KAJIAN KONTRAK /PERJANJIAN KERJASAMA PENGGUNAAN JASA PENGAMANAN ANTARA UNIVERSITAS WARMADEWA SEBAGAI PENGGUNA JASA DAN PT.IBU JERO SEBAGAI PENYEDIA JASA (DITINJAU DARI ASPEK MANAJEMEN KONTRAK) Wayan Jawat
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 3 No. 1 (2014)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.3.1.264.1-17

Abstract

Suatu kontrak kerja sekurang-kurangnya harus mencakup uraian mengenai (i) para pihak; (ii) rumusan pekerjaan; (iii) masa pertanggungan dan/atau pemeliharaan; (iv) tenaga ahli; (v) hak dan kewajiban para pihak; (vi) tata cara pembayaran; (vii) cidera janji; (viii) penyelesaian perselisihan; (ix) pemutusan kontrak kerja; (x) keadaan memaksa (force majeure); (xi) perlindungan pekerja. Perjanjian kerjasama/kontrak antara Universitas Warmadewa dengan PT. Ibu Jero telah memenuhi kriteria berkontrak sesuai dengan pasal 1320 KUHPer. Perjanjian kerjasama/kontrak antara Universitas Warmadewa dengan PT. Ibu Jero adalah kontrak jasa yang membutuhkan skillware menurut Perpres No.54/2010 dan Perpres No.70/2012, Pasal 1 (17). Jika mengacu ketentuan yang ada, isi kontrak terdapat beberapa pasal yang dapat berpotensi terjadinya wanprestasi, karena kurang jelas/rinci dan kurang tegas. Dalam kontrak hendaknya mencantumkan konsiderasi pertimbanganpertimbangan yang mendasari membuat perjanjian. Perjanjian kerjasama/kontrak antara Universitas Warmadewa dengan PT. Ibu Jero perlu dijabarkan lebih rinci, jelas dan tegas terhadap beberapa pasal untuk menghindari terjadinya wanprestasi di kemudian hari yang berdampak terhadap timbulnya sengketa. Setelah kontrak ditandatangani oleh kedua pihak, perlu dilakukan monitoring dan evaluasi (monev) terhadap kontrak sebagaimana ketentuan dalam penerapan Manajemen Kontrak. Kata kunci: kontrak, manajemen kontrak, pengguna jasa, penyedia jasa.
PERBANDINGAN PERILAKU STRUKTUR BETON BERTULANG ANALISIS SISTEM DINDING BATA SEBAGAI STRUT DENGAN SISTEM OPEN FRAME (Studi Kasus: Gedung Rumah Toko, Jalan A. A. Gede Ngurah No 112 Mataram, NTB) I Made Kusuma Wirnata; I Ketut Yasa Bagiarta; I Wayan Jawat
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 5 No. 2 (2016)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.5.2.376.24-45

Abstract

Pada umumnya dinding pengisi pada perencanaan gedung hanya dianggap sebagai beban mati yang terbagi rata (open frame) dan tidak diperhitungkan sebagai komponen struktural, akan tetapi dinding pengisi memiliki pengaruh terhadap gaya – gaya dalam dan perilaku struktur. Dalam analisis ini dilakukan perbandingan dua model struktur dengan studi kasus gedung rumah toko, untuk mengetahui perbandingan perilaku struktur beton bertulang yang memperhitungkan dinding pengisi dan yang tidak memperhitungkan dinding pengisi.Model yang pertama dibuat sebagai model open frame dan yang kedua dinding pengisi dibuat sebagai diagonal strut. Kedua model ini dianalisis menggunakan alat bantusoftware SAP 2000 versi 17.1.1, dan kinerja strukturnya dilakukan dengan Analisis Beban Dorong Statis Non linier (Non Linear Static Pushover Analysis) yang telah tersedia dalam program SAP 2000 versi 17. Analisis ini menghasilkan perbandingan gaya – gaya dalam yang terjadi dari dua model tersebut, perbandingan simpangan antar tingkat dan kinerja struktur yang berupa kurva pushover. Dari analisis tersebut memperlihatkan simpangan antar tingkat yang terjadi pada model open frame lebih besar dibanding dengan simpangan model strut sebesar 40 % pada arah X dan 63% pada arah Y. Perbandingan gaya – gaya dalam yang terjadi yaitu pada perbandingan dengan beban gravitasi maupun beban gempa keberadaan dinding pengisi memiliki kecenderungan mengurangi momen yang terjadi apalagi pengaruh beban gempa dengan perbandingan yang paling besar yaitu sebesar 69% pada kolom 3 portal D, akan tetapi untuk gaya aksial dan gaya geser yang terjadi dapat terjadi lebih besar. Dari analisis pushover, model open frame mampu menerima beban hingga 6925463,21 Newton dan perpindahan target 53,99 mm dengan level kinerja Collapse (C), sedangkan pada model strut mampu menerima beban hingga 8215111,00 Newton dan perpindahan target 55,89 mm dengan level kinerja Collapse (C). Untuk arah Y model open frame mampu menerima beban hingga 8554807,32 Newton dan perpindahan target 66,91 mm dengan level kinerja Collapse (C), sedangkan pada model strut mampu menerima beban hingga 10952469,00 Newton dan perpindahan target 66,43 mm dengan level kinerja Collapse (C). Nilai daktilitas aktual pada model open frame yaitu 3,11 untuk arah X dan 4,31 untuk arah Y, sedangkan pada model strut yaitu 2,96 untuk arah X dan 2,98 untuk arah Y. Kata kunci: model open frame, model strut, gaya dalam, analisis pushover
PENGENDALIAN KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK PEMBANGUNAN HOTEL I Wayan Jawat
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 6 No. 1 (2017)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.6.1.456.13-33

Abstract

ABSTRACT The development of equipment technology were used in construction projects must be balanced with skill and high level of risk management, the most appropriate solution by using the safety and health management system so that the assets and labor that is an investment for the entrepreneur can be saved. The issues of occupational safety and health can’t be separated from industry problems, because safety and health are closely related to productivity. Occupational Safety and Health (OSH) in industry are associated with environmental issues. The Ritz Carlton Bali project in Sawangan Nusa Dua is one of the projects undertaken by PT. Tatamulia Nusantara Indah and has ISO certified. The implementation of OSH standards on this project is contained in the OSH plan and is always carried out monitoring and evaluation activities by the safety team in the field. To give more understanding on the implementation of OSH to all project workers was scheduled OSH simulation for 1 (one) hour adjust to schedule of project and informed by safety team, including effort of control that must be done. Based on this, it becomes interesting to do an assessment on OSH Control on Construction Project at The Ritz Carlton Bali Project in Sawangan Nusa Dua. The purpose of this study is to understand the control of OSH on construction projects. The result is a preliminary study was conducted to identify the potential OSH risks of The Ritz Carlton Bali Project. The procedures for reviewing these OSH risks and their system of controls are routinely applied to update hazard and risk records. All important risks are always controlled and monitored. Documented procedures must be available to avoid the delivery of policies and targets. Keyword: planning, labor costs, construction projects
METODE PELAKSANAAN KONSTRUKSI REVETMENT Wayan Jawat
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 6 No. 2 (2017)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.6.2.486.161-177

Abstract

ABSTRACT Construction method is the key to be able to realize the entire planning into a physical building form. Basically the construction method is the application of the concept of engineering based on the relationship between the requirements in the tender documents (procurement documents), technical and economic conditions that exist in the field, and all resources including the experience of contractors. The role of the method of carrying out a construction project work is to construct ways of working in the performance of a job and a means of fulfilling, determining the means of employment that support the implementation of a work such as establishing, selecting the equipment to be used in the work appropriate to the type of work effective and efficient in operating costs. How it works can also help in determining the sequence of work, arrange the schedule so that it can determine the completion of a job. Coastal areas are highly intensive areas for human activities such as: government centers, settlements, industries, ports, fishponds, buffers and tourism. The island of Bali is a major international tourist destination so keeping the beach in good condition is a must. This has made the development of natural land function especially in coastal and coastal areas as the buffer of ecological cycle (Public Works Agency of Bali Province, 2014). The main material in making this revetment is andesite stone consisting of andesite stone weighing 475-525kg, 100 kg, and 10-40 kg, as for the workmanship using the help of heavy equipment in the form of excavators to move construction materials. Keyword: method, construction, revetment, coastal
ESTIMASI BIAYA PENCEGAHAN DAN PENGAWASAN K3 PADA PROYEK KONSTRUKSI I Wayan Jawat; I Nyoman Suwitanujaya
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 7 No. 1 (2018)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.7.1.820.88-101

Abstract

ABSTRACT The construction phase is a stage that needs attention so that the main goal of producing a quality project can be achieved. In the construction phase, project managers should consider the positive and negative aspects that will occur in the next stage, the operational phase. The construction project is a job sector that has high risk compared to other sectors. The number of work accidents in Indonesia is quite high and continues to increase from previous years. the number of accidents in Indonesia continues to increase from 2007 to 2011. The number of work accidents in Indonesia in 2008 experienced the highest increase of 13.17%. While in 2011 the number of work accidents in Indonesia that the smallest increase is 0.79%. It indicates the risk of accidents in Indonesia is quite high. Cost of safety can be divided by other approaches that consist of cost prevention, inspection cost, and accident cost. If the security system is not valid or there is no safety program, usually the cost of prevention and inspection is not provided or available but small (less adequate), while the accident costs are great. prevention and inspection is sufficient, so as to reduce the cost of accidents to be small. Safety and work safety management system planning is a series of steps, hazard identification, risk assessment, risk control, and cost calculation of risk control. Based on this it becomes interesting to do an assessment of the estimated cost prevention (prevention cost) and inspection cost (K3) on the construction project. The results of the review on the construction project reviewed indicate that the costs required for prevention cost and inspection cost of work accidents amount to IDR 726,182,726.28 or 5.39% of the total contract value consisting of the cost of personal protective equipment amounting to IDR 585,780,486.28, the cost of occupational safety and health equipment of IDR 32,402,240.00 and the cost of personnel of occupational safety and health is IDR 108.000.000,00. Keywords: cost estimation, construction project, risk, work accident
PRODUKTIVITAS TRUCK CONCRETE PUMP DAN TRUCK MIXER PADA PEKERJAAN PENGECORAN BETON READY MIX Wayan Jawat; Anak Agung Sagung Dewi Rahadiani; Ni Komang Armaeni
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 7 No. 2 (2018)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.7.2.945.164-183

Abstract

In determining the duration of a job, the things that need to be known are the volume of work and the productivity of the tool. Tool productivity depends on the capacity and cycle time of the tool. Generally the tool cycle time is set in minutes while tool productivity is calculated in production / hour. The need for heavy equipment, especially in foundry work, needs to pay attention to the number of equipment to be used so that the number of truck concrete pumps and truck mixers to be used can be balanced. Based on this, the purpose of this study is to determine the productivity of construction equipment, especially truck concrete pumps and truck mixers in ready mix concrete casting jobs in accordance with the real conditions in the field. The benefits of this research can be used as a thought contribution for educational institutions in developing and applying knowledge about the productivity of construction equipment in ready mix concrete casting jobs. In addition, providing input on the results of studies conducted as an effort to improve managerial understanding in the construction world for contractors, consultants and suppliers of ready mix concrete in the management of construction projects so as to increase competitive advantage. Data analysis method was carried out after the data collection in the field was obtained, then the analysis was carried out by performing direct calculations for cycle times for each activity of truck concrete pumps and truck mixers. Calculate the productivity of truck concrete pumps and truck mixers. Furthermore, the production capacity of truck concrete pumps and truck mixers is calculated. Calculating the duration of truck concrete pumps and determining the cost of using truck concrete pumps and truck mixers per hour. Based on the research, truck concrete pump productivity obtained was 0.521m³ / minute while the productivity of the truck mixer was 0.835 m³ / minute. This productivity was determined by cycle time, equipment conditions, work area conditions, work methods, work volume. The duration required by truck concrete pump to complete the ready mix concrete casting work on plates and beams with a volume of 65 m³ is 2,079 hours while the duration required by the truck mixer is 1,297 hours. The total truck concrete pump cost after being analyzed was obtained at IDR.376,765,212.00 while the total truck mixer cost was IDR. 4,583,876,132.00.
IMPLEMENTASI METODE PELAKSANAAN PADA PEKERJAAN STRUKTUR TANGGUL SUNGAI Wayan Jawat; I Wayan Eka Kusuma Putra; I Gusti Putu Wijaya Putra
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 8 No. 1 (2019)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.8.1.1130.27-43

Abstract

Proyek konstruksi merupakan suatu rangkaian kegiatan yang saling berkaitan untuk mencapai tujuan tertentu (bangunan/konstruksi) dalam batasan waktu, biaya dan mutu tertentu. Proyek konstruksi selalu memerlukan resources (sumber daya) yaitu man (manusia), material (bahan bangunan), machine (peralatan), method (metode pelaksanaan), money (uang), information (informasi), dan time (waktu). Metode pelaksanaan pekerjaan merupakan urutan pelaksanaan pekerjaan yang logis dan teknik sehubungan dengan tersedianya sumber daya yang dibutuhkan dan kondisi medan kerja, guna memperoleh cara pelaksanaan yang efektif dan efisien. Tanggul adalah suatu konstruksi yang dibuat untuk mencegah banjir di dataran yang dilindungi. Dalam pelaksanaan kegiatan ini perlu dibuat penjabaran tata cara dan teknik-teknik pelaksanaan pekerjaan yang merupakan inti dari seluruh kegiatan dalam sistem manajemen konstruksi. Untuk itu menarik dilakukan kajian tentang penerapan metode pelaksanaan pembuatan tanggul sungai sepanjang alur Tukad Mati bagian tengah. Tujuan yang ingin dicapai dalam penelitian ini adalah mengimplementasikan metode pelaksanaan pembuatan tanggul sepanjang alur Tukad Mati bagian tengah. Manfaat yang didapat dari kajian ini adalah meningkatkan pemahaman tentang penerapan teori metode pelaksanaan pembuatan tanggul sepanjang alur sungai. Sebagai sumbangan pemikiran bagi institusi pendidikan dalam mengembangkan dan menerapkan pengetahuan tentang metode pelaksanaan pembuatan tanggul, penataan alur sungai, dan normalisasi sedimentasi. Berdasarkan hasil kajian bahwa, pekerjaan galian tanah pada pekerjaan pembuatan tanggul menggunakan excavator sebagai alat gali utama. Material hasil galian diletakkan dipinggir galian pondasi dan nantinya hasil galian berguna sebagai kistdam. Kistdam terdiri dari hasil galian, anyaman bambu, dan turap bambu. Kistdam dipasang pada setiap segmen dimana setiap segmen panjangnya 12m. Sedangkan turap bambu dipasang dengan jarak 10-15 cm. Pekerjaan bekisting tanggul dilakukan dalam 4 tahap. Pekerjaan perancah dilaksanakan sebanyak 2 tahap. Pekerjaan pengecoran menggunakan beton readymix K-300 dengan pengaturan penempatan truck mixer dengan pompa kodok.
ANALISIS RISIKO KRITERIA INVESTASI PADA MODEL ALIRAN KAS PROYEK PERUMAHAN DI DAERAH PERBATASAN KABUPATEN/KOTA DENPASAR Ni Komang Armaeni; I Wayan Jawat; I Kadek Merta Wijaya
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 8 No. 2 (2019)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.8.2.1408.234-244

Abstract

The cash flow Model of investment projects in the field of housing is attractive to be observed, thus several most rational alternative can be selected. Conditions in the border area of Denpasar city has not found any research on investment risk analysis in the field of housing. Therefore, this research is very important to implement so that it can give consideration to the investor in investing. The objective of this research is to determine the project cash flow model on the housing investment in border area of Denpasar City. Data collection process begins with survey data in the office of REI (Real Estate Indonesia) Bali branch and developers of housing projects in border area of Denpasar City. Data collection using questionnaire and developer as the respondents. The analysis was carried out on two investment models namely model 1 (100% loan capital) and model 2 (30% own capital and 70% loan capital), while the investment valuation control uses NPV and BCR with the risk analysis using the @risk program. The analysis shows that Model 1 does not meet the investment criteria because the value of NPV 1, so it is eligible to be chosen. The results of the risk analysis with the @risk program for model 2 has a probability of NPV > 0 is 76.4% and the probability of BCR > 1 is 77.1%. This means that the cash flow model has the greatest opportunity to obtain greater profits. Model aliran kas proyek investasi di bidang perumahan menarik untuk diamati, sehingga beberapa alternatif investasi yang paling rasional dapat dipilih. Untuk kondisi di daerah perbatasan Kota Denpasar belum ditemukan adanya kajian tentang analisis risiko investasi dalam bidang perumahan. Oleh karena itu penelitian ini sangat penting untuk dilaksanakan sehingga dapat memberikan pertimbangan kepada investor dalam berinvestasi. Tujuan pada penelitian ini adalah untuk mengetahui model aliran kas proyek pada investasi perumahan di daerah perbatasan Kota Denpasar. Proses pengumpulan data diawali dengan survey data di kantor REI (Real Estate Indonesia) cabang Bali dan beberapa pengembang proyek perumahan di daerah perbatasan Kota Denpasar. Pengumpulan data menggunakan kuisioner dan pengembang sebagai respondennya. Analisis dilakukan terhadap dua model investasi yaitu model 1 (100% modal pinjaman) dan model 2 (30% modal sendiri dan 70% modal pinjaman), sedangkan kontrol penilaian investasi menggunakan NPV dan BCR dengan analisis risikonya menggunakan program @risk. Hasil analisis menunjukkan bahwa model 1 tidak memenuhi kriteria investasi, karena nilai NPV < 0 dan BCR < 1, sehingga tidak layak untuk dipilih. Model 2 memiliki nilai NPV > 0 dan BCR > 1, sehingga layak untuk dipilih. Hasil analisis risiko dengan program @risk untuk model 2 memiliki nilai probabilitas NPV > 0 sebesar 76.4% dan probabilitas BCR > 1 sebesar 77.1%. Hal ini berarti bahwa aliran kas model tersebut memiliki peluang paling besar untuk memperoleh keuntungan yang lebih besar.
KAJIAN METODA PELAKSANAAN PEKERJAAN PONDASI BORED PILE PADA TAHAP PERENCANAAN PELAKSANAAN I Wayan Jawat; Putu Panji Tresna Gita; I Made Satria Dharmayoga
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 9 No. 2 (2020)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.9.2.1830.126-142

Abstract

Bored pile foundation is a pile foundation whose installation is done by drilling the soil first. This type of bored pile foundation is widely used in construction projects. The selected bore pile foundation is adjusted to the type of soil, terrain conditions, and the selected construction method. The construction method is the elaboration of procedures and works implementation techniques which are the core of all activities in the construction management system. For this reason, it is interesting to study the method of implementing the bore pile foundation at the planning stage of the implementation of the GOR Development project in Abiansemal, Badung. The implementation planning stage is an important activity in order to provide a more detailed picture of strategies and techniques for working efficiently and effectively in terms of time, quality and cost. The goal to be achieved in this research is to study the method of implementing the foundation at the planning stage of implementation. So that it can contribute to the development of knowledge about the application of the theory of the method of implementing the bore pile foundation and is information for those who are interested in further research. Based on the results of the study that the preparatory work begins with the determination of the pile center point and placement of bored pile devices. In drilling work using the wet drilling method volume 1105.00 m with a duration of 8 days. For the work of reinforcing the volume of 9309.61 kg and the duration of 13 days was preceded by the fabrication process and continued with the installation of reinforcement into the borehole. Casting is done using a pipe, volume 74.394 m³ with a duration of 11 days. Next, determine the pile cap and excavation work, followed by pile cap floor work with concrete fillings, volume 136.708 m³ for 6 days. As formwork using concrete blocks with a volume of 237.474 m² worked on for 14 days, followed by the formation of reinforcement and assembly of volume 5454.21 kg with a duration of 9 days and casting methods carried out manually with a volume of 117.632 m³ and a duration of 14 days.
Kemitraan Masyarakat dan Laboratorium Teknik Sipil untuk Mengatasi Kendala Perijinan IMB di Wilayah Sanur Kaja Wayan Jawat; Putu Ika Wahyuni; I Ketut Nudja
Jurnal Sutramas Vol. 1 No. 1 (2021): Jurnal Sutramas
Publisher : Fakultas Teknik Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Wilayah kota Denpasar merupakan pusat perekonomian, pusat pendidikan dan sebagai ibu kota Provinsi Bali. Pertumbuhan penduduk tiap tahunnya berimbas terhadap meningkatnya perekonomian serta kebutuhan hidup, sehingga angka pembangunan yang terjadi di Kota Denpasar juga mengalami peningkatan. Salah satu permasalahan kota yaitu pemukiman, khususnya kebutuhan masyarakat untuk memperoleh hunian yang layak dan harga terjangkau. Untuk membangun hunian dibutuhkan persyaratan Ijin Mendirikan Bangunan (IMB) dimana dalam pengurusan tersebut terdapat beberapa kendala yang dihadapi masyarakat. Beberapa kendala tersebut antara lain: belum pahamnya masyarakat terkait alur pengurusan IMB, berapa besar biaya yang akan dikeluarkan untuk mengurus IMB, pengurusan dokumen lingkungan, dan pengujian daya dukung tanah, dan pemenuhan persyaratan teknis bangunan lainnya. Adapun rencana solusi yang ingin disusun dalam pengabdian masyarakat kali ini adalah pendampingan terhadap masyarakat yang melakukan pengurusan IMB khususnya Desa Sanur Kaja Kecamatan Denpasar Selatan sekaligus mengidentifikasi kendala lain yang dihadapi masyarakat selama melakukan pengurusan IMB. Selain itu adapun solusi tambahan yang diberikan adalah menyediakan jasa pengetesan tanah yang akan dibangun dengan melibatkan Laboratorium Teknik Sipil Universitas Warmadewa. Pelaksanaan pengabdian masyarakat ini dilakukan dengan proses wawancara dan diskusi dengan pihak perangkat desa dan masyarakat untuk identifikasi permasalahanselama pembangunan dan pengurusan IMB.