Journal : Jurnal Spesialis Teknik Sipil (JSpTS)

Analisis Prediksi Kondisi Kekerasan Jalan Raya menggunakan Aplikasi IRI untuk Penanganan Jalan (Studi Kasus: Ruas Jalan Nasional Kota Jalan Nasional Kota Ruas, Gresik-Sadang) Kogoya, Desmin; Nugroho, Laksono Djoko; Oetomo, Wateno
Jurnal Spesialis Teknik Sipil (JSpTS) Vol 5 No 2 (2024)
Publisher : Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/jspts.v5i2.12065

Abstract

Road pavement conditions will overcome the decline in service levels over time. The decline in the level of road services is characterized by the occurrence of damage to the structure of the pavement layer of the road and left in a long period of time it will be able to renew the level of the layer of security that can increase security, comfort, and smoothness in crossing. The purpose of this study is to analyze the influence of traffic, pavement structure and CBR on the value of road IRI and estimation of road pavement conditions in the next 10 years. The data used in this research are traffic load, CBR, rainfall and road pavement structure. The analysis was carried out using a method developed by IRI (International Roughness Index) to predict road conditions. Data collection was carried out by surveying road damage using the ROADROID application and (RCI) the Road Condition Index as preliminary data. This research will be applied to data collected from the national road network in East Java province, specifically the Bts national road section. Gresik City - Sadang. To facilitate analysis, the road segment is divided into 3 segments with the length of each km segment starting from Km 20 to Km 40. The results of data analysis show an increase in traffic load of 31% will result in an increase in IRI value of 0.061 m / km per year, a structural value of 11.32% resulting in an increase in IRI of 0.034 m / km per growth, based on a CBR of 38% resulting in an increase IRI value of 0.017 m / km per year. The predicted results of road pavement conditions on Km 40, 20 and 20 sections are minor damaged roads, for Km 20, 40 routine maintenance sections.
Analisis Crashing Pelaksanaan Pekerjaan Berulang pada Proyek Perumahan dengan Metode LoB (Line of Balance) Studi Kasus Perumahan Bumi Podo Rukun Fadjarwati, Indah; Oetomo, Wateno; Widhiarto, Herry
Jurnal Spesialis Teknik Sipil (JSpTS) Vol 6 No 1 (2025)
Publisher : Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/jspts.v6i1.131835

Abstract

Housing construction is a recurring and sustainable job. So if the scheduling does not take into account the character of this work then the repetitive work unit will experience a delay (lag). So that it will result in the duration of the project. To overcome this, an uninterrupted scheduling method is needed from one unit to the next. The scheduling method that matches this type of repetitive work is the Line of Balance (LoB) because each activity / activity is described in a straight line and the speed of work can be changed according to needs. This is to avoid the occurrence of crashes / conflicts between activities. This method can also minimize the delay time as mentioned above. But this method cannot show dependency between critical activities and the other activities. For this reason, another method is needed in order to fill this gap. The suitable method is CPM through Microsoft Project. This combination of methods besides managing the time of project implementation also regulates human resources, namely by maximizing the allocation of human resources. Because in this multi-unit project the quantity of work is the main thing. From some analysis calculations, the results obtained that the addition of buffers with productivity speed smoothing, and the acceleration of the duration of the activity more effective to accelerate the implementation time of the project with a duration of 154 days.
Analisis Biaya dan Waktu Pekerjaan Finishing dengan Metode Earned Value di Proyek Gedung Serba Guna Kabupaten Gresik Wahyudi, Muhammad; Oetomo, Wateno; Mudjanarko, Sri Wiwoho
Jurnal Spesialis Teknik Sipil (JSpTS) Vol 6 No 1 (2025)
Publisher : Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/jspts.v6i1.131843

Abstract

Architectural work in a construction project, generally is a non-structural work. However, the implementation can require a long time and a large cost weight. The implementation of finishing work in multi-purpose building construction project of Gresik Regency that was already running and had problems, that is a lot of workers but lack of work progress, so an increase of the cost from budget planned. Therefore it needs to doing research that for get the actual time of project implementation and get Estimate at Completion (EAC). The results is that the actual time of project implementation is not suitable with time of project planning. The project has been to late so there is a decrease in project performance. In the 1st week of project implementation on time, in the 2nd week until the 15th week the project has been to late (schedule overrun). So based on the time of implementation, the project has decreased performance. The total estimated cost can be seen from the Estimate at Completion (EAC) calculation, which is Rp.274,424,152.89.
Co-Authors ., Rudiansyah Agus Firmanda, Yocky Ar Rasyied, Syahrur Rahman ARI SUSANTO Ariyanti, Menik Astasari, Arianti Widi At Taufan, Salman Atmajaya, I Made Buda Atros, Pahridal Az Zahra, Karunia Bonny, Apde Budi Witjaksana, Budi Budy Wiryawan Cahyono, Bagus Denastyan Agpenta Putra, Videla Didik Purnomo, Didik Djoko Nugroho , Laksono Djoko Nugroho, Laksono Dozier, Alpha Dwi Budi Santoso Dwi Purnomo Eriansyah, Ferdho Esti Wulandari Fadjarwati, Indah Fairuz Rahman, Refa Fajar, Chandra Fareza Akbar, Muhammad Fathony Maulidy, Ahmad Frengky Rumihin, Ony Gede Sarya, Gede Hadi, Suprapto Hariyanto, Tri Perwira Harris, Oscar Hartatik, Nurani HARTAWAN, DEDY SUGI Helmy Darjanto, Helmy Herry Widhiarto, Herry Hudyantoro, Hudyantoro Ibnu Khaldun Ikko Bagus Ismanto Indah Purwanty, Kharisma Irfan, Ahmad Irniawan, Dodik Irwanto, Aditya Jadmiko, Fikri Koespiadi Kogoya, Desmin Laksono Djoko Nugroho Lestari, Agustin Dwi Mahendra, Muhammad Yusuf Marleno, Risma Meilasari, Shavica Kurnia Michella Beatrix Miftakhul Arifin Muhammad Wahyudi Muhammadun, Haris Muhammadun, Harris Nashrullah Arifin, Isyraq Nugraha, Coki Adianta Nugroho, Deden Patanduk, Apriyanto Iring Pradana, Suresta Prasetiyo W., Arif Prasetyo, Djoko Puntodewo, Setyasto Purwayudhaningsari, Ranatika Putera, Rendra Pramana Putra, Ahmad Ferdiansyah Pratama Putra, Harisa Ramadhani Putranto, Vyonita Rafi, M . Rahadian, Deni Rahman, Medio Duddian Wahyu Ramadhani, Ardhi Ramadiasri Putra, Prastya Rini Rahmawati, Rini Rival Sibuea, Josep Rizky Haris, Ahmad Rosyid, Rizal Rusida, Dukha Rusmin Rusmin, Rusmin S Siswanto Sajiyo , Sajiyo Sajiyo Sajiyo, Sajiyo Sari, Anindya Novita Septoraharjo, Eko Rony Setyawan, Dhimas Triadi Setyo, Mayogo Siswanto Sri Wiwoho Mudjanarko, Sri Wiwoho Sugiharto, Arif Sundana, Hari Sundari Sundari suparjan suparjan Teki Tjendani, Hanie Umarwoko Daniarto, Cornelius Wahyusetianingsih, Tri Wulandari , Esti