METODE PELAKSANAAN PEKERJAAN SALURAN IRIGASI SEKUNDER D.I SIGULAI KABUPATEN SIMEULUE (MYC) Susi Purnama Sari; Zulyaden Zulyaden
KOLONI Vol. 1 No. 4 (2022): DESEMBER 2022
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (476.641 KB) | DOI: 10.31004/koloni.v1i4.319

Abstract

In civil engineering work, a method must be needed in carrying out work in a project. In the work of air structures such as irrigation buildings, it is very necessary to carry out work in the field according to what has been planned. In the construction of irrigation networks there are earthworks which are the land where the pavement is built, which consists of soil, soil stockpiles, heavy equipment which are important factors in projects, especially large-scale construction projects, project management and implementation work plans, quality and quantity of materials used. will be used. The method of carrying out the work of the Sigulai secondary irrigation channel, which discusses the implementation of the survey. The research survey was conducted at D.I Sigulai which is in West Simeulue, Simeulue Regency. In the implementation of secondary irrigation canal work, survey work is carried out in seven months using theodolite, Waterpass, Meter, Compass, Clinometer, and Total Station. This study uses two data, the first is primary data which is the result of measurements and surveys, namely, coordinate data for the location of irrigation buildings and data which includes: area of ​​irrigation areas, maps of Sigulai irrigation areas, irrigation network schemes and irrigation building schemes obtained from Banda Aceh Water Service. The research results obtained that in the manufacture of secondary irrigation canals and auxiliary buildings there is a method of carrying out the work which consists of: Execution of ordinary earthworks, ordinary soil embankments, concrete layers, and concrete work floors is carried out using heavy equipment and the work of workers in their work, which is carried out during 24 (twenty four) months and the execution of complementary building works consisting of ordinary earthworks, concrete work floors, formwork, reinforcement, installation of river stones, plastering, and broadcasting is carried out using heavy equipment and laborers in the work, which is carried out for 10 (twenty four) months ten) months. Keywords: secondary, sigulai, Theodolite, Waterpass, Meter, Compass, Banda Aceh, simeulue
Perancangan Asrama Mahasiswa UIN Ar-Raniry Banda Aceh DE, Zuhrahmi; Zulyaden, Zulyaden; Marbun, Mahmudin; Aminah, Aminah; Rahmi, Merlisa
KOLONI Vol. 2 No. 1 (2023): MARET 2023
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/koloni.v2i1.279

Abstract

Ar-Raniry State Islamic University is one of the universities located in Banda Aceh, Aceh, Indonesia. A student dormitory is a residential building dedicated to a homogeneous group. Currently, Ar-Raniry State Islamic University has not provided dormitories for underprivileged students who come from outside Banda Aceh and outside Aceh Province. Judging from the expensive rent of boarding houses or houses and the number of students who increase every year, this case can be concerning for underprivileged students. From the results of interviews with one hundred UIN Ar-Raniry students, student interest in the idea of building student dormitories is very large. As many as 90% of respondents strongly agreed and were even willing to live in the dormitory. The design of this student dormitory aims to ease the burden of underprivileged students and has benefits for building users. By applying a green architecture approach, the building is able to minimize adverse effects on the environment and the surrounding nature and is able to minimize the use of electricity by applying the principles of green architecture. Keywords: Dormitory, UIN Ar-Raniry, Green Architecture
METODE PELAKSANAAN PEKERJAAN SALURAN IRIGASI SEKUNDER D.I SIGULAI KABUPATEN SIMEULUE (MYC) Sari, Susi Purnama; Zulyaden, Zulyaden
KOLONI Vol. 1 No. 4 (2022): DESEMBER 2022
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/koloni.v1i4.319

Abstract

In civil engineering work, a method must be needed in carrying out work in a project. In the work of air structures such as irrigation buildings, it is very necessary to carry out work in the field according to what has been planned. In the construction of irrigation networks there are earthworks which are the land where the pavement is built, which consists of soil, soil stockpiles, heavy equipment which are important factors in projects, especially large-scale construction projects, project management and implementation work plans, quality and quantity of materials used. will be used. The method of carrying out the work of the Sigulai secondary irrigation channel, which discusses the implementation of the survey. The research survey was conducted at D.I Sigulai which is in West Simeulue, Simeulue Regency. In the implementation of secondary irrigation canal work, survey work is carried out in seven months using theodolite, Waterpass, Meter, Compass, Clinometer, and Total Station. This study uses two data, the first is primary data which is the result of measurements and surveys, namely, coordinate data for the location of irrigation buildings and data which includes: area of ​​irrigation areas, maps of Sigulai irrigation areas, irrigation network schemes and irrigation building schemes obtained from Banda Aceh Water Service. The research results obtained that in the manufacture of secondary irrigation canals and auxiliary buildings there is a method of carrying out the work which consists of: Execution of ordinary earthworks, ordinary soil embankments, concrete layers, and concrete work floors is carried out using heavy equipment and the work of workers in their work, which is carried out during 24 (twenty four) months and the execution of complementary building works consisting of ordinary earthworks, concrete work floors, formwork, reinforcement, installation of river stones, plastering, and broadcasting is carried out using heavy equipment and laborers in the work, which is carried out for 10 (twenty four) months ten) months. Keywords: secondary, sigulai, Theodolite, Waterpass, Meter, Compass, Banda Aceh, simeulue