Determination the Number and Schedule of Security Officers for Pandemic Period and Hybrid Learning at University Rainisa Maini Heryanto; Kartika Suhada; Winda Halim; Grace Vania
PROZIMA (Productivity, Optimization and Manufacturing System Engineering) Vol 7 No 1 (2023): Juni
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/prozima.v7i1.1618

Abstract

The recovery condition after the Covid-19 pandemic in various sectors from the economic sector, education, and even tourism requires many adjustments in various factors. A university is an educational institution that applies the concept of online learning in pandemic conditions. Restrictions on activities carried out on campus have an influence on the workload of security officers. In this study, the number of security officers was determined during the pandemic and hybrid learning so as to minimize the costs that must be incurred by the university. Determining the number of security officers needed uses a workload analysis based on interviews and considers several factors such as the target level of environmental security, the wide coverage of the security area, and the workload of the security officers themselves. After knowing the number of security officers needed, then scheduling based on work shifts uses the Tibrewala, Philippe, and Brown algorithm so that the workload is evenly distributed. The results obtained show that during the pandemic 35 security officers are needed with an estimated allocation of IDR 156,103,200 per month and get a savings of IDR 84,287,500,- per month (35.1%). For hybrid learning, it takes 51 personnel with an estimated allocation of IDR 224,303,200,- per month. This cost increases by IDR 68.200.000,- per month (43.7%) of pandemic conditions. This research is expected to provide consideration for universities as one of the steps to make savings and be useful during the pandemic and hybrid learning.
Konsultasi dan Pelatihan Penentuan Jumlah Operator yang Optimal pada Tiap Stasiun Kerja untuk Meningkatkan Kapasitas Produksi di Pabrik Mie Ho Kie San, Patikraja Florence Leony; Vivi Arisandhy; David Try Liputra; Kartika Suhada; Rainisa Maini Heryanto; Debora Vivia Kusumawardani; Yonathan Yehezkiel Widjaja; Martin Martin; Nadia Natalia Suwandi; Muhamad Bagus Tri Ananda; Grecia Grecia
Bubungan Tinggi: Jurnal Pengabdian Masyarakat Vol 5, No 3 (2023)
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/btjpm.v5i3.8464

Abstract

Pabrik mie Ho Kie San merupakan sebuah UMKM yang berlokasi di Kecamatan Patikraja, Kabupaten Banyumas, Jawa Tengah. Pabrik ini memproduksi mie tradisional yang terdiri dari mie halus dan mie kasar. Pabrik mengalami masalah dalam menentukan jumlah operator produksi, khususnya di bagian packing. Hal tersebut dikarenakan salah satu proses dalam pembuatan mie adalah pengeringan, dimana proses ini sangat bergantung dengan cuaca. Apabila cuaca hujan, maka proses pengeringan akan terhambat. Akibatnya hasil pengeringan yang akan dikemas menjadi sedikit. Hal tersebut menyebabkan jumlah operator packing terlalu banyak dan target produksi juga tidak tercapai. Oleh karena itu dilakukan kegiatan pengabdian kepada masyarakat (abdimas) untuk membantu mitra dalam menentukan jumlah operator produksi yang optimal pada tiap stasiun kerja agar kapasitas produksinya dapat meningkat. Metode yang digunakan adalah konsultasi dan pelatihan. Tahapan yang dilakukan meliputi konsultasi awal tentang kondisi di pabrik, perhitungan waktu baku, penyusunan peta proses operasi, perhitungan kapasitas produksi saat ini, penyeimbangan lintasan dengan strategi paralleling dan perhitungan jumlah operator yang optimal, pembuatan program spreadsheet, pelatihan, dan evaluasi. Kegiatan ini dilaksanakan pada tanggal 19 Oktober-21 Desember 2022. Mitra sasarannya adalah pabrik mie Ho Kie San, dimana peserta yang mewakili mitra ada 1 orang, yaitu dari bagian Human Resource Development. Berdasarkan hasil konsultasi dan pelatihan diperoleh jumlah operator yang dibutuhkan, sehingga kapasitas mixing yang semula 1,43 ton/hari meningkat menjadi 2,09 ton/hari (peningkatan 46,15%) dan kapasitas packing yang semula 0,4-0,67 ton/hari meningkat menjadi 1,55-1,63 ton/hari (meningkat 138,81%-287,75%). Hasil dari pelatihan tersebut diharapkan dapat membantu pabrik dalam menyelesaikan permasalahan yang dihadapi, sekaligus juga meningkatkan kapasitas produksinya. Ho Kie San is a Micro, Small, and Medium-scale Enterprise (MSME), which takes place in Patikraja District, Banyumas Regency, Central Java. The factory produces traditional dried noodles with two different cut sizes, fine and coarse. The factory found an issue determining the optimal number of operators on the shop floor, especially in the packaging station. This is because one of the processes in making noodles is drying, which is very dependent on the weather. If it rains, the drying process will be hampered. Consequently, the results of drying to be packaged are small. This causes the number of packing operators to be too many, and the production target is not achieved. Therefore, community service activities are carried out to assist partners in determining the optimal number of production operators at each workstation to increase production capacity. The method used is consultation and training to determine the optimal number of operators at each workstation. The steps done involve 1) consultation, 2) standard time calculation, 3) operation process chart construction, 4) existing production capacity calculation, 5) line balancing by paralleling and calculating the optimal number of operators, 6) spreadsheet formulation, 7) training, and 8) evaluation. This activity was held on 19 October-21 December 2022. The target partner is the Ho Kie San noodle factory, where 1 participant represents the partner from the Human Resource Development division. Based on the results of consultation and training, the number of operators needed was obtained, so that the mixing capacity, which was originally 1.43 tons/day, increased to 2.09 tons/day (an increase of 46.15%) and the packing capacity, which was originally 0.4-0.67 tons/day increased to 1.55-1.63 tons/day (an increase of 138.81% -287.75%). The outcomes of the training provided are expected to help the factory solve the issues of idle time and increase its production capacity. 
Pelatihan Penerapan Streamlining Production Flow dalam Upaya Continuous Improvement di Pabrik Mie Ho Kie San, Patikraja Florence Leony; Vivi Arisandhy; David Try Liputra; Kartika Suhada; Victor Suhandi; Rainisa Maini Heryanto; Rudy Wawolumaja; Chandra Wiranata; Cindy Felicia Wisanta; Kharens Emerentia; Lea Mashari; Mellisa Pricilia Hambali
Jurnal Surya Masyarakat Vol 6, No 2 (2024): Mei 2024
Publisher : Universitas Muhammadiyah Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26714/jsm.6.2.2024.157-166

Abstract

Ho Kie San Noodle Factory is one of the MSMEs in Patikraja District, Central Java that produces traditional noodles. Previously, the community service team had assisted this partner in increasing its production potential. However, there are still many improvements that can be made. The management conveyed the need for Kaizen (continuous improvement) material. Therefore, community service activities were carried out again in this factory. The method used is training. There were 9 participants who attended, representing the human resource department, finance department, general department, administration department, technical department, production department, inventory department and marketing department. The stages of the activities carried out were factory surveys and interviews with management, training implementation preparation, compiling training materials, filling preliminary questionnaires, training to representatives of each department within the company regarding the concept of continuous improvement and streamlined, and filling evaluation questionnaires. Based on the results of the questionnaire, it was found that the level of understanding of the participants increased after the training. Providing materials of Kaizen (continuous improvement) as well as production flow streamlining can help participants in streamlining the flow in each department and can also give motivation to continue making improvements in each department.
Pelatihan Penerapan Streamlining Production Flow dalam Upaya Continuous Improvement di Pabrik Mie Ho Kie San, Patikraja Leony, Florence; Arisandhy, Vivi; Liputra, David Try; Suhada, Kartika; Suhandi, Victor; Heryanto, Rainisa Maini; Wawolumaja, Rudy; Wiranata, Chandra; Wisanta, Cindy Felicia; Emerentia, Kharens; Mashari, Lea; Hambali, Mellisa Pricilia
Jurnal Surya Masyarakat Vol 6, No 2 (2024): Mei 2024
Publisher : Universitas Muhammadiyah Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26714/jsm.6.2.2024.157-166

Abstract

Ho Kie San Noodle Factory is one of the MSMEs in Patikraja District, Central Java that produces traditional noodles. Previously, the community service team had assisted this partner in increasing its production potential. However, there are still many improvements that can be made. The management conveyed the need for Kaizen (continuous improvement) material. Therefore, community service activities were carried out again in this factory. The method used is training. There were 9 participants who attended, representing the human resource department, finance department, general department, administration department, technical department, production department, inventory department and marketing department. The stages of the activities carried out were factory surveys and interviews with management, training implementation preparation, compiling training materials, filling preliminary questionnaires, training to representatives of each department within the company regarding the concept of continuous improvement and streamlined, and filling evaluation questionnaires. Based on the results of the questionnaire, it was found that the level of understanding of the participants increased after the training. Providing materials of Kaizen (continuous improvement) as well as production flow streamlining can help participants in streamlining the flow in each department and can also give motivation to continue making improvements in each department.
USULAN SISTEM PERPARKIRAN DAN PENENTUAN KEBUTUHAN LAHAN PARKIR DI UNIVERSITAS “X” DENGAN MENGGUNAKAN MODEL ANTRIAN DAN SIMULASI Arisandhy, Vivi; Suhada, Kartika; Rexivio, Derys Christian; Kartawidjaja, Maria Angela; Sukwadi, Ronald
Journal of Industrial Engineering and Operation Management (JIEOM) Vol 7, No 2 (2024)
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31602/jieom.v7i2.16079

Abstract

Penelitian mengenai sistem perparkiran dan sistem antrian telah banyak dilakukan sebelumnya. Namun penelitian yang membahas sistem perparkiran yang berpengaruh ke sistem antrian dan perhitungan kebutuhan lahan parkir belum banyak dilakukan. Panjangnya antrian mobil di depan Gerbang 2 Universitas “X” banyak dikeluhkan mahasiswa dan mengganggu kelancaran arus lalu lintas depan kampus. Oleh karena itu, akan diusulkan sistem perparkiran dan penentuan kebutuhan lahan parkir di universitas tersebut. Langkah pertama yang dilakukan adalah pengujian kesamaan rata-rata untuk laju kedatangan mobil dan lama waktu parkir antar rentang waktu dan antar hari dengan SPSS. Selanjutnya dilakukan penentuan distribusi laju kedatangan mobil dan lama waktu parkir, lama waktu pelayanan manless dan loket keluar dengan Stat Fit. Kemudian dibuat model simulasi sistem antrian saat ini dan usulan dengan program Promodel. Dengan melakukan perubahan lokasi pintu masuk, posisi manless dan loket operator keluar, terjadi penurunan lama waktu menunggu sebesar 95,88% di manless Gedung A, 42,31% di manless Gedung B, 79,40% di drop-off point dan panjang antrian maksimum di depan gerbang masuk menurun sebesar 91,40%. Kebutuhan maksimum lahan parkir Gedung B adalah 394 mobil. Dengan diijinkannya parkir paralel, lahan parkir dapat menampung 392 mobil. Oleh karena kekurangan lahan hanya sebesar 2 mobil, maka lahan parkir Gedung B yang ada saat ini masih mencukupi kebutuhan.Kata Kunci:  Antrian, Lahan Parkir, Manless, Sistem Perparkiran, Simulasi
USULAN PERANCANGAN TATA LETAK GUDANG DENGAN MENGGUNAKAN METODE CLASS-BASED STORAGE (Studi Kasus di PT Heksatex Indah, Cimahi Selatan) Johan Johan; Kartika Suhada
Journal of Integrated System Vol. 1 No. 1 (2018)
Publisher : Universitas Kristen Maranatha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28932/jis.v1i1.989

Abstract

PT Heksatex Indah adalah perusahaan yang bergerak di bidang tekstil rajut lusi. Masalah yang dihadapi oleh perusahaan ini adalah operator mengalami kesulitan dalam melakukan aktivitas pemasukan, pencarian, dan pengeluaran kain dari/ke gudang pra-proses (kain grey) dikarenakan kain diletakkan di area gang dan banyak jenis kain yang sama berada di beberapa lokasi penyimpanan. Dalam memecahkan permasalahan yang dihadapi perusahaan, digunakan metode class-based storage dalam merancang tata letak gudang yang baru dengan menggunakan alat penyimpanan kain usulan yang sudah dimodifikasi dari alat penyimpanan kain sebelumnya. Selain itu, diusulkan pula penggunaan alat material handling baru, yaitu trolley kecil, untuk memudahkan kerja operator supaya tidak membawa gulungan kain satu per satu. Berdasarkan hasil perhitungan, jika perusahaan menerapkan tata letak usulan, maka terjadi penghematan jarak rata-rata dari pintu ke lokasi penyimpanan sebesar 64,53 m dan 52,35 %. Tata letak kain usulan memiliki tata letak yang lebih rapi dan teratur dibandingkan dengan tata letak kain saat ini karena kain yang sama berada di satu lokasi dan tidak terdapat kain yang disimpan di gang yang menghalangi operator dalam melakukan aktivitasnya. Kata kunci : Class-based, Gudang, Material Handling, Kain, Jarak Rata-rata
Usulan Alokasi Lahan Parkir Mobil dan Motor yang Optimal dengan Mempertimbangkan Besar Pengeluaran serta Biaya Parkir yang Dibayarkan Konsumen ke Toserba “X” Menggunakan Model Simulasi Indri Kristanti; Kartika Suhada; Victor Suhandi
Journal of Integrated System Vol. 1 No. 2 (2018)
Publisher : Universitas Kristen Maranatha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28932/jis.v1i2.1033

Abstract

Toserba “X” terletak di Kota Bandung, Jawa Barat. Salah satu fasilitas yang disediakan bagi para pengunjung Toserba “X” “adalah lahan parkir mobil dan motor. Permasalahan yang dihadapi adalah banyaknya pengunjung  yang menggunakan mobil dan motor, sedangkan Akan tetapi,  tidak tidak tersedia lahan kosong atau lahan tambahan untuk menampung semua kendaraan mobil dan motor yang masuk. Oleh karena itu, perlu dilakukan perhitungan penyediaan ruang parkir yang optimal untuk kendaraan mobil dan motor berdasarkan besar pengeluaran (belanja dan konsumsi) serta biaya parkir yang dibayarkan konsumen ke Toserba “X” agar pihak Toserba “X” memperoleh pendapatan yang optimal. Langkah awal yang dilakukan adalah menguji kesamaan rata-rata laju kedatangan dan kesamaan rata-rata lama parkir untuk mobil dan motor antar jamnya dengan menggunakan program IBM SPSS Statistics 21. Dari hasil pengujian diperoleh kelompok laju kedatangan mobil dan motor yang berbeda serta lama parkir mobil dan motor yang berbeda. Oleh karena itu, dilakukan uji Least Significant Difference untuk mengetahui kelompok jam yang tidak sama. Selanjutnya dilakukan uji independensi data dan penyesuaian distribusi untuk mengetahui jenis distribusi yang sesuai dengan kelompok data tersebut menggunakan program Stat::Fit Version 2. Kemudian, membangun model yang merepresentasikan lahan parkir Toserba “X” serta menginput data distribusi laju kedatangan, distribusi lama parkir, entitas, lokasi, dan path network  menggunakan program ProModel. Setelah output simulasi didapatkan, maka dilakukan optimisasi model dengan menggunakan Sim Runner untuk mendapatkan kapasitas mobil dan motor dengan pendapatan yang optimum. Lahan parkir memiliki kapasitas awal 138 mobil dan 353 motor. Dari hasil penelitian, diketahui bahwa kapasitas lahan parkir yang optimal yang harus disediakan di hari Selasa yaitu 117 mobil dan 468 motor dengan pendapatan optimum Rp 928.051.818 (kenaikan pendapatan sebesar 13%), di hari Rabu yaitu 118 mobil dan 464 motor dengan pendapatan optimum Rp 876.938.748 (kenaikan sebesar 20%), di hari Kamis yaitu 106 mobil dan 532 motor dengan pendapatan optimum Rp 728.858.401 (kenaikan sebesar 9%), di hari Jumat yaitu 119 mobil dan 459 motor dengan pendapatan optimum Rp 869.534.434 (kenaikan sebesar 13%), di hari Sabtu yaitu 107 mobil dan 527 motor dengan pendapatan optimum Rp 1.059.684.909 (kenaikan sebesar 20%), di hari Minggu yaitu 98 mobil dan 579 motor dengan pendapatan optimum Rp 1.101.505.935 (kenaikan sebesar 34%), di hari Senin yaitu 119 mobil dan 459 motor dengan pendapatan optimum Rp 859.317.123 (kenaikan sebesar 9%). Kata kunci: Lahan Parkir, Statistika, Model Simulasi, Optimisasi, Tata Letak
Usulan Algoritma Penjadwalan Pengiriman Produk Di PT Ultra Jaya Milk Industry & Trading Company Tbk Joshua Gerald; Kartika Suhada; David Try Liputra
Journal of Integrated System Vol. 2 No. 1 (2019): Journal of Integrated System
Publisher : Universitas Kristen Maranatha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28932/jis.v2i1.1594

Abstract

Abstrak PT Ultra Jaya Milk Industry & Trading Company Tbk yang berlokasi di jalan Raya Cimareme 131, Padalarang Kab. Bandung Barat, merupakan perusahaan yang bergerak dibidang manufaktur minuman dalam kemasan. Permasalahan yang dihadapi perusahaan adalah keterlambatan tibanya produk di tangan konsumen. Hal tersebut menyebabkan timbulnya beberapa permasalahan, seperti: harus diperbaikinya kontrak kerjasama dengan pihak konsumen yang membutuhkan waktu cukup lama dan konsekuensi biaya yang ditimbulkan akibat perbaikan kontrak tersebut. Maka dari itu diusulkan algoritma penjadwalan yang didalamnya terdapat metode backward scheduling dalam membantu penyelesaian algortima penjadwalan. Dari hasil algoritma usulan untuk 5 periode pengiriman, didapatkan terjadi penurunan keterlambatan secara berturut-turut adalah 9, 13, 7, 5 dan 10. Selain penurunan jumlah keterlambatan, algoritma usulan juga dapat memberikan pengurangan kebutuhan moda transportasi. Dimana jumlah pengurangan kebutuhan moda transportasi dari ke 5 periode usulan secara berturut-turut adalah 2, 2, 1, 1, 2. Algoritma usulan membantu perusahaan dalam merancang jadwal pengiriman karena dapat mengurangi permasalahan keterlambatan sampainya produk ke tangan konsumen. Kata kunci : indutri minuman kemasan, distribusi, penjadwalaan, algoritma, backward scheduling. Asbtract PT Ultra Jaya Milk Industry & Trading Company Tbk is located on Jalan Raya Cimareme 131, Padalarang Kab. West Bandung, is a company engaged in beverage packaging manufacturing. The problem faced by the company is the delay in the arrival of the product in the hands of consumers. This has led to several problems, such as: the contract of cooperation with the consumer must be improved, which takes a long time and the consequences of costs resulting from the repair of the contract. Therefore, a scheduling algorithm is proposed, in which there is a backward scheduling method in assisting the completion of scheduling algorithms. From the results of the proposed algorithm for the 5 delivery periods, it was found that there were decreases in delay, respectively 9, 13, 7, 5 and 10. In addition to a decrease in the number of delays, the proposed algorithm can also reduce the need for transportation modes. Where the number of reductions in transportation mode needs from the 5 proposed periods are 2, 2, 1, 1, 2. The proposed algorithm helps the company in designing the delivery schedule because it can reduce the problem of delays in arriving at the hands of consumers. Keywords : beverage packaging industry, distribution, scheduling, algorithms, backward scheduling.
Usulan Pengendalian Persediaan Peralatan dan Perlengkapan Hotel, Restoran, dan Café di Mr. Kitchen Melvita Samudra; Kartika Suhada
Journal of Integrated System Vol. 2 No. 2 (2019): Journal of Integrated System
Publisher : Universitas Kristen Maranatha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28932/jis.v2i2.2007

Abstract

PT. Multi Wahana Kencana atau lebih dikenal dengan sebutan Mr. Kitchen adalah perusahaan yang bergerak dalam bidang penyedia peralatan dan perlengkapan horeca (hotel, restoran, dan café, yang berada di Jl. Garuda, Bandung. Masalah yang dihadapi perusahaan adalah kelebihan persediaan barang di gudang yang menyebabkan biaya simpan membesar.Dalam penelitian ini diusulkan dua alternatif metode pengendalian persediaan, yaitu metode P (t, E) dan metode Monte Carlo. Perhitungan metode saat ini dan metode P (t, E) dilakukan beberapa penyesuaian, yaitu penyesuaian pada demand dan cara perhitungan. Berdasarkan hasil pengolahan data, total biaya metode saat ini adalah sebesar Rp. 4,207,814,304.40. Metode usulan yang mempunyai total biaya terkecil adalah metode Monte Carlo yaitu Rp. 1,356,682,580.71, dimana didapatkan penghematan sebesar Rp. 2,851,131,723.69 atau 67.76%. Penghematan didapatkan dari penurunan biaya simpan sebesar Rp. 3,210,543,597.88 atau 89.14% dan biaya pesan sebesar Rp. 218,404,023.30 atau 80.77%. Walaupun biaya stockout meningkat sebesar Rp 577,815.897.49 atau 172.12%.Kata kunci: pengendalian persediaan, Metode P (t, E), Metode Monte Caro
Usulan Pengendalian Persediaan Bahan Baku Produk Active Speaker Di PT Hartono Istana Teknologi Auryn Thomas; Kartika Suhada
Journal of Integrated System Vol. 3 No. 1 (2020): Journal of Integrated System
Publisher : Universitas Kristen Maranatha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28932/jis.v3i1.2481

Abstract

PT Hartono Istana Teknologi adalah perusahaan yang bergerak dalam bidang pembuatan produk elektronik, diantaranya: TV, DVD, mobile phone, tablet PC, portable audio dan active speaker. Saat ini perusahaan mengalami permasalahan penumpukan bahan baku produk active speaker. Hal ini menunjukkan kurang tepatnya metode pengendalian persediaan yang diterapkan. Selama ini Bagian PPIC telah memperhitungkan kebergantungan kebutuhan antar bahan baku untuk pembuatan produk jadi dan melakukan pemesanan bahan baku ke supplier tiap 4 hingga 5 minggu sekali, dimana periode tersebut ditetapkan berdasarkan estimasi yang belum mempertimbangkan besar elemen biaya pengendalian persediaan. Oleh karena itu dalam penelitian ini akan diusulkan pengendalian persediaan yang akan meminimasi total biaya pengendalian persediaan yang timbul. Dalam penelitian ini yang diamati adalah produk active speaker tipe PS-PAS09(B)59, karena memiliki penjualan tertinggi. Langkah awal yang dilakukan menghitung elemen biaya pengendalian persediaan, meliputi: biaya pesan, biaya simpan dan biaya setup. Selanjutnya dilakukan perhitungan pengendalian persediaan dengan teknik lotting mengikuti kebijakan perusahaan dan teknik lotting Wagner Within yang merupakan usulan. Perhitungan MRP menggunakan bantuan program WinQSB versi2.0. Berdasarkan hasil perhitungan diketahui bahwa penerapan teknik lot sizing usulan menghasilkan penurunan total biaya pengendalian persediaan dari Rp 111,033,881.91 menjadi Rp 147,617,045.19. Dengan demikian terjadi penghematan sebesar Rp 36,583,163.28 atau 25%. Kata kunci: Pengendalian Persediaan, Bahan Baku, Wagner Whitin