
All Issue Vol. 16 No. 2 (2026): Teras Jurnal (September 2026) Vol. 16 No. 1 (2026): Teras Jurnal Vol. 15 No. 1 (2025): Volume 15 Nomor 1, Maret 2025 Vol. 15 No. 2 (2025): Teras Jurnal (September) Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024 Vol. 14 No. 1 (2024): Volume 14 Nomor 1, Maret 2024 Vol. 13 No. 2 (2023): Volume 13 Nomor 2, September 2023 Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023 Vol. 12 No. 2 (2022): Volume 12 Nomor 2, September 2022 Vol. 12 No. 1 (2022): Volume 12 Nomor 1, Maret 2022 Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021 Vol. 11 No. 1 (2021): Maret 2021 Vol. 10 No. 2 (2020): Volume 10 Nomor 2 September 2020 Vol. 10 No. 1 (2020): Volume 10 Nomor 1 Vol. 9 No. 2 (2019): Volume 9, Nomor 2, September 2019 Vol. 9 No. 1 (2019): Volume 9, Nomor 1, Maret 2019 Vol. 8 No. 2 (2018): Vol 8 No 2 September 2018 Vol. 8 No. 1 (2018): Vol 8 Nomor 1, Maret 2018 Vol. 7 No. 2 (2017): Vol. 7 Nomor 2, September 2017 Vol. 7 No. 1 (2017): Vol 7 No 1 Maret 2017 Vol. 6 No. 1 (2016): Volume 6 Nomor 1 (2016), Teras Jurnal, Vol 6 No 1, Maret 2016 Vol. 6 No. 2 (2016): Volume 6 Nomor 2, September 2016 Vol. 5 No. 2 (2015): TERAS JURNAL Vol.5, No.2, September 2015 Vol. 5 No. 1 (2015): TERAS JURNAL, Vol. 5, No. 1, Maret 2015 Vol. 4 No. 2 (2014): TERAS JURNAL, VOL.4, NO.2, SEPTEMBER 2014 Vol. 4 No. 1 (2014): TERAS JURNAL, VOL.4, NO.1, MARET 2014 Vol. 3 No. 2 (2013): Teras Jurnal, Vol 3, No 2, September 2013 Vol. 3 No. 1 (2013): Teras Jurnal, Vol 3, No.1, Maret 2013 Vol. 2 No. 4 (2012): Teras Jurnal, Vol 2, No 4, Desember 2012 Vol. 1 No. 1 (2011): Teras Jurnal, Vol.1, No.1, Maret 2011 More Issue